5 anexo 4 - look ahead 3 week_05 06 15_rev_1

118
THREE-WEEK LOOKAHEAD TSF STARTER DAM K-131 Week Start: May 27, 2015 Week Ending: June 23, 2015 5.38 99621.68 263,878.32 June WEEKLY TOTALS QUANTITY Finally Planned Elevation CONSTRAINTS ACTION REQUIRED COMMENTS ACTIVITY DESCRIPTION WEEK 0 - PLAN THU FRI SAT SUN MON TUE WED May-27 May-28 May-29 May-30 May-31 Jun-01 Jun-02 Total %Progress TRENCH STARTER DAM Zone 4 Material Haulage from BA4 to WD1 833 833 833 - 833 833 833 5,000 m3 114,339 114,339 72% 690 1,875 1,830 510 150 600 285 5,940 119% 76,121 82,061 Zone 4 filling 2,687 2,687 2,687 - 2,687 2,687 2,687 16,120 m3 363,500 363,500 59% Elevation 2516.65 2,721 2,305 2,503 3,157 3,323 3,375 17,384 108% 198,134 215,518 Zone 5 fill (Blanket) 120 120 120 120 120 120 60 780 m3 53,500 53,500 74% Elevation 2542.10 104 104 74 44 133 133 593 76% 38,774 39,366 Zone 6 fill (Blanket) 120 120 120 120 120 120 120 840 m3 53,500 53,500 73% Elevation 2542.10 112 112 80 48 144 144 640 76% 38,661 39,301 Zone 7 fill 70 70 70 70 70 70 70 490 m3 100,000 100,000 80% Elevation 2541.50 52 131 22 52 257 52% 79,751 80,008 Cleaning of Foundation for Zone 7 2,539 msnm Elevation 2543 2,539 100% Dental Concrete – Slopes Trench - m3 8,038 8,038 100% - 8,054 8,054 EXCAVATION DRAIN DRAIN 1 X X X X X X X 400 m3 66,755 66,755 101% 238 227 464 116% 66,755 67,219 DRAIN 2 - m3 18,780 18,780 100% - 18,780 18,780 DRAIN 3 - m3 62,126 62,126 100% - 62,126 62,126 DRAIN 4 X X X X X X X 700 m3 9,032 9,032 188% 140 140 400 313 994 142% 15,965 16,959 DRAIN 5 m3 61,149 61,149 100% - 61,333 61,333 DRAIN 6 - m3 11,847 11,847 100% - 11,847 11,847 BACKFILL DRAIN DRAIN 1 Zone 5 Fill 43 43 43 - 43 43 43 258 m3 20,750 20,750 84% 49 49 49 49 49 49 292 113% 17,035 17,327 Zone 6 Fill 58 58 58 - 58 58 58 348 m3 12,298 12,298 110% 68 68 68 68 68 68 68 479 138% 13,032 13,510 DRAIN 2 Zone 5 Fill - m3 12,288 12,288 17% - 2,124 2,124 Zone 6 Fill - m3 7,001 7,001 31% - 2,202 2,202 Zone 6A Fill - m3 69,875 69,875 100% - 69,875 69,875 Placement of Barrier 0+570@0+610 - - Placement of Z6A Fill 0+570@0+610 - - Massive Z6A Filling 0+570@0+610 - - Installation of HDPE pipe 0+610@0+670 - - Pipe Filling Z6 0+610@0+670 56 56 - - - - - 112 22 22 19% Massive Z6A Filling 0+610@0+670 1,500 1,500 1,500 - 1,500 1,500 1,500 9,000 2,495 2,408 983 187 972 2,117 929 10,091 112% DRAIN 3 Zone 5 Fill 0+000 - 0+150 - m3 176,840 0% - - Zone 6 Fill 0+000 - 0+150 - m3 9,904 0% - - Zone 6A Fill 0+000 - 0+150 - m3 82,669 0% - - Installation of pipes (HDPE) - m - - Zone 4 - m3 - - EL avance va de acuerdo al avance de SMCV Prog. 0+190 a 0+240, Elevacion 2372 a 2373.8 Prog. 0+585 a 0+595, Elevacion 2403.85 a 2404.05 Error en rendimiento por mala planificacion

Upload: manuel-campos-lopez

Post on 06-Nov-2015

223 views

Category:

Documents


4 download

DESCRIPTION

Look ahead

TRANSCRIPT

PAC

THREE-WEEK LOOKAHEADTSF STARTER DAM K-13142151.042178.05.3899621.68263,878.324589JuneWEEKLY TOTALSJuneWEEKLY TOTALSJuneWEEKLY TOTALSJuneWEEKLY TOTALSQUANTITYFinally Planned ElevationCONSTRAINTSACTION REQUIREDCOMMENTSRATIOActual weekActivity weightWeek 1Activity weightACTIVITY DESCRIPTIONActivity CriticalSHIGTACTUAL scheduleBASELINEVARIANCEWEEK 0 - PLANWEEK 1 - PLANWEEK 2 - PLANWEEK 3THUFRISATSUNMONTUEWEDTHUFRISATSUNMONTUEWEDTHUFRISATSUNMONTUEWEDTHUFRISATSUNMONTUEWEDUnittotalStartFinishStartFinishMay-27May-28May-29May-30May-31Jun-01Jun-02Jun-03Jun-04Jun-05Jun-06Jun-07Jun-08Jun-09Jun-10Jun-11Jun-12Jun-13Jun-14Jun-15Jun-16Jun-17Jun-18Jun-19Jun-20Jun-21Jun-22Jun-23Total%Progress

TRENCH STARTER DAM

Zone 4 Material Haulage from BA4 to WD1DN14-Feb-1501-Jul-1514-Feb-1501-Jul-1508338338330.08338338335,0008338338338338338335,0008338338338338338335,0008338338338338338335,000m3114,339114,33972%0.271,366.500.070%1,366.500.070%Task TBD916901,8751,8305101506002855,940119%0.00.00.076,12182,0611,623.40Zone 4 fillingDN23-Mar-14 A24-Oct-1523-Mar-1407-Sep-1501-Jan-702,6872,6872,6870.02,6872,6872,68716,1202,6872,6872,6872,6872,6872,68716,1202,6872,6872,6872,6872,6872,68716,1202,6872,6872,6872,6872,6872,68716,120m3363,500363,50059%Elevation 2516.650.497,918.980.406%7,918.980.406%Task 322,7212,3052,5033,1573,3233,37517,384108%0.00.00.0198,134215,5188,539.87Zone 5 fill (Blanket)DN03-May-14 A14-Jul-1503-May-1412-Aug-152912012012012012012060780120120120120120120120840120120120120120120120840120120120120120120120840m353,50053,50074%Elevation 2542.100.38300.120.015%323.200.017%Task 44104104744413313359376%0.00.00.038,77439,366227.97Zone 6 fill (Blanket)DN03-May-14 A14-Jul-1503-May-1412-Aug-1529120120120120120120120840120120120120120120120840120120120120120120120840120120120120120120120840m353,50053,50073%Elevation 2542.100.38323.200.017%323.200.017%Task 44112112804814414464076%0.00.00.038,66139,301246.25Zone 7 fillDN06-Jun-14 A12-Aug-1506-Jun-1424-Aug-151270707070707070490707070707070704907070707070707049070707070707070490m3100,000100,00080%Elevation 2541.50EL avance va de acuerdo al avance de SMCV0.30146.430.008%146.430.008%Task 4552131225225752%0.00.00.079,75180,00876.80Cleaning of Foundation for Zone 7D06-Jun-14 A12-Aug-1506-Jun-1424-Aug-15122,5392,5422,5452,548msnm Elevation 25430.00.00.000%0.00.000%02,539100%0.00.00.00.0Dental Concrete Slopes TrenchD01-Apr-14 A25-Jul-1501-Apr-1406-Aug-15120.00.00.00.0m38,0388,038100%6.720.00.000%0.00.000%Task 390.0 0.00.00.08,0548,0540.0Grout Holes Drilling -Starter DamDN21-Jan-14 A15-May-1521-Jan-1418-Jan-15ERROR:#VALUE!0.00.00.0m310,92710,927107%7.560.00.000%0.00.000%Task 42XXXXXXX0.0 0.00.00.011,63911,6390.0EXCAVATION DRAIN

DRAIN 107-Sep-13 A24-May-1507-Sep-1318-Feb-15-95XXXXXXX4000.00.00.0m366,75566,755101%0.120.00.000%0.00.000%Task 5238227464116%0.00.00.066,75567,21954.89 DRAIN 2DN10-Mar-14 A06-Jul-1510-Mar-1428-Dec-14-1900.00.00.00.0m318,78018,780100%0.120.00.000%0.00.000%Task 50.0 0.00.00.018,78018,7800.0 DRAIN 3CRITICALDN08-Dec-14 A18-Aug-1510-Dec-1404-Mar-15-1670.00.00.00.0m362,12662,126100%0.120.00.000%0.00.000%Task 50.0 0.00.00.062,12662,1260.0 DRAIN 4DN24-Oct-14 A18-Aug-1515-Sep-1427-Apr-15-113XXXXXXX700XXXXX50XXXXX50XXXXX50m39,0329,032188%0.120.00.000%0.00.000%Task 5140140400313994142%0.00.00.015,96516,959117.44 DRAIN 5DN10-Mar-14 A14-Sep-1510-Mar-1409-Jul-15-67XXXXX50XXXXX50XXXXX50m361,14961,149100%0.120.00.000%0.00.000%Task 50.0 0.00.00.061,33361,3330.0 DRAIN 6DN18-Feb-15 A04-Nov-1510-Jul-1529-Aug-15-670.00.00.00.0m311,84711,847100%0.120.00.000%0.00.000%Task 50.0 0.00.00.011,84711,8470.0BACKFILL DRAIN

DRAIN 107-Sep-13 A24-May-1507-Sep-1318-Feb-15-95Zone 5 Fill4343430.0434343258626262626262371626262626262371626262626262371m320,75020,75084%Prog. 0+190 a 0+240, Elevacion 2372 a 2373.80.2770.510.004%101.500.005%Task TBD910494949494949292113%0.00.00.017,03517,32779.80Zone 6 Fill5858580.05858583480.00.046464646464646323m312,29812,298110%0.59206.220.011%0.00.000%Task 9068686868686868479138%0.00.00.013,03213,510283.73 DRAIN 210-Mar-14 A06-Jul-1510-Mar-1428-Dec-14-190Zone 5 FillDN00.0m312,28812,28817%0.590.00.000%0.00.000%Task 80.0 0.00.00.02,1242,1240.0Zone 6 FillDN0.00.00.00.0m37,0017,00131%0.590.00.000%0.00.000%Task 90.0 0.00.00.02,2022,2020.0Zone 6A FillDN0.00.00.00.0m369,87569,875100%Prog. 0+585 a 0+595, Elevacion 2403.85 a 2404.050.670.00.000%0.00.000%Task 1000.0 0.00.00.069,87569,8750.0Placement of Barrier 0+570@0+6100.00.00.67Task 100.0 0.0Placement of Z6A Fill 0+570@0+6100.01431432860.67Task 100.0 0.0Massive Z6A Filling 0+570@0+6100.01,5001,5001,5001,5006,0000.00.00.67Task 100.0 0.00.00.0Installation of HDPE pipe 0+610@0+6700.020202.67Task 70.0 0.0Pipe Filling Z6 0+610@0+67056560.00.00.00.00.011256561120.00.0Error en rendimiento por mala planificacion0.59Task 9222219%0.00.00.0Massive Z6A Filling 0+610@0+6701,5001,5001,5000.01,5001,5001,5009,0005005001,0001001001001001001001007000.67Task 102,4952,4089831879722,11792910,091112%0.00.0 DRAIN 308-Dec-14 A25-Jan-1615-Sep-1411-Aug-15-167Zone 5 Fill 0+000 - 0+150CRITICAL00.00.00.00.0m3176,8400%0.590.00.000%0.00.000%Task 80.0 0.00.00.00.00.0Zone 6 Fill 0+000 - 0+150CRITICAL00.00.00.0404040404040240m39,9040%0.590.00.000%0.00.000%Task 90.0 0.00.00.00.00.0Zone 6A Fill 0+000 - 0+150CRITICAL0+64000.00.00.02312312312312312312311,619m382,6690%0.670.00.000%0.00.000%Task 100.0 0.00.00.00.00.0Installation of pipes (HDPE)00.0XXXXXXX12XXXXXXX12m 2.670.00.000%0.00.000%Task 70.0 0.00.00.00.00.0Zone 4CRITICAL00.00.00.00.0m3 0.490.00.000%0.00.000%Task 320.0 0.00.00.00.00.0 DRAIN 424-Oct-14 A18-Aug-1515-Sep-1427-Apr-15-113Zone 5 FillDN00.00.00.00.00.0m311,98911,9893%0.590.00.000%0.00.000%Task 80.0 0.00.00.03913910.0Zone 6 FillDN03333330.0333333200333333333333200333333333333200104104104104104104625m36,0776,077110%Prog. 0+176 a 0+231.7, Elevacion 2433.70 a 2450.0Error en rendimiento por mala planificacion0.59118.520.006%118.520.006%Task 976434316281%0.00.00.06,5316,69396.00Zone 6A FillDN01671671670.01671671671,0020.04574574574574574572,7404574574574574574572,740m329,76529,765109%Prog. 0+176 a 0+231, Elevacion 2403.85 a 2404.15.0.67669.250.034%0.00.000%Task 101981981981981981981,188119%0.00.00.031,19132,379793.48Installation of pipes (HDPE)DN00.0XXXXX12m0.00.0 2.670.00.000%0.00.000%Task 70.0 0.00.00.054540.0Zone 40+075XXX0.0XXX50XXXXXX50XXXXX50XXXXX50m3242461608%Prog. 0+140 a 0+159, Elevacion 2426.80 a 1430.300.490.00.000%0.00.000%Task 320XXX0.0XXX50100%0.00.00.014,78614,7860.0 DRAIN 510-Mar-14 A14-Sep-1510-Mar-1409-Jul-15-67Zone 5 FillDN00.00.00.00.00.00.00.00.00.00.00.0m323,02023,0201%0.590.00.000%0.00.000%Task 80+460280280 0.00.00.00.0280165.53Zone 6 FillDN01501501500.01501501509001501501501501501509001501501501501501509004174174174174174172,500m411,96311,96340%Error en la planificacin por rendimiento0.59533.330.027%533.330.027%Task 90+1900+460547635648654%0.00.00.04,2664,752288.00Zone 6A FillD4834834830.04834834832,9004834834834834834832,9004834834834834834832,9002782782782782787782,165m574,32674,326111%Error en la planificacin por rendimiento0.671,936.940.099%1,936.940.099%Task 100+1700+460321,0371401,21042%0.00.00.081,08782,296807.91Installation of pipes (HDPE) DN12m 2.670.00.000%0.00.000%Task 70+2050+46012100%0.00.00.02252250.0Zone 4 FillDNXXXXXXX50XXXXXX50XXXXXX50XXXXXX50m32052050%0.490.00.000%0.00.000%Task 320+2200XXX0.0XXX50100%0.00.00.00.00.00.0 DRAIN 618-Feb-15 A04-Nov-1510-Jul-1529-Aug-15-67Zone 5 FillDN00.00.00.00.0m37,0357,035100%0.590.00.000%0.00.000%Task 80.0 0.00.00.07,0357,0350.0Zone 6 FillDN6161610.0616161365616161616161365616161616161365616161616161365m33,6533,653101%Error en la planificacin por rendimiento0.59216.470.011%216.470.011%Task 922226%0.00.00.03,6753,69712.80Zone 6A FillDN1141141140.01141141146831141141141141141146831141141141141141146832282282282282282281,365m313,65413,654101%Prog. 0+000 a 0+054, Elevacion 2516.70 a 2521.10Error en la planificacin por rendimiento0.67455.980.023%455.980.023%Task 1015115122%0.00.00.013,65413,805100.99Installation of pipes (HDPE) DNm3 2.670.00.000%0.00.000%Task 7 0.00.00.00.00.00.0Zone 4 FillDNXXXXXXX50XXXXXXX50XXXXXXX50XXXXXXX50m30.00.0 0.490.00.000%0.00.000%Task 320XXX0.0XXX50100%0.00.00.00.00.00.0SEEPAGE COLLECTION SYSTEM

