MATTHEW WARR PROFESSIONAL PORTFOLIO PROJECT OVERVIEW No.6 

RESUME/PORTFOLIO | CONFIDENTIAL 

 

Project Title    PLYMOUTH LIFE CENTRE 

Client    PLYMOUTH DISTRICT COUNCIL 

M&E Consultant    Arups 

Main Contractor    Balfour Beatty Engineering Services Limited 

Value M&E Works    £865,000.00 (Pipework services only) 

Duration    November 2010 – February 2012 (15months) 

Contract Type    ‐ 

Trinity undertook  this project  in November  ’10 on behalf  of  Balfour  Beatty  Engineering  for  the pipework  installation package with an  initial order value of £865,000.   Due  to  open  in  March  2012,  the  Plymouth  Life Centre, build  cost £46.5million will be one of  the country's  leading centers of sporting excellence.  It will also attract some of the region's top sportsmen and women, as well as a number of  international Olympic teams preparing for London 2012. 

Facilities  will  include  a  family  leisure  pool  with flumes, climbing zone with 15m wall, aerial assault course, bouldering and abseiling, eight lane indoor bowls  centre,  12‐court  multi‐use  sports  hall,  fitness  suites,  10‐lane  50m  swimming  pool  with moveable  floors and  'booms', diving pool, dryside training  facility  for  competitive  divers  with trampolines,  springboards,  harnesses,  crashmats,  sauna,  steam  rooms  and  showers, multi‐purpose areas  youth  gym,  squash,  training  and  studio spaces and a public cafe. 

This  being  one  of  the  largest  pipework  only installation  projects  Trinity  have  undertaken  and includes heating,  chilled, gas, domestic water and drainage  services  installations and on  the back of this project have secured national agreements with pipework and fixings companies.  At  the peak of  the works Trinity had  some 30No. operatives  on  site  installing  the  various  pipework services.  Due  to  delays  in  the  construction  this project has now overrun by some 28weeks and  is now scheduled for completion February ‘12