5.3. RELATÓRIO PROJETOS-PILOTO APLICAÇÃO DA SPP TOOLBOX
CÂMARA MUNICIPAL DE LOURES
5.3. PILOT PROJECTS REPORT SPP TOOLBOX APLICATION
LOURES MUNICIPALITY
Scientific coordination:
Paula Trindade, Building SPP project coordinator, Researcher, LNEG
Autors:
Viriato Aguilar, Department of Planning, Finance and Logistics, Loures Municipality
Rui Santos, Department of Planning, Finance and Logistics, Loures Municipality
Ivo Louro, Building SPP team, Research Fellow, LNEG
Pilot Project Team:
Paula Trindade, Building SPP project coordinator, Researcher, LNEG
Ana Paula Duarte, Building SPP team, Researcher, LNEG
Leonor Sota, Building SPP team, Technician, LNEG
Ana Cortiçada, Building SPP team, Research Fellow, LNEG
Viriato Aguilar, Department of Planning, Finance and Logistics, Loures Municipality
Rui Santos, Department of Planning, Finance and Logistics, Loures Municipality
Rui Coutinho, Loures Municipality
EXECUTIVE SUMMARY (English) .................................................................................................................. 1
1. Objectives ....................................................................................................................................... 1
2. Methodology .................................................................................................................................. 1
3. SPP Toolbox application ............................................................................................................... 1
3.1 Step 1 – Preparatory steps ..................................................................................................... 1
3.1.1. Definition of responsible team for Sustainable Procurement strategy ................. 1
3.1.2. Starting point (SPP diagnosis matrix) ........................................................................... 2
3.1.3. Carry out an expenditure analysis .............................................................................. 3
3.1.4. Selection of products/services groups on which to focus ..................................... 4
3.1.5. Defining the scope of the activities ............................................................................ 4
3.2 Step 2 – Targets and policy development ......................................................................... 4
3.2.1. Define and approve a long term vision for Sustainable Procurement at the
organization .................................................................................................................................... 4
3.2.2. Define and approve a SPP policy ............................................................................... 5
3.2.3. Internal and external communication of the SPP Policy ........................................ 6
3.3 Step 3 – Develop the action plan........................................................................................ 6
3.3.1. Define action plan timeframe ..................................................................................... 6
3.3.2. The action plan ............................................................................................................... 6
3.3.3. Define indicators ............................................................................................................. 6
3.4 Step 4 – Implement the action plan ................................................................................... 7
3.5 Step 5 – Monitoring and Reporting...................................................................................... 8
3.5.1. Calculation and analysis of indicators ....................................................................... 8
3.5.2. Results ............................................................................................................................... 8
3.6 Revision ..................................................................................................................................... 9
3.6.1. Difficulties and obstacles assessment ......................................................................... 9
3.6.2. Overcome obstacles and new measures ................................................................. 9
3.6.3. Update SPP Policy and Action Plan ......................................................................... 10
3.7 Conclusions ............................................................................................................................ 10
Loures - Aplicação da SPP Toolbox ....................................................................................................... 11
1. Fase 1 - Preparação .................................................................................................................... 11
1.1 Definição da equipa responsável ..................................................................................... 11
1.2 Ponto de partida das Compras Sustentáveis ................................................................. 12
1.3 Análise das despesas ........................................................................................................... 14
1.4 Seleção dos produtos/serviços prioritários ...................................................................... 14
1.5 Definição do âmbito das atividades ................................................................................ 15
2. Fase 2 – Metas e política de Compras Sustentáveis ............................................................. 15
2.1 Uma visão de longo prazo para as Compras Sustentáveis ......................................... 15
2.2 A política de Compras Sustentáveis ................................................................................. 16
2.3 Comunicação interna e externa da política de Compras Sustentáveis .................. 18
3. Fase 3 – Plano de Ação .............................................................................................................. 20
3.1 Prazo do Plano de Ação ..................................................................................................... 20
3.2 O Plano de Ação .................................................................................................................. 20
3.3 Indicadores ............................................................................................................................ 20
4. Fase 4 – Implementação do plano de ação......................................................................... 22
4.1 Detalhar o plano de ação ................................................................................................. 22
4.2 Implementar o plano de ação .......................................................................................... 23
5. Fase 5 – Monitorização e comunicação ................................................................................ 26
5.1 Cálculo e análise dos indicadores .................................................................................... 26
5.2 Resultados .............................................................................................................................. 27
6. Fase 6 - Revisão ............................................................................................................................ 28
7. Conclusões .................................................................................................................................... 28
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 1
EXECUTIVE SUMMARY (English)
1. OBJECTIVES
This action, performed under the scope of Action 5, had the objective of testing the SPP
toolbox in a real organization, in this specific case, Municipality of Loures.
2. METHODOLOGY
In this pilot project, held under the scope of the Building SPP project, Loures Municipality
had the technical support of LNEG, in order to implement the SPP Toolbox, procurement
procedures and training.
LNEG supported the application of the SPP Toolbox in LIPOR and this practical experience
in pilot projects was used to further develop the SPP Toolbox. On the other hand, actions
developed within pilot projects were used as models to develop the SPP Toolbox. The tool
has evolved from this process of iterative nature.
The actual implementation of the pilot project followed the methodology set by the SPP
Toolbox. In broad terms, this entailed an initial screening of strategic objectives, with
participation from all the departments, the identification of strategies/objectives with
relevance for procurement and the definition of a multidepartment working team.
The multidepartment working team, guided and supported by LNEG, was responsible for
the step-by-step application of the Toolbox, that envisioned a set of actions conducive to
the progressive development of a Sustainable Procurement Strategy, to which the
organization would commit itself.
The following sections report on the actions taken in the scope of the pilot project, related
to each step of the SPP Toolbox application, presenting also the achieved results.
3. SPP TOOLBOX APPLICATION
3.1 Step 1 – Preparatory steps
3.1.1. Definition of responsible team for Sustainable Procurement strategy
On 13 Feb 2012, a kick-off meeting of the Loures pilot was held. The alderman Ricardo
Leão was present and assured the political involvement in the project and in the SPP
Strategy definition. In this meeting all departments of Loures municipality were
represented with a total of 47 persons. LNEG presented the Building SPP project and
explained the objectives of the pilot project.
This meeting had the main goals of identifying existing policies and strategies in place in
the municipality and also defining departments involved in these strategies and that
should be represented in the responsible team for the SPP strategy.
Through the information collected, the responsible team was set. This team is responsible
for the strategic orientation of the SPP strategy and is composed by 10 elements from 8
different departments: Works Department, Mobility and Energy Department,
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 2
Administrative and Information Council Department, Education Department, Social
Cohesion and Housing Department, Planning and Urban Management Department,
Department of Environment and Municipal Transportation and Department of Planning,
Finance and Logistics.
Table 1 Members of the responsible team responsible for Loures pilot-project
Name Department
Carla Monteiro Works Department, Mobility and Energy Department
Telma Marçal Administrative and Information Council Department
Sandra Brito Education Department
Andreia Assunção Social Cohesion and Housing Department
Ana Luís
Planning and Urban Management Department Nuno Medeiros
Ana Risota Department of Environment and Municipal
Transportation
Viriato Aguilar
Department of Planning, Finance and Logistics Rui Santos
Since the project was in implementation during two different municipal mandates, the
political responsible in each mandate were:
Alderman Ricardo Leão (2009-2013)
Mayor Bernardino Soares (2013-2017)
Viriato Aguilar, the head of the Logistics Division was the team coordinator throughout the
duration of the project.