Drilling Grout Holes -Seepage Collection Sump DN26-Sep-14 A29-Apr-15 A21-Jan-1418-Jan-15ERROR:#VALUE!0.00.00.00.0ml13,30013,300106%7.560.00.000%0.00.000%Task 420.0 0.00.00.014,09314,0930.0FillingsDN00.00.00.00.0m37,7757,77567%0.00.000%0.00.000%0.0 0.00.00.05,1925,1920.0Concrete in Foundation Spillway Fill (AD 105)0.0505050500.0m30.0 0.00.00.0914914Conveyance Channel Excavation DN0.015015015015015015090015015015015015015090015015015015015015090041,17341,17322%0.110.00.000%97.720.005%Task 2500.0 0.00.00.0m38,9498,9490.0Filling Rip Rap - Zone 6A23-Mar-1526-Mar-150.00.01.07Task 260.0 0.0802802Installation of geomembrane23-Mar-1526-Mar-150.05050505050503005050505050503000.27Task 20Task 210.0 0.00.0MATERIAL PRODUCTION

Zone 5DN05-Sep-13 A25-Oct-1505-Sep-1318-Jul-15-991,8331,8331,8330.01,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,000m3370,000370,00081%Falla de equipos0.141,574.220.081%1,574.220.081%Task 2901,5091,4791,8341,0761,2021,1931,6129,90590%0.00.00.0289,516299,4211,417.48Zone 6DN05-Sep-13 A22-Apr-15 A05-Sep-1315-Jul-15ERROR:#VALUE!1,8331,8331,8330.01,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,000m3329,250329,25096%Falla de equipos0.353,801.700.195%3,801.700.195%Task 3001,8931,5941,4896901,2821,1961,7949,93890%0.00.00.0305,116315,0543,434.66Zone 2BDN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15-951,3331,3331,3330.01,3331,3331,3338,0001,3331,3331,3331,3331,3331,3338,0001,3331,3331,3331,3331,3331,3338,0001,3331,3331,3331,3331,3331,3338,000m3405,000405,00075%Falla de equipos0.141,144.890.059%1,144.890.059%Task 319591,1737625361,0991,0891,2436,85986%0.00.00.0297,000303,859981.53

Zone 4DN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15-953503503500.03503503502,1003503503501,0503503503503503503502,1003503503503503503502,100m3780,000780,00080%0.491,031.630.053%515.810.026%Task 325408617056692,775132%0.00.00.0618,845621,6201,363.22Zone 6ADN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15-953503503500.04004004002,2503503503501,0503503503503503503502,1003503503503503503502,100m3559,000559,00080%0.671,502.800.077%701.310.036%Task 103907837745162,463109%0.00.00.0447,018449,4811,645.07Production of dirty sandDN0.00.00.00.03503503501,0504004004001,2004004004004004004002,4004004004004004004002,400m3 0.00.000%0.00.000%3503503501,050100%0.00.00.00.029,630.951.52%26,348.2525,023.4127,104.6629,214.861.50%1.35%1.28%1.39%TOTAL HOURS1,951,271.25

TOTAL HOURS1,780,927.11

TOTAL GANADAS22,356.82

3WEEK

THREE-WEEK LOOKAHEADTSF STARTER DAM K-13142159.0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!4589JuneWEEKLY TOTALSJuneWEEKLY TOTALSJuneWEEKLY TOTALSQUANTITYCONSTRAINTSACTION REQUIREDCOMMENTSRATIOActual weekActivity weightWeek 1Activity weightACTIVITY DESCRIPTIONSHIGTACTUAL scheduleBASELINEVARIANCEWEEK 1 - PLANWEEK 2 - PLANWEEK 3 - PLANTHUFRISATSUNMONTUEWEDTHUFRISATSUNMONTUEWEDTHUFRISATSUNMONTUEWEDUnittotalStartFinishStartFinishJun-04Jun-05Jun-06Jun-07Jun-08Jun-09Jun-10Jun-11Jun-12Jun-13Jun-14Jun-15Jun-16Jun-17Jun-18Jun-19Jun-20Jun-21Jun-22Jun-23Jun-24Total%Progress

TRENCH STARTER DAM

Zone 4 Material Haulage from BA4 to WD1DN14-Feb-1501-Jul-1514-Feb-1501-Jul-1506676676676676676674,0006676676676676676674,0006676676676676676674,000m3114,339114,33967%0.271,093.200.056%1,093.200.056%Task TBD910.00.00.076,12176,1210.0Zone 4 fillingDN23-Mar-14 A24-Oct-1523-Mar-1407-Sep-1501-Jan-702,6872,6872,6872,6872,6872,68716,1202,6872,6872,6872,6872,6872,68716,1202,6872,6872,6872,6872,6872,68716,120m3363,500363,50055%0.497,918.980.406%7,918.980.406%Task 320.00.00.0198,134198,1340.0Zone 5 fill (Blanket)DN03-May-14 A14-Jul-1503-May-1412-Aug-15ERROR:#VALUE!120120120120120120120840120120120120120120120840120120120120120120120840m353,50053,50072%0.38323.200.017%323.200.017%Task 440.00.00.038,77438,7740.0Zone 6 fill (Blanket)DN03-May-14 A14-Jul-1503-May-1412-Aug-15ERROR:#VALUE!120120120120120120120840120120120120120120120840120120120120120120120840m353,50053,50072%0.38323.200.017%323.200.017%Task 440.00.00.038,66138,6610.0Zone 7 fillDN06-Jun-14 A12-Aug-1506-Jun-1424-Aug-15ERROR:#VALUE!707070707070704907070707070707049070707070707070490m3100,000100,00080%0.30146.430.008%146.430.008%Task 450.00.00.079,75179,7510.0Cleaning of Foundation for Zone 7D06-Jun-14 A12-Aug-1506-Jun-1424-Aug-15ERROR:#VALUE!2,5452,5482,551msnm 0.00.00.000%0.00.000%00.00.00.0Dental Concrete Slopes TrenchD01-Apr-14 A25-Jul-1501-Apr-1406-Aug-15ERROR:#VALUE!0.00.00.0m38,0388,038100%6.720.00.000%0.00.000%Task 390.00.00.08,0548,0540.0Grout Holes Drilling -Starter DamDN21-Jan-14 A15-May-1521-Jan-1418-Jan-15ERROR:#VALUE!0.00.0m310,92710,927107%7.560.00.000%0.00.000%Task 420.00.00.011,63911,6390.0EXCAVATION DRAIN

DRAIN 107-Sep-13 A24-May-1507-Sep-1318-Feb-15-95XXXXXXX50XXXXXXX50XXXXXXX50m366,75566,755100%0.120.00.000%0.00.000%Task 50.00.00.066,75566,7550.0 DRAIN 2DN10-Mar-14 A06-Jul-1510-Mar-1428-Dec-14ERROR:#VALUE!XXXXXXX50XXXXXXX50XXXXXXX50m318,78018,780100%0.120.00.000%0.00.000%Task 50.00.00.018,78018,7800.0 DRAIN 3DN08-Dec-14 A18-Aug-1510-Dec-1404-Mar-15-1673,659m362,12662,126100%0.120.00.000%0.00.000%Task 50.00.00.062,12662,1260.0 DRAIN 4DN24-Oct-14 A18-Aug-1515-Sep-1427-Apr-15ERROR:#VALUE!XXXXXX4003,659XXXXXX400XXXXXX400m39,0329,032177%0.120.00.000%0.00.000%Task 50.00.00.015,96515,9650.0 DRAIN 5DN10-Mar-14 A14-Sep-1510-Mar-1409-Jul-15-67m361,14961,149100%0.120.00.000%0.00.000%Task 50.00.061,33361,3330.0 DRAIN 6DN18-Feb-15 A04-Nov-1510-Jul-1529-Aug-15ERROR:#VALUE!0.00.00.0m311,84711,847100%0.120.00.000%0.00.000%Task 50.00.00.011,84711,8470.0BACKFILL DRAIN

DRAIN 107-Sep-13 A24-May-1507-Sep-1318-Feb-15-95Dren A1 (0+000 to 0+354)Zone 5 Fill124124124124124124743626262626262371626262626262371m320,75020,75082%0.27203.010.010%101.500.005%Task TBD9100.00.00.017,03517,0350.0Zone 6 Fill0.00.00.0m312,29812,298106%0.590.00.000%0.00.000%Task 900.00.00.013,03213,0320.0Zone 6A Fill0.0464646464646277464646464646277m312,29812,298106%0.590.00.000%164.270.008%Task 900.00.00.013,03213,0320.0 DRAIN 210-Mar-14 A06-Jul-1510-Mar-1428-Dec-14ERROR:#VALUE!Dren A2 (0+354 to 0+585)Zone 5 FillDN03393393391,016339339339339339339339339339339339339m312,28812,28817%0.59600.850.031%1,201.700.062%Task 80.00.00.02,1242,1240.0Zone 6 FillDN116116116116116116698116116116116116116698116116116116116116698m37,0017,00131%0.59413.630.021%413.630.021%Task 90.00.00.02,2022,2020.0Zone 6A FillDN4224224224224224222,5324224224224224224222,5324224224224224224222,532m369,87569,875100%0.671,691.150.087%1,691.150.087%Task 1000.00.00.069,87569,8750.0 DRAIN 308-Dec-14 A25-Jan-1615-Sep-1411-Aug-15ERROR:#VALUE!Dren A3 (0+585 @ 0+800)Zone 5 Fill 0+000 - 0+15000.00.00.0m3176,840176,840100%0.590.00.000%0.00.000%Task 80.00.00.0176,840176,8400.0Zone 6 Fill 0+000 - 0+15000.00.00.0m39,9049,904101%0.590.00.000%0.00.000%Task 90.00.00.010,01210,0120.0Zone 6A Fill 0+000 - 0+1500+64000.00.00.0m382,66982,669100%0.670.00.000%0.00.000%Task 100.00.00.082,66982,6690.0Installation of pipes (HDPE)00.012m 2.670.00.000%0.00.000%Task 70.00.00.017170.0Dren A3 (0+800 @ 0+1120)Zone 5 Fill 0+000 - 0+15000.00.00.0m3176,840176,840100%0.590.00.000%0.00.000%Task 80.00.00.0176,840176,8400.0Zone 6 Fill 0+000 - 0+15000.00.00.0m39,9049,904101%0.590.00.000%0.00.000%Task 90.00.00.010,01210,0120.0Zone 6A Fill 0+000 - 0+1500+64000.00.00.0m382,66982,669100%0.670.00.000%0.00.000%Task 100.00.00.082,66982,6690.0Installation of pipes (HDPE)00.012m 2.670.00.000%0.00.000%Task 70.00.00.017170.0 DRAIN 424-Oct-14 A18-Aug-1515-Sep-1427-Apr-15ERROR:#VALUE!Dren A4 (0+020 @ 0+100, Elevacion 2390 @ 2420)Zone 5 FillDN00.0333333333333201333333333333201m311,98911,9893%0.590.00.000%118.740.006%Task 80.00.00.03913910.0Zone 6 FillDN0171717171717101343434343434203343434343434203m36,0776,077107%0.5960.000.003%120.000.006%Task 90.00.00.06,5316,5310.0Zone 6A FillDN00.0808080808080482808080808080482m329,76529,765105%0.670.00.000%322.100.017%Task 100.00.00.031,19131,1910.0Installation of pipes (HDPE)DN0XXXXXXX12XXXXXXX12XXXXXXX12m0.00.0 2.670.00.000%0.00.000%Task 70.00.00.054540.0Zone 40+075XXXXXXX50XXXXXXX50XXXXXXX50m3242461608%0.490.00.000%0.00.000%Task 3200.00.014,78614,7860.0Dren A4 (0+100 @ 0+250, Elevacion 2420 @ 2460)Zone 5 FillDN00.00.00.0m311,98911,9893%0.590.00.000%0.00.000%Task 80.00.00.03913910.0Zone 6 FillDN00.00.00.0m36,0776,077107%0.590.00.000%0.00.000%Task 90.00.00.06,5316,5310.0Zone 6A FillDN00.00.00.0m329,76529,765105%0.670.00.000%0.00.000%Task 100.00.00.031,19131,1910.0Installation of pipes (HDPE)DN00.0m0.00.0 2.670.00.000%0.00.000%Task 70.00.00.054540.0Zone 40+075m3242461608%0.490.00.000%0.00.000%Task 3200.00.014,78614,7860.0Dren A4 (0+250 @ 0+390, Elevacion 2460 @ 2510)Zone 5 FillDN00.00.00.0m311,98911,9893%0.590.00.000%0.00.000%Task 80.00.00.03913910.0Zone 6 FillDN00.00.00.0m36,0776,077107%0.590.00.000%0.00.000%Task 90.00.00.06,5316,5310.0Zone 6A FillDN00.00.00.0m329,76529,765105%0.670.00.000%0.00.000%Task 100.00.00.031,19131,1910.0Installation of pipes (HDPE)DN00.0m0.00.0 2.670.00.000%0.00.000%Task 70.00.00.054540.0Zone 40+075m3242461608%0.490.00.000%0.00.000%Task 3200.00.014,78614,7860.0 DRAIN 510-Mar-14 A14-Sep-1510-Mar-1409-Jul-15-67Dren A5 (0+000 @ 0+240, Elevacion 2380 @ 2430)Zone 5 FillDN00.0134134134134134134803134134134134134134803m323,02023,0200%0.590.00.000%474.650.024%Task 80+4600.00.00.00.00.00.0Zone 6 FillDN0252525252525149252525252525149252525252525149m411,96311,96336%0.5988.360.005%88.360.005%Task 90+1900+4600.00.00.04,2664,2660.0Zone 6A FillD0.0414141414141249414141414141249m574,32674,326109%0.670.00.000%165.980.009%Task 100+1700+4600.00.00.081,08781,0870.0Installation of pipes (HDPE) DNXXXXXXX12XXXXXXX12XXXXXXX12m 2.670.00.000%0.00.000%Task 70+2050+4600.00.02252250.0Zone 4 FillDNXXXXXXX50XXXXXXX50m32052050%0.490.00.000%0.00.000%Task 320+22000.00.00.00.00.0Dren A5 (0+240 @ 0+440, Elevacion 2430 @ 2480)Zone 5 FillDN00.00.00.0m323,02023,0200%0.590.00.000%0.00.000%Task 80+4600.00.00.00.00.00.0Zone 6 FillDN00.00.00.0m411,96311,96336%0.590.00.000%0.00.000%Task 90+1900+4600.00.00.04,2664,2660.0Zone 6A FillD0.00.00.0m574,32674,326109%0.670.00.000%0.00.000%Task 100+1700+4600.00.081,08781,0870.0Installation of pipes (HDPE) DNm 2.670.00.000%0.00.000%Task 70+2050+4600.00.02252250.0Zone 4 FillDNm32052050%0.490.00.000%0.00.000%Task 320+22000.00.00.00.00.0Dren A5 (0+440 @ 0+600, Elevacion 2480 @ 2520)Zone 5 FillDN00.00.00.0m323,02023,0200%0.590.00.000%0.00.000%Task 80+4600.00.00.00.00.00.0Zone 6 FillDN00.0262626262626154262626262626154m411,96311,96336%0.590.00.000%91.140.005%Task 90+1900+4600.00.00.04,2664,2660.0Zone 6A FillD0.0707070707070417707070707070417m574,32674,326109%0.670.00.000%278.520.014%Task 100+1700+4600.00.081,08781,0870.0Installation of pipes (HDPE) DNm 2.670.00.000%0.00.000%Task 70+2050+4600.00.02252250.0Zone 4 FillDNm32052050%0.490.00.000%0.00.000%Task 320+22000.00.00.00.00.0Dren A5 (0+440 @ 0+600, Elevacion 2480 @ 2520)Zone 5 FillDN00.00.00.0m323,02023,0200%0.590.00.000%0.00.000%Task 80+4600.00.00.00.00.00.0Zone 6 FillDN00.00.00.0m411,96311,96336%0.590.00.000%0.00.000%Task 90+1900+4600.00.00.04,2664,2660.0Zone 6A FillD0.00.00.0m574,32674,326109%0.670.00.000%0.00.000%Task 100+1700+4600.00.00.081,08781,0870.0Installation of pipes (HDPE) DNm 2.670.00.000%0.00.000%Task 70+2050+4600.00.02252250.0Zone 4 FillDNm32052050%0.490.00.000%0.00.000%Task 320+22000.00.00.00.00.0Dren A5 (0+600 @ 0+690, Elevacion 2520 @ 2540)Zone 5 FillDN00.00.00.0m323,02023,0200%0.590.00.000%0.00.000%Task 80+4600.00.00.00.00.00.0Zone 6 FillDN00.00.00.0m411,96311,96336%0.590.00.000%0.00.000%Task 90+1900+4600.00.00.04,2664,2660.0Zone 6A FillD0.00.00.0m574,32674,326109%0.670.00.000%0.00.000%Task 100+1700+4600.00.00.081,08781,0870.0Installation of pipes (HDPE) DNm 2.670.00.000%0.00.000%Task 70+2050+4600.00.02252250.0Zone 4 FillDNm32052050%0.490.00.000%0.00.000%Task 320+22000.00.00.00.00.0 DRAIN 618-Feb-15 A04-Nov-1510-Jul-1529-Aug-15ERROR:#VALUE!Dren A6 (0+000 @ 0+200, Elevacion 2510 @ 2560)Zone 5 FillDN0575757575757343575757575757343575757575757343m37,0357,035100%0.59202.950.010%202.950.010%Task 80.00.00.07,0357,0350.0Zone 6 FillDN242424242424143484848484848287484848484848287m33,6533,653101%0.5984.980.004%169.950.009%Task 90.00.00.03,6753,6750.0Zone 6A FillDN128128128128128128770646464646464385646464646464385m313,65413,654100%0.67513.960.026%256.980.013%Task 100.00.00.013,65413,6540.0Installation of pipes (HDPE) DNXXXXXXX12XXXXXXX12XXXXXXX12m3 2.670.00.000%0.00.000%Task 70.00.00.00.00.0Zone 4 FillDNXXXXXXX50XXXXXXX50XXXXXXX50m30.00.0 0.490.00.000%0.00.000%Task 3200.00.00.00.00.0SEEPAGE COLLECTION SYSTEM

