5g eve leaflet 2020
TRANSCRIPT
28 Research ProgrammeHorizon 2020 / 5G Infrastructure
Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects
Duration36 months
Budget15.7 million euro
CoordinatorTIM (Italy)
Technical ManagerEricsson (Spain)
5G EVE Consortium
282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828
The 5G EVE project is co-funded by the European Commission under Horizon 2020
the 5G EVE Consortium; the European Commission is not responsible for its contents.
Contact
@5G_EVE
Project information
Madrid
RennesParis
Turin
Nice
Athens
Turin
FR-PL-ROIT-GR-ES FR-GR-ES
77
PAR
TNER
S
COU
NTR
IES
C
M
Y
CM
MY
CY
CMY
K
leaflet5Geve_printable.pdf 1 14/02/20 11:25
A 5G End-to-End Validation Platform for Verticals
INTENT-BASED INTERFACEFOR VERTICALS
MULTI DOMAIN SLICINGAND ORCHESTRATION
PERFORMANCE DIAGNOSTICS
Extensive validation of 12 vertical use cases
Smart Tourism
Industry 4.0
Augmented fair experience
Autonomous vehicles in manufacturing
Smart Turin
Connected ambulance
eHealth, Smart Mobility and Smart Home
Utilities Smart Energy
Fault management in smart grids
Intelligent railway for smart mobility
Smart Transport
Media & Entertainment
Ultra high fidelity media
On-site live event experience
Immersive and integrated media
Immersive virtual visit
Support of experimentation from 6 additional 5G PPP Phase 3 projects
Smart City Safety and Environment
A 5G End-to-End Validation Platform for Verticals 5G EVE Portal 4-Step Process to 5G Validation
P o r t a l TEST
RESULT & ANALYSISRESULT & ANALYSIS
TEST EXECUTION & MONITORING
4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation
P o r t a l P o r t a l P o r t a l P o r t a l TEST
PREPARATION
INTENT-BASED INTERFACEFOR VERTICALS
MULTI DOMAIN SLICINGAND ORCHESTRATION
PERFORMANCE DIAGNOSTICS
Specify "what" is requested without details on "how" it is to simplify the access to the 5G end-to-end facility
Instantiate and manage network slices over multiple 5G site facilities to meet target performance requirements
Derive insights on 5G performances from the analysis of various metrics (experiment, service, network and slice)
Modular, reusable set of Service Functions - both proprietary and open source - for complete end-to-end 5G service chains
5G VNFsOPEN FRAMEWORK
5G capabilities5G capabilities
5G added-value features
Extensive validation of 12 vertical use cases
Smart City Safety and Environment
Smart Tourism
Industry 4.0
Augmented fair experience
Autonomous vehicles in manufacturing
Smart Turin
Connected ambulance
eHealth, Smart Mobility and Smart Home
Utilities Smart Energy
Fault management in smart grids
Intelligent railway for smart mobility
Smart Transport
Media & Entertainment
On-site live event experience
Immersive and integrated media
Immersive virtual visit
Support of experimentation from 6 additional 5G PPP Phase 3 projects
resultsKPI assessment
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
of equipment andinfrastructure
collect logs and results
5G EVE Portal
InterworkingFramework
site facility France
site facility Italy
site facility 5Tonic-Spain
End-to-End 5G Networks
Smart City Safety and Environment
TESTDESIGN
m a y2019
jul2020
jan2021jan
2021j a nj a n
2020
LTE+vEPCPre-SchedulingNFVI + CUPSLTE-M / NB-IoT / MBB
Initial Testing Toolbox
KPI User DataRate
Limited Testing PortalKPI RTT Latency+Rel.
