Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa Central Electricity Authority piScama xao~Iya ivaVut saimait Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva- ), mauMba[- - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 Aa[- esa Aao : 9001-2008 ISO : 9001-2008 dUrBaaYa Phone: 022- 28221681; 28200194; 28200195; 28200196 fO@sa Fax : 022 – 28370193 Website : www.wrpc.nic.in E-mail : [email protected] saM : Paxaoivasa/p`caa./ Pa`sasa-kaya-saUcaI/2013-14/ 1417 idnaaMk : 10.02.2014 saovaa maoM , saUcaI ko Anausaar ivaYaya:- p.xao .iva.saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI 456 vaIM baOzk kI kaya- saUcaI. mahaodya, piMScama xao~Iya ivaVut saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI idnaaMk 13.02.2014 kao GETCO, Vadodara maoMoM haonao vaalaI 456 vaIM baOzk kI kaya-saUcaI AapkI saUcanaaqa- va Aagao kI kaya-vaahI ko ilae p`stut hO . Qanyavaad. BavadIya, saMlagna : ]Parao@tanausaar ( ema ema Qakato ) AQaIxaNa AiBayaMta (p`caalana)

Upload: others

Post on 27-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Baart sarkarGovernment of India kond`Iya ivaVut p`aiQakrNa

    Central Electricity Authority piScama xao~Iya ivaVut saimait

    Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauMba[- - 400 093

    F-3, MIDC Area, Andheri (East), Mumbai - 400 093

    Aa[- esa Aao : 9001-2008

    ISO : 9001-2008

    dUrBaaYa Phone: 022- 28221681; 28200194; 28200195; 28200196 fO@sa Fax : 022 – 28370193 Website : www.wrpc.nic.in E-mail : [email protected]

    saM: Paxaoivasa/p`caa./ Pa`sasa-kaya-saUcaI/2013-14/ 1417 idnaaMk : 10.02.2014

    saovaa maoM, saUcaI ko Anausaar ivaYaya:- p.xao.iva.saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI 456 vaIM baOzk kI kaya-

    saUcaI.

    mahaodya,

    piMScama xao~Iya ivaVut saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI idnaaMk 13.02.2014 kao GETCO, Vadodara maoMoM haonao vaalaI 456 vaIM baOzk kI kaya--saUcaI AapkI saUcanaaqa- va Aagao kI kaya-vaahI ko ilae p`stut hO .

    Qanyavaad.

    BavadIya,

    saMlagna : ]Parao@tanausaar

    ( ema ema Qakato) AQaIxaNa AiBayaMta (p`caalana)

  • AGENDA NOTES FOR 456th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC

    TO BE HELD ON 13TH FEBRUARY 2014 AT VADODARA ITEM No. 1: CONFIRMATION OF THE MINUTES

    Minutes of 455TH meeting of Operation & Coordination Sub-Committee of WRPC

    held on 16th JANUARY 2014 at Electricity Department, Diu, were forwarded vide letter

    No. WRPC/OPN/OCC-Minutes/2013-14/887 dated 29.01.2014.

    No comments have been received. OCC may confirm the same. ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF

    JANUARY 2014. 2.1 Frequency Particulars

    During January 2014 the system frequency was below 49.7 Hz for 0.62 % of time

    against 1.93 % of time during December 2013. The system frequency was within the

    IEGC range of 49.7 Hz -50.2 Hz for 89.92 % of the time against 88.51 % of time during

    December 2013. The average monthly frequency was 50.03 Hz during January 2014,

    whereas it was 50.02 Hz in the month of December 2013. Regarding operation in high

    frequency range, frequency during the month of January 2014 was above 50.20 Hz for

    9.46 % of time against 9.56 % of time during December 2013.

    The detailed frequency particulars are enclosed at Annex- 2.1.

    The Sub-Committee may like to note.

    2.2 Operational Discipline

    There was a net inter-regional export of 2944.00 MUs by WR against net export

    schedule of 2872.00 MUs. The Sub-Committee may like to discuss.

    2.3 Voltage Profile Voltage profile at some of 765/400 kV sub-stations during the month of January

    2014 furnished by WRLDC is enclosed at Annex-2.3.

    During the month, the deviations of voltages from the accepted limit on either

    side were recorded at the following locations in WR grid: -

  • 2

    456th OCCM AGENDA

    S.No. 765/400kV Sub-station

    Max. Voltageobserved (kV)

    Date of incidence

    Min. voltage observed (kV)*

    Date of incidence

    1 Indore 427 24.01.14 - - 2 Itarsi 427 31.01.14 - - 3 Karad 433 31.01.14 - - 4 Dhule 427 29.01.14 - - 5 Asoj 421 27.01.14 - - 6 Kasor 425 27.01.14 - - 7 Bhilai 428 31.01.14 - - 8 Jetpur 423 21.01.14 - - 9 Bina 430 07.01.14 - - 10 Gwalior 420 21.01.14 - - 11 Nagda 427 27.01.14 - - 12 Khandwa 433 31.01.14 - - 13 765kV Bina 81 07.01.14 - - 14 765 kV

    Gwalior 810 21.01.14 - -

    The Sub-Committee may like to discuss as above.

    2.4 U/F Relay Operations

    As per WRLDC records during January 2014 the system frequency didn’t touch 49.2

    Hz. The details of UFR operation received from constituents for the month of January

    2014 is enclosed at Annexure 2.4.

    GETCO has reported, AUFLS on five occasions in January 2014. Matter was

    discussed in 453rd & 454th OCC and Gujarat was advised to check the relay setting.

    GETCO may review the relay setting to avoid unintentional operation of UFR.

    As per CERC order dt 19.12.13 and dt. 23.12.2013 , petition filed by SRLDC and

    NRLDC, following shall be strictly complied.

    i) UFRs and df/dt relays are to be mapped on the SCADA system of each

    state so that it can be monitored from RLDC.

    ii) All STUs and SLDCs to map/network the UFR and df/dt on their SCADA

    system within 3 months

    iii) Load relief quantum shall be computed on average load.

    Strict compliance of IEGC regulation of 5.2(n) and 5.4.2(e) and non-compliance of

    regulation shall be reported to CERC by RLDC.

    The Sub-Committee may like to discuss.

  • 3

    456th OCCM AGENDA

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during January 2014 as furnished

    by the state utilities are given in Annex. 2.5. The Sub-Committee may note.

    2.6 Details of Generating Units under Forced outages Details of generating units under forced outages during January 2014 are given in

    Annex-2.6. The Sub-Committee may discuss.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during January 2014 are given in Annex-2.7

    The Sub-Committee may discuss.

    ITEM NO.3: OPERATIONAL PLANNING 3.1 Proposed Planned maintenance programme of generating units.

    The proposed maintenance programme of generating units for February 2014 &

    March 2014 is given in Annex 3.1. The Sub-Committee may discuss and finalize the outage schedule of

    generating units for the above period. 3.2 A. Outage Programme of Transmission Lines/elements

    Maintenance programme for transmission lines during the months of February

    2014 & March 2014 is given in Annex 3.2 A & B. The Sub-Committee may discuss and finalise the maintenance

    programme proposed above. B. Line outages planned vs. implemented:

    In 455th OCC meeting it was decided that WRLDC shall submit the list of

    planned transmission element outages vs. actual availed or emergency outages

    during the January 2014. WRLDC had submitted the list of emergency

    outages(Attached at Annexure-3.2-C1).

    WRLDC submitted the status of planned transmission element outages vs.

    actual availed or emergency outages during the January 2014. (Attached at Annexure-

    3.2-C2).

  • 4

    456th OCCM AGENDA

    The Sub-Committee may discuss.