Filling0.00.00.0m30.00.00.0914914Concrete in Foundation Spillway Fill (AD 105)DN505050500.041,17341,17322%0.115.430.000%5.430.000%Task 2500.00.00.0m38,9498,9490.0Filling Rip Rap - Zone 6A23-Mar-1526-Mar-150.00.01.07Task 260.00.0802802CANAL DE CONDUCCION4208642089000.2748850575Task 20Task 2100Trabajos Preliminares0.00.00.0m3Encausamiento de agua de filtracionDNXXXXX0.00.00.041,17341,17322%0.110.00.000%0.00.000%Task 2500.00.00.0m38,9498,9490.0Barrera de filtraciones23-Mar-1526-Mar-150.0XXX0.01.07Task 260.00.0802802Excavaciones0.00.00.0m3Excavacion en rocaDN0.00.00.00.088888248841,17341,17322%0.110.870.000%2.610.000%Task 2500.00.00.0m38,9498,9490.0Excavacion de material sueltoDN0.03003003003000.00.00.01,2000.041,17341,17322%0.110.00.000%130.290.007%Task 2500.00.00.0m38,9498,9490.0Excavacion caja y perfilado (prog. 0+000 to 0+500)23-Mar-1526-Mar-150.07373737373737373731.07Task 260.00.0802802Excavacion caja y perfilado (prog. 0+740 to 0+1057)0.0464646464646464646323m30.00.00.0914914RellenosDN0.00.00.041,17341,173 0.110.00.000%0.00.000%Task 25Relleno 23-Mar-1526-Mar-150.00.00.00.00.00.03903907803903903903903901.07Task 260.00.0802802Instalacion de Geomenbrana0.00.00.0m3Colocacion de GeomenbranaDN0.00.00.041,17341,17322%0.110.00.000%0.00.000%Task 2500.00.00.0m38,9498,9490.0MATERIAL PRODUCTION

Zone 5DN05-Sep-13 A25-Oct-1505-Sep-1318-Jul-15-991,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,000m3370,000370,00078%0.141,574.220.081%1,574.220.081%Task 2900.00.00.0289,516289,5160.0Zone 6DN05-Sep-13 A22-Apr-15 A05-Sep-1315-Jul-15ERROR:#VALUE!1,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,0001,8331,8331,8331,8331,8331,83311,000m3329,250329,25093%0.353,801.700.195%3,801.700.195%Task 3000.00.00.0305,116305,1160.0Zone 2BDN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15ERROR:#VALUE!1,3331,3331,3331,3331,3331,3338,0001,3331,3331,3331,3331,3331,3338,0001,3331,3331,3331,3331,3331,3338,000m3405,000405,00073%0.141,144.890.059%1,144.890.059%Task 310.00.00.0297,000297,0000.0

Zone 4DN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15ERROR:#VALUE!3503503503503501751,9253503503503503501751,9253503503503503501751,925m3780,000780,00079%0.49945.660.048%945.660.048%Task 320.00.00.0618,845618,8450.0Zone 6ADN30-Jan-14 A31-Jul-1530-Jan-1427-Apr-15ERROR:#VALUE!4004004004004002002,2004004004004004002002,2004004004004004002002,200m3559,000559,00080%0.671,469.410.075%1,469.410.075%Task 100.00.00.0447,018447,0180.0Produccion de material AluvialDN3003003003003003001,8003003003003003003001,8003003003003003003001,800m3 0.00.000%0.00.000%0.00.00.00.0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!TOTAL HOURS1,951,271.25

TOTAL HOURS1,780,927.11

TOTAL GANADASERROR:#REF!

Hoja2Task 4Rock Excavation-DrainsDrainsFront Work #100JM39330068283.254068283.25468283.2544474732545.62Task 5Unclassified excavation-DrainsDrainsFront Work #100AM335230142353.292247.192142353.292142106.1375016825.835Task 5Rippable material excavation-DrainsDrainsFront Work #100AM31897083170002197942.13Task 6Geotextile-DrainsDrainsFront Work #100KM266500665000164121641277157715Task 7HDPE Drain Pipe-DrainsDrainsFront Work #109ALM35003500122312230093299329Task 8Zone 5 SCS FilterDrainsFront Work #100BM390000900006324229.424166.45320553205Task 9Zone 6 -DrainDrainsFront Work #1010BM36100061000020941.620941.63614836148Task 10Zone 6A Course DrainDrainsFront Work #1010BM34300004300004762278229.1273467.1287202287202Task 11Seepage BarrierDrainsFront Work #109ALM2700270000035983598Task 12Geotextile - Seepage Conveyance ChannelSeepage Conveyance ChannelFront Work #200KM275007500000870870Task 13Geomembrane - Seepage Conveyance ChannelSeepage Conveyance ChannelFront Work #200KM27500750000087168716Task 14Structrual Concrete for Measurement WeirSeepage Conveyance ChannelFront Work #210GM350500313112751275Task 15Structural Concrete for Grout Cap Seepage Collection SumpSeepage Collection SumpFront Work #210PM380080008008001051810518Task 16Drilling Grout Holes -Seepage Collection SumpSeepage Collection SumpFront Work #200ILM133001330009705.69705.67836078360Task 17Water Pressure Testing of Grout Holes -Seepage Collection SumpSeepage Collection SumpFront Work #200EEA550550037737732933293Task 18Grouting with Portland Cement Grout -Seepage Collection SumpSeepage Collection SumpFront Work #210BKG690000690000087844.8487844.842994129941Task 19Grouting with Ultrafine Cement Grout -Seepage Collection SumpSeepage Collection SumpFront Work #210BKG2600026000018599.7618599.7613831383Task 20Geomembrane -Seepage Collection SumpSeepage Collection SumpFront Work #200KM2174001740000027652765Task 21Geotextile - Seepage Collection SumpSeepage Collection SumpFront Work #200KM2174001740000020182018Task 22Containment Berm Foundation Preparation -Seepage Collection SumpSeepage Collection SumpFront Work #200CM2790016126.23201536415364185349.525Task 23Alluvium Embankment Material Containment BermSeepage Collection SumpFront Work #200BM34020083498.04083498.0483498.041222525214.412Task 24Rock Excavation Seepage Collection Sump and Conveyance ChannelSeepage Collection Sump and Conveyance ChannelFront Work #200AM334000127701.4240120413.34120413.341556161861.74Task 25Unclassified excavation - Seepage Collection Sump and Conveyance ChannelSeepage Collection Sump and Conveyance ChannelFront Work #200AM3257400358999.1784752348871.6344119.62739438978.674Task 25Rippable material excavation - Seepage Collection Sump and Conveyance ChannelSeepage Collection Sump and Conveyance ChannelFront Work #200AM31386001990204290.964290.9616051668.46Task 26Riprap Seepage Collection SumpSeepage Collection SumpFront Work #209BM33200320002443244334373437Task 27Zone 6A Material Containment BermZone 6AFront Work #301AM24600460003500350011511151Task 28Structural Concrete for the Seepage Collection Sump Spillway and Control SectionSeepage Collection SumpFront Work #210GM32701382.17000442622657Task 29Process Zone 5 SD Transition for the Filter BlanketZone 5 Front Work #3010AM32530002530002733002530002530003620736207Task 30Process Zone 6 SD Transition for the Filter BlanketZone 6Front Work #3010AM32530002530005312902530002530008743987439Task 31Process Zone 2B Upstream TansitionZone 2BFront Work #3010AM340500040500046023205053159035796057960Task 32Zone 4 Downstream Face VeneerZone 4Front Work #3010BM3600000498854.317205255749.37238544.37294751245063.006298833Task 33Unclassified excavation - Starter Dam (*)Starter DamFront Work #100AM398800294509.83259186129.25185870.251051535202.43Task 33Rippable material excavation-Starter Dam (*)Starter DamFront Work #100AM35320053200039646.4439646.4461616161Task 34Starter Dam UnderdrainStarter DamFront Work #109ALM2602600257.16257.1615961596Task 35Cutoff Trench Excavation - Direct Labor (all inclusive)Starter DamFront Work #100AM3320600422766.760397305.63397305.6396871133619.77Task 36Removal of Weathered Tuff Material at Existing Ground SurfaceCmod 18Front Work #100AM312000059399.98019153.819153.8138976880Task 37Scaling of Tuff MaterialCmod 18Front Work #100AM35800013527.0204514.164514.1654061260.81Task 38Foundation Preparation and Grading Starter DamStarter DamFront Work #100CM226000093996.23010093.4610093.46119573480.18Task 39Dental Concrete Cutoff TrenchStarter DamFront Work #110AM31300130001300130087328732Task 40Slush Grout Cutoff TrenchStarter DamFront Work #110SM21550015500011429.1511429.154296042960Task 41Structural Concrete for Grout Cap Cutoff TrenchStarter DamFront Work #110PM3200020000200020002117321173Task 42Drilling Grout Holes Cutoff TrenchStarter DamFront Work #100ILM50005000
Pedro Manuel Campos Lopez: Pedro Manuel Campos Lopez:Pasa a task TBD750500050003778437784Task 43Grouting with Portland Cement Grout Cutoff TrenchStarter DamFront Work #110BKG5000005000000370579.1370579.12524225242Task 44Place and Compact Zones 5 and 6 (Downstream Filter Blanket)Zone 5 & 6Front Work #300BM3107000107000103678625.8977589.894117041170Task 45Place and Compact Zone 7 Select CoreZone 7Front Work #300BM310000010000020678141.7477935.742988329883Task 46Water Pressure Testing of Grout Holes Cutoff TrenchStarter DamFront Work #100EEA2302300303013771377Task 47Main Access ImprovementStarter DamFront Work #101AGLB1101185208520Task 48Haul Roads earthmovingAdditional Work #00DGLB10110Task 50.1Additional Cleaning in the left abutment T&MCmod 04F40D51000ELM19001901900960Task 50.2Excavation in detail Seepage Collection Sump T&MCmod 04F40D51000AM3600005500.25500.22360Task 50.8Grout Cap Left Abutment 0+235-0+382Cmod 04F40D51800Em300000Task 51.3Access to Borrow 4Cmod 06F40D50600ELM207502075207509550Task 51.4Rock Removal TSF Starter DamCmod 06F40D50800JM324952010028.208810028.2088012975Task 52.3Hauling of zone 4 material produced in borrow Area 2 to the DamCmod 07F40D51800Dm316548.55016548.5516548.550Task 52.4Supply and Installation of Geotextile 800gr/m2 over the zone 6 blanketCmod 07F40D51800KM2710005418.725418.721688Task 55.2Additional Steel Placement in Grout CapCmod 11F40D53800Ekg14409.26012198.43917412198.4391741265Task 57Grout Cap Right Abutment 0+720 - 0+750.6Starter DamF40D51800Em32000000Task 59.1Maintenance of the San Jose Road.Cmod 16F40D54100Eea1011141Task 59.2CSI 022Cmod 16F40D54100Eea101147Task 59.3CSI 023Cmod 16F40D54100Eea100.15610.15611708Task 59.4CSI 024Cmod 16F40D54100Eea10114453Task 60.1K131 -SMCV Material Handling Haul Road (Stand By Equipment)Cmod 17F40D52200AEA10113262Task 61Excavation to Bed Rock from Cut Off Trench to Downstream Blanket Starter DamF40D51800Am300000Task 62.2Higher Quantities Task 39 Dental Concrete - Cutoff TrenchCmod 19F40D54210AM315440154415449975Task 62.3Greater Length of Drill Holes in Cut Off Trench for GorutingCmod 19F40D55000ILM782.220782.22782.22193.87792032Task 63.2manual labor tasks associated with raising the chimney to elevation 2047.K131-CSI #26/Cmod 20F40D55400eglb1011869.47Task 63.3 Zone 2B fill ajacent to zone 7.K131-CSI #28/Cmod 20F40D55400bm36720446.6112446.61121458Task 63.4Additional steel placement in group CAP odf SK131-CSI #29/Cmod 20F40D55400ekgs13408012519.7212519.72294.43Task 66.1Additional Drilling in Grout Cap for Rebar - Cutt of TrenchCmod 23F40D55800EGLB1011517Task 67.1Additional Excavation in Spillway Foundation (Stations 0+000 to 0+050)Cmod 24F40D56300EM3550.740550.74550.741949.62Task 68.1Additional geotextile for Slopes on Drains A1 and A5Cmod 25F40D56500km21915108578.68578.61340Task 68.2Slope Cleaning for Geotextil placementCmod 25F40D56500Em228720125012502693Task 68.3.1Access constructionCmod 25F40D57000Eglb1011244Task 68.3.2Drilling for filling with expansive cement on slopeCmod 25F40D57000Im328501801801347Task 68.3.3Drilling for filling with expansive cement at the trench bottomCmod 25F40D57000Im338403003001418Task 68.3.4Filling with expansive cement on slopeCmod 25F40D57000Em32850180180951Task 68.3.5Filling with expansive cement at the trench bottomCmod 25F40D57000Em33840300300959Task 68.3.6Loading and haulage of removed materialCmod 25F40D57000Em39360300300670Task 68.3.7Trench profilingCmod 25F40D57000Em21200000390Task 68.3.8Trench cleaning for geological mappingCmod 25F40D57000em212000005095Task 68.3.9Containment barricadesCmod 25F40D57000eea2022360Task TBDProduction Zone 5 - Fine Transition33D011010AM31411900030126Task TBD10Unclassified material excavationCmod 27F40D54700Am313678.90003690.6Task TBD11Profiling and compactiion of subgrade in the Cut-Off areaCmod 27F40D54700em35589.02000385.64Task TBD12Placement of massive fillCmod 27F40D54700bm35849.010001982.23Task TBDProduction Zone 6 - Coarse Transition33D011010AM3136000002951Task TBD24Haulage of rough mined in BA1Cmod 27F40D55600dm386720065907.265907.25016.61Task TBD25Access Maintenance from BA1 to BA2Cmod 27F40D55600emonth30001832.26Task TBD26Longer Drilling in the Cutoff TrenchCmod 30F40D56400Ilm250002500250018892Task TBD27Drill Holes at Right and Left AbutmentCmod 30F40D56400eglb1110270Task TBD28Excavation structural backfill on BermCmod 30F40D57900am31269.0401269.041269.04634.52Task TBD29Spillway foundation cleaningCmod 30F40D57900em21262.67904004003788.04Task TBD30Cyclopean concrete placement f'c = 15MPACmod 30F40D57910am32596.473302028169815267.4Task TBD31Massive concrete formwork installation and uninstallationCmod 30F40D57900em2599.72502272271839.12Task TBD32Structural backfillCmod 30F40D57900bm3890.840890.84890.841286.64Task TBD33Spillway Reinforcement steel placementCmod 30F40D57900ekg1549.54801549.5481549.548136.11Task TBD34Anchor bars placement with Grout (sand-cement)Cmod 30F40D57900eea3700224224804.59Task TBD35Excavation on Slope of Left and Right AbutmentsCmod 31F40D58000aM311401.29010261.16110261.1612183Task TBD36Concrete Filling in Grout Cap FoundationCmod 30F40D58210pm3644.7852052004330.9Task TBD37Grout Cap foundation Formwork Installation and UnistallationCmod 30F40D58210pm3158.611281280742.27Task TBD38Water Stop 6" Supply and InstallationCmod 30F40D58200elm64.665252064.66Task TBD39Green Cut at Surface (Reference to Drawings Attached)Cmod 30F40D58200em2504.2640540501008.53Task TBD50Dental Concrete (Task 39) additional quantities in the area of the starter dam foundation (DELETED)Cmod 31F40D54210AM31511.5601511.561511.5610153.03Task TBD51Dental Concrete (Task 39) additional quantities in the area of the starter dam foundation. (DELETED)Cmod 31F40D57710AM35227.20744.11744.1135127Task TBD52Installation of material zone 2B from elev. 2406Cmod 32F40D56700eea100.090.0925875Task TBD53Installation of material zones 5 & 6 from elev. 2413Cmod 32F40D56700eea100.21580.215826100Task TBD60CSI-031 Zone 1 Material excavation drain A5Cmod 33F40D58900Am330250574.75574.75241.67Task TBD61CSI-033 Contractor to perform Test Pits in Starter Dam to verify the actual geological conditionsCmod 33F40D58900Els100.38070.38077079.08185075Task TBD62CSI-036 More wear of drill bits and less performance in additional drilling in grout cap pf Seepage Collection Sump (Stations 0+092.5 -0+131.64)Cmod 33F40D58900Iea1036.6501036.651036.65241.67Task TBD63CSI-039 Excavation and concrete fill in grout cap foundationCmod 33F40D58900Als37263.97037263.9737263.97671.21Task TBD64CSI-040 Contractor to perform additional drilling (tertiary, quaternary) through the rebar in the grout cap of seepage collection sump for nipple placement.Cmod 33F40D58900Iea1036.6501036.651036.65550Task TBD65Increase quantities for Task 41 Structural concrete for Grout CapCmod 35F40D59000Em3289.310188.1188.13063Task TBD75Third Additional Drilling for Grout Curtain-Cut off Trench Starter DamCmod 36F40D59400Elm2645.3202645.322645.3219990.154176Task TBD8Rock excavation with blastingCmod 27F40D54700jm320374.2900015093.3Task TBD85Boulders Extraction & Hauling - Seepage Collection SumpCmod 36F40D58300Am363790637963793479.11Task TBD9Soft Rock excavationCmod 27F40D54700am39399.289399.289399.2802814.14Task TBD91Z4 Material Production and HaulageCmod 37010Am3114338.620114338.62114338.620.273331248.744846Task TBD100Structural Fill ExcavationF40D60400Bm32016.6902016.692016.691008.35Task TBD110Structural FillF40D60400Bm33285.040181218124744.58Task TBD120Greater Haulage Distance of Alluvial MaterialF40D60400Dm34175.88000240.95Task TBD130Rebar in Spillway BackfillF40D60400Ekg11234.6503930.7423930.742986.83Task TBD140Cyclopean Concrete Placement fc= 15MPA + 30% big stonesF40D60410Im3816.3208168164800.01Task TBD150Anchor Steel with Grout (sand-cement)F40D60400Eea64000139.17Task TBD160Contractor is requested to built a temporary V Notch weir dwonstream of the final design locationF40D59900eea1000581Task TBD170CSI-045 Contractor has to relocate Zone 6A material (stockpile) from Borrow Area 2 to temporary sctockpile in waste dump no.1 making the dam available to be fill up.F40D61200eea1000971.48Task TBD180CSI-049 Contractor to perform in Drain A5 from station 0+515 to 0+535 a variation in zone 1 and zone 4 slopes (1.5H:1V instead of 2H:1V)until elevation 2508. Works also include the production, haulage and placement of zone 4 material.F40D61200eea10001062Task TBD190CSI-048: Contractor to perform in Drain A4 as directed by Engineer, the removal of ash and loose material and all unsuitable material placed on top of the rock and expose the rock clearly to meet 10% rock slope design.F40D61200eea10003970Task TBD200CSI-047 Contractor requested to perfom excavation with heavy equipment for blanket foundation from elevation 2497m to design elevation 2560m. work will be valued on a T&M basis. F40D62200eea10004232Task TBD210Third Additional Drilling for Grout Curtain-Cut off Trench Starter DamF40D61900elm1027.5059172069598.6501027.50591720691027.50591720697764.6567151491951271.24780705

