5g eve leaflet 2020

6
Madrid Rennes Paris Turin Nice Athens

Upload: others

Post on 05-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5G EVE Leaflet 2020

28 Research ProgrammeHorizon 2020 / 5G Infrastructure

Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects

Duration36 months

Budget15.7 million euro

CoordinatorTIM (Italy)

Technical ManagerEricsson (Spain)

5G EVE Consortium

282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828

The 5G EVE project is co-funded by the European Commission under Horizon 2020

the 5G EVE Consortium; the European Commission is not responsible for its contents.

Contact

@5G_EVE

Project information

Madrid

RennesParis

Turin

Nice

Athens

Turin

FR-PL-ROIT-GR-ES FR-GR-ES

77

PAR

TNER

S

COU

NTR

IES

C

M

Y

CM

MY

CY

CMY

K

leaflet5Geve_printable.pdf 1 14/02/20 11:25

Page 2: 5G EVE Leaflet 2020

A 5G End-to-End Validation Platform for Verticals

INTENT-BASED INTERFACEFOR VERTICALS

MULTI DOMAIN SLICINGAND ORCHESTRATION

PERFORMANCE DIAGNOSTICS

Extensive validation of 12 vertical use cases

Smart Tourism

Industry 4.0

Augmented fair experience

Autonomous vehicles in manufacturing

Smart Turin

Connected ambulance

eHealth, Smart Mobility and Smart Home

Utilities Smart Energy

Fault management in smart grids

Intelligent railway for smart mobility

Smart Transport

Media & Entertainment

Ultra high fidelity media

On-site live event experience

Immersive and integrated media

Immersive virtual visit

Support of experimentation from 6 additional 5G PPP Phase 3 projects

Smart City Safety and Environment

Page 3: 5G EVE Leaflet 2020

A 5G End-to-End Validation Platform for Verticals 5G EVE Portal 4-Step Process to 5G Validation

P o r t a l TEST

RESULT & ANALYSISRESULT & ANALYSIS

TEST EXECUTION & MONITORING

4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation

P o r t a l P o r t a l P o r t a l P o r t a l TEST

PREPARATION

INTENT-BASED INTERFACEFOR VERTICALS

MULTI DOMAIN SLICINGAND ORCHESTRATION

PERFORMANCE DIAGNOSTICS

Specify "what" is requested without details on "how" it is to simplify the access to the 5G end-to-end facility

Instantiate and manage network slices over multiple 5G site facilities to meet target performance requirements

Derive insights on 5G performances from the analysis of various metrics (experiment, service, network and slice)

Modular, reusable set of Service Functions - both proprietary and open source - for complete end-to-end 5G service chains

5G VNFsOPEN FRAMEWORK

5G capabilities5G capabilities

5G added-value features

Extensive validation of 12 vertical use cases

Smart City Safety and Environment

Smart Tourism

Industry 4.0

Augmented fair experience

Autonomous vehicles in manufacturing

Smart Turin

Connected ambulance

eHealth, Smart Mobility and Smart Home

Utilities Smart Energy

Fault management in smart grids

Intelligent railway for smart mobility

Smart Transport

Media & Entertainment

On-site live event experience

Immersive and integrated media

Immersive virtual visit

Support of experimentation from 6 additional 5G PPP Phase 3 projects

resultsKPI assessment

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

of equipment andinfrastructure

collect logs and results

5G EVE Portal

InterworkingFramework

site facility France

site facility Italy

site facility 5Tonic-Spain

End-to-End 5G Networks

Smart City Safety and Environment

TESTDESIGN

m a y2019

jul2020

jan2021jan

2021j a nj a n

2020

LTE+vEPCPre-SchedulingNFVI + CUPSLTE-M / NB-IoT / MBB

Initial Testing Toolbox

KPI User DataRate

Limited Testing PortalKPI RTT Latency+Rel.

Interconnected SitesControl Plane I/W

R15 5GNR + 5GC (NSA)Massive MIMONetwork Slicing + EC eMBB

Full Testing PortalKPI Peak Date Rate

Interconnected ICT17Multi-Site E2E I/W

R15 5GNR+5GC (NSA)Multi-User MIMOService Slicing + SBAURLLC (R15)

R16 5GNR + 5GC (NSA)RAN VitrualizationMulti-X Slicing URLLC + mMTC (R16)

Advanced DiagnosticsKPI Capacity+AvaillabInterconnected ICT19

Data Plane I/W

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

5G EVE Portal

Interworking

Intent-based Experiment Design

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

Intent-based Experiment Design

Multi-Site Catalogue & Inventory

Multi-site Network Service Orchestration

Runtime

Data Collection

Experiment Execution & Monitoring

Interworking of Multiple End-to-End 5G Site Facilities

Multi-site Network Runtime

Experiment ExecutionExperiment Execution & Monitoring

KPI & Performance Analytics

Data

KPI & Performance Service Management

site facility

Collection

site facility Greece

C

M

Y

CM

MY

CY

CMY

K

leaflet5Geve_printable.pdf 2 14/02/20 11:25

Page 4: 5G EVE Leaflet 2020

A 5G End-to-End Validation Platform for Verticals 5G EVE Portal 4-Step Process to 5G Validation