    3.3 Anticipated Power Supply Position for the months – February 2014 & March 2014

    Details of anticipated restricted & un-restricted demands for the months of February 2014 & March 2014 are given in Annex 3.3 (A). The details of anticipated regional deficit are given below: (All figures in MW)

    State/ Region

    February 2014 March 2014 Anticipated Availability

    Anticipated Peak Demand

    Shortage AnticipatedAvailability

    Anticipated Peak Demand

    Shortage

    GETCO 11500 11600 100 11750 11840 90 MPPTCL 9350 9363 13 9680 9780 100 CSEB 3250 3350 100 3310 3400 90 MSETCL 17100 18050 950 18000 19050 1050 GOA 400 410 10 418 435 17 DD 330 335 5 335 345 10 DNH 610 620 10 620 635 15 WR 41530 42261 731 40570 43736 3166 Constituents may furnish the anticipated station wise Availability & Energy for the months of February 2014 & March 2014. ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF JANUARY 2014 The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexures: Annex 4.1 - Actual Generation and Requirement for January 2014. Annex 4.2 - Peak Demand: Schedule Vs Actual for January 2014. Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines for January 2014. Annex 4.7 – Details of level of Major Reservoirs in Western Region for January 2014.

    The Sub-Committee may like to note. ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month. The

    tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

    working day of the month as same have to be reported to MOP via GM division of

    CEA. Accordingly WRLDC may kindly furnish the tripping details to WRPC for

    necessary action. The tripping details during the month received from WRLDC is

    enclosed at Annexure-5.

    The Sub-Committee may like to note/discuss.

  • 5

    456th OCCM AGENDA

    ITEM NO. 6 Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below :

    Sl No. Name of

    constituents Date of Receipt

    1 PGCIL,WRTS-I 06.02.2014 2 PGCIL,WRTS-II 08.02.2014 3 MPPTCL 13.02.2014 4 NTPC 08.02.2014 5 CSPTCL 06.02.2014 6 GETCO 13.02.2014 7 MSETCL 13.02.2014

    Constituents of WR are requested to ensure healthiness and sent information to this

    office regularly as per the recommendation of enquiry committee of Grid disturbances on

    25.02.2007 and 28.02.2007.

    The sub-Committee may like to note.

    ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors. As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR. Accordingly the information regarding the commissioning schedule is as below:

    S. No.

    400 kV Sub/stn.

    Size (MVAR)

    Implementing agency

    Expected commissioning date

    1 Ranchodpura 125 MVAR GETCO Commd. On 8th July 2013 2 Varsana 125 MVAR GETCO Commd. On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd. On 5th August 2013 4 Amreli 125 MVAR GETCO Commd. On 12.07.2013 5 Jetpur 63 MVAR GETCO Commd. on 11.07.2013 6 Zerda 125 MVAR GETCO Commd. in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29.11.2013 8 Limbdi

    (Chornia) 125 MVAR GETCO 25th July 2013

    9 Jabalpur 125 MVAR PGCIL APRIL-14 TO June 2014 10 Khandwa 125 MVAR PGCIL APRIL-14 TO June 2014 11 Shujalpur 125 MVAR PGCIL APRIL-14 TO June 2014 12 Bhatapara 125 MVAR PGCIL APRIL-14 TO June 2014 13 Raigarh 125 MVAR PGCIL APRIL-14 TO June 2014

  • 6

    456th OCCM AGENDA

    14 Aurangabad 125 MVAR PGCIL APRIL-14 TO June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26.11.2013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August – December 2014 23 Bachau 125 MVAR PGCIL August – December 2014 24 Pirana 125 MVAR PGCIL August – December 2014 25 Itarsi 2X125

    MVAR PGCIL August – December 2014

    26 Seoni 125 MVAR PGCIL August – December 2014 27 Parli 125 MVAR PGCIL August – December 2014 28 Raipur 125 MVAR PGCIL August – December 2014 29 Gwalior 125 MVAR PGCIL August – December 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPGCL March-2015

    Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above. Utilities may give update on the status of implementation.

    7.2 Status of completion of 765/400 kV and above on going Transmission Schemes being executed/implemented by Transmission Agencies.

    The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows: - S. No.

    Name of the Line Target Completion Date

    Remarks

    POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

    16.03.2013 2 400 kV Navsari - Boisar D/C Line Dec- 2014 Severe ROW problem 3 765kV S/C Satna-Gwalior line (Ckt.-I) Feb - 2014 4 765kV S/C Satna-Gwalior line

    (359Km + 60Km D/C Portion) Ckt.-II April- 2014

    5 765 kV Sasan-Satna-II

    Commissioned on 01.06.13

  • 7

    456th OCCM AGENDA

    GUJARAT 1 400 kV D/C Kosamba-Chorania line

    (Package I)(From Chorania S/S to AP-54)

    April -2014

    2 400 kV D/C Kosamba-Chorania line (Package II)(From Kosamba S/S to AP-54)

    April -2014

    3 400 kV D/C Mundra-Zerda line No. 1 August -2014 4 400 kV D/C Mundra-Zerda line No. 2 April -2014 5 400 kV D/C Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

    Halvad March - 2014

    7 400 kV D/C Amreli-Kasor line(Part-1) April - 2014 8 315 MVA IInd ICT at Kosamba S/S Charged on 15.11.2013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

    DCDS Line 23,24.10.2013

    2 Malwa TPH-Chhegaon 400 KV DCDS Line

    Ckt –I on 22.03.2013 Ckt-II on 11.07.2013

    3 Chhegaon-Julwania 400 KV DCDS Line

    March - 2015

    4 Pithampur- Indore 400KV DCDS Line March- 2014

    5 Satpura TPH-Ashta 400KV DCDS Line

    March – 2015

    CSPTCL 1 400 kV Korba (W)-Khedamara

    DCDS Ckt II LILOed at Marwa August 2013 Test charged on

    20.08.2013

    2 400 kV Khedamara- Raita DCDS February -2014

    3 400kV DCDS Marwa-Raipur(Raita) January -2014

    Test charge from Raipur end in August 2013

    4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt.)

    June -2014

    MAHARASHTRA(STU)

    1 400KV Chandrapur- II- Warora D/C Dec - 2013 end.

    2 400KV D/C line from Koradi-II to Wardha S/S(PG) D/C

    March - 2014

    3 400 kV Chandrapur-Warora-II Commissioned on 16.01.2014 4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27.12.2013 5 400 kV Chandrapur-Parli-II LILO at

    Chandrapur-II S/S Commissioned on

    16.01.2014

  • 8

    456th OCCM AGENDA

    MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt. Ltd

    1 400 kV Parli(PG)-Pune D/C Commissioned Ckt - 1 on 08.11.2013 Commissioned Ckt - 2 on 10.11.2013

    2 400 kV Pune (PG)-Aurangabad (MSETCL) D/C

    November-13 Commissioned Ckt - 1 on 05.12.2013 Commissioned Ckt - 2 on 04.12.2013

    3 LILO Lonikhand –Kalwa at Pune(PG) Lonikhand-Pune charged on 21:30 on 09.07.2013 and Kalwa –Pune at 21:45 on 09.07.2013.

    GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd

    1 400 kV Rajgarh(PG)-Karamsad (GETCO) D/C

    February -2014

    The Sub-Committee may note/discuss.

    7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14.

    The status regarding Generating units, commissioned /expected to be commissioned during the current year 2013-14 according the available information is as below:

    Name of the Power Projects Unit No. Capacity (MW)

    Date of Commissioning /Schedule Date

    GUJARAT Ukai 6 500 COD on 08.06.2013

    Pipavav CCPP- GPCL & GSPC joint venture Block-1 350

    March- 2014 Made in synchronized on 10.10.2013.

    Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 382.5 COD on 04.04.2013 CHHATTISGARH Marwa TPS I 500 25.12.2013 Korba (w) Ext-5 500 COD on 05.09.2013 KSK Mahanadi 3 600 COD on 14.08.2013

    VEDANTA VIDYUT 1 135 Synchronized on 11.08.2013

    MAHARASHTRA

    INDIABULLS (Amaravati) 1 270 Synchronized on 03.06.2013

    INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05.04.2013

  • 9

    456th OCCM AGENDA

    VIPL (Butibori) 2 300

    First synchronized on 02.01.2013 Full load on 19.03.2013

    GMR EMCO 2 300 COD on 27.08.2013 Dhariwal 1 300 Synd. On 2.9.13 Bhusawal 5 500/400 COD on 03.01.2014 MADHYA PRADESH

    SINGAJI TPP 1 600

    Synchronized on 31.08.2013 Coal fired on 30.09.2013

    2 600 June-2014 M/s Jhabua Power, Seoni 1 300 JANUARY – 2014 MB Power, Anuppur 1 300 JANUARY – 2014 Satpura 11 250 Synchronized on 02.10.2013 SATPURA 10 250 COD on 18.08.2013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

    The WR utilities may intimate the current status on above. ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    All the constituents are requested to submit the CMP report for the Third quarter

    (October 2013 to December 2013) for the year 2013-14.

