    EPC Contracting of

    Balance of Plant

    A Sensible Option

    Sunil Bhat

    22 May, 2012

    BoP Systems

    Conference, New Delhi

  • 7/30/2019 6 Sunil Bhatt

    2/35

    1 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    3/35

    2 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    4/35

    3 SB | BoP Systems Conference | 22 May, 2012

    BoP - the show stopper

    BoilerIsland29%

    TurbineIsland20%

    CHP9%

    AHP

    4%

    CoolingTower

    4%

    Water System4%

    Fuel Oil System2%

    Electrical7% C&I

    1% Chimney1%

    Civil Works15%

    Spares3%Others

    1%

    BoP

    51%

    Cost break-up of a typical 660 MW

    BoP Systems execution determines the

    success of a power project on Time, Schedule

    and Cost parameters

    BoP contributes toapprox. 50% of the

    capital cost thus

    among the most

    important cost pillar

    While BTG island inTechnology &

    manufacturing

    intense, BoP island in

    Integration & site

    activity intense

    Almost 74% of delayed powerprojects delayed due

    to non-readiness of

    BoP system

    Source : CERC

  • 7/30/2019 6 Sunil Bhatt

    5/35

    4 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    6/35

    5 SB | BoP Systems Conference | 22 May, 2012

    Power Project Contracting Structures

    Entire project is broken into multiplepackages (close to ~ 25 40 packages)Multiple Packages

    BTG is ordered as a single EPC packagehowever BoP is broken into multiple

    packages

    BTG - EPC

    BoP - Multiple Pkgs

    Two EPC orders placed.