P o r t a l TEST

RESULT & ANALYSISRESULT & ANALYSIS

TEST EXECUTION & MONITORING

4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation

P o r t a l P o r t a l P o r t a l P o r t a l TEST

PREPARATION

INTENT-BASED INTERFACEFOR VERTICALS

MULTI DOMAIN SLICINGAND ORCHESTRATION

PERFORMANCE DIAGNOSTICS

Specify "what" is requested without details on "how" it is to simplify the access to the 5G end-to-end facility

Instantiate and manage network slices over multiple 5G site facilities to meet target performance requirements

Derive insights on 5G performances from the analysis of various metrics (experiment, service, network and slice)

Modular, reusable set of Service Functions - both proprietary and open source - for complete end-to-end 5G service chains

5G VNFsOPEN FRAMEWORK

5G capabilities5G capabilities

5G added-value features

Extensive validation of 12 vertical use cases

Smart City Safety and Environment

Smart Tourism

Industry 4.0

Augmented fair experience

Autonomous vehicles in manufacturing

Smart Turin

Connected ambulance

eHealth, Smart Mobility and Smart Home

Utilities Smart Energy

Fault management in smart grids

Intelligent railway for smart mobility

Smart Transport

Media & Entertainment

On-site live event experience

Immersive and integrated media

Immersive virtual visit

Support of experimentation from 6 additional 5G PPP Phase 3 projects

resultsKPI assessment

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

of equipment andinfrastructure

collect logs and results

5G EVE Portal

InterworkingFramework

site facility France

site facility Italy

site facility 5Tonic-Spain

End-to-End 5G Networks

Smart City Safety and Environment

TESTDESIGN

m a y2019

jul2020

jan2021jan

2021j a nj a n

2020

LTE+vEPCPre-SchedulingNFVI + CUPSLTE-M / NB-IoT / MBB

Initial Testing Toolbox

KPI User DataRate

Limited Testing PortalKPI RTT Latency+Rel.

Interconnected SitesControl Plane I/W

R15 5GNR + 5GC (NSA)Massive MIMONetwork Slicing + EC eMBB

Full Testing PortalKPI Peak Date Rate

Interconnected ICT17Multi-Site E2E I/W

R15 5GNR+5GC (NSA)Multi-User MIMOService Slicing + SBAURLLC (R15)

R16 5GNR + 5GC (NSA)RAN VitrualizationMulti-X Slicing URLLC + mMTC (R16)

Advanced DiagnosticsKPI Capacity+AvaillabInterconnected ICT19

Data Plane I/W

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

5G EVE Portal

Interworking

Intent-based Experiment Design

5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities

Intent-based Experiment Design

Multi-Site Catalogue & Inventory

Multi-site Network Service Orchestration

Runtime

Data Collection

Experiment Execution & Monitoring

Interworking of Multiple End-to-End 5G Site Facilities

Multi-site Network Runtime

Experiment ExecutionExperiment Execution & Monitoring

KPI & Performance Analytics

Data

KPI & Performance Service Management

site facility

Collection

site facility Greece

C

M

Y

CM

MY

CY

CMY

K

leaflet5Geve_printable.pdf 2 14/02/20 11:25

Page 5: 5G EVE Leaflet 2020

28 Research ProgrammeHorizon 2020 / 5G Infrastructure

Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects

Duration36 months

Budget15.7 million euro

CoordinatorTIM (Italy)

Technical ManagerEricsson (Spain)

5G EVE Consortium

282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828

The 5G EVE project is co-funded by the European Commission under Horizon 2020

the 5G EVE Consortium; the European Commission is not responsible for its contents.

Contact

@5G_EVE

Project information

Madrid

RennesParis

Turin

Nice

Athens

Turin

FR-PL-ROIT-GR-ES FR-GR-ES

77

PAR

TNER

S

COU

NTR

IES

C

M

Y

CM

MY

CY

CMY

K

leaflet5Geve_printable.pdf 1 14/02/20 11:25

Page 6: 5G EVE Leaflet 2020

28 Research ProgrammeHorizon 2020 / 5G Infrastructure

Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects

Duration36 months

Budget15.7 million euro

CoordinatorTIM (Italy)

Technical ManagerEricsson (Spain)

5G EVE Consortium

282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828

The 5G EVE project is co-funded by the European Commission under Horizon 2020

the 5G EVE Consortium; the European Commission is not responsible for its contents.

Contact

@5G_EVE

Project information

Madrid

RennesParis

Turin

Nice

Athens

Turin

FR-PL-ROIT-GR-ES FR-GR-ES

77

PAR

TNER

S

COU

NTR

IES

C

M

Y

CM

MY

CY

CMY

K

leaflet5Geve_printable.pdf 1 14/02/20 11:25