    The Sub-Committee members may like to note and furnish details in respect of above. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR REGARDING

    Status of physical & cyber security in Power Sector for the Third quarter (October

    2013 to December 2013) have not been received from some of the constituents.

    In 454th OCC meeting it was decided that PGCIL to prepare and issue guidelines for all

    transmission licensees for implementation of CMP.

    In 455th OCC, PGCIL had given a presentation on CMP for transmission systems.

    The constituents/utilities may like to update the status.

    The Sub-Committee may like to note and furnish details in respect of above.

  • 10

    456th OCCM AGENDA

    8.3 COMMISSIONING OF 400 KV PUNE (PG)-AURANGABAD (MSETCL) D/C LINES: Vice president, WRTMPL vide letter WRTMPL/UKG/PUNE/2013 dated 02.01.2014 intimated regarding commissioning of 400 KV PUNE (PG)-AURANGABAD (MSETCL) D/C that :

    • RETML had completed construction of Pune Aurangabad line on 30.11.2013

    • Could not test the line on 30.11.2013 as MSETCL's 400 kV D/C-Q

    Aurangabad-Babhleshwar line crossing work was in progress at our Pune-

    Aurangabad line location no-98/0-98A/0.

    • However after completion of MSETCL's crossing work on 01.12.2013, we

    completed final testing of line on the same day. Line was handed over to

    PGCIL for commissioning on 01.12.2013

    • Due to testing of PGCIL Bays at 400kV MSETCL substation at Waluj

    Aurangabad, the Pune Aurangabad line circuit-II was commissioned on

    04.12.2013 & Circuit-I on 05.12.2013.

    In 455th OCC, the matter was discussed & suggested to call a separate meeting

    among MSETCL(STU-Aurangabad), SLDC Kalwa, WRTS-I(PGCIL), WRLDC,

    WRPC & WRTMPL in second week of February, 2014. Subsequently a meeting

    was held on 07.02.2014 at REMI Mumbai. Minutes of the meeting is enclosed at

    Annexure – 8.3.

    The Sub-Committee may like to note/discuss. ITEMS FROM WRLDC: ITEM NO. 9.1: IMPLEMENTATION OF THE REVISED AUFLS IN GOA, DD AND DNH During the 455th OCC meeting held on 16-17 January 2014 and 25th WRPC meeting held on 03-04th February 2014 it was decided that Goa, DD and DNH shall complete the implementation of the revised AUFLS in Goa, DD and DNH with assistance from respective STU-Maharashtra / STU-Gujarat. Representatives from the respective Electricity departments may apprise the status of the progress. The Sub-Committee may like to discuss the same.

  • 11

    456th OCCM AGENDA

    ITEM NO. 9.2: IMPLEMENTATION OF THE REVISED DF/DT SCHEME

    DF/DT Scheme in Western Region

    STATE Required Load relief

    Implemented Load relief

    Required Load relief

    Implemented Load relief

    Required Load relief

    Implemented Load relief

    GUJARAT 1006 * 905 1454 1001 1610

    MADHYA PRADESH 361 475 355 415 392 445

    CHATTISGARH 27 120 37 40 120 40

    MAHARASHTRA 546 370 621 1131 686 522

    **TPC 60 82 273Total load relief 2000 965 2000 3040 2472 2617

    * Gujarat changed the setting of 49.9/0.1Hz/sec to 49.9/0.2 Hz/sec as per discussion in 119th Protection Committee.

    The other stage is set at 49.9 /0.3 Hz/sec ‐  Total  Load Relief  399 MW

    ** TPC -Load Relief of 931 MW at 49.9 Hz/0.5 Hz/sec

    Stage - I 49.9/0.1 Hz/sec Stage - II 49.9/0.2 Hz/sec Stage - III 49.9/0.4 Hz/sec

    The Sub-Committee may like to discuss the same.

    ITEM NO 9.3: STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

    The line reactors of 765 kV Sasan-Satna ckt-1 and ckt-2 as well as the 765 kV bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end. In the absence of these reactors, high voltage is experienced at Sasan and nearby stations. Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation. Consequently the reliability of evacuation of generation from two units of Sasan is affected. During 454th OCC meeting, the revised schedule of the above elements as informed by M/s Reliance was as under:

    Schedule informed in

    451st OCC meeting Schedule informed in 454 OCC meeting

    1. Line reactor of 765 kV Sasan-Satna ckt-1

    By Sep 2013 By Dec 2013

    2 Line reactor of 765 kV Sasan-Satna ckt-2

    By Dec 2013 By Feb 2014

    3 765 kV Bus-1 Reactor Jan 2014 By Mar 2014 4 765 kV Bus-2 Reactor Jan 2014 By Mar 2014

  • 12

    456th OCCM AGENDA

    Representative from Reliance may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan. OCC members may also be apprised of the tap position of the generator transformer # 2 and 3.

    ITEM NO 9.4 : CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL

    The contribution of generators in WR in voltage control was analyzed for December 2013. Following units were injecting reactive power even during high voltage

    1. 210 MW units of Khaparkheda, Koradi and Chandrapur (Maharashtra) 2. 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3. 210 MW unit # 2,3 of Korba West (Chattisgarh) 4. 200 MW unit # 3,4 of Ukai (T) in (Gujarat) 5. 660 MW unit #1 and #3 of Sipat, 500 MW unit # 10 of Vindhyachal (NTPC)

    Message was sent from WRLDC to respective utilities to take up with the concerned generating stations to review the AVR / GT tap setting for enhancing the contribution of the generating stations in controlling high voltage in Western Region. Respective utilities may apprise the status.

    The Sub-Committee may like to discuss the same.

    ITEM NO. 9.5 : RGMO / FGMO OF MANDATED GENERATORS IN WR

    As per the information available at WRLDC/WRPC, there are 245 number of units with a total capacity of 55827 MW in Western Region that are mandated to operate in Restricted / Free Governor Mode. The need for compliance to the IEGC regulations w.r.t RGMO/FGMO was emphasized in the 455th OCC meeting as well as during the 25th TCC/WRPC meeting.

    During January 2014, the response of generators, as observed SCADA data available at WRLDC, during three events in January 2014, is summarized below. It is seen that the primary response of generators in frequency control is inadequate. Thereafter WRLDC vide its letter ref WRLDC/RGMO-FGMO/1-2014 dated 23.01.2014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 5.2 (f), (g), (h) and (i). All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction.

  • 13

    456th OCCM AGENDA

    Number 1 2 3

    Description

    761 MWgeneration loss 

    CB blast at Chandrapur at 18:53 hrs. on 21.1.14 

    Tripping of 765kV Raichur‐Sholapur line‐I carrying 1000 MW at 0533 hrs. on 2.1.2014

    Tripping of HVDC B'Wati both the poles carrying 250 MW at 21:20 hrs of 7.1.14

    Nature Decrease Increase Increase

    Quantum0.08 Hz 

    (from 50.02 Hz to 49.94 Hz)

    0.25 Hz(from 50.25 Hz to 

    50.50 Hz)

    0.07 Hz(from 49.92 to 49.99 

    Hz)

    Sl. NoGenerating Station

    MW change MW change MW change

    1 Korba  15 ‐7 ‐32 Vindhyachal  ‐6 40 ‐263 SIPAT 21 ‐55 384 CGPL ‐13 17 ‐35 SASAN 0 0 06 NSPCL ‐1 2 ‐17 Jindal 0 1 ‐28 LANCO ‐2 ‐2 19 KSK 0 2 010 Mouda 0 Data N/A ‐611 SSP 1 0 0

    Frequency change

    Event

    A meeting under chairmanship of Shri Devendra Chaudhari, Addl Secretary, MOP was

    held on 13.01.2014 at MOP New Delhi. The minutes of meeting giving latest activities

    planned regarding RGMO/FGMO is enclosed at annexure-9.5

    The Sub-Committee may like to note/discuss.