3.1.2. Starting point (SPP diagnosis matrix)
Loures municipality, through its Logistics Division, has already a mission in place that
integrates concise sustainability aspects. This mission has been put into place thanks to a
change of paradigm in the way Loures municipality conducts its public procurement,
which introduced some major changes, like the centralization of all procurement in the
Logistics Division, legislation alterations and the use of electronic platforms for public
procurement.
In addition to the mission, the municipality also has an internal commitment to integrate
sustainability criteria in a set number of procedures every year. Since 2009, the
municipality has been increasing the intensity of this commitment, which has gained its
momentum from the exchange with other organizations in seminars that took place in
Porto (Portugal), Athens and Crete (Greece).
Considering this background, Loures Municipality realized the diagnosis of the
organization in terms of sustainable procurement. This analysis enabled to diagnose the
starting situation of the municipality and help setting the objectives in this area. Figure 1
presents the SPP matrix diagnosis for Loures Municipality.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 3
Figure 1 SPP Diagnosis Matrix chart for Loures - Starting Point
As Figure 1 demonstrates, the Municipality already had some developed areas in SPP. It
had well defined objectives at the level of Policy, strategy and communications, but
lacked a global and organization wide policy. In terms of People, the Logistics Division
carried out and promoted awareness and technical training in SPP. On the Market item,
the municipality frequently exchanged information on SPP with some of its regular
suppliers. In the Procurement process it’s starting to consider the most economically
advantageous tender, and not limiting all procedures to the price criterion. In what
pertains to Monitoring and results, the municipality already used some indicators geared
towards SPP.
3.1.3. Carry out an expenditure analysis
This step corresponds to the evaluation of existing and anticipated contracts and
contracts coming to an end and their budgetary importance for the municipality. As
Figure 2 shows, the three selected priority categories under the scope of this pilot project
had a combined weight of 18% of the total value of established contracts in 2013.
Figure 2 Expenditure analysis of priority products/services in Loures Municipality, 2013
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial3 4 2 2 3
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Policy, strategy and communication
People
Market
Procurement process
Monitoring and results
2% 10%
6%
82%
Urban pest control
School transports
Security andSurveilance services
Other contracts
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 4
3.1.4. Selection of products/services groups on which to focus
This step involved the application of the matrix for the selection of priority products /
services, starting from the list of products/services to be purchased by the municipality
that was identified in the previous step. For each of these products/services was assessed
if: the product/service is covered by any policy/strategy identified, it´s economic value, if
it was identified by the internal stakeholder’s (questionnaire) and the potential for
influencing the market.
In addition, the municipality also considered if the procedures associated with these
products had the following characteristics:
Procedures that, during the period of the pilot project, would already be in the
phase of tender documents preparation.
Economical relevancy;
Related with working expenditures that would be replicated in the future, in order
to have a good working base in those future procedures.
Capability of the local market to comply with the demands set in the awarding
criteria of the procedure;
All procedures having different objects, in order to develop tailored sustainability
criteria for each one and taking into account the specific nature of each, so as to
not generalize and use the same criteria for all.
From this selection process the following priority products/services were selected for
implementation of the pilot project: urban pest control, school transport and security and
surveillance services.
3.1.5. Defining the scope of the activities
The Logistics Division of the Loures Municipality is responsible for all procurement activities,
which cover the needs of all municipality services. As such, the SPP strategy and related
activities encompasses the whole organization.
In what pertains to the pilot project, the selected products/services were requested by
specific departments within the Municipality:
Urban pest control: Unit of Environmental Public Services;
School Transport: School Social Action Division;
Security and Surveillance Services: Administrative and Technical Support Division.
3.2 Step 2 – Targets and policy development
3.2.1. Define and approve a long term vision for Sustainable Procurement at the
organization
In Loures municipality the Logistics Division (responsible for procurement activities)
developed a vision for sustainable procurement. The vision states that the municipality is
committed to promote environmentally and socially sustainable procurement at the
lowest price offered by the market. They have an annual commitment that defines the
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 5
inclusion of criteria and / or clauses of environmental and social sustainability in the
procurement procedures.
3.2.2. Define and approve a SPP policy
Loures municipality has prepared a Strategic Plan for Sustainable Procurement 2014-17,
that aims to set some rules and objectives in this area to the municipality. This plan awaits
approval from the mayor and intends to be a strategic tool in sustainable procurement.
The Strategic Plan for Sustainable Procurement 2014-2017 is based on four priority action
vectors:
To promote and develop public procurement procedures that include sustainable
criteria:
To promote and stimulate awareness near the suppliers, in order to inform them of
the legal (national and international) aspects of sustainable procurement;
To continue to participate as a partner in national and international sustainable
procurement projects;
To participate in sustainable good practices awards, with the objective to
communicate the best that is done in the Municipality.
Considering the Strategic Plan mentioned above and the implementation of the
pilot-projects under the scope of Building SPP, the following SPP diagnosis matrix
(Figure 3) sets the targets that Loures Municipality is aiming to achieve by 2017.
Figure 3 SPP diagnosis matrix and targets for 2017
As it can be seen in table and figure, Loures municipality is trying to achieve the following
objectives in 2017:
Policy, strategy and communications: with the approval of the Strategic Plan, the
municipality aims to have the conduct of the whole organization being ruled by
principles of SPP and to have the same plane undergo constant revision and
readjustments;
People: the Logistics Division will be the hub for promotion and generalization of
sustainability criteria, supported by a well aware and trained team;
Market: promote regular formal and informal contacts with the corporate market;
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial3 4 2 2 3
Score
situação
20175 5 4 4 5
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Initial score
Final Score
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 6
Procurement Procedure: to generalize sustainability criteria in public procurement;
Monitoring and results: to have a municipal strategic plan where the inclusion of
sustainability criteria in tender procedures is only one component of a better
defined and broadening whole.
3.2.3. Internal and external communication of the SPP Policy
Internal communication
The Logistics Division communicates the SPP policy to other collaborators and
departments of the Loures Municipality in all the meetings in which it takes part and also
through the organizations intranet.
External communication
The logistics division has a section about the work being done on the Building SPP project
on its website that can be assessed through the following link:
http://www.cm-loures.pt/Ligacao.aspx?DisplayId=680&CursorId=683
The Division also communicates its work on the SPP policy in other national and
transnational meetings, and promotes this project near the suppliers.
3.3 Step 3 – Develop the action plan
3.3.1. Define action plan timeframe
Loures set the year 2017 as the horizon of the action plan, which corresponds to the end
of the actual executive mandate (2013-2017).
3.3.2. The action plan
In this step, Loures municipality defined several goals to the period 2013-2017. Loures set
2017 as the horizon of the action plan, which corresponds to the end of the executive
mandate. The goals defined include the maintenance of sustainability indicators in the
framework of evaluation and accountability, internal and external dissemination of
actions taken, regular training of employees in sustainable procurement and realization of
seminars and workshops with suppliers to exchange knowledge for new products
emerging in the market and new strategic options for municipality procurement.
3.3.3. Define indicators
At this stage the municipality of Loures defined indicators for each action specified in the
action plan.
It was intended for these to:
be Integrated, to encompass the diverse dominions of the municipal structure;
constitute criteria of municipal development;
be adapted to the “local” characteristics, this is, to account for the specificities of
the objectives.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 7
With this in mind the following indicators were developed considering the time period of
2014-2017:
Table 2 Indicators
Type of
indicator Indicator Targets Responsibilities
Numerical
Percentage of public tenders that
include sustainability factors or clauses
2014 >= 35%
2015 >= 40%
2016 >= 45%
2017 >= 50%
Logistics Division
Temporal
Communicate SPP actions (meetings,
news, others) in the intranet and
website of the Loures Municipality
2 per year (1st
semester / 2nd
semester)
Logistics Division
SPP Training to the procurers 1 per year (1st
semester)
Logistics Division
Human Resources
Management
Division
Seminar for SPP good practices
awareness
1 every 2 years
(4th trimester of
2014 and 4th
trimester of 2016)
Logistics Division
Meeting with suppliers for experience
exchange
1 every 2 years
(4th trimester of
2014 and 4th
trimester of 2016)
Logistics Division
3.4 Step 4 – Implement the action plan
The action plan implemented by Loures Municipality was comprised of 12 actions
subordinated under three themes. Table 3 summarizes the implementation of the action
plan by Loures Municipality in order to execute its pilot project under the scope of Building
SPP.