Hoja1Activity IDActivity NameAt Comp DurStartFinishT.F.F.F.BL StartBL FinVar - BL FinCONTRACT K131-TSF STARTER DAM REV 1_Update to May-13,2015107319-Mar-13 A24-Feb-160019-Mar-1330-Oct-15-117 ADJUDICATION OF CONTRACT13519-Mar-13 A01-Aug-13 A019-Mar-131-Aug-1303Letter of Award019-Mar-13 A19-Mar-1304Contract Signature001-Aug-13 A1-Aug-1305Advance Payment Depos It003-Apr-13 A3-Apr-1306Prepare Submit & Obtain Approbal of1019-Mar-13 A28-Mar-13 A19-Mar-1328-Mar-1307Reseipt Detail Engeneering Report022-Apr-13 A22-Apr-1308Handover of Area022-Apr-13 A22-Apr-130 KEY MILESTONE DATES103922-Apr-13 A24-Feb-160022-Apr-1330-Oct-15-117101Date For Commencement022-Apr-13 A22-Apr-130102Start Of Mobilization022-Apr-13 A22-Apr-130103Start Starter Dam Embankments024-Dec-13 A24-Dec-130104One: Mobilization022-Apr-13 A22-Apr-131105Two: Foundation Excavation025-Aug-1518418421-Sep-1528106Three: Grouting015-May-1528628618-Jan-15-116107Four: Seepage Sump07-Sep-1517017013-Aug-15-25108Five: Seepage Channel019-Jul-1522122116-May-15-64109Six: Zones 2B, 5, 6031-Jul-1520820830-Jul-15-2110Seven: Zones 4, 5, 6, 6A025-Oct-1512212218-Jul-15-99111Eight: Starter Dam Embankment016-Nov-15717130-Sep-15-46112Nine: Starter Dam05-Sep-1517217223-Sep-1518113Ten: Seepage Collection (Drains)04-Nov-1511211229-Aug-15-67114Demobilization024-Feb-160030-Oct-15-117 CONSTRUCTION WORKS100922-Apr-13 A25-Jan-1630022-Apr-1330-Sep-15-117 PRELIMINARY WORKS88322-Apr-13 A22-Sep-15156022-Apr-134-Apr-15-170201Mobilization30022-Apr-13 A16-Feb-14 A22-Apr-1316-Feb-141202Temporary Facilities48803-May-13 A03-Sep-14 A3-May-1313-Aug-14-20203Surveying87926-Apr-13 A22-Sep-1512612626-Apr-134-Apr-15-170204Main Access Improvement4601-May-13 A16-Jun-13 A1-May-1318-Jun-133205Seepage Collection Road25203-Jul-13 A12-Mar-14 A3-Jul-1312-Mar-141206Access to Borrow 4 - CM102423-May-14 A16-Jun-14 A23-May-1416-Jun-141207Rock Removal TSF Starter Dam710-Jun-14 A17-Jun-14 A10-Jun-1417-Jun-141208Additional Cleanning in the left abutment T&M710-Jun-14 A17-Jun-14 A10-Jun-1417-Jun-141209Excavation in detail Seepage Collection Sump T&M710-Jun-14 A17-Jun-14 A10-Jun-1417-Jun-141210Supply and Installation of Geotextile 800 gr/m2710-Jun-14 A17-Jun-14 A10-Jun-1417-Jun-141211Additional Steel Placement in Grout Cap710-Jun-14 A17-Jun-14 A10-Jun-1417-Jun-141 FRONT WORK No 01 STARTER DAM & DRAINS100724-Apr-13 A25-Jan-1630024-Apr-1330-Sep-15-117 STARTER DAM93624-Apr-13 A16-Nov-15101024-Apr-1330-Sep-15-46 FOUNDATION EXCAVATION75824-Apr-13 A21-May-15184024-Apr-1317-Sep-1511930000Archaeological Polygons Release (by SMCV)007-Sep-13 A7-Sep-13030004Entrega de Poligonal del Proyecto016-May-13 A16-May-13130006Acceso Interrumpido por SMCV524-Apr-13 A28-Apr-13 A24-Apr-1328-Apr-13030010Removal Of Weathered Tuff Material At Existing Ground Surface6314-Jul-13 A15-Sep-13 A25-Dec-1416-Jan-1548930020Scaling Of Tuff Material 2410 (by SMCV)902-Nov-13 A11-Nov-13 A14-May-1515-May-1555130030Scaling Of Tuff Material 2420 (by SMCV)912-Nov-13 A21-Nov-13 A14-Jun-1515-Jun-1557230040Scaling Of Tuff Material 2430 (by SMCV)922-Nov-13 A01-Dec-13 A14-Jul-1515-Jul-1559230050Scaling Of Tuff Material 2440 (by SMCV)802-Dec-13 A10-Dec-13 A13-Aug-1514-Aug-1561330060Scaling Of Tuff Material 2450 (by SMCV)511-Dec-13 A16-Dec-13 A12-Sep-1513-Sep-1563730070Scaling Of Tuff Material 2460 (by SMCV)217-Dec-13 A19-Dec-13 A14-Sep-1515-Sep-1563630080Scaling Of Tuff Material 2470 (by SMCV)220-Dec-13 A22-Dec-13 A16-Sep-1517-Sep-1563530090Unclassified Excavation Creek Botton 2398 - 24001228-Apr-13 A09-May-13 A28-Apr-139-May-13030100Unclassified Excavation Creek Botton 2400 - 24102007-Sep-13 A26-Sep-13 A7-Sep-1326-Sep-13030110Unclassified Excavation Creek Botton 2410 - 24201227-Sep-13 A08-Oct-13 A27-Sep-138-Oct-130 CUTOFF TRENCH - LEFT ABUTMENT42128-Apr-13 A23-Jun-14 A028-Apr-1323-Jun-14130900Cutoff Trench Excavation Valley Bottom1828-Apr-13 A15-May-13 A28-Apr-1315-May-13031000Blasting Start Delayed (No Permits/Unsuitable Blasting Mats - by SMCV)3816-May-13 A22-Jun-13 A16-May-1322-Jun-13031010Cutoff Trench Excavation Left Abutment623-Jun-13 A29-Jun-13 A23-Jun-1329-Jun-13131020Delay Blasting Service (Daily Report 07-01-2013)530-Jun-13 A04-Jul-13 A30-Jun-134-Jul-13031030Cutoff Trench Excavation Left Abutment505-Jul-13 A09-Jul-13 A5-Jul-139-Jul-13031040Delay Blasting Service (Daily Report 07-11-2013)310-Jul-13 A12-Jul-13 A10-Jul-1312-Jul-13031050Cutoff Trench Excavation Left Abutment213-Jul-13 A15-Jul-13 A13-Jul-1315-Jul-13131060Delay Blasting Service (Daily Report 07-16-2013)416-Jul-13 A20-Jul-13 A16-Jul-1320-Jul-13131070Cutoff Trench Excavation Left Abutment1021-Jul-13 A30-Jul-13 A21-Jul-1330-Jul-13031080Delay Blasting Service (Daily Report 07-30-2013)931-Jul-13 A08-Aug-13 A31-Jul-138-Aug-13031090Cutoff Trench Excavation Left Abutment609-Aug-13 A15-Aug-13 A9-Aug-1315-Aug-13131100Cutoff Trench Excavation Left Abutment Performance 50%4016-Aug-13 A25-Sep-13 A16-Aug-1325-Sep-13131110Cutoff Trench Excavation Left Abutment1526-Sep-13 A10-Oct-13 A26-Sep-1310-Oct-13031120Delay Blasting Service (Daily Report 10-11-2013)511-Oct-13 A15-Oct-13 A11-Oct-1315-Oct-13031130Cutoff Trench Excavation Left Abutment816-Oct-13 A23-Oct-13 A16-Oct-1323-Oct-13031140Delay Blasting Service (Daily Report 10-24-2013)524-Oct-13 A28-Oct-13 A24-Oct-1328-Oct-13031150Cutoff Trench Excavation Left Abutment429-Oct-13 A01-Nov-13 A29-Oct-131-Nov-13031160Delay Blasting Service (Daily Report 11-02-2013)302-Nov-13 A04-Nov-13 A2-Nov-134-Nov-13031170Cutoff Trench Excavation Left Abutment905-Nov-13 A13-Nov-13 A5-Nov-1313-Nov-13031180Delay Blasting Service (Daily Report 11-14-2013)214-Nov-13 A15-Nov-13 A14-Nov-1315-Nov-13031190Cutoff Trench Excavation Left Abutment416-Nov-13 A19-Nov-13 A16-Nov-1319-Nov-13031200Delay Blasting Service (Daily Report 11-20-2013)320-Nov-13 A22-Nov-13 A20-Nov-1322-Nov-13031210Cutoff Trench Excavation Left Abutment1323-Nov-13 A05-Dec-13 A23-Nov-135-Dec-13031220Delay Blasting Service (Daily Report 12-06-2013)306-Dec-13 A08-Dec-13 A6-Dec-138-Dec-13031230Cutoff Trench Excavation Left Abutment309-Dec-13 A11-Dec-13 A9-Dec-1311-Dec-13031240Delay Blasting Service (Daily Report 12-12-2013)212-Dec-13 A13-Dec-13 A12-Dec-1313-Dec-13031250Cutoff Trench Excavation Left Abutment2914-Dec-13 A11-Jan-14 A14-Dec-1311-Jan-14031260Cutoff Trench Excavation Left Abutment (CM8)1706-Jun-14 A23-Jun-14 A6-Jun-1423-Jun-141 CUTOFF TRENCH - RIGHT ABUTMENT69427-Jun-13 A21-May-15142027-Jun-1327-Nov-14-17531300Access Road Right Abutment2527-Jun-13 A21-Jul-13 A27-Jun-1321-Jul-13031310Cutoff Trench Excavation Right Abutment522-Jul-13 A26-Jul-13 A22-Jul-1326-Jul-13031320Delay Blasting Service (Daily Report 07-27-2013)527-Jul-13 A31-Jul-13 A27-Jul-1331-Jul-13031330Cutoff Trench Excavation Right Abutment601-Aug-13 A07-Aug-13 A1-Aug-137-Aug-13131340Delay Blasting Service (Daily Report 08-08-2013)308-Aug-13 A10-Aug-13 A8-Aug-1310-Aug-13031350Cutoff Trench Excavation Right Abutment311-Aug-13 A13-Aug-13 A11-Aug-1313-Aug-13031360Delay Desing Levels Excavation by MWH (K131-CAR-089)2414-Aug-13 A06-Sep-13 A14-Aug-136-Sep-13031370Cutoff Trench Excavation Right Abutment Performance 30% No Engineering1707-Sep-13 A23-Sep-13 A7-Sep-1323-Sep-13031380Delay Desing Levels Excavation by MWH (RFI 36, RFI 37, IC-010)1724-Sep-13 A10-Oct-13 A24-Sep-1310-Oct-13031390Cutoff Trench Excavation Right Abutment Performance 30% No Engineering2011-Oct-13 A31-Oct-13 A11-Oct-1331-Oct-13131400New Desing Levels Excavation by MWH (FI-022)1301-Nov-13 A13-Nov-13 A1-Nov-1313-Nov-13031410Cutoff Trench Excavation Right Abutment2114-Nov-13 A05-Dec-13 A14-Nov-135-Dec-13131420Delay Blasting Service (Daily Report 12-08-2013)206-Dec-13 A08-Dec-13 A6-Dec-138-Dec-13131430Cutoff Trench Excavation Right Abutment8009-Dec-13 A26-Feb-14 A9-Dec-1326-Feb-14031440Cleaning of Excavation Material Cutoff Trench Right Abutment (Downstream)5127-Feb-14 A18-Apr-14 A27-Feb-1418-Apr-14031450Construct Access Road in 0+5005626-Mar-14 A21-May-14 A26-Mar-1421-May-14031460Cleaning of Excavation Material Cutoff Trench Right Abutment (Downstream) by SMCV1419-Apr-14 A03-May-14 A19-Apr-143-May-14131470Cutoff Trench Excavation Right Abutment 0+675 - 0+710 (FI-033)7211-Mar-15 A21-May-15142014-Oct-1427-Nov-14-17531480Cutoff Trench Excavation Right Abutment (CM8)1606-Jun-14 A22-Jun-14 A6-Jun-1422-Jun-141 STARTER DAM86128-Apr-13 A5-Sep-15172028-Apr-1323-Sep-151831500Works Haul Road SMCV (Under Drain Zone)021-Dec-13 A21-Dec-13031510Procure & Install Foundation Drain Excavation4028-Apr-13 A06-Jun-13 A28-Apr-136-Jun-13031520Procure & Install Foundation Drain Fill and Hdpe322-Dec-13 A24-Dec-13 A22-Dec-1324-Dec-13031530Foundation Preparation And Grading 2390 - 2400 (by SMCV)525-Jun-14 A30-Jun-14 A25-Jun-1430-Jun-14131540Foundation Preparation And Grading 2400 - 2410 (by SMCV)1901-Jul-14 A20-Jul-14 A1-Jul-1424-Aug-143631550Foundation Preparation And Grading 2410 - 2420 (by SMCV)1221-Jul-14 A02-Aug-14 A24-Aug-1411-Sep-144031560Foundation Preparation And Grading 2420 - 2430 (by SMCV)1403-Aug-14 A17-Aug-14 A11-Sep-144-Oct-144831570Foundation Preparation And Grading 2430 - 2440 (by SMCV)1718-Aug-14 A04-Sep-14 A4-Oct-1430-Oct-145631580Foundation Preparation And Grading 2440 - 2445 (by SMCV)1705-Sep-14 A22-Sep-14 A30-Oct-1427-Nov-146631590Foundation Preparation And Grading 2445 - 2450 (by SMCV)1523-Sep-14 A08-Oct-14 A27-Nov-1411-Dec-146431600Foundation Preparation And Grading 2450 - 2460 (by SMCV)3409-Oct-14 A12-Nov-14 A11-Dec-1425-Dec-144331610Foundation Preparation And Grading 2460 - 2470 (by SMCV)1313-Nov-14 A26-Nov-14 A25-Dec-1423-Jan-155831620Foundation Preparation And Grading 2470 - 2480 (by SMCV)3427-Nov-14 A31-Dec-14 A23-Jan-1515-Feb-154631630Foundation Preparation And Grading 2480 - 2490 (by SMCV)1701-Jan-15 A18-Jan-15 A15-Feb-157-Mar-154831640Foundation Preparation And Grading 2490 - 2500 (by SMCV)1919-Jan-15 A07-Feb-15 A7-Mar-1527-Mar-154831650Foundation Preparation And Grading 2500 - 2505 (by SMCV)1008-Feb-15 A18-Feb-15 A27-Mar-1516-Apr-155731660Foundation Preparation And Grading 2505 - 2510 (by SMCV)1919-Feb-15 A10-Mar-15 A16-Apr-1526-Apr-154731670Foundation Preparation And Grading 2510 - 2520 (by SMCV)2811-Mar-15 A08-Apr-15 A26-Apr-157-May-152931680Foundation Preparation And Grading 2520 - 2530 (by SMCV)2609-Apr-15 A05-May-15 A7-May-1527-May-152231690Foundation