    ITEM NO. 9.6 :STATUS OF COMPLETION OF DIA AT 400 KV CHANDRAPUR 2 STATION OF MSETCL

    A bus fault occurred at 400 kV Chandrapur2 on 21st January 2014, 18:53 hrs resulting in tripping of multiple transmission elements at 400 kV Chandrapur2. During analysis it was learnt that there few of the tie / main bays were yet to be completed at the time of the event. Further the telemetry of the 400 kV Chandrapur2 was also not available. MSETCL representative may apprise OCC regarding the following:

    • Status of integration of 400 kV Chandrapur2 in SCADA system of WR and the availability of telemetry from Chandrapur2

    • Status of tie bay (at Chandrapur2) of the 400 kV Warora-Chandrapur2 D/C and 400 kV Dhariwal-Chandrapur2 ckt at 400 kV Chandrapur2 S/S

    • Status of main bay of 400 kV Chandrapur2-Chandrapur_old ckt-1 • Status of the SPS for automatic generation reduction of 600 MW

    consequent to tripping of either / both 400 kV Warora-Chandrapur2 ckts. • Status of healthiness of PLCC link between Wardha-Warora ckts (false DT

    signal was generated during the event causing tripping of 400 kV Wardha-Warora one ckt.

    The Sub-Committee may like to discuss the same.

  • 14

    456th OCCM AGENDA

    ITEM NO.9.7: STATUS OF REAL-TIME DATA AND TELEMETRY

    The decisions in real time are based on the SCADA data available in the control room of the load dispatch centre. Non availability of telemetry (Analog and status) from several substations/ generating stations in Western Region is a matter of concern. The Constituent wise detail are as under

    a) Maharashtra During 454th OCC, MSETCL informed that fresh order on M/S Tata Tele services has been awarded. MSETCL may expedite the availability of telemetry from critical substations. Present status may be updated.

    b) Chhattisgarh Data (except MW) from Korba West generating station is not available

    c) Madhya Pradesh Telemetry of Singhaji power station is not available. Telemetry of following bus reactors is not available at WRLDC:

    S. No.

    Station Name Bus Reactor

    Nunber x Capacity

    Total MVAR

    Rated voltage

    Status of Telemetry at

    WRLDC1 Nagda 2*50 100 420 Not available2 Indore 2*25 50 33 Not available3 Bhopal 2*25 50 33 Not available4 Birsinghpur 1*50 50 420 Not available

    d) Gujarat Data is not-available/intermittent from following stations in Gujarat

    a. 220 kV Nano of Tata—(not available) b. Kansari 400 kV s/s and Navsari 220 kV…Intermittent (PLCC Problem)

    S. No. Station BUS REACTOR

    No of Reactor*capacity MVARRated voltage Telemetry Status

    1 Kasor 1x50 + 1x125 175 420 Telemetry of 125 MVAR BR is not available

    2 Soja 1x50 + 1x80 130 420 Telemetry of 80 MVAR BR is not available

    e) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 9.2 % during the

  • 15

    456th OCCM AGENDA

    period 1st Jan to 19th Jan 2014. Data from the following stations in Goa is not available at WRLDC: S No. Station Status

    1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

    f) Daman & Diu Due to non-availability of SCADA data from Daman & Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 5.71 % during the period 1st Jan to 19th Jan 2014. Data from The error is mainly due to non-availability of data from 220 kV Magarwada.

    g) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

    h) POWERGRID The data from the following stations is not available at WRLDC

    765 kV Tamnar (Communication problem, GPRS link is not stable)

    Telemetry from following stations is Intermittent at WRLDC

    765 kV Durg (PLCC frequent problems)

    765 kV Kotra (communication intermittency)

    765 kV Gwalior (working on GPRS, stable and permanent link is yet to

    establish by WRTS II)

    The Sub-Committee may like to discuss the same.

    ITEM NO 9.8 :MOCK BLACK START EXERCISE

     

    As per sec 5.8(b) of IEGC the users/STUs etc. need to conduct Black start mock

    exercises in their respective systems once in every six month under intimation to

    RLDC. Also the all the black start Diesel Generator (DG) sets are [as per sec 5.8(b) of

    IEGC] required to be tested weekly and the test report needs to be sent to RLDC on

    quarterly basis.

    The following table summarizes the status of mock exercises in respect of black start

    facilities in Western Region.

  • 16

    456th OCCM AGENDA

    Sl No Power Station Installed Cap. (MW)

    Unit Type

    Black Start Source

    Capacity of Black start source

    Last BS Capabil

    ity demonstrated

    on

    Receipt of DG set testing

    report at RLDC

    GUJARAT

    1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 22.12.13 Y

    2 Mini Hydro 2 x 2.5 Hydro Diesel 50 KW ?? N

    3 Kadana 4 x 60 Hydro Diesel 500 KVA 2.4.13 Y

    (2.4.13)

    4

    Dhuvaran

    1 x 107 (68+39) + 1 x 112 (72+40)

    Gas

    Details to be furnished by Gujarat

    Details to be furnished by Gujarat.

    ??

    N

    5 GIPCL-I 3 x 32 + 1 x49 Gas / Steam Diesel

    141 KW 07.09.12

    Y

    6 GIPCL-II 1x104+1x56 Gas / Steam Diesel 500 kVA ?? N

    7

    Torrent Power Stn. C Stn.- D,E,F,CCPP

    StnC:2x30 StnD:120 Stn.E,F(110MW each)CCPP:100MW

    Thermal (Units-C,D,E,F)/ Gas(CCPP)

    Stn-C islands Diesel

    Stn.C:15kVA; Stn.D,E ,F and CCPP(500 kVA each)

    28.11.12

    Y

    8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA ?? N

    9 Sugen 3x382.5 MW Gas Diesel 2x6MVA ?? N

    Madhya Pradesh

    10 Gandhisagar 5 x 23 Hydro DG set 100 kVA ?? N

    11 Birsinghpur 1 x 20 Hydro Battery 220 Volt Battery ??

    N

    12 Pench 2 x 80 Hydro DG set 250 kVA 12.10.12 Y

    13 Bargi 2 x 45 Hydro DG set 250 kVA 10.02.12 Y

    14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA ?? N

  • 17

    456th OCCM AGENDA

    Sl No Power Station Installed Cap. (MW)

    Unit Type

    Black Start Source

    Capacity of Black start source

    Last BS Capabil

    ity demonstrated

    on

    Receipt of DG set testing

    report at RLDC

    15 Indira Sagar 8x125 Hydro DG set 2x1000 KVA 22.5.11

    Y

    Chhattisgarh

    16

    Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 25.08.12

    N

    17

    Korba(E)-phse-I

    Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

    DG Set 1500 kW(3.3kV) ??

    N

    Maharashtra

    18

    Koyna I & II

    4 x 65 4 x 75 Hydro

    House generator

    2 MVA 23.10.13 N

    19 KDPH 2 x20 Hydro DG set 310 KW ??

    N

    20 Eldari 3 x 7.5 Hydro DG set 6 KW ??

    N

    21

    Uran (Gas)

    4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

    Gas DG set

    4 MW PH1:412kVA PH2:450kVA WH:520kVA

    16.10.12

    N

    22 RGPPL

    Block 1: 640MW+Block 2: 663.54MW+Block 3: 663.54MW

    Gas

    Gas Turbine (Frame-6)

    35 MW (Under testing): Details to be provided by RGPPL.

    ??

    N

    23 Ghatghar 2x125 Hydro DG set

    1x1250 kVA 5.10.12

    N

    24 Khopoli 3x24+2x12 Hydro

    DC Governor & bearing oil pumps

    DC power (self start)

    27.10.13 (detailed report awaited)

    N

  • 18

    456th OCCM AGENDA

    Sl No Power Station Installed Cap. (MW)

    Unit Type

    Black Start Source

    Capacity of Black start source

    Last BS Capabil

    ity demonstrated

    on

    Receipt of DG set testing

    report at RLDC

    25 Bhivpuri

    3 x 24 + 2 x 1.5 +2x12 Hydro

    DC Governor & bearing

    -do- ??