Table 3 Loures Municipality Action Plan
Theme Action Deadline Responsibilities
Procurement
process
Develop a document with the guidelines of the Strategic Plan
and have it approved.
Dez-13
Logistics Division
Annual definition of the number/percentage of procedures that
include sustainable factors or clauses.
2014-2017 Logistics Division
Conduct tender for the contracting of Security and Surveillance
Services, with inclusion of environmental and social criteria.
Jul-13 Logistics Division
Conduct tender for the contracting of School Transport service,
with inclusion of environmental and social criteria.
Set-13 Logistics Division
Conduct tender for the contracting of Urban Pest Control
service, with inclusion of environmental and social criteria.
May-13 Logistics Division
Procurement
process
Conduct tender for the contracting of School Transport service,
with inclusion of environmental and social criteria.
Set-14 Logistics Division
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 8
Theme Action Deadline Responsibilities
Conduct tender for the contracting of Communications services
(fixed, mobile and data), with inclusion of environmental and
social criteria.
Apr-14 Logistics Division
Conduct tender for the contracting of Cleaning Services for the
municipal facilities, with the inclusion of environmental and
social criteria.
Oct-14 Logistics Division
People
Communication of performed actions (meetings, news, others)
in the intranet and website of the municipality.
2014-2017
Logistics Division
Training in Sustainable Procurement for the procurers.
2014-
2017
Logistics Division
Human Resources
Management
Division
Market
Organization of an Awareness Seminar aimed at suppliers, in
order to call their attention for good practices in sustainable
procurement.
2014-2017
Logistics Division
Meeting with suppliers for experience exchange. 2014-2017
Logistics Division
This action plan entailed the conduction of three tenders during the implementation of the
pilot project. These were all public tenders.
The tenders were published in an online platform that the Municipality subscribes and the
following responses were achieved:
Urban Pest Control services: 11 proposals were submitted;
School transport services: 2 proposals were submitted;
Security and Surveillance services: 13 proposals were submitted.
These results show a healthy response to the demands (environmental and social) set in the
tenders, highlighting how the market was capable to meet them.
3.5 Step 5 – Monitoring and Reporting
3.5.1. Calculation and analysis of indicators
The Municipality has already concluded many of the actions proposed in Action Plan,
namely all those pertaining to theme Procurement Process.
In terms of the indicator Percentage of public tenders that include sustainability factors or
clauses in a year, whose 2014 target was set to 35%, the municipality reports that it has
exceeded its expectations with a final value of 40%.
3.5.2. Results
Figure 4 shows how Loures Municipality has achieved positive results with its participation
on this project.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 9
Figure 4 SPP diagnosis matrix - final results
As Figure 4 demonstrates, the initial score of the Municipality in the SPP diagnosis Matrix
was overcome, showing how the organization is working towards the achievement of the
targets set for 2017.
Through this project Loures Municipality gathered benefits like:
Better understanding of some of the aspects related with the environmental and
social issues associated with the contracted services.
o Example: the underlying factors behind urban pests proliferation (littering)
and its simultaneous resolution.
Environmental benefits from the use of best practices in the performance of the
services:
o Example: rigorous application of pesticides and its use only after a
technical assessment demands it.
Social benefits through the reinforcement of the contractual demands pertaining
to the compliance with Conventions 29, 87, 98, 100, 105, 111, 138, 182 of the
Internation Labour Organization
3.6 Revision
3.6.1. Difficulties and obstacles assessment
No major obstacles were found during the implementation of the pilot project. Due to the
current economic situation some concerns were present at the beginning, as it was
considered that this conjuncture might not be ideal for the implementation project of this
nature.
3.6.2. Overcome obstacles and new measures
Even with the concern assumed above, as the project progressed, the benefits that could
be achieved became clearer, and this made the Municipality become more confident in
its implementation. The municipality came to believe that this was a pioneering work that
would adequately prepare the organization for new EU directives.
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial
3 4 2 2 3
Score
situação
atual
4 5 3 3 4
Score
situação
20175 5 4 4 5
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Initial score
Current Score
Final Score
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 10
3.6.3. Update SPP Policy and Action Plan
Loures Municipality will revise and update its SPP strategy at the end of the current
municipal mandate that will take place in the 2nd semester of 2017.
3.7 Conclusions
The work done in this project leads Loures Municipality to conclude the following aspects:
The organization has gained a lot of knowledge through the support provided by
LNEG and the cooperation with the other partners;
The conscious decision to implement sustainable procurement has had some
impact on the vision of the market over this aspect;
Sustainable products and services aren’t more expensive than conventional
solutions. If we consider life cycle costs, their efficiency and waste reduction, these
sustainable solutions might bring savings to the organization.
Some of the actions taken contribute to comply with existing legislation (e.g.
waste management);
Sustainable procurement improves the public image of the organization, by
conveying responsibility to the citizens.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 11
LOURES - APLICAÇÃO DA SPP TOOLBOX
1. FASE 1 - PREPARAÇÃO
1.1 Definição da equipa responsável
Figura 1 Reunião de apresentação do projeto piloto.
Na sequência da reunião de apresentação do projeto-piloto que se realizou no auditório
do museu da cerâmica em Sacavém, o LNEG (Paula Trindade) distribuiu um questionário
com o objetivo de se apurar quais as unidades orgânicas que tendo em conta as suas
valências e atividade diária reuniam atributos mais relevantes para poderem integrar a
equipa responsável para trabalhar no presente projeto-piloto.
Da análise dos resultados, concluiu-se que a equipa responsável passaria a integrar os
seguintes técnicos, departamentos:
Tabela 1 Equipa Responsável
Descritivo Nome
Departamento de Obras, Mobilidade e Energia Carla Monteiro
Departamento de Gestão Administrativa e Informação
Municipal
Telma Marçal
Departamento de Educação Sandra Brito
Departamento de Coesão Social e Habitação Andreia Assunção
Departamento de Planeamento e Gestão Urbanística Ana Luís /Nuno
Medeiros
Departamento do Ambiente e Transporte Municipais Ana Risota
Departamento de Planeamento, Finanças e Logística Viriato Aguilar/Rui
Santos
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 12
Considerando que o projeto esteve em execução entre 2 mandatos autárquicos distintos os
responsáveis políticos para as compras sustentáveis nos referidos mandatos foram:
No mandato autárquico de 2009-2013 (Vereador Ricardo Leão);
No presente mandato autárquico 2013-2017 (Presidente da Câmara, Bernardino
Soares).
O coordenador da equipa ao longo de todo o projeto foi o Chefe da Divisão de
Logística, o Dr. Viriato Aguilar.
1.2 Ponto de partida das Compras Sustentáveis
A Câmara Municipal de Loures através da Divisão de Logística, possui na sua visão e
missão, aspetos concisos de sustentabilidade ambiental e social.
