5 step shaft alignment procedure
DESCRIPTION
Shaft Alignment ProcedureTRANSCRIPT
5-STEP
With all bolts loose align machine to where it looks
aligned by eye. Set up laseralignment system.
Measure, diagnose, and correct Soft Foot with the
assistance of the laser system and feeler gauges.
Measure and correct alignment of the machine
to achieve the final alignment to the required targets within tolerances.
Print the report to document
the alignment.
With feeler gauge find obvious gaps and fill them with shims, taking care of any rough soft
foot condition.
Aim to have all soft foot readings within 2 mils (thou).
Save the alignment file.
The goal is to minimize any coupling strain, and ensure
that the machine is alignable.
Replace damaged shim packs with new, corrosion and crush resistant shims.
Re-tighten bolts to 100% torque.
Ensure the misalignment is less than 15 mils (thou)
at the coupling.
Visual inspection of the foundation, grout,
and baseplate.
Take two sets of measurements to
ensure repeatability.
Clean up: remove rust, scale, paint, dirt from under
and around the feet.
Safety: Lock-out and tag-out of the machines, etc.
Pre-Alignment Checks
Rough Alignment and RoughSoft Foot
Initial Laser Alignment Check
Final Soft FootCheck with
Laser System
Final Alignmentto Tolerance
and Documentation
1 2 3 4 5
LUDECA.COM
2x
SHAFT ALIGNMENT PROCEDURE
Keep it running. © Copyright 2015 by LUDECA, INC. No copying or reproduction of this information, in any form whatsoever, may be undertaken without express written permission of LUDECA, INC. WARNING: The content of this graphic is a basic guide to re-align machines. In practice, more details must be taken into account. LUDECA, INC is not responsible for any damage or injury arising out of the use of this document.
Order No. 01-218-01
<15mils (thou)
100%
2mils (thou)