    N

    26 Bhira 6 x 25 Hydro

    1 No.of 500 KVA house generator with water turbine

    500 kVA

    20.10.13 (detailed

    report awaited)

    N

    27

    Bhira PSS 1 x 150 Hydro DG set 500 kVA ??

    N

    28 Trombay 1 x 120

    Gas Turbine DG Set 2.5 MW ??

    N

    1 x 60 Steam Turbine

    NTPC

    29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 15.10.13

    N

    30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW ??

    N

    NCA

    31 SSP(RBPH & CHPH) 6x200+5*50 Hydro Diesel 2x1000kVA 08.04.12 N

    Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 5.8(b) of IEGC. There is a proposal from NCA /SSP (Ref: letter ref 3/17/011/BSMD/Power/1722 dated 28th Nov 2013) for conducting a black start exercise using generators at (5x50 MW) canal head

  • 19

    456th OCCM AGENDA

    power house (CHPH) station of SSP. Details of the radial load to be provided to the proposed island by GETCO and other issues may be discussed by the sub-committee. The Sub-Committee may like to discuss the same.

    ITEM NO 9.9 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR

    KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 23:50 hrs of 14th February 2013. Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end. The Sub-Committee may like to discuss the same. ITEM NO 9.10 SPS IN WESTERN REGION

    1. SPS AT SIPAT WRLDC vide letter No. WRLDC/MO-I/1719/2013 dt 21.6.13 requested to take up this matter with the concerned for early implementation of the SPS.

    Status of the SPS at NTPC Sipat is as under:

    1 449th OCC SPS was proposed by WRLDC. It was decided to have a

    separate meeting to finalize the scheme 2 450th OCC Member Secretary, WRPC intimated that the matter will be

    discussed in 119th PCM on 3rd & 4th September 2013 at Tarapur. 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

    119th PCM held on 3rd & 4th September 2013 at TARAPUR. The tentative scheme were formulated which needed finer tuning.

    4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

    office for engineering approval. 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained

    2. SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x67.5MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP. For the new SPS scheme envisaged for the Balco CTU connection, namely the Grid Islanding and Load Management Scheme (GILMS), Balco have placed an order

  • 20

    456th OCCM AGENDA

    with M/s SEL. As discussed earlier, the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW. The Sub-Committee may like to discuss the same. ITEM NO 9.11 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

    As per the information available at WRLDC following elements are out for a

    long period.

    Sl. No Date of

    outage

    Reason

    ISTS/IPP

    1 80 MVAR BR at

    ESSAR(Mahan)

    23.12.13 Oil leakage

    2 125 MVAR BR at JPL 12.05.13 Hydrogen formation

    3 50 MVAR LR of Indore-Asoj-II

    at Indore

    19.06.13 R phase bushing burst

    MSETCL

    400 kV Deepnagar-

    Aurangbad-I

    14.11.2013 Voltage Regulation

    MPPTCL

    400 kV Birsinghpur-Katni-I 14.02.2013 Gas leakage in B-ph CB

    CSPTCL

    400/220 kV Bhilai-III 14.04.2013 Buchholz operated

    The Sub-Committee may like to discuss the same.

    ITEM NO 9.12 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs, SEB, distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations. Therefore it is imperative that adequate attention may be paid towards load forecasting. The matter was discussed in the 455th OCC as well as in the 25th TCC/WRPC board meeting wherein it was decided to create a task force for exploring

  • 21

    456th OCCM AGENDA

    development of a software for load forecasting. Members may like to deliberate further. The Sub-Committee may like to discuss the same. ITEM NO 9.13 REAL-TIME MONITORING OF FEEDERS / SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders / substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time. CERC has also directed all the constituents to for mapping of these feeders in the SCDA of SLDCs/RLDC. Members may like to deliberate further. The Sub-Committee may like to discuss the same.

    ITEM NO 9.14 :COMPLIANCE OF IEGC. 

    (i) Compliance to IEGC clause 5.4.2 (g) w.e.f 17.02.14

    The amended IEGC 5.4.2 (g) is as under : “RLDCs shall devise standard instantaneous message formats in order to give directions in case of contingencies and/or threat to the system security to reduce deviation from schedule by the bulk consumer, SLDC/State Utility/ ISGS/Regional Entity/Injecting Utility at different overdrawal/under drawal/over-injection/under-injection conditions depending upon the severity. The concerned SLDC/other regional entity shall ensure immediate compliance with these directions of RLDC and send a compliance report to the concerned RLDC." Unquote All utilities are requested to organize to send compliance report of action taken on receipt of message /instructions from WRLDC.

    ii) Compliance to IEGC Clause 5.5 on Periodic Reports

    As per IEGC clause 5.5.1 c) RLDC is preparing Weekly report and the same is uploading in website www.wrldc.com/www.wrldc.in regularly. One of the point of Weekly report 5.5.1 c) (h) is to report the “Non-compliance of instructions of SLDC by SEB/distribution licenses / bulk consumers, to curtail drawal resulting in non-compliance of IEGC.” All SLDCs are requested to send Noncompliance report of SLDC instructions by SEB/ distribution licenses / bulk consumers to RLDC on weekly basis. RLDC is receiving this report form Madhya Pradesh but not receiving reports from other states. The Sub-Committee may like to discuss the same.

  • 22

    456th OCCM AGENDA

    ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting, the 457th OCC Meeting

    will be hosted by RGPPL or Maharashtra and may be scheduled on 11.03.2014.

    RGPPL or Maharashtra may confirm the same.

    *****************

  • Anaulagnak 2.1

    maah janavarI 2014

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.51 Hz. BETWEEN 0200 Hrs & 0300 Hrs Hrs. ON 18.01.2014AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.72 Hz. BETWEEN 1600 Hrs & 1700 Hrs Hrs. ON 12.01.2014nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 50.03 Hz.AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.67 Hz. AT 03:02 Hrs. ON 18.01.14AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.40 Hz. AT 03:20:00 Hrs. ON 10.01.2014nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS JANUARY 2014 DECEMBER 2013 NOVEMBER 2013

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00 48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00 48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00 48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.01 0.05 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.61 1.88 1.27 49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 50.2 Hz. 89.92 88.51 90.89 49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 50.2 Hz. AND 51 Hz. 9.46 9.56 7.84

    50.2 hT\ja AaOr 50.3 hT\ja ko baIca0.00 0.00 0.00 0.00

    50.3 hT\ja AaOr 51.0 hT\ja ko baIca3.8 BETWEEN 51.0 Hz. AND 51.5 Hz. 0.00 0.00 0.00

    51.0 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING JANUARY 2014

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )

  • Voltage Profile during the month of Jan. 2014

    दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 425 402 426 404 423 423 412 412 419 403 417 405 427 415 420 4032 426 399 425 397 431 408 426 402 415 400 421 408 427 411 420 4033 423 400 424 399 430 406 427 402 414 402 420 407 423 411 418 4014 423 402 424 403 423 423 412 412 414 397 413 399 424 412 417 4005 423 398 424 402 432 411 427 402 416 399 416 403 423 413 417 3986 425 400 426 401 431 409 426 402 417 399 415 402 425 409 415 4017 426 399 425 399 423 423 412 412 416 397 414 402 425 412 415 3988 424 397 423 395 423 423 412 412 417 396 416 402 426 412 412 4109 423 398 423 399 423 423 412 412 416 399 415 405 423 411 417 401