A missão que a Divisão de Logística se impôs concretizar, só foi possível efetivar através
de mudança de paradigma na realização das compras públicas na Câmara Municipal
de Loures, nomeadamente:
A centralização das compras na Divisão de Logística, permitiu obter maiores
poupanças e maior concorrência entre os fornecedores e canalizar esforços
para outras vertentes da contratação pública;
A alteração da legislação e a utilização de plataformas eletrónicas de
contratação pública;
Paralelamente ao descrito na nossa visão e missão, define-se anualmente como
compromisso interno através do quadro de avaliação e responsabilização (QUAR),
indicador que define a inclusão de critérios e/ou clausulado de sustentabilidade
ambiental e/ou social em determinado número de procedimentos. Esta constatação
tem-se verificado com maior incidência a partir do ano de 2009, com partilha e
divulgação de resultados para outras entidades no decorrer dos seminários realizados no
Porto (Portugal), em Atenas e Creta (Grécia).A nível da matriz apresentada no quadro
seguinte, consideramos que estamos nos seguintes níveis nas vertentes consideradas:
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 13
Figura 2 Matriz de diagnóstico SPP, Situação inicial
Conforme se constata pela representação gráfica, fazemos a seguinte leitura
explicativa:
Ao nível da politica, estratégia e comunicação, consideramos de facto, que
existem objetivos bem definidos ao nível de algumas estruturas (Divisões e/ou
Departamentos) mas não existe ainda um poltíca global transversal a toda a
organização;
Relativamente ao item relacionado com as pessoas, a unidade orgânica (Divisão
de Logística) que tutelada pelo respetivo dirigente aborda (ação de
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial
3 4 2 2 3
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Policy, strategy and communication
People
Market
Procurement process
Monitoring and results
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 14
sensibilização), fomenta (ações de formação – 9 de Abril de 2014 nas instalações
do LNEG) e implementa esta vertente nos processos de contratação pública;
Sobre o mercado, ocorrem regularmente conversas e troca de informação com
alguns fornecedores habituais sobre as compras públicas sustentáveis;
No processo de procura, já se dá maior ênfase à proposta economicamente
mais vantanjosa, não se considerando na totalidade dos procedimentos o preço
mais baixo;
Na monitorização e resultados, existem alguns indicadores que são orientados
para as compras públicas sustentáveis.
1.3 Análise das despesas
Figura 3 Análise das despesas e peso dos produtos prioritários relativamente ao valor total dos contratos adjudicados,
2013
Conforme se verifica pelo gráfico supra, os 3 projetos-piloto que foram tidos em conta ao
nível do projeto representam 18% da totalidade do montante adjudicado em 2013,
estamos a falar de valores considerados relevantes em termos adjudicação (1.343.375,63
€ valores com iva incluído) e em termos de tipologia e objeto dos concursos.
1.4 Seleção dos produtos/serviços prioritários
A seleção dos produtos considerados prioritários, foi realizada tendo como suporte de
apoio à ferramenta SPP Toolbox, escalonando-se o potencial que possuíam para o
projeto em causa e cumulativamente detinham os seguintes pressupostos:
Serem procedimentos que no período em questão, teriam que estar em fase de
elaboração das peças do procedimento (caderno de encargos, programa de
concurso);
Serem processos com uma determinada relevância económico-financeira, de
modo a dar especial ênfase ao projeto;
Que fossem procedimentos relacionados com as despesas de funcionamento,
que se repercutiriam no tempo e que permitiria em futuros processos ter já uma
boa base de trabalho;
O mercado envolvente teria capacidade de dar resposta às exigências em
termos de critérios de adjudicação que seriam colocados nas peças;
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 15
Serem procedimentos cujo objeto fosse díspar, de forma, a que os critérios e
conteúdos de índole sustentável fossem ajustados em função da sua natureza e
não generalizando sempre os mesmos critérios.
Do cruzamento e análise realizada consideraram-se três procedimentos que detinham as
condições necessárias conforme exposto:
Pragas urbanas;
Transportes escolares;
Vigilância e segurança das instalações municipais.
1.5 Definição do âmbito das atividades
Sendo a Divisão de Logística um prestador de serviços por excelência da autarquia as
atividades desenvolvidas no âmbito das compras e mais especificamente nos
procedimentos relacionados com os projetos-piloto são transversais a toda a
organização (Câmara Municipal de Loures).
Os serviços requisitantes são envolvidos no processo de elaboração de compras
públicas, que, juntamente com os técnicos da Divisão de Logística trocam e partilham
ideias de modo a que as peças do procedimento definam de forma clara, precisa,
consistente e inovadora os conteúdos pretendidos.
O exemplo dessa envolvência e participação, são os 3 (três) projetos-pilotos que tiveram
como requisitantes unidades orgânicas distintas:
Pragas urbanas – Unidade de Serviços Públicos Ambientais;
Transportes escolares – Divisão de Ação Social Escolar;
Vigilância – Divisão de Apoio Técnico e Administrativo.
2. FASE 2 – METAS E POLÍTICA DE COMPRAS SUSTENTÁVEIS
2.1 Uma visão de longo prazo para as Compras Sustentáveis
A Divisão de Logística obriga-se a ter na sua missão, visão e valores que são repercutidos
na implementação de indicadores e ações no âmbito social e ambiental, conforme se
verifica seguidamente:
“A Divisão de Logística tem por visão promover aquisições ambiental e socialmente
sustentáveis de forma centralizada ao mais baixo preço oferecido pelo mercado,
garantir o fornecimento atempado e sem falhas dos bens e serviços e acesso a
catálogos on-line dos artigos e desmaterialização total dos procedimentos de
contratação pública.”
“A Divisão de Logística tem por missão disponibilizar de forma regular e atempada em
quantidade, qualidade, com padrões de sustentabilidade e ao menor custo possível
todos os bens e serviços necessários ao funcionamento dos serviços municipais.”
A Divisão de Logística tem como valores nortear o seu comportamento e ações,
pautando-se por:
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 16
Eficiência, processos internos aferindo a relação entre os serviços prestados e os
recursos utilizados;
Eficácia, no cumprimento dos seus objetivos e, se possível, ultrapassar os
resultados esperados;
Participação, envolvimento ativo dos diversos agentes no processo global de
aquisições públicas;
Inovação, aceitar os desafios que se colocam e prosseguir soluções criativas,
sempre numa perspetiva de melhoria contínua;
Consciência ambiental e social, compatibilizar as decisões a tomar com as
necessidades a satisfazer, num quadro de consciência ambiental e social.
Estas linhas orientadoras foram definidas e estabelecidas internamente ao nível da
Divisão, que foram repercutidas nos documentos (Quadro de avaliação e
responsabilização) validados superiormente (administração) e disponibilizadas no sítio da
intranet de forma a serem do conhecimento dos todos os serviços camarários.
2.2 A política de Compras Sustentáveis
Para além do já exposto anteriormente, a Divisão de Logística elaborou um documento
que se encontra em fase de draft que intitulou como compras públicas sustentáveis -
plano estratégico 2014-2017, que assenta em quatro vetores de atuação prioritária:
1. Fomentar e desenvolver procedimentos de contratação pública com inclusão de
fatores ou clausulado técnico, promovendo o desenvolvimento sustentável;
a. Manutenção de indicadores da Divisão de logística no seu QUAR (Quadro
de avaliação e responsabilização) anual, que desde 2010, prevê um
indicador onde se estabelece como meta:
“N.º de processos aquisitivos lançados com inclusão de critérios de
sustentabilidade (ambientais e sociais), no âmbito da participação nos
projetos co-financiados (SPP e Landmark)”
O que se têm traduzido nos seguintes resultados de execução:
Figura 4 Metas e indicadores alcançados relativos ao Nº de processos aquisitovos com inclusão de critérios de
sustentabilidade
b. Determinar como meta futura, definir oportunamente no QUAR do
Departamento e da Divisão de Logística que até ao ano de 2017 pelo
menos 50% do total de procedimentos realizados através de concurso
público integrem critérios de sustentabilidade;
8 8 12
6 8 13 13
5
0
10
20
2010 2011 2012 2013
METAS PROPOSTAS INDICADORES ALCANÇADOS
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 17
Figura 5 Ojectivos para a realização de concursos públicos com critérios de sustentabilidade.
c. Determinar que os serviços requisitantes participem na definição dos
critérios de sustentabilidade a introduzir nos concursos e na apresentação
das fórmulas de avaliação da proposta economicamente mais vantajosa.