Interconnected SitesControl Plane I/W
R15 5GNR + 5GC (NSA)Massive MIMONetwork Slicing + EC eMBB
Full Testing PortalKPI Peak Date Rate
Interconnected ICT17Multi-Site E2E I/W
R15 5GNR+5GC (NSA)Multi-User MIMOService Slicing + SBAURLLC (R15)
R16 5GNR + 5GC (NSA)RAN VitrualizationMulti-X Slicing URLLC + mMTC (R16)
Advanced DiagnosticsKPI Capacity+AvaillabInterconnected ICT19
Data Plane I/W
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
5G EVE Portal
Interworking
Intent-based Experiment Design
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
Intent-based Experiment Design
Multi-Site Catalogue & Inventory
Multi-site Network Service Orchestration
Runtime
Data Collection
Experiment Execution & Monitoring
Interworking of Multiple End-to-End 5G Site Facilities
Multi-site Network Runtime
Experiment ExecutionExperiment Execution & Monitoring
KPI & Performance Analytics
Data
KPI & Performance Service Management
site facility
Collection
site facility Greece
C
M
Y
CM
MY
CY
CMY
K
leaflet5Geve_printable.pdf 2 14/02/20 11:25
A 5G End-to-End Validation Platform for Verticals 5G EVE Portal 4-Step Process to 5G Validation
P o r t a l TEST
RESULT & ANALYSISRESULT & ANALYSIS
TEST EXECUTION & MONITORING
4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation4-Step Process to 5G Validation
P o r t a l P o r t a l P o r t a l P o r t a l TEST
PREPARATION
INTENT-BASED INTERFACEFOR VERTICALS
MULTI DOMAIN SLICINGAND ORCHESTRATION
PERFORMANCE DIAGNOSTICS
Specify "what" is requested without details on "how" it is to simplify the access to the 5G end-to-end facility
Instantiate and manage network slices over multiple 5G site facilities to meet target performance requirements
Derive insights on 5G performances from the analysis of various metrics (experiment, service, network and slice)
Modular, reusable set of Service Functions - both proprietary and open source - for complete end-to-end 5G service chains
5G VNFsOPEN FRAMEWORK
5G capabilities5G capabilities
5G added-value features
Extensive validation of 12 vertical use cases
Smart City Safety and Environment
Smart Tourism
Industry 4.0
Augmented fair experience
Autonomous vehicles in manufacturing
Smart Turin
Connected ambulance
eHealth, Smart Mobility and Smart Home
Utilities Smart Energy
Fault management in smart grids
Intelligent railway for smart mobility
Smart Transport
Media & Entertainment
On-site live event experience
Immersive and integrated media
Immersive virtual visit
Support of experimentation from 6 additional 5G PPP Phase 3 projects
resultsKPI assessment
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
of equipment andinfrastructure
collect logs and results
5G EVE Portal
InterworkingFramework
site facility France
site facility Italy
site facility 5Tonic-Spain
End-to-End 5G Networks
Smart City Safety and Environment
TESTDESIGN
m a y2019
jul2020
jan2021jan
2021j a nj a n
2020
LTE+vEPCPre-SchedulingNFVI + CUPSLTE-M / NB-IoT / MBB
Initial Testing Toolbox
KPI User DataRate
Limited Testing PortalKPI RTT Latency+Rel.
Interconnected SitesControl Plane I/W
R15 5GNR + 5GC (NSA)Massive MIMONetwork Slicing + EC eMBB
Full Testing PortalKPI Peak Date Rate
Interconnected ICT17Multi-Site E2E I/W
R15 5GNR+5GC (NSA)Multi-User MIMOService Slicing + SBAURLLC (R15)
R16 5GNR + 5GC (NSA)RAN VitrualizationMulti-X Slicing URLLC + mMTC (R16)
Advanced DiagnosticsKPI Capacity+AvaillabInterconnected ICT19
Data Plane I/W
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
5G EVE Portal
Interworking
Intent-based Experiment Design
5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities5G EVE Platform Interworking of Multiple End-to-End 5G Site Facilities
Intent-based Experiment Design
Multi-Site Catalogue & Inventory
Multi-site Network Service Orchestration
Runtime
Data Collection
Experiment Execution & Monitoring
Interworking of Multiple End-to-End 5G Site Facilities
Multi-site Network Runtime
Experiment ExecutionExperiment Execution & Monitoring
KPI & Performance Analytics
Data
KPI & Performance Service Management
site facility
Collection
site facility Greece
C
M
Y
CM
MY
CY
CMY
K
leaflet5Geve_printable.pdf 2 14/02/20 11:25
28 Research ProgrammeHorizon 2020 / 5G Infrastructure
Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects
Duration36 months
Budget15.7 million euro
CoordinatorTIM (Italy)
Technical ManagerEricsson (Spain)
5G EVE Consortium
282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828
The 5G EVE project is co-funded by the European Commission under Horizon 2020
the 5G EVE Consortium; the European Commission is not responsible for its contents.
Contact
@5G_EVE
Project information
Madrid
RennesParis
Turin
Nice
Athens
Turin
FR-PL-ROIT-GR-ES FR-GR-ES
77
PAR
TNER
S
COU
NTR
IES
C
M
Y
CM
MY
CY
CMY
K
leaflet5Geve_printable.pdf 1 14/02/20 11:25
28 Research ProgrammeHorizon 2020 / 5G Infrastructure
Public-Private Partnership5G PPP Phase 3, Part 1: Infrastructure Projects
Duration36 months
Budget15.7 million euro
CoordinatorTIM (Italy)
Technical ManagerEricsson (Spain)
5G EVE Consortium
282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828282828
The 5G EVE project is co-funded by the European Commission under Horizon 2020
the 5G EVE Consortium; the European Commission is not responsible for its contents.
Contact
@5G_EVE
Project information
Madrid
RennesParis
Turin
Nice
Athens
Turin
FR-PL-ROIT-GR-ES FR-GR-ES
77
PAR
TNER
S
COU
NTR
IES
C
M
Y
CM
MY
CY
CMY
K
leaflet5Geve_printable.pdf 1 14/02/20 11:25