    10 424 398 424 399 431 405 427 403 413 399 418 406 423 412 413 39811 423 400 422 397 431 408 426 402 415 402 423 411 425 412 417 40012 424 403 425 404 423 423 412 412 417 400 417 402 428 416 419 39913 424 396 424 396 431 407 426 402 418 398 418 406 428 414 418 39614 422 399 424 399 423 423 412 412 420 404 418 406 426 411 416 39815 421 396 424 397 423 423 412 412 419 403 418 405 427 414 418 40016 423 393 424 397 423 423 412 412 415 400 415 402 425 413 418 40317 425 393 426 392 423 423 412 412 416 400 414 404 427 411 417 39918 424 399 426 399 424 409 420 412 416 399 414 403 428 416 422 40419 425 406 426 408 430 407 427 402 415 401 422 406 425 415 420 40020 423 399 422 400 409 409 414 414 416 402 415 404 423 414 419 40321 424 402 425 399 409 409 414 414 417 404 416 406 423 408 423 40122 426 404 424 400 429 409 425 403 417 401 416 402 425 409 422 40123 427 402 424 403 409 401 408 402 416 411 416 409 425 404 420 40324 427 400 424 401 409 400 408 400 416 400 416 400 425 400 420 40025 425 410 422 406 409 409 408 408 419 400 417 404 426 414 418 39726 425 410 421 408 429 407 427 402 419 404 421 410 427 418 421 40027 426 404 422 403 430 405 427 402 421 400 425 408 425 412 421 40628 423 403 424 400 409 409 408 408 416 403 415 406 425 412 420 40529 425 403 426 396 429 406 427 402 416 399 416 403 426 412 414 39830 424 405 426 406 430 405 426 402 415 402 414 401 427 415 417 40031 424 404 427 406 433 413 419 408 415 400 414 402 428 413 415 399

    427 393 427 392 433 400 427 400 421 396 425 399 428 400 423 396

    जेतपुरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

    सं नक Annex-2.3इंदौर इटारसी कराड धलुे असोज कासोर िभलाई

    व तूदाब परेखा जनवर 2014

  • दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 425 406 415 393 426 402 431 407 764 744 791 762 800 756 804 7722 429 401 415 391 427 399 429 400 761 737 790 751 798 754 812 7663 423 404 413 392 426 398 431 403 759 736 798 755 793 754 804 7694 423 404 413 392 423 401 430 406 760 739 798 755 793 754 804 7695 427 408 417 402 424 395 427 400 759 741 792 762 800 772 811 7826 424 402 418 392 425 400 428 401 761 738 796 756 804 754 809 7667 430 402 415 399 426 398 430 395 760 737 794 758 799 756 817 7668 425 400 413 390 426 398 429 394 760 737 789 753 795 751 805 7619 424 405 414 396 424 398 428 402 755 740 789 760 795 761 807 77210 424 402 413 393 424 399 429 403 758 739 793 759 792 755 808 76611 424 416 412 395 426 402 430 404 763 739 793 759 790 756 807 76712 427 410 413 395 426 403 431 406 765 747 798 770 798 761 806 77713 425 399 413 388 427 397 430 397 767 743 798 760 795 749 808 76114 423 400 415 391 425 400 428 404 765 744 798 760 795 749 808 76115 426 401 415 389 426 396 428 401 766 744 796 759 798 778 808 76416 425 399 415 392 427 392 431 396 763 745 790 758 787 755 805 76417 424 399 420 397 425 402 429 392 764 739 796 744 802 762 805 76918 429 401 418 394 426 399 430 403 765 745 789 754 802 756 814 76219 425 408 415 394 426 404 431 411 769 749 797 765 795 759 807 77620 424 400 414 392 424 398 427 401 768 748 793 760 799 755 802 76121 426 405 420 401 426 403 430 400 767 744 793 755 810 771 810 76922 427 406 419 398 427 406 429 401 770 746 798 758 807 766 811 76523 427 403 419 401 426 409 427 401 768 749 792 761 807 773 805 76524 423 410 417 401 426 400 427 400 768 749 788 762 805 773 808 77825 428 417 418 405 426 410 429 407 769 752 797 717 805 778 810 78926 427 415 417 405 426 410 424 406 770 755 800 777 804 779 812 78627 428 405 419 395 427 406 425 400 769 745 792 752 805 761 804 76428 425 406 417 402 425 404 425 397 764 744 787 750 803 773 803 76929 428 409 417 399 427 403 433 400 765 744 794 756 804 770 813 77430 426 408 416 395 426 406 432 405 767 749 797 766 801 765 808 77631 424 407 416 398 426 408 433 410 768 748 794 765 803 766 810 774

    430 399 420 388 427 392 433 392 770 736 800 717 810 749 817 761

    वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

    बना वािलयर नागदा खंडवा िसपत िसविन

  • No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    1 01-Jan-14 0 0 0 0 0 0 0 02 02-Jan-14 0 0 0 0 0 0 0 03 03-Jan-14 0 0 0 0 0 0 0 04 04-Jan-14 0 0 0 0 0 0 0 05 05-Jan-14 0 0 0 0 0 0 0 06 06-Jan-14 0 0 0 0 0 0 0 07 07-Jan-14 0 0 0 0 0 0 0 08 08-Jan-14 0 0 0 0 0 0 0 09 09-Jan-14 0 0 0 0 0 0 0 0

    10 10-Jan-14 0 0 0 0 0 0 0 011 11-Jan-14 0 0 0 0 0 0 0 012 12-Jan-14 0 0 0 0 0 0 0 013 13-Jan-14 0 0 0 0 0 0 0 014 14-Jan-14 1 3.7 0 0 0 0 0 015 15-Jan-14 0 0 0 0 0 0 0 016 16-Jan-14 0 0 0 017 17-Jan-14 0 0 0 0 0 0 0 018 18-Jan-14 0 0 0 0 0 0 0 019 19-Jan-14 0 0 0 0 0 0 0 020 20-Jan-14 0 0 0 0 0 0 0 021 21-Jan-14 0 0 0 0 0 0 0 022 22-Jan-14 0 0 0 0 0 0 0 023 23-Jan-14 0 0 0 0 0 0 0 024 24-Jan-14 0 0 0 0 0 0 0 025 25-Jan-14 0 0 0 0 0 0 0 026 26-Jan-14 2 78 0 0 0 0 0 027 27-Jan-14 0 0 0 0 0 0 0 028 28-Jan-14 0 0 0 0 0 0 0 029 29-Jan-14 1 79 0 0 0 0 0 030 30-Jan-14 0 0 0 0 0 0 0 031 31-Jan-14 0 0

    Max 2 78 0 0 0 0.0 0 0Total 4 81.7 0 0 0 0 0 0

    1025 91 490 851

    ANNEX -2.4

    DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)

    Chhattisgarh

    Under Frequency Operation in various Constituent System of Western Region during the month JANUARY 2013

    Recommonded Load relief at 49.2 Hz / 49.0/48.8/48.6 Hz

    Gujarat

    NIL NIL

    Maharashtra

  • ANNEXURE-2.5

    POWER CUT/RESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JANUARY-2014 k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2. Power supply to Agricultural & Rural Sectors

    a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 16 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HT/LT IndustriesM (b) Baar inayamana Load Shedding

    SaUnya Nil SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector: -

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply(DLF)

    01.01.2014 31.01.2014 23:46 22:53 23:35

    2.1 Three-Phase Supply(Irrigation)

    01.01.2014 31.01.2014 09:56 09:27 09:48

    2.1 Three-Phase Supply(Mixed)

    01.01.2014 31.01.2014 23:49 22:48 23:33

  • 3 Anya jaanakarI 3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

    idnaaMk Date tk To idnaaMk

    Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

    Max. (Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.01.2014 31.01.2014 23:53 23:31 23:46 3.2 District Head Qtrs. 01.01.2014 31.01.2014 23:56 23:37 23:50 3.3 Tehsil Head Qtrs. 01.01.2014 31.01.2014 23:51 23:20 23:43

    ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day From To (a) Power Cuts/Restriction on HT/ LT Industries (b) Load Shedding From 01.01.14 to 25.01.14 26.01.2014(REPUBLIC DAY) From 27.01.2014 to 31.01.2014

    SaUnya Nil

    @ 0-1300MW @0-100 MW

    @0-900MW

    SaUnya Nil

    00.00 00.00

    00.00

    SaUnya Nil 24.00 24.00 24.00

    SaUnya Nil

    @ 11.35 MUs/day @1.88 MUs/day @8.93 MUs/day

    (c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs) 2.1 Three-Phase Supply 01.01.2014 31.01.2014 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.01.2014 31.01.2014 18:00 18:00 18:00 3 Anya jaanakarI Any other information: There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samaya Restriction Time

    p`it idna kula }jaa- kTaOtI

    Total Energy Cut (MUs /day)

    sao From tk To

    (A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)

    95.29 (Av) of 26 days 00.00(Av) 00.00 (Av)

    1.Rural 90.50 (Av) for 69.87 Hrs. 2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    - - -

    17.00 - - -

    - - -

    23.00 - - - -

    - - -

    0.572 - -

    0.205 -

    3. HT Industries 47.81 (Av) for 25.95 Hrs. 0.043 Total Energy Cut/day 0.819 ( b) Any other information 1.Weekly Off/staggering of power supply

    1day (In a week as per consumer’s option) 50MW(Av.)