2. Fomentar e dinamizar ações de sensibilização junto aos fornecedores da Câmara
Municipal de Loures, a fim de os dotar de informação sobre as exigências legais
nacionais e internacionais nas matérias associadas às compras sustentáveis;
3. Continuar a participar como parceiro em projetos nacionais e transnacionais de
caráter do expresso no presente documento;
4. Participar sempre que possível em concursos para prémios de boas práticas de
índole sustentável (ambiental e social), com o objetivo de dar a conhecer o que
de bem se faz no Município.
O plano ainda não foi aprovado, encontra-se em fase de validação superior, pese
embora o referido neste parágrafo, já esteja em desenvolvimento conforme as metas
propostas no plano estratégico.
Pretende-se que no final do horizonte (2017), nos encontremos no seguinte nível:
Figura 6 Matriz diagnóstico SPP com situação inicial e objectivos para 2017
Ao nível da politica, estratégia e comunicação, pretendemos que com
aprovação do plano estratégico – compras públicas sustentáveis, toda a
organização passe a reger-se por príncipios vinculados a estas matérias e o
mesmo possa ser alvo de revisão e reajustamentos;
0%
20%
40%
60%
Concursos públicos comcritérios sustentabilidade
(2014-2017)
35% 40% 45% 50%
2014
2015
2016
2017
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial
3 4 2 2 3
Score
situação
20175 5 4 4 5
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Initial score
Final Score
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 18
Relativamente ao item relacionado com as pessoas, pretende-se que a Divisão
de Logística seja o elo de divulgação e generalização de critérios de
sustentabilidade ambiental e social, fundamentada numa equipa devidamente
sensibilizada e formada nestas matérias;
Sobre o mercado, fomentar de forma regular contatos formais e informais com o
mercado empresarial;
No processo de procura, pretende-se generalizar os processos de contratação
pública com inclusão de critérios de sustentabilidade.
Na monitorização e resultados, pretende-se que as ações, como a inclusão de
critérios de sustentabilidade ambiental e social nos procedimentos aquisitivos
desenvolvidos pela Divisão de Logística seja apenas uma componente de um
todo mais abrangente e que esta vertente esteja perfeitamente definida em
termos de plano estratégico do município.
2.3 Comunicação interna e externa da política de Compras Sustentáveis
Comunicação interna
A Divisão de Logística tem prestado informação sobre a evolução do projeto sustentado
nas reuniões em que participa a todos os colegas da autarquia através da intranet,
conforme se constata em baixo:
Figura 7 Comunicação das ações de SPP na intranet da Câmara Municipal de Loures
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 19
Comunicação externa
Em simultâneo a divisão de Logística possui no seu sítio da internet toda a informação
sobre o projeto cofinanciado Building-SPP - Capacidade em Compras Públicas
Sustentáveis que pode ser acedido através do seguinte link:
http://www.cm-loures.pt/Ligacao.aspx?DisplayId=680&CursorId=683
Figura 8 Apresentação do projecto Building SPP no website da Câmara Municipal de Loures
Também tem disponibilizado informação sobre a evolução do mesmo através da
divulgação das reuniões nacionais e transnacionais em que tem participado, conforme
se constata na Figura 8 (em baixo)
Em diversas reuniões com fornecedores, a Divisão de Logística tem concomitantemente
divulgado o projeto através da cedência de folhetos e sensibilizando-os para esta
realidade de modo a que possam interiorizá-la e irem-se ajustando de forma progressiva
às novas exigências do mercado.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 20
3. FASE 3 – PLANO DE AÇÃO
3.1 Prazo do Plano de Ação
O prazo do plano de ação foi definido em relação ao mandato autárquico 2013 – 2017.
3.2 O Plano de Ação
O plano de ação incide sobre os seguintes objetivos:
Plano estratégico de compras sustentáveis para o mandato 2013-2017, onde se
definem determinadas metas que se visam alcançar ao longo do horizonte
mencionado;
Manutenção de indicadores de sustentabilidade no quadro de avaliação e
responsabilização da Divisão de Logística (QUAR);
Divulgação interna e externa de ações desenvolvidas no âmbito das compras
sustentáveis;
Formação regular de colaboradores;
Seminários/workshops com fornecedores da autarquia;
Troca de conhecimentos relativamente a novos produtos que vão surgindo no
mercado e novas opções estratégicas de compras do Município.
3.3 Indicadores
Os indicadores estabelecidos constituíram uma forma de simplificação e sintetização de
fenómenos mais ou menos complexos através da sua quantificação. Somente desta
forma seria possível fazer a medição e o devido acompanhamento da execução do
plano definido, pretendendo-se que os mesmos fossem:
Integrados, ou seja, englobar os diversos domínios da estrutura autárquica;
Constituir critérios de desenvolvimento municipal;
Adaptados às características “locais”, isto é, ter em conta as especificidades dos
objetivos;
Neste sentido os indicadores definidos passaram por:
Indicadores numéricos;
Tabela 2 Indicadores numéricos
Action Deadline Responsibilities Targets Indicators
Definição anual do % concursos públicos
que devem incluir factores e/ou
clausulado de sustentabilidade
2014-2017 Divisão de Logística
Percentagem de
concursos com
indicadores de
sustentabilidade
2014 > =35%
2015 >= 40%
2016 >= 45%
2017 >= 50%
01.01.2014 - 16-06-2014
Percentagem de concursos
públicos com fatores e/ou
clausulado de
sustentabilidade » 40%
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 21
Indicadores temporais;
Tabela 3 Indicadores temporais
Action Deadline Responsibilities Targets Indicators
Colocação de ações (reuniões, notícias,
outros) realizadas na intranet e internet
da CMLoures2014-2017
Divisão de Logística
2 p/ ano
(1º semestre/2º
semestre) Por quantificar
Formação em compras sustentáveis aos
técnicos de compras 2014-2017
Divisão de Logística
Divisão de Gestão de
Recursos Humanos
1 p/ano
(1º semestre)Já fizeram 2 (Landmark e
Building/GPP2020)
Organizar seminário com intuito de
sensibilizá-los para as boas práticas, no
âmbito das compras sustentáveis2014-2017
Divisão de Logística
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
Realizar reunião com fornecedores para
troca de experiências 2014-2017Divisão de Logística
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 22
4. FASE 4 – IMPLEMENTAÇÃO DO PLANO DE AÇÃO
4.1 Detalhar o plano de ação
Tabela 4 Plano de Ação do projecto-piloto detalhado
Action plan timeframe: 2013-2017
Goals (step 2) Theme Action Deadline Responsibilities Targets Indicators Resources (financial, human,…) Stakeholders (users, suppliers, …)
Plano estratégico de compras
sustentáveis para o mandato 2013-
2017 dos novos órgãos autárquicos
Procurement processElaborar documento com as diretrizes do
plano estratégicodez-13
Divisão de Logística1 documento Documento elaborado humanos Câmara Municipal
Procurement process
Definição anual do % concursos públicos
que devem incluir factores e/ou
clausulado de sustentabilidade
2014-2017 Divisão de Logística
Percentagem de
concursos com
indicadores de
sustentabilidade
2014 > =35%
2015 >= 40%
2016 >= 45%
2017 >= 50%
01.01.2014 - 16-06-2014
Percentagem de concursos
públicos com fatores e/ou
clausulado de
sustentabilidade » 40%
humanos Câmara Municipal
Procurement process
Realizar concurso para contratação de
serviço de segurança e vigilância
introduzindo critérios ambientais e
sociais
jul-13 Divisão de Logística Financeiros e humanos Divisão de Logística
Procurement process
Realizar concurso para contratação de
serviço de transporte escolar
