© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012 Decommissioning Process Presented by Dr. Brian Twomey [email protected] Mobile: +44 7831 355837

Upload: others

Post on 30-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Decommissioning Process Presented by

Dr. Brian Twomey [email protected]

Mobile: +44 7831 355837

Page 2: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Agenda – With some insights on

  Decommissioning Process- Steel Jacket Structures

  Decommissioning Process- Pipeline Systems

  Decommissioning Process- FPSO Systems

  Decommissioning Process- Deepwater

Page 3: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Decommissioning Process

(Steel Jacket Structures)

Page 4: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

A Typical Decommissioning Process

  Surveying Topsides, Jacket & Subsea   Engineering & planning   Well P&A   Conductor Removal   Topsides Cleaning & Preparation   Subsea Preparation   Pipeline disconnection   Topside Removal   Jacket Removal   Subsea Template Removal   Pipeline etc. Removal (If Required)   Seabed Clearance (500 m Zone)   Post Decommissioning Survey

Page 5: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Decommissioning Process

(Subsea Pipelines)

Page 6: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Complexity of Pipeline Decommissioning 1

Page 7: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Pipeline Cover Weights

REF: Pipeshield

Page 8: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

What to do With Rock Dump - Regulations???

Page 9: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

What to do With Mattresses & Grout Bags- Your Regulations???

Page 10: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

How Good Is Your Data - Your Regulations???

Page 11: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Rules & Methods To Monitor pipelines- Your Regulations???

Page 12: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning
Page 13: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Complexity of Pipeline Decommissioning-What is the current status of your pipeline re decommissioning ???

Page 14: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Decommissioning of land-falls to onshore Gas Receiving Facility – Your Decom Regulations??

Page 15: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

As the example of pipelines demonstrates, decommissioning is a very complex and specialised area. Decommissioning needs to be regulated carefully as the regulations applied will DIRECTLY effect your final decommissioning costs.

Regulations versus Decommissioning Costs

Page 16: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

Do you understand the implications of each regulation on the decommissioning work scope and costs? What is the true benefit to Society of the each regulation and does the regulation achieve the required balanced outcome? The balance of common sense versus the perfect environment ? Cab the money be used better- schools, hospitals etc. ? Can the resultant decommissioning regulations should create work for the local workforce and still achieve the goals?

QUESTIONS TO THINK ABOUT?

Page 17: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Decommissioning Process

(FPSO Production Systems)

Page 18: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Types of Facilities Covered in Workshop

Page 19: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Types of Facilities Covered in Workshop

Page 20: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Offshore Loading Methods

Page 21: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Simple View of Early Subsea Facilities Linked to FPSO

Page 22: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

FPSO Surface Facilities Supporting Subsea Facilities

Page 23: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Typical Subsea Facilities Connected to FPSO

Page 24: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

  Trees with or without over-trawlable structure

  Subsea manifolds with or without an over-trawlable structure

  Riser bases

  Flowlines, gas lift-lines

  Control and chemical supply umbilicals

  Flexible risers and buoyancy system (mid water arches)

  Gas Export and Gas Lift Subsea Isolation Valves (SSIVs)

  FPSO Mooring system

  Export pipeline tie-in structure

  Water disposal wells

Components of a Typical FPSO Production Facility

Page 25: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Page 26: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Decommissioning Process

(Deepwater Production Systems)

Page 27: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Major Deepwater Provinces

Page 28: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Page 29: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Perdido Spar: The Current GOM Deepwater King

Ref: Shell EP Technology No.3, 2008

Page 30: 6 Preparation for Decommissioning 14June12 BT issued › eppm › projects › 40 › docs › 5 Preparation for... · 2012-06-21 · CCOP/EPPM Workshop on End of Concession & Decommissioning

© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012

Thank you for your attention

Any Questions ?