    One for BTG and the other for BoP

    EPC BTG

    EPC BOP

    A Single EPC order for the complete powerplant project

    Includes both BTG and BoPComplete EPC

    BoP ordered in Multiple Package

    BoP ordered as EPC

  • 7/30/2019 6 Sunil Bhatt

    7/35

    6 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    8/35

    7 SB | BoP Systems Conference | 22 May, 2012

    Multiple Package Route

    Developer

    Contractor # nContractor # 1

    Responsibility Matrix - Developer

    Project

    Mgmt

    Interface

    Mgmt

    Intra Pkg

    Engg

    Intra Pkg

    Co-

    ordination

    Advantages

    Least cost ofPurchase

    Total Control overindividual Vendor

    Selection Total Control over

    individual packagespecification

    Responsibility Matrix - Contractor

    Package Schedule Package Performance

  • 7/30/2019 6 Sunil Bhatt

    9/35

    8 SB | BoP Systems Conference | 22 May, 2012

    Multiple Package Route

    Developer

    Contractor # nContractor # 1

    Responsibility Matrix - Developer

    Project

    Mgmt

    Interface

    Mgmt

    Intra Pkg

    Engg

    Intra Pkg

    Co-

    ordination

    Drawbacks

    Requires large numberexperienced staff formicro level ProjectMonitoring

    Team to havecompetency in ProjectManagement, InterfaceManagement

    Large ordering cycletime

    Concentrates onindividual packageguarantee parameters

    Responsibility Matrix - Contractor

    Package Schedule Package Performance

  • 7/30/2019 6 Sunil Bhatt

    10/35

    9 SB | BoP Systems Conference | 22 May, 2012

    Multiple Package Route

    Developer

    Contractor # nContractor # 1

    Responsibility Matrix - Developer

    Project

    Mgmt

    Interface

    Mgmt

    Intra Pkg

    Engg

    Intra Pkg

    Co-

    ordination

    Successful with

    Developers having in-house EPC teamexperienced inEngineering & ProjectManagement

    Developers having EPCsubsidiary

    Responsibility Matrix - Contractor

    Package Schedule Package Performance

  • 7/30/2019 6 Sunil Bhatt

    11/35

    10 SB | BoP Systems Conference | 22 May, 2012

    EPC Route

    ECPContractor

    Developer

    Contractor# n

    Contractor# 1

    Responsibility Matrix - Contractor

    Project Management

    Interface Management

    Intra Package Engineering

    Intra Package Co-ordination

    Plant Level Performance Guarantee

    Advantages

    Single pointresponsibility

    Integrated PlantLevel Performance

    guarantee Less manpower

    requirement fordeveloper

  • 7/30/2019 6 Sunil Bhatt

    12/35

    11 SB | BoP Systems Conference | 22 May, 2012

    EPC Route

    ECPContractor

    Developer

    Contractor# n

    Contractor# 1

    Responsibility Matrix - Contractor

    Project Management

    Interface Management

    Intra Package Engineering

    Intra Package Co-ordination

    Plant Level Performance Guarantee

    Drawbacks

    Higher initialcost

    Less control onproject schedule

    Less control overvendor selection

  • 7/30/2019 6 Sunil Bhatt

    13/35

    12 SB | BoP Systems Conference | 22 May, 2012

    EPC Route

    ECPContractor

    Developer

    Contractor# n

    Contractor# 1

    Responsibility Matrix - Contractor

    Project Management

    Interface Management

    Intra Package Engineering

    Intra Package Co-ordination

    Plant Level Performance Guarantee

    Successful with

    SEBs who donthave huge teamfor project

    management

    Private IPPs

  • 7/30/2019 6 Sunil Bhatt

    14/35

    13 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    15/35

    Package Route Vs EPC

    Attribute Package Route EPC Route

    Project Engineering External Consultant to beappointed. Owner bears

    additional Cost

    EPC Contractor

    Responsibility

    InterfaceEngineering

    Owner has to co-ordinate.

    Owner bears additional

    manpower and risk

    EPC Contractor

    Responsibility

    Probability of Timelycompletion ofProject

    Low due to Multiple

    vendors

    High due to single vendor

    responsibility and higher

    stakes

    Project Cost Uncertain : Default of evenone vendor adversely

    impact project completionschedule

    Assured : Minimal

    variations expected

    Project Management High cost as large staff tobe employed by Owner

    Minimal cost as single

    vendor employed

  • 7/30/2019 6 Sunil Bhatt

    16/35

    Package Route Vs EPC

    Attribute Package Route EPC Route

    FunctionalGuarantees

    Numerous : Owner to

    handle multiple contractors

    for equipment / system

    level performance

    guarantees

    Key Plant level

    performance guarantees :

    EPC Contractors single

    point responsibility

    Benefits of designstandardization andoptimization

    Difficult : Largely

    dependent on Owners

    experience / practices

    Easy : EPC contractors are

    better equipped & updated

    to provide value for money

    Selection ofReputed & reliable

    Contractors

    Difficult to maintain

    uniformity in contractors

    competence and capabilitylevels

    Easy : Selection restricted

    only to performing and

    competent EPC contractors

    After sales servicesSupport

    Low : Small size contractor

    / vendors

    High : Reputation at stake

  • 7/30/2019 6 Sunil Bhatt

    17/35

    Single Point Responsibility for Design, Engineering,Supply, Erection & Commissioning

    Simpler co-ordination requirement One point contact.Minimum staffing required from end user organization

    Minimum Finance risk

    Minimal schedule risk Least Interfacing related issues between sub systems,

    thereby faster commissioning

    Flexibility during engineering for design changes withoutaffecting overall schedule

    Enforceable Guaranteed Plant performance Stiff Penalties that are levied as percentage of total package

    cost is a big deterrent

    EPC Value Proposition

  • 7/30/2019 6 Sunil Bhatt

    18/35

    17 SB | BoP Systems Conference | 22 May, 2012

    Agenda

    BoP the show stopper

    Power Project Contracting Options

    Pros and Cons of each Options

    EPC Vs Package Route

    L&Ts EPC business landscape in Power Sector

  • 7/30/2019 6 Sunil Bhatt

    19/35

    L&T Power: Many facetsL&T-MHI

    STG

    L&T-MHI

    Boiler IslandL&T-Howden

    Fans & APHs

    L&T-S&L

    Engineering

    Gas

    EPC

    PipingCentre

    Foundry

    CoalEPC

    /STGI

    TPPC

    ESP

    L&T-BMH

    -Coal HandlingPlant

    -S/R, Wagon T

    L&T-ECC/EBG

    -E&I

    -Control &Automation

    L&T-Valves

    -Valves &Fittings

    L&T-HED-Heater

    -Condenser

    -Deaerator

    L&TPOWER

    In-house Capabilities are 85% of Total Power Plant Offerings

  • 7/30/2019 6 Sunil Bhatt

    20/35

    Water systems

    Fuel Oil System incl

    Storage

    Feed Cycle Equipment

    Power Cycle Piping

    LP Piping

    CHP, AHP

    Compressed Air System

    HVAC

    Fire Protection

    LV Switchgear

    Electrical BOP

    Control rooms

    Civil Works for Main

    Plant, Power House &

    BOP

    Cooling Towers

    Chimneys

    Erection of Boilers STG /

    GTG, ESP

    Civil Works & BOP

  • 7/30/2019 6 Sunil Bhatt

    21/35

    Civil & Construction

    Extensive experience inconstruction of all types of

    Power Plants

    Coal based

    Gas based Open Cycle

    Gas based Combined Cycle

    Co-generation

    330 MW PPN CCPP

    660 MW Sipat

    Kayamkulam CCPP

  • 7/30/2019 6 Sunil Bhatt

    22/35

    Steam Generators &

    auxiliaries

    GTG / STG & auxil iaries

    HRSG

    HP & LP piping

    Ducting & refractory/ lining

    Inland Transportation &

    Stores Management at site

    Welding new alloys - X20,

    P91.