introduzindo critérios ambientais e
sociais
set-13 Divisão de Logística Financeiros e humanos Divisão de Logística
Procurement processRealizar concurso para contratação de
serviço de controlo de pragas urbanasmai-13 Divisão de Logística Financeiros e humanos Divisão de Logística
Procurement process
Realizar concurso para contratação de
serviço de transporte escolar
introduzindo critérios ambientais e
sociais
set-14 Divisão de Logística Financeiros e humanos Divisão de Logística
Procurement process
Realizar concurso para prestação de
serviços de comunicações (fixos, móveis
e dados) introduzindo critérios
ambientais e sociais
abr-14 Divisão de Logística Financeiros e humanos Divisão de Logística
Procurement process
Realizar concurso para serviços de
limpeza das instalaçóes muncipais com
inclusão de consumíveis e
equipamentos, para deposição de
resíduos sanitários, introduzindo critérios
ambientais e sociais
out-14 Divisão de Logística Financeiros e humanos Divisão de Logística
Divulgação interna e externa de
ações desenvolvidas no âmbito das
compras sustentáveis
People
Colocação de ações (reuniões, notícias,
outros) realizadas na intranet e internet
da CMLoures2014-2017
Divisão de Logística
2 p/ ano
(1º semestre/2º
semestre) Por quantificarHumanos
Câmara Municipal
Fornecedores
Formação regular de colaboradores PeopleFormação em compras sustentáveis aos
técnicos de compras 2014-2017
Divisão de Logística
Divisão de Gestão de
Recursos Humanos
1 p/ano
(1º semestre)Já fizeram 2 (Landmark e
Building/GPP2020)Financeiros Entidade externa
Seminários/workshop`s com
fornecedores da autarquiaMarket
Organizar seminário com intuito de
sensibilizá-los para as boas práticas, no
âmbito das compras sustentáveis2014-2017
Divisão de Logística
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
HumanosCâmara Municipal
Fornecedores
Troca de conhecimentos
relativamente a novos produtos
que vão surgindo no mercado e
novas opções estratégicas de
compras do Município.
MarketRealizar reunião com fornecedores para
troca de experiências 2014-2017Divisão de Logística
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
1 p/ período bienal
4º trimestre de 2014
4ª Trimestre de 2016
HumanosCâmara Municipal
Fornecedores
Manutenção de indicadores de
sustentabilidade no quadro de
avaliação e responsabilização da
Divisão de Logística (QUAR)
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 23
4.2 Implementar o plano de ação
Tabela 5 Implementação do plano de ação
Action Task Deadline Responsibilities
Aprovação pelo presidente da Câmara Dez-13/Jan-14 Divisão Logística
Apresentar proposta ao órgão executivo com plano estratégico de compras públicas. Jan/Fev-14 Órgão executivo
Análise e discusão dos objetivos concretizados e por concretizar Dez de cada ano Divisão de Logística
Definição do n.º/% de indicadores de sustentabilildade ambiental Dez. de cada ano Divisão de Logística
Definição de critérios ambientais e sociais concluido Divisão de Logística
Elaboração das peças concursais concluido Divisão de Logística
Publicitação do concurso concluido Divisão de Logística
Receção de propostas concluido Divisão de Logística
Adjudicaçãoconcluido - válido
até Junho 2015Órgão Competente
Definição de critérios ambientais e sociais concluido Divisão de Logística
Elaboração das peças concursais concluido Divisão de Logística
Publicitação do concurso concluido Divisão de Logística
Receção de propostas concluido Divisão de Logística
Adjudicaçãoconcluido - válido
até Junho de 2014Órgão Competente
Definição de critérios ambientais e sociais concluido Divisão de Logística
Elaboração das peças concursais concluido Divisão de Logística
Publicitação do concurso concluido Divisão de Logística
Receção de propostas concluido Divisão de Logística
Adjudicação
concluido - válido
até Setembro de
2015
Órgão Competente
Definição de critérios ambientais e sociais fev-14 Divisão de Logística
Elaboração das peças concursais mar-14 Divisão de Logística
Publicitação do concurso abr-14 Divisão de Logística
Receção de propostas
47 dias após
publicação em DR e
JOUE
Divisão de Logística
Adjudicação set-14 Órgão Competente
Definição de critérios ambientais e sociais set-13 Divisão de Logística
Elaboração das peças concursais out-13 Divisão de Logística
Publicitação do concurso nov-13 Divisão de Logística
Receção de propostas
47 dias após
publicação em DR e
JOUE
Divisão de Logística
Adjudicação abr-14 Órgão Competente
Definição de critérios ambientais e sociais mar-14 Divisão de Logística
Elaboração das peças concursais abr-14 Divisão de Logística
Publicitação do concurso mai-14 Divisão de Logística
Receção de propostas
47 dias após
publicação em DR e
JOUE
Divisão de Logística
Adjudicação out-14 Órgão Competente
Preparação do conteúdo das ações
1º semestre
2º semestre
2014-2017
Divisão de Logística
Envio para publicitação
1º semestre
2º semestre
2014-2017
Divisão de Logística
Publicitação da ação
1º semestre
2º semestre
2014-2017
Divisão de Logística
Identificar necessidades de formação 1º semestre 2014
Divisão logística e
área de formação
profissional
Contactar entidade formadora - possibilidade de conjugar com formação dada pelo LNEG em
Lisboa, Algarve?1º semestre 2014
Área de formação
profissional
Definir programa 1º semestre 2014
Divisão logística e
área de formação
profissional
Organização de questões logísticas 1º semestre 2014
Divisão logística e
área de formação
profissional
Formação 1º semestre 2014
Divisão logística e
área de formação
profissional
Identificar o tema/assunto /programa do Seminário 3º trimestre 2014 Divisão logística
Identificar a tipologia de fornecedores 3 º trimestre 2014 Divisão logística
Contatar fornecedores 3 º trimestre 2014 Divisão logística
Convite a oradores (caso necessário) 3 º trimestre 2014 Divisão logística
Organização de questões logísticas 4º trimestre 2014 Divisão logística
Realização do Seminário 4º trimestre 2014 Divisão logística
Identificar o tema/assunto da reunião 3º trimestre 2014 Divisão logística
Identificar a tipologia de fornecedores 3º trimestre 2014 Divisão logística
Organização de questões logísticas 4º trimestre 2014 Divisão logística
Realização da Reunião 4º trimestre 2014 Divisão logística
Elaborar documento com as diretrizes do plano estratégico
Definição anual do n.º/% procedimentos que devem incluir
factores e/ou clausulado de sustentabilidade
Colocação de ações (reuniões/notícias, outros) realizadas na
intranet e internet da CMLoures
Realizar reunião com fornecedores para troca de
experiências/pesquisa de mercado para saber capacidade
de resposta
Realizar concurso para contratação de serviço de controlo
de pragas urbanas
Formação em compras sustentáveis aos técnicos de
compras
Realizar concurso para contratação de serviço de segurança
e vigilância introduzindo critérios ambientais e sociais
Realizar concurso para contratação de serviço de transporte
escolar introduzindo critérios ambientais e socias
Organizar seminário com intuito de sensibilizar os
fornecedores para as boas práticas, no âmbito das compras
sustentáveis
Realizar concurso para serviços de limpeza das instalaçóes
muncipais com inclusão de consumíveis e equipamentos,
para deposição de resíduos sanitários, introduzindo
critérios ambientais e sociais
Realizar concurso para contratação de serviço de transporte
escolar introduzindo critérios ambientais e sociais
Realizar concurso para prestação de serviços de
comunicações (fixos, móveis e dados) introduzindo critérios
ambientais e sociais
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 24
Tabela 6 Dados do procedimento concursal relativo à aquisição do serviço de controlo de pragas urbanas.