Preparation And Grading 2530 - 2540 (by SMCV)1606-May-15 A21-May-15170428-May-1513-Jun-152431700Foundation Preparation And Grading 2540 - 2550 (by SMCV)1725-May-1511-Jun-151671127-Jun-1513-Jul-153331710Foundation Preparation And Grading 2550 - 2560 (by SMCV)2222-Jun-1514-Jul-15156222-Jul-1512-Aug-153031720Foundation Preparation And Grading 2560 - 2570 (by SMCV)4016-Jul-1525-Aug-15154013-Aug-1521-Sep-1528 CLEANING, SURVEY, GEOLOGICAL MAPPING, DENTAL CONCRETE, SLUSH GROUT CUTOFF TRENCH BOTTOM56319-Nov-13 A4-Jun-15265019-Nov-135-Jan-15-150 LEFT ABUTMENT15719-Nov-13 A24-Apr-14 A019-Nov-1324-Apr-14032000Trench Bottom Cleaning 0+440 - 0+460313-Mar-14 A16-Mar-14 A13-Mar-1416-Mar-14132010Trench Bottom Survey and Mapping (by MWH) 0+440 - 0+460117-Mar-14 A17-Mar-14 A17-Mar-1417-Mar-14032020Trench Bottom Dental Concrete 0+440 - 0+460118-Mar-14 A18-Mar-14 A18-Mar-1418-Mar-14032030Trench Bottom Dental Concrete 0+385 - 0+405105-Apr-14 A05-Apr-14 A5-Apr-145-Apr-14032040Trench Bottom Cleaning 0+400 - 0+4401906-Apr-14 A24-Apr-14 A6-Apr-1424-Apr-14032050Trench Bottom Dental Concrete 0+400 - 0+440124-Apr-14 A24-Apr-14 A24-Apr-1424-Apr-14032060Trench Bottom Dental Concrete 0+372 - 0+382818-Feb-14 A25-Feb-14 A18-Feb-1425-Feb-14032070Trench Bottom Dental Concrete 0+362 - 0+372626-Feb-14 A03-Mar-14 A26-Feb-143-Mar-14032080Trench Bottom Dental Concrete 0+352 - 0+362404-Mar-14 A07-Mar-14 A4-Mar-147-Mar-14032090Trench Bottom Dental Concrete 0+342 - 0+352508-Mar-14 A12-Mar-14 A8-Mar-1412-Mar-14032100Trench Bottom Dental Concrete 0+332 - 0+342313-Mar-14 A15-Mar-14 A13-Mar-1415-Mar-14032110Trench Bottom Dental Concrete 0+322 - 0+332416-Mar-14 A19-Mar-14 A16-Mar-1419-Mar-14032120Trench Bottom Dental Concrete 0+312 - 0+322320-Mar-14 A22-Mar-14 A20-Mar-1422-Mar-14032130Trench Bottom Dental Concrete 0+302 - 0+312423-Mar-14 A26-Mar-14 A23-Mar-1426-Mar-14032140Trench Bottom Dental Concrete 0+292 - 0+302527-Mar-14 A31-Mar-14 A27-Mar-1431-Mar-14032150Trench Bottom Dental Concrete 0+284 - 0+292401-Apr-14 A04-Apr-14 A1-Apr-144-Apr-14032160Trench Bottom Dental Concrete 0+276 - 0+284405-Apr-14 A08-Apr-14 A5-Apr-148-Apr-14032170Trench Bottom Dental Concrete 0+264 - 0+276309-Apr-14 A11-Apr-14 A9-Apr-1411-Apr-14032180Trench Bottom Dental Concrete 0+252 - 0+264412-Apr-14 A15-Apr-14 A12-Apr-1415-Apr-14032190Trench Bottom Dental Concrete 0+243 - 0+252616-Apr-14 A22-Apr-14 A16-Apr-1422-Apr-14132200Trench Bottom Cleaning 0+210 - 0+3003019-Nov-13 A18-Dec-13 A19-Nov-1318-Dec-13032210Trench Bottom Survey and Mapping (by MWH) 0+210 - 0+300 (FI-038 02-08-2014)5219-Dec-13 A08-Feb-14 A19-Dec-138-Feb-14032220Trench Bottom Cleaning 0+270 - 0+382909-Feb-14 A17-Feb-14 A9-Feb-1417-Feb-140 RIGHT ABUTMENT46327-Feb-14 A4-Jun-15265027-Feb-145-Jan-15-15032230Trench Bottom Cleaning 0+460 - 0+4801327-Feb-14 A12-Mar-14 A27-Feb-1412-Mar-14132240Trench Bottom Survey and Mapping (by MWH) 0+460 - 0+480113-Mar-14 A13-Mar-14 A13-Mar-1413-Mar-14032250Trench Bottom Dental Concrete 0+460 - 0+480114-Mar-14 A14-Mar-14 A14-Mar-1414-Mar-14032260Trench Bottom Dental Concrete 0+480 - 0+490405-May-14 A08-May-14 A5-May-148-May-14032270Trench Bottom Cleaning 0+545 - 0+4903308-May-14 A10-Jun-14 A8-May-1410-Jun-14132280Trench Bottom Survey and Mapping (by MWH) 0+545 - 0+490011-Jun-14 A11-Jun-14 A11-Jun-1411-Jun-14132290Trench Bottom Slush and Dental Concrete 0+545 - 0+4901330-May-14 A12-Jun-14 A30-May-1412-Jun-14132300Trench Bottom Cleaning 0+545 - 0+5651626-Jun-14 A12-Jul-14 A26-Jun-1412-Jul-14132310Trench Bottom Cleaning 0+565 - 0+5851018-Jul-14 A28-Jul-14 A18-Jul-1428-Jul-14132320Trench Bottom Cleaning 0+585 - 0+605929-Jul-14 A07-Aug-14 A29-Jul-147-Aug-14132330Trench Bottom Cleaning 0+605 - 0+625508-Aug-14 A13-Aug-14 A8-Aug-1413-Aug-14132340Trench Bottom Survey and Mapping (by MWH) 0+545 - 0+565312-Jul-14 A15-Jul-14 A12-Jul-1415-Jul-14132350Trench Bottom Survey and Mapping (by MWH) 0+565 - 0+585130-Jul-14 A31-Jul-14 A30-Jul-1431-Jul-14132360Trench Bottom Survey and Mapping (by MWH) 0+585 - 0+605110-Aug-14 A11-Aug-14 A10-Aug-1411-Aug-14132370Trench Bottom Survey and Mapping (by MWH) 0+605 - 0+625112-Aug-14 A13-Aug-14 A12-Aug-1413-Aug-14132380Trench Bottom Slush and Dental Concrete 0+545 - 0+565115-Jul-14 A16-Jul-14 A15-Jul-1416-Jul-14132390Trench Bottom Slush and Dental Concrete 0+565 - 0+585201-Aug-14 A03-Aug-14 A1-Aug-143-Aug-14132400Trench Bottom Slush and Dental Concrete 0+585 - 0+605112-Aug-14 A13-Aug-14 A12-Aug-1413-Aug-14132410Trench Bottom Slush and Dental Concrete 0+605 - 0+625320-Aug-14 A23-Aug-14 A13-Aug-1414-Aug-14-832420Trench Bottom Cleaning 0+625 - 0+6452224-Aug-14 A15-Sep-14 A15-Aug-1424-Aug-14-2132430Trench Bottom Cleaning 0+645 - 0+665621-Sep-14 A27-Sep-14 A28-Aug-146-Sep-14-2032440Trench Bottom Cleaning 0+665 - 0+6851320-Oct-14 A02-Nov-14 A11-Sep-1420-Sep-14-4232450Trench Bottom Cleaning 0+685 - 0+7051610-Nov-14 A26-Nov-14 A28-Nov-147-Dec-141232460Trench Bottom Cleaning 0+705 - 0+7252727-Nov-14 A24-Dec-14 A11-Dec-1420-Dec-14-332470Trench Bottom Cleaning 0+725 - 0+7553330-Apr-15 A1-Jun-15265024-Dec-142-Jan-15-15032480Trench Bottom Survey and Mapping (by MWH) 0+625 - 0+645316-Sep-14 A19-Sep-14 A25-Aug-1425-Aug-14-2432490Trench Bottom Survey and Mapping (by MWH) 0+645 - 0+665128-Sep-14 A29-Sep-14 A8-Sep-148-Sep-14-2032500Trench Bottom Survey and Mapping (by MWH) 0+665 - 0+685203-Nov-14 A05-Nov-14 A21-Sep-1421-Sep-14-4432510Trench Bottom Survey and Mapping (by MWH) 0+685 - 0+705227-Nov-14 A29-Nov-14 A8-Dec-148-Dec-141032520Trench Bottom Survey and Mapping (by MWH) 0+705 - 0+725122-May-1522-May-15265021-Dec-1421-Dec-14-15232530Trench Bottom Survey and Mapping (by MWH) 0+725 - 0+75511-Jun-152-Jun-1526503-Jan-153-Jan-15-15032540Trench Bottom Slush and Dental Concrete 0+625 - 0+645317-Sep-14 A20-Sep-14 A26-Aug-1427-Aug-14-2332550Trench Bottom Slush and Dental Concrete 0+665 - 0+6851006-Nov-14 A16-Nov-14 A9-Sep-1410-Sep-14-6632570Trench Bottom Slush and Dental Concrete 0+685 - 0+705929-Nov-14 A08-Dec-14 A9-Dec-1410-Dec-14332580Trench Bottom Slush and Dental Concrete 0+705 - 0+725223-May-1524-May-15265022-Dec-1423-Dec-14-15232590Trench Bottom Slush and Dental Concrete 0+725 - 0+75522-Jun-154-Jun-152652654-Jan-155-Jan-15-150 CLEANING, SURVEY, GEOLOGICAL MAPPING, DENTAL CONCRETE, SLUSH GROUT CUTOFF TRENCH SLOPES48101-Apr-14 A25-Jul-1516001-Apr-146-Aug-1512 LEFT ABUTMENT48101-Apr-14 A25-Jul-1516001-Apr-146-Aug-151233000Downstream Trench Cleaning 0+440 - 0+4601101-Apr-14 A12-Apr-14 A1-Apr-1412-Apr-14133010Downstream Trench Survey and Mapping (by MWH) 0+440 - 0+460013-Apr-14 A13-Apr-14 A13-Apr-1413-Apr-14133020Downstream Trench Dental Concrete 0+440 - 0+460014-Apr-14 A14-Apr-14 A14-Apr-1414-Apr-14133030Slope Trench Cleaning 0+440 - 0+4601222-Apr-14 A04-May-14 A22-Apr-144-May-14133040Slope Trench Survey and Mapping (by MWH) 0+440 - 0+460105-May-14 A05-May-14 A5-May-145-May-14033050Slope Trench Dental Concrete 0+440 - 0+460106-May-14 A06-May-14 A6-May-146-May-14033060Slopes, Upstream, Downstream Cleaning 0+420 - 0+440803-Jul-14 A11-Jul-14 A3-Jul-1411-Jul-14133070Slopes, Upstream, Downstream Cleaning 0+400 - 0+4202021-Jul-14 A10-Aug-14 A13-Aug-1422-Aug-141333080Slopes, Upstream, Downstream Cleaning 0+380 - 0+4001311-Aug-14 A24-Aug-14 A23-Aug-141-Sep-14933090Slopes, Upstream, Downstream Cleaning 0+200 - 0+2201615-Oct-14 A31-Oct-14 A28-Mar-156-Apr-1515833100Slopes, Upstream, Downstream Cleaning 0+180 - 0+2001001-Nov-14 A11-Nov-14 A25-Apr-154-May-1517533110Slopes, Upstream, Downstream Cleaning 0+160 - 0+1801612-Nov-14 A28-Nov-14 A5-May-1514-May-1516833120Slopes, Upstream, Downstream Cleaning 0+140 - 0+1602201-May-15 A22-May-15194026-May-154-Jun-151333130Slopes, Upstream, Downstream Cleaning 0+120 - 0+1401025-Jun-155-Jul-1516008-Jul-1517-Jul-151233140Slopes, Upstream, Downstream Cleaning 0+100 - 0+120105-Jul-1515-Jul-15160018-Jul-1527-Jul-151233150Slopes, Upstream, Downstream Cleaning 0+090 - 0+100815-Jul-1523-Jul-15160028-Jul-154-Aug-151233160Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+420 - 0+440111-Jul-14 A12-Jul-14 A11-Jul-1412-Jul-14133170Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+400 - 0+4202021-Jul-14 A10-Aug-14 A16-Aug-1423-Aug-141433180Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+380 - 0+4001311-Aug-14 A24-Aug-14 A26-Aug-142-Sep-141033190Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+200 - 0+220408-Apr-15 A11-Apr-15 A31-Mar-153-Apr-15-833200Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+180 - 0+200306-Apr-15 A09-Apr-15 A28-Apr-151-May-152333210Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+160 - 0+1801510-Apr-15 A25-Apr-15 A8-May-1511-May-151733220Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+140 - 0+1601601-May-15 A16-May-15215029-May-151-Jun-151633230Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+120 - 0+140428-Jun-152-Jul-15172011-Jul-1514-Jul-151233240Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+100 - 0+12048-Jul-1512-Jul-15166021-Jul-1524-Jul-151233250Slopes, Upstream, Downstream Survey and Mapping (by MWH) 0+090 - 0+100418-Jul-1522-Jul-15160031-Jul-153-Aug-151233260Slopes, Upstream, Downstream Dental Concrete 0+420 - 0+440312-Jul-14 A15-Jul-14 A12-Jul-1415-Jul-14133270Slopes, Upstream, Downstream Dental Concrete 0+400 - 0+4202021-Jul-14 A10-Aug-14 A19-Aug-1426-Aug-141733280Slopes, Upstream, Downstream Dental Concrete 0+380 - 0+4001311-Aug-14 A24-Aug-14 A29-Aug-145-Sep-141333290Slopes, Upstream, Downstream Dental Concrete 0+200 - 0+220411-Apr-15 A14-Apr-15 A3-Apr-156-Apr-15-833300Slopes, Upstream, Downstream Dental Concrete 0+180 - 0+200931-Mar-15 A09-Apr-15 A1-May-154-May-152633310Slopes, Upstream, Downstream Dental Concrete 0+160 - 0+1801213-Apr-15 A25-Apr-15 A11-May-1514-May-152033320Slopes, Upstream, Downstream Dental Concrete 0+140 - 0+1601601-May-15 A16-May-15218461-Jun-154-Jun-151933330Slopes, Upstream, Downstream Dental Concrete 0+120 - 0+14041-Jul-155-Jul-15172614-Jul-1517-Jul-151233340Slopes, Upstream, Downstream Dental Concrete 0+100 - 0+120411-Jul-1515-Jul-15166624-Jul-1527-Jul-151233350Slopes, Upstream, Downstream Dental Concrete 0+090 - 0+100421-Jul-1525-Jul-15160183-Aug-156-Aug-1512 RIGHT ABUTMENT43104-Apr-14 A8-Jun-1514204-Apr-1412-Jun-15433400Downstream Trench Cleaning 0+460 - 0+480804-Apr-14 A12-Apr-14 A4-Apr-1412-Apr-14133410Downstream