    Erecting the first of any

    type of Boiler in India

    110, 200, 300, 500, 660 MW

    Power Block Erection

  • 7/30/2019 6 Sunil Bhatt

    23/35

    5x660 MW Adani Power, Mundra Boiler Erection

  • 7/30/2019 6 Sunil Bhatt

    24/35

    4x600 MW Jharsuguda (Sterlite Energy Ltd.)

  • 7/30/2019 6 Sunil Bhatt

    25/35

    2x 250 MW CESC Budge Budge 210 MW NEYVELI TPS

    Chimney

  • 7/30/2019 6 Sunil Bhatt

    26/35

    Induced Draft

    Natural Circulation

    Cooling Tower

  • 7/30/2019 6 Sunil Bhatt

    27/35

    HP FW Heater LP FW Heater

    Rectangular Condenser Circular Condenser

    In-house manufacturing

  • 7/30/2019 6 Sunil Bhatt

    28/35

    Technology based equipment for

    Sizing & Conveying

    Stockyard preparation machines

    Wagon loading & marshalling system

    Main Activ ities

    Design & Engineering

    Manufacturing & Supply

    Construction, Testing &

    Commissioning

    Performance testing, training and after

    sales service

    Coal Handling Plants (CHP)

  • 7/30/2019 6 Sunil Bhatt

    29/35

    CHP our track record

    In Power Sector, 31 CHPs has been installed by L&T ti ll date

    12 Track Hoppers ranging from 110 mtr to 310 mtr length

    More than 100 KM conveying system upto 4000 TPH

    58 Paddle Feeders upto 2400 TPH

    69 Crushers upto 1875 TPH

    13 Apron Feeders upto 1500 TPH

    Largest capacity CHP in Power sector 3200 TPH for NTPC Barh (3 x 660 MW)

    Wagon Shifter Indiabulls, Nasik 5x270 MW (under execution)

    Asias longest Track Hopper of 310 mtr long at NTPC Kahalgaon & Barh

    In house manufacturing facilities for key CHP equipment and dedicated vendor base

    for other components

    AMC/ O&M contracts

  • 7/30/2019 6 Sunil Bhatt

    30/35

    CHP - Wagon Tippler

    20 Wagon Tipplers up to 24 tips / hr

    First Wagon Tippler supplied at Kothagudam T.P.P (Year 1987)

  • 7/30/2019 6 Sunil Bhatt

    31/35

    BOOM LENGTH: 41 M

    STACKING CAP: 3300 TPH

    RECLAIMING CAP: 3750 TPH (PEAK)

    CHP-Reversible Stacker Cum Reclaimer

    29 Stacker Reclaimers upto 4000 TPH

  • 7/30/2019 6 Sunil Bhatt

    32/35

    Switchyard

    Design, detail

    engineering, supply, erection, testing& commissioning :

    33KV to 440KV Switchyards

    220KV to 400KV Gas InsulatedSubstations

  • 7/30/2019 6 Sunil Bhatt

    33/35

    Other Competencies

    Station Switchgear, SPBD

    Service Transformers, Non

    SPBDs

    MV / LV Swi tchgear

    HT / LT Cabl ing

    Illumination System

    Earthing & Lightning

    Protection

    Switchboards (PCC / MCC)

    C&I (including PLC, SCADA

    & Telemetry, dr ives)

  • 7/30/2019 6 Sunil Bhatt

    34/35

    33 SB | BoP Systems Conference | 22 May, 2012

    L&T Value Proposition

    BoilerIsland29%

    TurbineIsland20%

    CHP9%

    AHP4%

    CoolingTower

    4%

    Water System4%

    Fuel Oil System2% Electrical

    7% C&I1% Chimney

    1%

    Civil Works15%

    Spares3%Others

    1%

    BoP51%

    Cost break-up of a typical 660 MW

    L&T In-house Capability

    L&T has in-housecapability for Super-

    critical & Ultra-

    Supercritical BTG

    for ratings upto

    1000 MW

    In addition, L&T hasmore than 85% of

    BoP package

    capabilities in-

    house

    Because of majorityin-house

    capabilities, L&T is

    best placed to

    delivery projects onscheduled.