Tabela 7 Dados do procedimento concursal relativo à aquisição do serviço de segurança e vigilância para as instalações do
Municpio de Loures.
Tabela 8 Dados do procedimento concursal relativo à aquisição do serviço de transporte escolar.
O tipo de procedimento que foi realizado no âmbito dos projetos-piloto foi conforme se
constata nas tabelas supra, concursos públicos e cujo objeto consta nas referidas tabelas
como designação.
A opção por concurso público, teve essencialmente a ver com as imposições dos limites
previstos no código dos contratos públicos, tendo associada em última análise a vontade
expressa em fomentar o princípio da concorrência que consiste na ideia de acesso público de
todos os interessados aos procedimentos da contratação. Por outras palavras, está em causa
a ideia de que o universo concorrencial não é definido pela entidade adjudicante, antes se
verificando uma apresentação pública das propostas (no concurso público).
A consulta ao mercado foi através de plataforma eletrónica contratada pelo Município
conforme previsto no código dos contratos públicos, evidência que surge nas imagens
seguintes:
TIPO
PROCEDIMENTODESIGNAÇÃO SERVIÇO N.º
DATA
CONTRATO
INÍCIO DE
EXECUÇÃO
PRAZO
EXECUÇÃO
FIM DE
EXECUÇÃOENTIDADE
VALOR
ADJUDICAÇÃO
(S/IVA)
VALOR
ADJUDICAÇÃO
(C/IVA)
Concurso Público
Prestação de serviço de Controlo Preventivo de Pragas
Urbanas (murídeos e espécies da classe insecta e
aracnídia)na área terrirtorial do Município de Loures
DATM/USPA 85/2013 27-09-2013 27-09-2013 24 meses 26-09-2015 Luthisa- Lusitana de Tratamentos de Higiene, Lda 96.078,08 € 118.176,04 €
TIPO
PROCEDIMENTODESIGNAÇÃO SERVIÇO N.º
DATA
CONTRATO
INÍCIO DE
EXECUÇÃO
PRAZO
EXECUÇÃO
FIM DE
EXECUÇÃOENTIDADE
VALOR
ADJUDICAÇÃO
(S/IVA)
VALOR
ADJUDICAÇÃO
(C/IVA)
Concurso PúblicoServiços de segurança e vigilância para instalações do
Município de Loures - Lote I, II, IIIDATA 53/2013 03-07-2013 01-07-2014 12 meses 30-06-2015 Strong-Segurança,S.A. 375.658,27 € 462.059,67 €
TIPO
PROCEDIMENTODESIGNAÇÃO SERVIÇO N.º
DATA
CONTRATO
INÍCIO DE
EXECUÇÃO
PRAZO
EXECUÇÃ
O
FIM DE
EXECUÇÃOENTIDADE
VALOR
ADJUDICAÇÃO
(S/IVA)
VALOR
ADJUDICAÇÃO
(C/IVA)
Concurso Público
Prestação de serviços de transporte escolar para diversos destinos
programados, nos percursos casa/escola, em automóveis ligeiros e
pesados de passageiros, para um total estimado de 633 alunos,
com inclusão de vigilantes para o ano letivo de 2013-2014.
DASE 74/2013 06-09-2013 09-09-2013 9 meses 30-06-2014 Barraqueiro Transportes, S.A. 705.544,00 € 763.139,92 €
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 25
Figura 9 Publicação do Concurso para a aquisição do serviço de controlo da pragas urbanas
O procedimento relativo à Figura 9 recolheu 11 (onze) propostas.
Figura 10 Publicação do Concurso para a aquisição do serviço de transporte escolar.
Neste procedimento (Figura 10) foram rececionadas 2 (duas) propostas.
Figura 11 Publicação do Concurso para a aquisição do serviço de segurança e vigilância nas instalações do Município de
Loures.
Relativamente a este procedimento (Figura 11) foram rececionadas 13 (treze) propostas.
Constata-se que em termos de resultados nenhum dos procedimentos abrangidos pelos
projetos-piloto ficou deserto, o que traduz de forma inequívoca que o mercado teve
capacidade para ir ao encontro das exigências manifestadas por esta autarquia em termos
de conteúdos de cariz social e ambiental.
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 26
5. FASE 5 – MONITORIZAÇÃO E COMUNICAÇÃO
5.1 Cálculo e análise dos indicadores
Tabela 9 Ação para a elaboração de um documento com as directrizes do plano estratégico
Relativamente a esta meta o documento já se encontra concluído.
Tabela 10 Açoes relativas aos procedimentos de compras com inclusão de critérios de sustentabilidade
Ao nível dos indicadores referentes ao n.º de concursos públicos lançados com inclusão de
critérios de sustentabilidade (ambientais e sociais), cuja meta para 2014 era de 35%, constata-
se que de Janeiro a Junho de 2014 já se atingiu a meta definida, mais concretamente 40%,
conforme gráfico infra.
Figura 12 Resultados dos indicadores referentes ao número de concursos públicos lançados com inclusão de critérios de
sustentabilidade.
Goals (step 2) Theme Action Deadline Responsibilities Targets Indicators
Plano estratégico de compras
sustentáveis para o mandato 2013-
2017 dos novos órgãos autárquicos
Procurement processElaborar documento com as diretrizes do
plano estratégicodez-13
Divisão de Logística1 documento Documento elaborado
Goals (step 2) Theme Action Deadline Responsibilities Targets
Procurement process
Definição anual do % concursos públicos
que devem incluir factores e/ou
clausulado de sustentabilidade
2014-2017 Divisão de Logística
Percentagem de
concursos com
indicadores de
sustentabilidade
2014 > =35%
2015 >= 40%
2016 >= 45%
2017 >= 50%
Procurement process
Realizar concurso para contratação de
serviço de segurança e vigilância
introduzindo critérios ambientais e
sociais
jul-13 Divisão de Logística
Procurement process
Realizar concurso para contratação de
serviço de transporte escolar
introduzindo critérios ambientais e
sociais
set-13 Divisão de Logística
Procurement processRealizar concurso para contratação de
serviço de controlo de pragas urbanasmai-13 Divisão de Logística
Procurement process
Realizar concurso para contratação de
serviço de transporte escolar
introduzindo critérios ambientais e
sociais
set-14 Divisão de Logística
Procurement process
Realizar concurso para prestação de
serviços de comunicações (fixos, móveis
e dados) introduzindo critérios
ambientais e sociais
abr-14 Divisão de Logística
Procurement process
Realizar concurso para serviços de
limpeza das instalaçóes muncipais com
inclusão de consumíveis e
equipamentos, para deposição de
resíduos sanitários, introduzindo critérios
ambientais e sociais
out-14 Divisão de Logística
Manutenção de indicadores de
sustentabilidade no quadro de
avaliação e responsabilização da
Divisão de Logística (QUAR)
32% 34% 36% 38% 40%
Metas
Atingidos
2014
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 27
5.2 Resultados
Os resultados positivos decorrentes na participação no projeto são visíveis através do “SPP
diagnosis matrix”
Figura 13 SPP Diagnosis Matrix - Resultados finais
Verifica-se que o score obtido na fase inicial, foi superado em todas as vertentes, estimando-se
que no final do horizonte temporal definido (2017) alcançar os valores de referência.