Trench Survey and Mapping (by MWH) 0+460 - 0+480013-Apr-14 A13-Apr-14 A13-Apr-1413-Apr-14133420Downstream Trench Dental Concrete 0+460 - 0+480014-Apr-14 A14-Apr-14 A14-Apr-1414-Apr-14133430Slope Trench Cleaning 0+460 - 0+480302-May-14 A04-May-14 A2-May-144-May-14033440Slope Trench Survey and Mapping (by MWH) 0+460 - 0+480105-May-14 A05-May-14 A5-May-145-May-14033450Slope Trench Dental Concrete 0+460 - 0+480106-May-14 A06-May-14 A6-May-146-May-14033460Upstream Trench Dental 0+480 - 0+490005-May-14 A05-May-14 A5-May-145-May-14133470Upstream, Downstream Dental 0+470 - 0+480107-May-14 A07-May-14 A7-May-147-May-14033480Upstream Trench Dental Concrete 0+450 - 0+470001-May-14 A01-May-14 A1-May-141-May-14133490Slopes Downstream Cleaning 0+490 - 0+510512-Jun-14 A17-Jun-14 A12-Jun-1417-Jun-14133500Slopes Downstream Cleaning 0+510 - 0+530525-Jul-14 A30-Jul-14 A25-Jul-1430-Jul-14133510Slopes Downstream Cleaning 0+530 - 0+550502-Aug-14 A07-Aug-14 A2-Aug-147-Aug-14133520Slopes Downstream Cleaning 0+550 - 0+5702611-Aug-14 A06-Sep-14 A25-Aug-1430-Aug-14-633530Slopes Downstream Cleaning 0+570 - 0+5901707-Sep-14 A24-Sep-14 A1-Oct-145-Oct-141233540Slopes Downstream Cleaning 0+590 - 0+6102725-Sep-14 A22-Oct-14 A26-Oct-1430-Oct-14933550Slopes Downstream Cleaning 0+610 - 0+6303703-Nov-14 A10-Dec-14 A15-Dec-1419-Dec-141033560Slopes Downstream Cleaning 0+630 - 0+6505711-Dec-14 A06-Feb-15 A9-Jan-1513-Jan-15-2333570Slopes Downstream Cleaning 0+650 - 0+6702228-Feb-15 A22-Mar-15 A28-Feb-154-Mar-15-1733580Slopes Downstream Cleaning 0+670 - 0+690513-May-1517-May-15148025-Apr-1529-Apr-15-1833590Slopes Downstream Cleaning 0+690 - 0+710522-May-1526-May-15142026-May-1530-May-15433600Slopes Downstream Survey and Mapping (by MWH) 0+490 - 0+510018-Jun-14 A18-Jun-14 A18-Jun-1418-Jun-14133610Slopes Downstream Survey and Mapping (by MWH) 0+510 - 0+530001-Aug-14 A01-Aug-14 A1-Aug-141-Aug-14133620Slopes Downstream Survey and Mapping (by MWH) 0+530 - 0+550010-Aug-14 A10-Aug-14 A10-Aug-1410-Aug-14133630Slopes Downstream Survey and Mapping (by MWH) 0+550 - 0+5702611-Aug-14 A06-Sep-14 A30-Aug-1431-Aug-14-633640Slopes Downstream Survey and Mapping (by MWH) 0+570 - 0+59011407-Sep-14 A30-Dec-14 A6-Oct-146-Oct-14-8433650Slopes Downstream Survey and Mapping (by MWH) 0+590 - 0+610122-Oct-14 A23-Oct-14 A31-Oct-1431-Oct-14833660Slopes Downstream Survey and Mapping (by MWH) 0+610 - 0+630226-Jan-15 A28-Jan-15 A20-Dec-1420-Dec-14-3833670Slopes Downstream Survey and Mapping (by MWH) 0+630 - 0+650107-Feb-15 A08-Feb-15 A14-Jan-1514-Jan-15-2433680Slopes Downstream Survey and Mapping (by MWH) 0+650 - 0+670419-Mar-15 A23-Mar-15 A5-Mar-155-Mar-15-1733690Slopes Downstream Survey and Mapping (by MWH) 0+670 - 0+690118-May-1518-May-15148030-Apr-1530-Apr-15-1833700Slopes Downstream Survey and Mapping (by MWH) 0+690 - 0+710127-May-1527-May-15142031-May-1531-May-15433710Slopes Downstream Dental Concrete 0+490 - 0+510419-Jun-14 A23-Jun-14 A19-Jun-1423-Jun-14133720Slopes Downstream Dental Concrete 0+510 - 0+530201-Aug-14 A03-Aug-14 A1-Aug-143-Aug-14133730Slopes Downstream Dental Concrete 0+530 - 0+550211-Aug-14 A13-Aug-14 A11-Aug-1413-Aug-14133740Slopes Downstream Dental Concrete 0+550 - 0+5702611-Aug-14 A06-Sep-14 A31-Aug-143-Sep-14-233750Slopes Downstream Dental Concrete 0+570 - 0+5903907-Sep-14 A16-Oct-14 A7-Oct-149-Oct-14-633760Slopes Downstream Dental Concrete 0+590 - 0+6109722-Oct-14 A27-Jan-15 A1-Nov-143-Nov-14-8433770Slopes Downstream Dental Concrete 0+610 - 0+630429-Jan-15 A02-Feb-15 A21-Dec-1423-Dec-14-4033780Slopes Downstream Dental Concrete 0+630 - 0+650308-Feb-15 A11-Feb-15 A15-Jan-1517-Jan-15-2433790Slopes Downstream Dental Concrete 0+650 - 0+670424-Mar-15 A28-Mar-15 A6-Mar-158-Mar-15-1933800Slopes Downstream Dental Concrete 0+670 - 0+690319-May-1521-May-1514801-May-153-May-15-1833810Slopes Downstream Dental Concrete 0+690 - 0+710328-May-1530-May-1514201-Jun-153-Jun-15433820Slopes, Upstream Cleaning 0+490 - 0+510603-Jul-14 A09-Jul-14 A3-Jul-149-Jul-14133830Slopes, Upstream Cleaning 0+510 - 0+530427-Jul-14 A31-Jul-14 A27-Jul-1431-Jul-14133840Slopes, Upstream Cleaning 0+530 - 0+550308-Aug-14 A11-Aug-14 A8-Aug-1411-Aug-14133850Slopes, Upstream Cleaning 0+550 - 0+5702611-Aug-14 A06-Sep-14 A3-Sep-148-Sep-14333860Slopes, Upstream Cleaning 0+570 - 0+5904007-Sep-14 A16-Oct-14 A10-Oct-1414-Oct-14-233870Slopes, Upstream Cleaning 0+590 - 0+6102725-Sep-14 A22-Oct-14 A4-Nov-148-Nov-141833880Slopes, Upstream Cleaning 0+610 - 0+6303703-Nov-14 A10-Dec-14 A24-Dec-1428-Dec-141933890Slopes, Upstream Cleaning 0+630 - 0+650308-Feb-15 A11-Feb-15 A18-Jan-1522-Jan-15-1933900Slopes, Upstream Cleaning 0+650 - 0+6702228-Feb-15 A22-Mar-15 A9-Mar-1513-Mar-15-833910Slopes, Upstream Cleaning 0+670 - 0+690522-May-1526-May-1514804-May-158-May-15-1833920Slopes, Upstream Cleaning 0+690 - 0+710531-May-154-Jun-1514204-Jun-158-Jun-15433930Slopes, Upstream Survey and Mapping (by MWH) 0+490 - 0+510013-Aug-14 A13-Aug-14 A13-Aug-1413-Aug-14133940Slopes, Upstream Survey and Mapping (by MWH) 0+510 - 0+530017-Aug-14 A17-Aug-14 A17-Aug-1417-Aug-14133950Slopes, Upstream Survey and Mapping (by MWH) 0+530 - 0+550019-Aug-14 A19-Aug-14 A13-Aug-1413-Aug-14-533960Slopes, Upstream Survey and Mapping (by MWH) 0+550 - 0+5701819-Aug-14 A06-Sep-14 A8-Sep-149-Sep-14333970Slopes, Upstream Survey and Mapping (by MWH) 0+570 - 0+590017-Oct-14 A17-Oct-14 A15-Oct-1415-Oct-14-133980Slopes, Upstream Survey and Mapping (by MWH) 0+590 - 0+610122-Oct-14 A23-Oct-14 A9-Nov-149-Nov-141833990Slopes, Upstream Survey and Mapping (by MWH) 0+610 - 0+630226-Jan-15 A28-Jan-15 A29-Dec-1429-Dec-14-2934000Slopes, Upstream Survey and Mapping (by MWH) 0+630 - 0+650116-May-1516-May-15156023-Jan-1523-Jan-15-11334010Slopes, Upstream Survey and Mapping (by MWH) 0+650 - 0+670113-May-1513-May-15159314-Mar-1514-Mar-15-6034020Slopes, Upstream Survey and Mapping (by MWH) 0+670 - 0+690127-May-1527-May-1514809-May-159-May-15-1834030Slopes, Upstream Survey and Mapping (by MWH) 0+690 - 0+71015-Jun-155-Jun-1514209-Jun-159-Jun-15434040Slopes, Upstream Dental Concrete 0+490 - 0+510214-Aug-14 A16-Aug-14 A14-Aug-1416-Aug-14134050Slopes, Upstream Dental Concrete 0+510 - 0+530218-Aug-14 A20-Aug-14 A18-Aug-1420-Aug-14134060Slopes, Upstream Dental Concrete 0+530 - 0+550221-Aug-14 A23-Aug-14 A21-Aug-1423-Aug-14134070Slopes, Upstream Dental Concrete 0+550 - 0+5701423-Aug-14 A06-Sep-14 A9-Sep-1412-Sep-14734080Slopes, Upstream Dental Concrete 0+570 - 0+5902224-Sep-14 A16-Oct-14 A16-Oct-1418-Oct-14334090Slopes, Upstream Dental Concrete 0+590 - 0+610313-May-1515-May-15156010-Nov-1412-Nov-14-18434100Slopes, Upstream Dental Concrete 0+610 - 0+630429-Jan-15 A02-Feb-15 A30-Dec-141-Jan-15-3134110Slopes, Upstream Dental Concrete 0+630 - 0+650308-Feb-15 A11-Feb-15 A24-Jan-1526-Jan-15-1534120Slopes, Upstream Dental Concrete 0+650 - 0+670317-May-1519-May-15156815-Mar-1517-Mar-15-6334130Slopes, Upstream Dental Concrete 0+670 - 0+690328-May-1530-May-15148610-May-1512-May-15-1834140Slopes, Upstream Dental Concrete 0+690 - 0+71036-Jun-158-Jun-15142010-Jun-1512-Jun-154 COMPAC ZONE 7, ZONE 5, ZONE 649103-May-14 A5-Sep-1514203-May-1423-Sep-151834460Compact Zone 7 Material 2398 - 24051906-Jun-14 A25-Jun-14 A6-Jun-1425-Jun-14134470Compact Zone 7 Material 2405 - 2410515-Jul-14 A20-Jul-14 A15-Jul-1420-Jul-14134480Compact Zone 7 Material 2410 - 24201221-Jul-14 A02-Aug-14 A21-Jul-142-Aug-14134490Compact Zone 7 Material 2420 - 24301403-Aug-14 A17-Aug-14 A3-Aug-1425-Aug-14934500Compact Zone 7 Material 2430 - 24401718-Aug-14 A04-Sep-14 A6-Sep-1430-Sep-142734510Compact Zone 7 Material 2440 - 24502505-Sep-14 A30-Sep-14 A1-Oct-1425-Oct-142634520Compact Zone 7 Material 2450 - 24603101-Oct-14 A31-Oct-14 A26-Oct-1419-Nov-141934530Compact Zone 7 Material 2460 - 24702301-Nov-14 A24-Nov-14 A20-Nov-1414-Dec-142134540Compact Zone 7 Material 2470 - 24802925-Nov-14 A24-Dec-14 A15-Dec-148-Jan-151634550Compact Zone 7 Material 2480 - 24902425-Dec-14 A18-Jan-15 A9-Jan-152-Feb-151634560Compact Zone 7 Material 2490 - 25002719-Jan-15 A15-Feb-15 A3-Feb-1527-Feb-151334580Compact Zone 7 Material 2500 - 25102416-Feb-15 A12-Mar-15 A16-Mar-1527-Mar-151634590Compact Zone 7 Material 2510 - 25202613-Mar-15 A07-Apr-15 A31-Mar-1524-Apr-151734600Compact Zone 7 Material 2520 - 25302708-Apr-15 A05-May-15 A1-May-1525-May-152134610Compact Zone 7 Material 2530 - 25405106-May-15 A25-Jun-15142013-Jun-157-Jul-151234620Compact Zone 7 Material 2540 - 25502425-Jun-1519-Jul-1514208-Jul-1531-Jul-151234630Compact Zone 7 Material 2550 - 25602419-Jul-1512-Aug-1514201-Aug-1524-Aug-151234640Compact Zone 7 Material 2560 - 25702412-Aug-155-Sep-15142031-Aug-1523-Sep-151834650Compact Blanket Zone 5 & 6 Material 2400 - 2405603-May-14 A08-May-14 A3-May-148-May-14034660Compact Blanket Zone 5 & 6 Material 2405 - 24101409-May-14 A22-May-14 A9-May-1422-May-14034670Compact Blanket Zone 5 & 6 Material 2410 - 24202001-Jul-14 A20-Jul-14 A1-Jul-1420-Jul-14034680Compact Blanket Zone 5 & 6 Material 2420 - 24302821-Jul-14 A17-Aug-14 A21-Jul-1415-Aug-14-234690Compact Blanket Zone 5 & 6 Material 2430 - 24401818-Aug-14 A04-Sep-14 A15-Aug-148-Sep-14334700Compact Blanket Zone 5 & 6 Material 2440 - 24502605-Sep-14 A30-Sep-14 A8-Sep-142-Oct-14134710Compact Blanket Zone 5 & 6 Material 2450 - 24601701-Oct-14 A17-Oct-14 A2-Oct-1426-Oct-14834720Compact Blanket Zone 5 & 6 Material 2460 - 24703718-Oct-14 A24-Nov-14 A26-Oct-1419-Nov-14-534730Compact Blanket Zone 5 & 6 Material 2470 - 24802825-Nov-14 A23-Dec-14 A20-Nov-1413-Dec-14-934740Compact Blanket Zone 5 & 6 Material 2480 - 24902124-Dec-14 A14-Jan-15 A20-Dec-1412-Jan-15-134750Compact Blanket Zone 5 & 6 Material 2490 - 25002315-Jan-15 A07-Feb-15 A20-Jan-1512-Feb-15634770Compact Blanket Zone 5 & 6 Material 2500 - 25103008-Feb-15 A10-Mar-15 A4-Mar-1515-Mar-15634780Compact Blanket Zone 5 & 6 Material 2510 - 25202811-Mar-15 A08-Apr-15 A20-Mar-1512-Apr-15534790Compact Blanket Zone 5 & 6 Material 2520 - 25302609-Apr-15 A05-May-15 A20-Apr-1513-May-15934800Compact Blanket Zone 5 & 6 Material 2530 - 25401906-May-15 A24-May-15178021-May-1513-Jun-152034810Compact Blanket Zone 5 & 6 Material 2540 - 25502425-May-1517-Jun-15178420-Jun-1513-Jul-152634820Compact Blanket Zone 5 & 6 Material 2550 - 25602222-Jun-1514-Jul-151742022-Jul-1512-Aug-153034830Compact Blanket Zone 5 & 6 