6. municipality of likovrisi pefki

19
ISO 50001 as a tool for better energy management and a more accurate SEAP: Our experience George Markogiannakis, Mechanical Engineer, MSc. CRES On behalf of: Mrs. Vicky Amenta Mechanical Engineer Technical Department Municipality of Likovrisi-Pefki Municipality of Likovrisi - Pefki

Upload: 50001seaps-2nd-training-session

Post on 04-Aug-2015

25 views

Category:

Business


1 download

TRANSCRIPT

ISO 50001 as a tool for better energy management and a more accurate SEAP: Our experience

George Markogiannakis, Mechanical Engineer, MSc.

CRES

On behalf of: Mrs. Vicky Amenta Mechanical Engineer Technical Department

Municipality of Likovrisi-Pefki

Municipality of Likovrisi - Pefki

Who we are – Where we are

Municipality of Likovrisi - Pefki

A small suburb of about:

4.126.000 m2 and

31.000 population

and

212.000 m2 of urban spaces

The roadmap to ISO50001 and SEAP

Municipality of Likovrisi - Pefki

Convenant of Mayors March 2011

First actions on SEAP March 2012

invitation from CRES to integrate ISO50001

October 2012

Submission of SEAP February 2013

ISO 50001 certification

July 2013

Major Priorities

Municipality of Likovrisi - Pefki

• Efficient energy management

• which does not affect the quality of services provided

• to citizens who are aware and active in “environmental” aspects

Energy management improvement

• Public activities

• Private activities

SEAP

ISO50001

Basic structure

Municipality of Likovrisi - Pefki

Initial Energy consumption data mining

Energy consumption monitoring

Measurable efficiency in

energy management

Baseline: 2011

Municipality’s facilities

Residential and tertiary sector

ISO5

00

01

SEAP

Steps

Municipality of Likovrisi - Pefki

Commitment

• Put the vision in words

• The management should understand and support the effort (allocation of resources)

• The management should inspire/ convince the personnel

Management

• Decide the scope : buildings, cars & equipment, streetlights, some of them all of them?

• Set up the team

Energy data

• Decide the Baseline

• Collect data since the baseline date

• Make an energy profile for every consumption (i.e. equipment installed, users, hours of operation, etc.)

Monitoring

• Set goals for the future and plan measures in order to achieve them

• Key performance indexes given

• Continuous monitoring of energy consumption

• Review the goals and assess achievements and failures

SEAP

ISO50001

• PUBLIC + PRIVATE

• • NO

• 2nd YEAR

• YES

• YEARLY

• NO

Was it easy?

Municipality of Likovrisi - Pefki

• Problems from definition of the baseline

• There was a huge amount of data, even for a small city, which must be checked and double checked!

• Information is not available on time, so real time monitoring is not possible

The Scope in our case

Municipality of Likovrisi - Pefki

18 admin . buildings/ 3 kindergardens / 19 school

buildings

2.200 lamps 125W/250W

55 cars and vehicles

Data collection/ input/ management: a snapshot

Municipality of Likovrisi - Pefki

Data collection/ input/ management : a snapshot

Data collection/ input/ management : a snapshot

Data collection/ input/ management : a snapshot

Data collection/ input/ management : a snapshot

Data collection/ input/ management : a snapshot

The results

Municipality of Likovrisi - Pefki

• We know exactly how much energy, what kind of energy, where and why we consume

• We have a deeper understanding of the energy profile of every building/ car/ streetlight

• We have all the information for : – A better use of energy – Redesign / reorganise our services – Making a priority list of where we should focus our

efforts – Making accurate calculations for the feasibility of each

planned investment – Understanding immediately where and why there has

been a bad use of energy at least at the big consumers

Key Factors

Municipality of Likovrisi - Pefki

• Commitment of the management

• Build a small team of inspired and involved people.

• Train the personnel and make them share the same vision

• Keep the processes as simple as possible

• Set simple, realistic, achievable and measurable goals

• Communicate the results as much as possible within the organisation

• Involvement of a person from the municipality management to the supervision of the system

• People working in the field, e.g. person responsible for vehicles, for the buildings, streetilighting, etc.

• It has a multiplying effect

• Adjust the system to your operations not the other way around

• Because your first goal is to have the system up and running

• Achievements should be credited to the people involved. Create your own success stories

1-2 achievements

Municipality of Likovrisi - Pefki

• Swimming pool: Immediate low cost measures: isothermic cover

(40% energy saving) – Study for use of other sources of renewable energy

Planned high cost measures: Use of renewable energy (geothermy)

• Streetlights: Till June 240 streetlights with 250W lamps will be

replaced by 70W LED lamps and till the end of the year 210 more will be replaced

Till the end of the year a streetlight management system will be installed, for better management and possible dimming.

Municipality of Likovrisi - Pefki

Thank you for your attention

George Markogiannakis

[email protected]

Municipality of Likovrisi - Pefki

I wish

you will find

the experience

as fulfilling as we did!!

Vicky Amenta

[email protected]