Os principais benefícios ambientais e/ou sociais obtidos com estes processos de compra
foram:
Pragas urbanas:
o Passou-se a analisar na fonte a origem do problema e a associar a proliferação
das pragas urbanas aos fatores que lhe dão origem, nomeadamente a
existência de deposição ilegal de resíduos, e resolvê-los simultaneamente;
o Aplicação criteriosa de pesticidas reduzindo o impacte ambiental, com a
diminuição de aplicação dos mesmos e exclusivamente quando necessária,
após avaliação técnica no local;
o Reforço no cumprimento de regras contratuais adicionais alusivas às normas
laborais fundamentais das Convenções 29, 87, 98, 100, 105, 111, 138 e 182 da
Organização Internacional do Trabalho (OIT).
Vigilância:
o Redução de consumos e de custos;
o Utilização de fibras biológicas e fibras recicláveis nos fardamentos dos
seguranças;
o Reforço no cumprimento das regras contratuais adicionais alusivas às normas
laborais fundamentais das Convenções 29, 87, 98, 100, 105, 111, 138 e 182 da
Organização Internacional do Trabalho (OIT).
LevelPolicy, strategy and
communicationPeople Market Procurement process Monitoring and results
Susta inable procurement
champion and a working team
identi fied. Regular tra ining for
key procurement s taff.
Performance objectives
include susta inable
procurement factors . These
can include benefi ts achieved.
4
Susta inable procurement
pol icy in place endorsed by
top management.
Communicated to s taff and key
suppl iers .
Susta inable procurement
champion and a working team
identi fied. Al l procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Genera l program of suppl ier
engagement ini tiated with top
management involvement
towards continuous
susta inabi l i ty improvements .
Program involves two way
communication between
procurers and suppl iers .
Inclus ion of susta inabi l i ty
cri teria in key contracts . Li fe
cycle costs (LCC) approach
adopted in some contracts .
Actions are defined to secure
that objectives are atta ined
3
Exis ting susta inable
procurement objectives but no
susta inable procurement
pol icy in place.
Susta inable procurement
champion. Key procurement
s taff has received bas ic
tra ining in susta inable
procurement.
Key suppl iers identi fied based
on expenditure analys is and
susta inabi l i ty impact and
targeted for engagement.
Key susta inabi l i ty objectives
(derived from organization
plans and pol icies ) and
expenditure analys is used for
priori ti sation of contracts .
Analys is of indicators i s
carried out to assess planed
procurement objectives
2
Pockets of excel lence within
purchas ing driven by
individual personal i ties
No ass igned respons ibi l i ties
for susta inable procurement.
Some individuals with bas ic
tra ining in SPP.
Some ad hoc working with
suppl iers on environmental
performance
Expenditure analys is
undertaken and some
contracts include genera l
susta inabi l i ty cri teria .
Contracts awarded on the
bas is of va lue-for-money not
lowest price.
Indicators have been defined
and ca lculated to monitor
actions implementation
regarding people,
procurement process and
market levels
1
No susta inable procurement
pol icy in place or activi ty
undertaken by the
organisation
No ass igned respons ibi l i ties
for susta inable procurement.
No awareness/tra ining in SPP.
No l ia ison with suppl iers
regarding susta inabi l i ty
i s sues
Contracts do not include
susta inabi l i ty aspects .
Compl iance with lega l
requirements .
Results are not monitored.
Score
situação
inicial
3 4 2 2 3
Score
situação
atual
4 5 3 3 4
Score
situação
20175 5 4 4 5
5
Susta inable procurement
pol icy in place, action plan
and regular review with
commitment from top
management. Susta inable
procurement pol icy i s part of a
wider susta inable
development s trategy.
Communicated to s taff,
suppl iers and key
Supply chain improvement
program in place including
susta inabi l i ty audits .
Achievements are formal ly
recorded and best practices
shared with other
organizations .
Susta inabi l i ty cons idered at
an early s tage and in a l l
s tages of the procurement
process . Management actions
to minimize ri sks in
procurement process (lack of
competi tors , non-compl iance
with susta inable cri teria , type
of procedure used, contract
management)
Susta inable procurement
actions are l inked to
organization susta inable
development objectives and
actions
1
2
3
4
5
Matrix
Initial score
Current Score
Final Score
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 28
Transportes escolares
o Redução de Co2 emitido para a atmosfera;
o Utilização de fardamentos com fibras biológicas e recicláveis;
o Redução de sinistralidade.
6. FASE 6 - REVISÃO
Considerou-se oportuno estabelecer como meta da revisão da estratégia do SPP no final do
mandato autárquico que agora decorre e que terminará no 2º semestre de 2017.
Não houve obstáculos de maior, talvez algumas dúvidas iniciais sobre este projeto,
considerando que no período em que decorreu o mesmo haver fortes constrangimentos
económicos e financeiros em termos nacionais e locais, que pontualmente colocaram em
causa se esta seria a altura ideal para implementar um projeto desta natureza.
Pese embora o referido no parágrafo anterior, o projeto foi decorrendo sem entraves de maior
e à medida que ia evoluindo tanto a nível interno (administração, unidades orgânicas
envolvidas) como ao nível externo (fornecedores), foi havendo um reforço da confiança e foi
ficando cada vez mais sólido e estável ao perceber-se as vantagens daí decorrentes e que o
trabalhado realizado pelo líder do projeto e parceiros, seria em muitos aspetos pioneiro
estando a autarquia e os serviços municipais neste momento melhor preparados para os
novos conteúdos provenientes das novas diretivas comunitárias.
7. CONCLUSÕES
Com a participação no projeto e com a implementação dos projetos-piloto, permitiu à
Câmara Municipal de Loures desenvolver e implementar metodologias de compras
sustentáveis. Importa salientar que durante a execução do projeto houve um inegável
enriquecimento de conhecimentos através da informação e acompanhamento prestado
pelo líder do projeto (LNEG) e uma profícua cooperação e partilha entre os restantes
parceiros, salientando-se os seguintes aspetos que consideramos ter obtido ao longo do
período que decorreu o projeto (3 anos):
Tendo em conta a opção consciente em termos de sustentabilidade ambiental e
social adotada pela autarquia, esta, possa ter contribuído para uma mudança da
visão do mercado sobre estas matérias (envolvimento dos fornecedores nos processos
de contratação pública envolvidos nos projetos-piloto);
Ao contrário do que se pressupõe as compras públicas sustentáveis não são no seu
todo mais caras, pelo contrário, ao se considerar o ciclo de vida, ao priorizar-se a
eficiência e redução de desperdício, resultam em economias para a organização,
pelos procedimentos lançados apesar de terem exigências de índole sustentável o que
à partida presumir-se-iam mais caros, não foram expressamente mais dispendiosos para
a autarquia do que os procedimentos da mesma natureza lançados anteriormente;
Com a participação no projeto e na opção por compras públicas sustentáveis e como
a administração pública que é, a câmara municipal de Loures visa a minimização do
impacte de resíduos, imposta por diversa legislação;
5.3. RELATÓRIO PROJETOS-PILOTO - APLICAÇÃO DA SPP TOOLBOX – CM DE LOURES 29
Consideramos que a opção pelas compras públicas sustentáveis melhora a imagem
da autarquia, pois transmitem responsabilidade aos seus munícipes e demonstra que
seus líderes são ambientalmente, socialmente e economicamente eficientes como
gestores públicos.