Material 2560 - 2570223-Aug-1525-Aug-151541121-Aug-1511-Sep-1518 CV1000Combined Zones 2b, 3, 5, 6 Level 2410 (by SMCV)1901-Jul-14 A20-Jul-14 A1-Jul-1420-Jul-141 CV1010Combined Zones 2b, 3, 5, 6 Level 2420 (by SMCV)1221-Jul-14 A02-Aug-14 A21-Jul-142-Aug-141 CV1020Combined Zones 2b, 3, 5, 6 Level 2430 (by SMCV)1303-Aug-14 A16-Aug-14 A3-Aug-1417-Aug-142 CV1030Combined Zones 2b, 3, 5, 6 Level 2440 (by SMCV)1817-Aug-14 A04-Sep-14 A18-Aug-146-Sep-143 CV1040Combined Zones 2b, 3, 5, 6 Level 2450 (by SMCV)2505-Sep-14 A30-Sep-14 A7-Sep-1424-Sep-14-5 CV1050Combined Zones 2b, 3, 5, 6 Level 2460 (by SMCV)3001-Oct-14 A31-Oct-14 A25-Sep-1425-Oct-14-5 CV1060Combined Zones 2b, 3, 5, 6 Level 2470 (by SMCV)2301-Nov-14 A24-Nov-14 A26-Oct-1424-Nov-141 CV1070Combined Zones 2b, 3, 5, 6 Level 2480 (by SMCV)2701-Dec-14 A28-Dec-14 A25-Nov-1425-Dec-14-2 CV1080Combined Zones 2b, 3, 5, 6 Level 2490 (by SMCV)2029-Dec-14 A18-Jan-15 A26-Dec-1424-Jan-157 CV1090Combined Zones 2b, 3, 5, 6 Level 2500 (by SMCV)2819-Jan-15 A16-Feb-15 A25-Jan-1524-Feb-159 CV1100Combined Zones 2b, 3, 5, 6 Level 2510 (by SMCV)2217-Feb-15 A11-Mar-15 A25-Feb-1527-Mar-1517 CV1110Combined Zones 2b, 3, 5, 6 Level 2520 (by SMCV)2512-Mar-15 A06-Apr-15 A28-Mar-1524-Apr-1519 CV1120Combined Zones 2b, 3, 5, 6 Level 2530 (by SMCV)2807-Apr-15 A05-May-15 A25-Apr-1525-May-1521 CV1130Combined Zones 2b, 3, 5, 6 Level 2540 (by SMCV)2406-May-15 A30-May-15145026-May-1525-Jun-1527 CV1140Combined Zones 2b, 3, 5, 6 Level 2550 (by SMCV)2130-May-1520-Jun-15145026-Jun-1525-Jul-1536 CV1150Combined Zones 2b, 3, 5, 6 Level 2560 (by SMCV)2620-Jun-1516-Jul-15145026-Jul-1524-Aug-1540 CV1160Combined Zones 2b, 3, 5, 6 Level 2570 (by SMCV)4223-Jul-153-Sep-15145325-Aug-1523-Sep-1521 GROUTING47921-Jan-14 A15-May-15286021-Jan-1418-Jan-15-11635000Concrete Grout Cap - Left Abutment (station 0+372-0+382)818-Feb-14 A25-Feb-14 A18-Feb-1425-Feb-14035010Concrete Grout Cap - Left Abutment (station 0+362-0+372)526-Feb-14 A03-Mar-14 A26-Feb-143-Mar-14135020Concrete Grout Cap - Left Abutment (station 0+352-0+362)304-Mar-14 A07-Mar-14 A4-Mar-147-Mar-14135030Concrete Grout Cap - Left Abutment (station 0+342-0+352)408-Mar-14 A12-Mar-14 A8-Mar-1412-Mar-14135040Concrete Grout Cap - Left Abutment (station 0+332-0+342)213-Mar-14 A15-Mar-14 A13-Mar-1415-Mar-14135050Concrete Grout Cap - Left Abutment (station 0+322-0+332)316-Mar-14 A19-Mar-14 A16-Mar-1419-Mar-14135060Concrete Grout Cap - Left Abutment (station 0+312-0+322)220-Mar-14 A22-Mar-14 A20-Mar-1422-Mar-14135070Concrete Grout Cap - Left Abutment (station 0+302-0+312)323-Mar-14 A26-Mar-14 A23-Mar-1426-Mar-14135080Concrete Grout Cap - Left Abutment (station 0+292-0+302)427-Mar-14 A31-Mar-14 A27-Mar-1431-Mar-14135081Concrete Grout Cap - Left Abutment (station 0+284-0+292)301-Apr-14 A04-Apr-14 A1-Apr-144-Apr-14135082Concrete Grout Cap - Left Abutment (station 0+276-0+284)305-Apr-14 A08-Apr-14 A5-Apr-148-Apr-14135083Concrete Grout Cap - Left Abutment (station 0+268-0+276)209-Apr-14 A11-Apr-14 A9-Apr-1411-Apr-14135084Concrete Grout Cap - Left Abutment (station 0+252-0+268)312-Apr-14 A15-Apr-14 A12-Apr-1415-Apr-14135085Concrete Grout Cap - Left Abutment (station 0+243-0+252)616-Apr-14 A22-Apr-14 A16-Apr-1422-Apr-14135090Grouting Laboratory Mobilization021-Jan-14 A21-Jan-14 A21-Jan-1421-Jan-14135100Definition for Water Source for Grouting (by SMCV)027-Jan-14 A27-Jan-14035110Grouting Mix Desing1827-Jan-14 A13-Feb-14 A27-Jan-1413-Feb-14035120Grout Probes Breaking721-Feb-14 A27-Feb-14 A21-Feb-1427-Feb-14035130Drilling and Grouting Equipment Mobilization and Approbation3321-Jan-14 A22-Feb-14 A21-Jan-1422-Feb-14035140Engineering 0+440 - 0+480 by MWH2723-Feb-14 A21-Mar-14 A23-Feb-1421-Mar-14035150Drill & Grout 0+440 - 0+480 Valley Bottom3422-Mar-14 A24-Apr-14 A22-Mar-1424-Apr-14035152Increasing Quantities Drill & Grout 0+440 - 0+480 Valley Bottom2625-Apr-14 A21-May-14 A25-Apr-1421-May-14135155Engineering 0+305 - 0+440 by MWH2822-Mar-14 A18-Apr-14 A22-Mar-1418-Apr-14035160Drill & Grout 0+432 - 0+440 Left Abutment522-May-14 A27-May-14 A22-May-1427-May-14135170Drill & Grout 0+424 - 0+432 Left Abutment1130-May-14 A10-Jun-14 A30-May-1410-Jun-14135180Drill & Grout 0+416 - 0+424 Left Abutment802-Jun-14 A10-Jun-14 A2-Jun-1410-Jun-14135190Drill & Grout 0+408 - 0+416 Left Abutment810-Jun-14 A18-Jun-14 A10-Jun-1418-Jun-14135200Drill & Grout 0+400 - 0+408 Left Abutment813-Jun-14 A20-Jun-14 A13-Jun-1420-Jun-14035210Drill & Grout 0+392 - 0+400 Left Abutment916-Jun-14 A25-Jun-14 A16-Jun-1425-Jun-14135220Drill & Grout 0+384 - 0+392 Left Abutment923-Jun-14 A02-Jul-14 A23-Jun-142-Jul-14135230Drill & Grout 0+380 - 0+384 Left Abutment502-Jul-14 A07-Jul-14 A2-Jul-147-Jul-14135240Drill & Grout 0+360 - 0+380 Left Abutment1903-Jul-14 A22-Jul-14 A3-Jul-1422-Jul-14135250Drill & Grout 0+340 - 0+360 Left Abutment1405-Jul-14 A19-Jul-14 A5-Jul-1419-Jul-14135260Drill & Grout 0+320 - 0+340 Left Abutment715-Jul-14 A22-Jul-14 A15-Jul-1422-Jul-14135270Drill & Grout 0+300 - 0+320 Left Abutment1620-Jul-14 A05-Aug-14 A20-Jul-1413-Aug-14935280Drill & Grout 0+280 - 0+300 Left Abutment517-Jul-14 A22-Jul-14 A17-Jul-1414-Aug-142435290Drill & Grout 0+260 - 0+280 Left Abutment2822-Jul-14 A19-Aug-14 A14-Aug-1418-Aug-14035300Drill & Grout 0+240 - 0+260 Left Abutment220-Aug-14 A22-Aug-14 A18-Aug-1422-Aug-14135310Drill & Grout 0+220 - 0+240 Left Abutment2823-Aug-14 A20-Sep-14 A22-Aug-1426-Aug-14-2535320Drill & Grout 0+160 - 0+180 Left Abutment701-Oct-14 A08-Oct-14 A20-Sep-1424-Sep-14-1335330Drill & Grout 0+140 - 0+160 Left Abutment309-Sep-14 A12-Sep-14 A24-Sep-1427-Sep-141635340Drill & Grout 0+125 - 0+140 Left Abutment315-Sep-14 A18-Sep-14 A28-Sep-142-Oct-141535350Install Scaffolding 0+110 to Up Levels701-Aug-14 A08-Aug-14 A13-Aug-1420-Aug-141335360Drill & Grout 0+117 - 0+125 Left Abutment317-Sep-14 A19-Sep-14 A21-Aug-1423-Aug-14-2735370Drill & Grout 0+109 - 0+117 Left Abutment408-Aug-14 A12-Aug-14 A24-Aug-1426-Aug-141535380Drill & Grout 0+101 - 0+109 Left Abutment213-Aug-14 A15-Aug-14 A27-Aug-1429-Aug-141535390Drill & Grout 0+093 - 0+101 Left Abutment616-Aug-14 A22-Aug-14 A30-Aug-141-Sep-141135400Drill & Grout 0+090 - 0+093 Left Abutment523-Aug-14 A28-Aug-14 A2-Sep-144-Sep-14835410Remove Access 0+180 - 0+2201013-Sep-14 A23-Sep-14 A26-Aug-145-Sep-14-1735420Drill & Grout 0+180 - 0+220 Left Abutment222-Sep-14 A24-Sep-14 A12-Sep-1416-Sep-14-735430Drill & Grout 0+160 - 0+180 Left Abutment510-Oct-14 A15-Oct-14 A16-Sep-1420-Sep-14-2435440Engineering 0+480 - 0+490 by MWH2019-Apr-14 A08-May-14 A19-Apr-148-May-14035450Drill & Grout 0+480 - 0+490 Right Abutment225-May-14 A27-May-14 A25-May-1427-May-14135460Drill & Grout 0+490 - 0+510 Right Abutment1428-May-14 A11-Jun-14 A28-May-1411-Jun-14135470Drill & Grout 0+510 - 0+530 Right Abutment1107-Jun-14 A18-Jun-14 A7-Jun-1418-Jun-14135480Drill & Grout 0+530 - 0+550 Right Abutment116-Jun-14 A17-Jun-14 A16-Jun-1417-Jun-14135490Drill & Grout 0+550 - 0+570 Right Abutment5119-Jun-14 A09-Aug-14 A27-Aug-1431-Aug-142335500Drill & Grout 0+570 - 0+590 Right Abutment1110-Aug-14 A21-Aug-14 A31-Aug-144-Sep-141535510Drill & Grout 0+590 - 0+610 Right Abutment417-Sep-14 A20-Sep-14 A4-Sep-148-Sep-14-1235520Drill & Grout 0+610 - 0+625 Right Abutment3217-Sep-14 A18-Oct-14 A8-Sep-1412-Sep-14-3635530Install Scaffolding 0+625 to Up Leves815-Oct-14 A22-Oct-14 A4-Sep-1412-Sep-14-4035540Drill & Grout 0+625 - 0+633 Right Abutment715-Oct-14 A22-Oct-14 A12-Sep-1415-Sep-14-3635550Drill & Grout 0+633 - 0+641 Right Abutment823-Oct-14 A31-Oct-14 A15-Sep-1418-Sep-14-4235560Drill & Grout 0+641 - 0+649 Right Abutment601-Nov-14 A07-Nov-14 A18-Sep-1421-Sep-14-4635570Drill & Grout 0+649 - 0+657 Right Abutment807-Nov-14 A15-Nov-14 A21-Sep-1424-Sep-14-5135580Drill & Grout 0+657 - 0+665 Right Abutment1016-Nov-14 A26-Nov-14 A24-Sep-1427-Sep-14-5935590Drill & Grout 0+665 - 0+673 Right Abutment1027-Nov-14 A07-Dec-14 A27-Sep-1430-Sep-14-6735600Drill & Grout 0+673 - 0+681 Right Abutment1208-Dec-14 A20-Dec-14 A30-Sep-143-Oct-14-7735610Drill & Grout 0+681 - 0+689 Right Abutment1021-Dec-14 A31-Dec-14 A11-Dec-1413-Dec-14-1735620Drill & Grout 0+689 - 0+697 Right Abutment601-Jan-15 A07-Jan-15 A14-Dec-1416-Dec-14-2135630Drill & Grout 0+697 - 0+700 Right Abutment708-Jan-15 A15-Jan-15 A17-Dec-1419-Dec-14-2635640Drill & Grout 0+700 - 0+720 Right Abutment1216-Jan-15 A28-Jan-15 A24-Dec-1427-Dec-14-3135650Drill & Grout 0+720 - 0+740 Right Abutment2229-Jan-15 A20-Feb-15 A6-Jan-159-Jan-15-4135660Install Scaffolding 0+740 to Up Levels4108-Jan-15 A18-Feb-15 A20-Dec-1427-Dec-14-5235670Drill & Grout 0+740 - 0+748 Right Abutment7718-Feb-15 A06-May-15 A10-Jan-1512-Jan-15-11335680Drill & Grout 0+748 - 0+756 Right Abutment807-May-15 A15-May-15256013-Jan-1518-Jan-15-116 STARTER DAM EMBANKMENT65431-Jan-14 A16-Nov-1571031-Jan-1430-Sep-15-4638000Elev 2375 to 2380 Load Haul Place Zone 43023-Mar-14 A22-Apr-14 A23-Mar-1422-Apr-14138010Elev 2380 to 2390 Load Haul Place Zone 42423-Apr-14 A17-May-14 A23-Apr-1417-May-14138020Elev 2390 to 2400 Load Haul Place Zone 41818-May-14 A05-Jun-14 A18-May-145-Jun-14138030Elev 2400 to 2410 Load Haul Place Zone 42506-Jun-14 A01-Jul-14 A6-Jun-141-Jul-14138040Elev 2410 to 2420 Load Haul Place Zone 41401-Jul-14 A14-Jul-14 A1-Jul-1415-Jul-14138050Elev 2420 to 2430 Load Haul Place Zone 41215-Jul-14 A26-Jul-14 A15-Jul-1415-Aug-142038060Elev 2430 to 2440 Load Haul Place Zone 43627-Jul-14 A31-Aug-14 A1-Aug-1430-Aug-14-138070Elev 2440 to 2450 Load Haul Place Zone 48601-Sep-14 A26-Nov-14 A30-Aug-1413-Sep-14-7338080Elev 2450 to 2460 Load Haul Place Zone 45727-Nov-14 A06-Mar-15 A15-Oct-1423-Oct-14-13338090Elev 2460 to 2470 Load Haul Place Zone 41907-Mar-15 A26-Mar-15 A12-Nov-1422-Nov-14-12338100Elev 2470 to 2480 Load Haul Place Zone 41427-Mar-15 A10-Apr-15 A11-Dec-1423-Dec-14-10738110Elev 2480 to 2490 Load Haul Place Zone 41311-Apr-15 A24-Apr-15 A9-Jan-1522-Jan-15-9138120Elev 2490 to 2500 Load Haul Place Zone 41425-Apr-15 A10-May-15 A7-Feb-1522-Feb-15-7638130Elev 2500 to 2510 Load Haul Place Zone 41411-May-15 A25-May-157105-Mar-1525-Mar-15-6038140Elev 2510 to 2520 Load Haul Place Zone 42525-May-1519-Jun-1571029-Mar-1522-Apr-15-5738150Elev 2520 to 2530 Load Haul Place Zone 42719-Jun-1516-Jul-1571027-Apr-1523-May-15-5338160Elev 2530 to 2540 Load Haul Place Zone 42616-Jul-1511-Aug-1571029-May-1523-Jun-15-4838170Elev 