    -

    -

    0.039

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.01.2014 to 31.01.14, 6.00 Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -

    *-up till 26/1/2014, as conveyed to SLDC, CSPTCL for power cut under Atal Jyoti scheme by Raipur & Durg region, CSPDCL 3 Anya jaanakarI / Any other information: SaUnya Nil ca : gaaovaa Goa: SaUnya Nil

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    संल नकAnnex-2.6 Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)

    Western Regional Load DespatchCentre,Mumbai

    अिनवाय युिनट आऊटेज का जनवर 2014का वःता रत यौरा Details of forced unit outages during the month ofJan.2014

    अन ुबमांक Sl.No

    यिुनट Unit

    सघंटक Constituent/IPP

    मता मेगावॉटCap.MW

    स o From

    समय दनांक

    स o From

    समय दनांक

    कारण Reason

    Time Date Date

    1. एसएलपीपी SLPP-2

    गुरा विनिल GSECL

    125 10:55 5-Jan-14 NA 24-Jan-14 BTL

    2. यूट पीएस UTPS-3

    गुरा विनिल GSECL

    200 7:55 12-Jan-14 16:55 15-Jan-14 BTL

    3. एःसार वा डनर

    ESSAR VADINAR-I

    गुरा विनिल GSECL

    660 21:56 20-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Coal shortage

    4. यूट पीएस UTPS-6

    गुरा विनिल GSECL

    500 1:55 24-Jan-14 17:33 27-Jan-14 BTL

    5. एएलट पीएस ALTPS-2

    गुरा विनिल GSECL

    125 9:08 31-Jan-14 22:58 3-Feb-14 BTL

    6. आरजीपीपीएल RGPPL-2A

    मारा वउकंिल MSPGCL

    350 9:10 6-Jun-13 12:00 1-Jan-14 No requisition

    7. आरजीपीपीएल RGPPL-3A

    मारा वउकंिल MSPGCL

    320 8:28 6-Jun-13 12:00 1-Jan-14 No requisition

    8. आरजीपीपीएल RGPPL-1B

    मारा वउकंिल MSPGCL

    320 22:30 25-Jun-13 12:00 1-Jan-14 No requisition

    9. आरजीपीपीएल RGPPL-1A

    मारा वउकंिल MSPGCL

    320 21:47 27-Jun-13 12:00 1-Jan-14 No requisition

    10. टाटा TATA-6

    मारा वउकंिल MSPGCL

    500 23:52 19-Jul-13 अनपुल ध Still out

    अनपुल ध Still out

    For Economy S/D

    11. वीआईपीएल VIPL-I

    मारा वउकंिल MSPGCL

    300 1:05 2-Oct-13 अनपुल ध Still out

    अनपुल ध Still out

    Turbine bearing vibration probl em

    12. डब यूपीसीएल WPCL-4

    मारा वउकंिल MSPGCL

    135 0:07 22-Dec-13 16:56 14-Jan-14 Water cooler leakage

    13. आरजीपीपीएल RGPPL -2A

    मारा वउकंिल MSPGCL

    333 12:00 1-Jan-14 0:00 16-Jan-14 Main gas pipe maintenance

    14. आरजीपीपीएल RGPPL -1B

    मारा वउकंिल MSPGCL

    320 12:00 1-Jan-14 0:00 16-Jan-14 Main gas pipe maintenance

    15. आरजीपीपीएल RGPPL -1A

    मारा वउकंिल MSPGCL

    320 12:00 1-Jan-14 0:00 16-Jan-14 Main gas pipe maintenance

    16. आरजीपीपीएल RGPPL -2B

    मारा वउकंिल MSPGCL

    320 12:00 1-Jan-14 0:00 16-Jan-14 Main gas pipe maintenance

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    17. इं डयाबलु India Bull-1

    मारा वउकंिल MSPGCL

    270 9:18 4-Jan-14 14:32 15-Jan-14 Coal shortage

    18. एपीएल ितरोडा APL Tiroda -3

    मारा वउकंिल MSPGCL

    660 3:17 8-Jan-14 9:37 12-Jan-14 BTL

    19. कोराड Koradi-7

    मारा वउकंिल MSPGCL

    210 7:04 7-Jan-14 6:48 26-Jan-14 PA fan probl em

    20. पल Parli-5

    मारा वउकंिल MSPGCL

    210 18:11 9-Jan-14 9:30 17-Jan-14 Coal shortage

    21. टाटा TATA-8

    मारा वउकंिल MSPGCL

    250 22:55 9-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    H/T due to fire near turbine generator desk

    22. डब यूपीसीएल WPCL-1

    मारा वउकंिल MSPGCL

    135 0:23 14-Jan-14 21:54 26-Jan-14 Furnace press high

    23. चंिपुर Chandrapur-2

    मारा वउकंिल MSPGCL

    210 12:38 14-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    ID fan problem

    24. चंिपुर Chandrapur-6

    मारा वउकंिल MSPGCL

    500 22:18 14-Jan-14 7:38 17-Jan-14 BTL

    25. Khaparkheda-5 मारा वउकंिल MSPGCL

    500 20:59 16-Jan-14 17:08 20-Jan-14 Air preheater problem

    26. आरजीपीपीएल RGPPL-1B

    मारा वउकंिल MSPGCL

    320 0:00 16-Jan-14 Ready Ready Less requisition

    27. आरजीपीपीएल RGPPL-2B

    मारा वउकंिल MSPGCL

    320 0:00 16-Jan-14 Ready Ready Less requisition

    28. आरजीपीपीएल RGPPL 3A

    मारा वउकंिल MSPGCL

    320 0:00 16-Jan-14 Ready Ready Less requisition

    29. एपीएमएल APML-3

    मारा वउकंिल MSPGCL

    660 1:26 17-Jan-14 5:04 22-Jan-14 GT-B-ph bushing failed

    30. आरजीपीपीएल RGPPL-1A

    मारा वउकंिल MSPGCL

    320 15:00 18-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    SRV problem

    31. धार वाल DHARIWAL-I

    मारा वउकंिल MSPGCL

    300 18:53 21-Jan-14 19:35 3-Feb-14 Y-ph breaker blast at C'pur-2

    32. कोराड KORADI-6

    मारा वउकंिल MSPGCL

    210 6:51 24-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Coal bunkering problem

    33. डहाणू DAHANU-1

    मारा वउकंिल MSPGCL

    250 0:35 27-Jan-14 17:50 30-Jan-14 BTL

    34. पल PARLI-4

    मारा वउकंिल MSPGCL

    210 18:36 28-Jan-14 19:56 3-Feb-14 Air preheater problem

    35. डब यूपीसीएल WPCL-1

    मारा वउकंिल MSPGCL

    135 12:45 30-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Furnace press high

    36. सातपूरा Satpura-6

    मू वउकंिल MPPGCL

    200 16:13 14-Jan-14 5:30 17-Jan-14 Suspected BTL

    37. सातपूरा SATPURA-7

    मू वउकंिल MPPGCL

    210 7:29 30-Jan-14 19:00 9-Feb-14 Generator stator Y-Ph- earth fault

    38. कोरबा पूव Korba(E)-5

    छरा वउकंिल CSPGCL

    120 18:00 4-Jan-14 4:25 12-Jan-14 Short circuit in 6.6 kV tie bay

    39. कोरबा प म Korba(W)-5

    छरा वउकंिल CSPGCL

    500 1:36 16-Jan-14 5:08 27-Jan-14 Drum level high

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    40. कोरबा पूव Korba EXT.(E)-2