2540 to 2550 Load Haul Place Zone 42811-Aug-158-Sep-1571026-Jun-1523-Jul-15-4638180Elev 2550 to 2560 Load Haul Place Zone 4468-Sep-1524-Oct-1571024-Jul-157-Sep-15-4638190Elev 2560 to 2570 Load Haul Place Zone 43611-Oct-1516-Nov-1571026-Aug-1530-Sep-15-46 CV1990Downstream Zone 1 by SMCV Level 23701831-Jan-14 A17-Feb-14 A31-Jan-1417-Feb-140 CV2000Downstream Zone 1 by SMCV Level 23801818-Feb-14 A07-Mar-14 A18-Feb-147-Mar-140 CV2010Downstream Zone 1 by SMCV Level 23901808-Mar-14 A25-Mar-14 A8-Mar-1425-Mar-140 CV2020Downstream Zone 1 by SMCV Level 24002526-Mar-14 A19-Apr-14 A26-Mar-1419-Apr-140 CV2030Downstream Zone 1 by SMCV Level 24101820-Apr-14 A07-May-14 A20-Apr-147-May-140 CV2040Downstream Zone 1 by SMCV Level 24201808-May-14 A25-May-14 A8-May-1424-May-14-1 CV2050Downstream Zone 1 by SMCV Level 24301526-May-14 A09-Jun-14 A26-May-149-Jun-140 CV2060Downstream Zone 1 by SMCV Level 24401410-Jun-14 A23-Jun-14 A10-Jun-1423-Jun-140 CV2070Downstream Zone 1 by SMCV Level 2450724-Jun-14 A30-Jun-14 A25-Jun-1430-Jun-140 CV2080Downstream Zone 1 by SMCV Level 24603217-Oct-14 A18-Nov-14 A13-Sep-1413-Oct-14-35 CV2090Downstream Zone 1 by SMCV Level 2470519-Nov-14 A24-Nov-14 A14-Oct-1412-Nov-14-11 CV2100Downstream Zone 1 by SMCV Level 24801901-Dec-14 A20-Dec-14 A13-Nov-1413-Dec-14-6 CV2110Downstream Zone 1 by SMCV Level 24902421-Dec-14 A14-Jan-15 A14-Dec-1412-Jan-15-1 CV2120Downstream Zone 1 by SMCV Level 25002615-Jan-15 A10-Feb-15 A13-Jan-1512-Feb-153 CV2130Downstream Zone 1 by SMCV Level 25102811-Feb-15 A11-Mar-15 A13-Feb-1515-Mar-155 CV2140Downstream Zone 1 by SMCV Level 25202612-Mar-15 A07-Apr-15 A16-Mar-1512-Apr-156 CV2150Downstream Zone 1 by SMCV Level 25302108-Apr-15 A29-Apr-15 A13-Apr-1513-May-1515 CV2160Downstream Zone 1 by SMCV Level 25402130-Apr-15 A21-May-15143014-May-1513-Jun-1524 CV2170Downstream Zone 1 by SMCV Level 25502121-May-1511-Jun-15144014-Jun-1513-Jul-1533 CV2180Downstream Zone 1 by SMCV Level 25602618-Jun-1514-Jul-15144014-Jul-1512-Aug-1530 CV2190Downstream Zone 1 by SMCV Level 25704214-Jul-1525-Aug-15144013-Aug-1511-Sep-1518 CV2200Downstream Zone 1 Stage II by SMCV7915-Jul-14 A01-Oct-14 A15-Jul-1412-Sep-14-19 SEEPAGE COLLECTION (DRAINS)87107-Sep-13 A25-Jan-163007-Sep-1329-Aug-15-149 DRAIN 162507-Sep-13 A24-May-1527607-Sep-1318-Feb-15-9540000Archaeological Polygons Release (by SMCV)007-Sep-13 A7-Sep-13140010Excavation Drain A128707-Sep-13 A20-Jun-14 A7-Sep-1320-Jun-140 PIPE TRENCH N17916-Jun-14 A04-Sep-14 A016-Jun-1417-Aug-14-1840020Start Pipe Trench N01016-Jun-14 A16-Jun-14040030Trench Excavation7817-Jun-14 A04-Sep-14 A17-Jun-1414-Aug-14-2140040Cleanning and profile trench7520-Jun-14 A04-Sep-14 A20-Jun-1416-Aug-14-1940050Geotextile Placement6827-Jun-14 A04-Sep-14 A27-Jun-1416-Aug-14-19400600.3 m Bedding Zone 6 or 6A6728-Jun-14 A04-Sep-14 A28-Jun-1416-Aug-14-1940070Place HDPE pipe perforated5015-Jul-14 A04-Sep-14 A15-Jul-1417-Aug-14-1840080Zone 6 material Compaction2716-Jul-14 A13-Aug-14 A16-Jul-1413-Aug-14040090End Pipe Trench N01004-Sep-14 A16-Aug-14-20 PIPE TRENCH N37916-Jun-14 A04-Sep-14 A016-Jun-1423-Aug-14-1240100Start Pipe Trench N03016-Jun-14 A16-Jun-14040110Trench Excavation7817-Jun-14 A04-Sep-14 A17-Jun-1414-Aug-14-2140120Cleanning and profile trench7520-Jun-14 A04-Sep-14 A20-Jun-1418-Aug-14-1740130Geotextile Placement6827-Jun-14 A04-Sep-14 A27-Jun-1420-Aug-14-15401400.3 m Bedding Zone 6 or 6A6728-Jun-14 A04-Sep-14 A28-Jun-1420-Aug-14-1540150Place HDPE pipe perforated4718-Jul-14 A04-Sep-14 A18-Jul-1420-Aug-14-1540160Zone 6 material Compaction4223-Jul-14 A04-Sep-14 A23-Jul-1423-Aug-14-1240170End Pipe Trench N03004-Sep-14 A23-Aug-14-12 PIPE TRENCH N28613-Aug-14 A07-Nov-14 A013-Aug-146-Sep-14-6240180Start Pipe Trench N02013-Aug-14 A23-Aug-141140190Trench Excavation8213-Aug-14 A03-Nov-14 A13-Aug-1427-Aug-14-6740200Cleanning and profile trench8213-Aug-14 A03-Nov-14 A24-Aug-1429-Aug-14-6640210Geotextile Placement8016-Aug-14 A04-Nov-14 A25-Aug-1430-Aug-14-66402200.3 m Bedding Zone 6 or 6A8116-Aug-14 A05-Nov-14 A26-Aug-1431-Aug-14-6640230Place HDPE pipe perforated8216-Aug-14 A06-Nov-14 A27-Aug-141-Sep-14-6640240Zone 6 material Compaction6930-Aug-14 A07-Nov-14 A28-Aug-146-Sep-14-6240250End Pipe Trench N02007-Nov-14 A6-Sep-14-62 FILLING ACTIVITIES26304-Sep-14 A24-May-1527606-Sep-1418-Feb-15-95 SEEPAGE BARRIER N16504-Sep-14 A08-Nov-14 A06-Sep-1419-Sep-14-4940260Start Seepage Barrier N01004-Sep-14 A6-Sep-14240270Control of Topography6004-Sep-14 A03-Nov-14 A7-Sep-147-Sep-14-5640280Cleanning of Area6004-Sep-14 A03-Nov-14 A6-Sep-147-Sep-14-5740290Geomembrane Placement6404-Sep-14 A07-Nov-14 A8-Sep-149-Sep-14-5840300Structural Fill Zone 6A (550 m3)6504-Sep-14 A08-Nov-14 A10-Sep-1419-Sep-14-4940310Finish Seepage Barrier008-Nov-14 A19-Sep-14-49 SEEPAGE BARRIER N211804-Sep-14 A31-Dec-14 A06-Sep-1419-Sep-14-10240320Start Seepage Barrier N02004-Sep-14 A6-Sep-14240330Cleannig of Area6304-Sep-14 A06-Nov-14 A6-Sep-147-Sep-14-6040340Control of Topography6404-Sep-14 A06-Nov-14 A7-Sep-147-Sep-14-6040350Geomembrane Placement7704-Sep-14 A19-Nov-14 A8-Sep-149-Sep-14-7140360Structural Fill Zone 6A (550 m3)8004-Sep-14 A22-Nov-14 A10-Sep-1419-Sep-14-6440370Finish Seepage Barrier N02031-Dec-14 A19-Sep-14-102 FILLING26304-Sep-14 A24-May-15276013-Sep-1418-Feb-15-9540380Place and compact zone 6A (12,000 m3)1204-Sep-14 A15-Sep-14 A13-Sep-1422-Sep-14740390Place and compact zone 6A (12,000 m3)816-Sep-14 A23-Sep-14 A22-Sep-142-Oct-14940400Place and compact zone 6A (12,000 m3)824-Sep-14 A01-Oct-14 A2-Oct-1412-Oct-141140410Place and compact zone 6A (12,000 m3)702-Oct-14 A08-Oct-14 A12-Oct-1422-Oct-141440420Place and compact zone 6A (12,000 m3)709-Oct-14 A15-Oct-14 A22-Oct-141-Nov-141740430Place and compact zone 6A (12,000 m3)716-Oct-14 A22-Oct-14 A1-Nov-1411-Nov-142040440Place and compact zone 6A (12,000 m3)723-Oct-14 A29-Oct-14 A11-Nov-1421-Nov-142340450Place and compact zone 6A (12,000 m3)830-Oct-14 A07-Nov-14 A21-Nov-141-Dec-142540460Place and compact zone 6A (12,000 m3)508-Nov-14 A13-Nov-14 A1-Dec-1411-Dec-142940470Place and compact zone 6A (12,000 m3)514-Nov-14 A19-Nov-14 A11-Dec-1421-Dec-143340480Place and compact zone 6A (12,000 m3)719-Nov-14 A26-Nov-14 A21-Dec-1431-Dec-143640490Place and compact zone 6A (12,000 m3)727-Nov-14 A04-Dec-14 A1-Jan-1510-Jan-153840500Place and compact zone 6 (4000 m3)704-Dec-14 A10-Dec-14 A11-Jan-1515-Jan-153640510Place and compact zone 6 (4000 m3)811-Dec-14 A19-Dec-14 A16-Jan-1520-Jan-153340520Place and compact zone 6 (4000 m3)1120-Dec-14 A31-Dec-14 A21-Jan-1525-Jan-152640530Place and compact zone 5 (7000 m3)817-Dec-14 A25-Dec-14 A26-Jan-152-Feb-154040540Place and compact zone 5 (7000 m3)1226-Dec-14 A06-Jan-15 A3-Feb-1510-Feb-153540550Place and compact zone 5 (7000 m3)3207-Jan-15 A24-May-15276011-Feb-1518-Feb-15-9540560End Filling024-May-1527616418-Feb-15-95 DRAIN 248410-Mar-14 A6-Jul-15203010-Mar-1428-Dec-14-19041000Rippable material excavation-Drains10510-Mar-14 A22-Jun-14 A10-Mar-1422-Jun-14041010Rock Excavation-Drains10411-Mar-14 A22-Jun-14 A11-Mar-1422-Jun-14041020Loose material excavation-Drains12011-Mar-14 A08-Jul-14 A11-Mar-148-Jul-14041025Fill Zone 43023-Jun-14 A22-Jul-14 A23-Jun-1422-Jul-14041030Drain Trench Excavation27313-Aug-14 A13-May-150013-Aug-141-Sep-14-25341040Geotextile-Drains309-May-15 A12-May-15 A2-Sep-145-Sep-14-24841050HDPE Drain Pipe-Drains8206-Sep-14 A26-Nov-14 A6-Sep-1413-Sep-14-7441060Zone 6 in Drain Trench4308-Oct-14 A20-Nov-14 A6-Sep-1417-Sep-14-6341070Tie-in Sub Drain with Drain A2306-Sep-14 A09-Sep-14 A14-Sep-1415-Sep-14741080Seepage Barrier712-Nov-14 A19-Nov-14 A14-Sep-1417-Sep-14-6241090Zone 6A - Course Drain719-Nov-14 A26-Nov-14 A18-Sep-143-Oct-14-5341100Zone 6A - Course Drain727-Nov-14 A04-Dec-14 A4-Oct-1419-Oct-14-4541110Zone 6A - Course Drain405-Dec-14 A09-Dec-14 A20-Oct-143-Nov-14-3541120Zone 6A - Course Drain16910-Dec-14 A27-May-15004-Nov-1418-Nov-14-19041130Zone 6 -Drains10725-Dec-14 A10-Jun-150019-Nov-142-Dec-14-19041140Zone 5 SCS Filter2611-Jun-156-Jul-152032033-Dec-1428-Dec-14-190 DRAIN 341408-Dec-14 A25-Jan-160015-Sep-1411-Aug-15-16742000Areas Release Drains 3+4 (by SMCV: informed 17-jun-14)010-Dec-14 A15-Sep-14-8642010Rock Excavation-Drains 0+000 - 0+15019208-Dec-14 A17-Jun-150010-Dec-141-Jan-15-16742020Geotextile-Drains 0+000 - 0+150417-Jun-1521-Jun-15002-Jan-155-Jan-15-16742030HDPE Drain Pipe-Drains 0+000 - 0+150321-Jun-1524-Jun-15006-Jan-158-Jan-15-16742040Zone 6 - Over Pipe 0+000 - 0+150224-Jun-1526-Jun-15009-Jan-1510-Jan-15-16742050Zone 6A - Course Drain 0+000 - 0+1502326-Jun-1519-Jul-150011-Jan-152-Feb-15-16742060Zone 6 - Drains 0+000 - 0+150819-Jul-1527-Jul-15003-Feb-1510-Feb-15-16742070Zone 5 SCS Filter 0+000 - 0+1502227-Jul-1518-Aug-150011-Feb-154-Mar-15-16742080Rock Excavation-Drains 0+150 - 0+3002018-Aug-157-Sep-15005-Mar-1524-Mar-15-16742090Geotextile-Drains 0+150 - 0+30047-Sep-1511-Sep-150025-Mar-1528-Mar-15-16742100HDPE Drain Pipe-Drains 0+150 - 0+300311-Sep-1514-Sep-150029-Mar-1531-Mar-15-16742110Zone 6 - Over Pipe 0+150 - 0+300214-Sep-1516-Sep-15001-Apr-152-Apr-15-16742120Zone 6A - Course Drain 0+150 - 0+3002216-Sep-158-Oct-15003-Apr-1524-Apr-15-16742130Zone 6 - Drains 0+150 - 0+30088-Oct-1516-Oct-150025-Apr-152-May-15-16742140Zone 5 SCS Filter 0+150 - 0+3002216-Oct-157-Nov-15003-May-1524-May-15-16742150Rock Excavation-Drains 0+300 - 0+515207-Nov-1527-Nov-150025-May-1513-Jun-15-16742160Geotextile-Drains 0+300 - 0+515427-Nov-151-Dec-150014-Jun-1517-Jun-15-16742170HDPE Drain Pipe-Drains 0+300 - 0+51531-Dec-154-Dec-150018-Jun-1520-Jun-15-16742180Zone 6 - Over Pipe 0+300 - 0+51524-Dec-156-Dec-150021-Jun-1522-Jun-15-16742190Zone 6A - Course Drain 0+300 - 0+515226-Dec-1528-Dec-150023-Jun-1514-Jul-15-16742200Zone 5 SCS Filter 0+300 - 0+515205-Jan-1625-Jan-160023-Jul-1511-Aug-15-16742210Zone 6 - Drains 0+300 - 0+515828-Dec-155-Jan-160015-Jul-1522-Jul-15-167 DRAIN 429924-Oct-14 A18-Aug-15190015-Sep-1427-Apr-15-11343000Areas Release Drains 3+4 (by SMCV: informed 17-jun-14)012-May-15 A15-Sep-14-23943005Loose material excavation-Drains 2390 - 240011224-Oct-14 A27-Feb-15 A15-Sep-1420-Sep-14-15943010Rippable material excavation-Drains 2390 - 240012624-Oct-14 A27-Feb-15 A15-Sep-1420-Sep-14-15943020Rock Excavation-Drains 2390 - 240012624-Oct-14 A27-Feb-15 A15-Sep-1420-Sep-14-15943030