    छरा वउकंिल CSPGCL

    250 11:56 24-Jan-14 0:59 29-Jan-14 BTL

    41. एपीएल APL-7

    एपीएल APL

    600 10:59 25-Jan-14 NA 30-Jan-14 HPH-3 tube leakage

    42. ससान SASAN-3

    रलाय स RELIANCE

    660 3:09 26-Jan-14 12:44 6-Feb-14 Gen differential protectionoperated

    43. ससान SASAN -2

    रलाय स RELIANCE

    660 17:16 29-Jan-14 1:51 5-Feb-14 PA fan problem

    44. एससीपीएल SCPL - I

    एसीबीआईएल ACBIL

    50 18:53 29-Dec-13 0:57 12-Jan-14 Leakage at BFP discharge line

    45. एसीबीआईएल ACBIL-2

    एसीबीआईएल ACBIL

    135 8:00 22-Jan-14 23:54 27-Jan-14 BTL

    46. एःसार महान Essar-Mahan-1

    एःसार ESSAR

    600 0:01 9-Nov-13 5:58 8-Jan-14 Less requisi tion

    47. एःसार महान Essar-Mahan

    एःसार ESSAR

    600 0:00 29-Jan-14 Ready Ready Less requisi tion

    48. लॅ को Lanco-2

    लॅ को Lanco

    300 12:20 21-Aug-13 अनपुल ध Still out

    अनपुल ध Still out

    Coal shortage

    49. लॅ को

    Lanco-1 लॅ कोLANCO 300 4:34 22-Jan-14 21:20 26-Jan-14 Master fuel trip

    50. जीएमआरएमको GMR EMCO - I

    जीएमआरGMR 300 16:57 1-Jan-14 22:13 4-Jan-14 Leakage in HP turbine

    51. जेपीएल JPL-4

    जेपीएल JPL

    250 8:05 11-Jan-14 22:02 14-Jan-14 Less requisition

    52. वंदना Vandana-1

    वंदना Vandana

    135 1:49 12-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    BTL

    53. CGPL-20 टाटा TATA

    800 20:08 13-Jan-14 8:45 24-Jan-14 BTL

    54. टॅ स TAPS - 3

    एनपीसी NPC 540 1:30 3-Jan-14 6:35 8-Jan-14 Maintenance

    55. टॅ स TAPS -1

    एनपीसी NPC 160 19:41 27-Jan-14 15:15 1-Feb-14 Maintenance

    56. गांधार Gandhar-2

    एनट पीसीNTPC 219 13:03 16-Dec-13 10:22 10-Jan-14 Less requisition

    57. कावास Kawas 2A

    एनट पीसीNTPC 164 20:18 23-Dec-13 Ready Ready Less requisition

    58. कावास Kawas 2B

    एनट पीसीNTPC 164 0:15 25-Dec-13 9:00 13-Jan-14 Less requisition

    59. गांधार Gandhar-3

    एनट पीसीNTPC 144 20:37 28-Dec-13 Ready Ready Less requisition

    60. गांधार Gandhar-I

    एनट पीसीNTPC 144 20:11 1-Jan-14 Ready Ready Less requisition

    61. कावास Kawas 1B

    एनट पीसीNTPC 164 22:19 3-Jan-14 NA 09-Jan-14 Less requisition

    62. कावास Kawas 1A

    एनट पीसीNTPC 164 20:38 6-Jan-14 6:50 10-Jan-14 Less requisition

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    63. मौदा Mouda-1

    एनट पीसीNTPC 500 23:18 8-Jan-14 13:45 11-Jan-14 H2 leakage

    64. कावास Kawas 2B

    एनट पीसीNTPC 164 9:00 13-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Maintenance

    65. कावास Kawas 1A

    एनट पीसीNTPC 164 19:39 13-Jan-14 Ready Ready Less requisition

    66. कावास Kawas-1B

    एनट पीसीNTPC 164 17:47 14-Jan-14 8:42 27-Jan-14 Less requisition

    67. VSTPS-3 एनट पीसीNTPC 210 19:45 23-Jan-14 9:28 27-Jan-14 Less requisition

    68. कावास Kawas 1A

    एनट पीसीNTPC 164 10:53 26-Jan-14 14:16 3-Feb-14 Less requisition

    69. कावास Kawas-1B

    एनट पीसीNTPC 164 20:09 29-Jan-14 8:22 4-Feb-14 Less requisition

    70. गांधार Gandhar-2

    एनट पीसीNTPC 219 0:23 30-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Less requisition

    Note: Units out for more than 72 hrs are only included.

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    संल नकAnnex-2.7 पावर िसःटम ऑपरेशन कारपोरेशन िलिमटेड

    (पावरिमड क एक पूण ःवािम व वाली कंपनी)

    प म े ऽय भार ूेषण के ि,मु बई Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)

    Western Regional Load DespatchCentre,Mumbai

    िनयो जत युिनट आऊटेज का जनवर 2014 का वःता रत यौरा Details of planned unit outages during the month of Jan.2014

    अन ुबमांक Sl.No

    यिुनट Unit

    सघंटक Constituent/IPP

    मता मेगावॉटCap.MW

    सo From

    समय दनांक

    स o From

    समय दनांक

    कारण Reason

    Time Date Time Date

    1. पल ParlI-3

    मारा वउकंिल MSPGCL

    210 23:51 13-Feb-13 अनपुल ध Still out

    अनपुल ध Still out

    AOH

    2. चंिपुर Chandrapur-5

    मारा वउकंिल MSPGCL

    500 1:01 14-Jul-13 अनपुल ध Still out

    अनपुल ध Still out

    AOH

    3. डहाणू Dahanu-1

    मारा वउकंिल MSPGCL

    210 21:00 4-Jan-14 07:19 24-Jan-14 AOH

    4. उरण Uran-6

    मारा वउकंिल MSPGCL

    120 12:45 14-Jan-14 14:34 31-Jan-14 AOH

    5. कोरबा प म Korba(W)- 3

    छरा वउकंिल CSPGCL

    210 19:48 21-Dec-13 15:44 14-Jan-14 AOH

    6. जेपीएल JPL-3

    जेपीएल JPL

    250 0:05 17-Jan-14 20:24 2-Feb-14 AOH

  • Annex- 3.1

    (MW) sao From tk To1 gau}ivainaila GUVNL

    1.1 WTPS 3 210 13.02.2014 24.03.2014 AOH1.2 SUGEN 10 382.5 07.02.2014 13.02.2014 R & M work1.3 EPGL 2 600 11.02.2014 28.02.2014 Boiler & Turbine annual inspection1.4 GPEC STG 241 08.03.2014 16.04.2014 Major outage1.5 GPEC GT12 138 08.03.2014 17.03.2014 Expansion joint maintenance1.6 GPEC GT11 138 19.03.2014 28.03.2014 Expansion joint maintenance1.7 GPEC ALL GT 655 08.03.2014 09.03.2014 Two days full station outage for control system up-

    2NIL

    3 Craiva]kMila CSPGCL

    3.1DSPM-II

    II250 20.02.14 02.03.14

    PLANNED MAINENANCE 3.2 Korba West-IV 4 210 10.02.14 05.03.14 AOH

    4

    NIL

    5 koMd``Iya xao~ Central Sector5.1 KAWAS GT2B 106 23.01.14 13.03.14 R & M WORK

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING FEBRUARY 2014 AND MARCH 2014

    Capacity Outage as per Annual Maintenance Plan

    maraiva]kMila MSPGCL

    map`iva]kMila MPPGCL

    ReasonS. No. Unit No.

  • Date Time Date Time

    1 400 D/C Korba-Raipur 3 & 4 20-Feb-14 8:00 20-Feb-14 18:00 Daily For Bus spliting work at Raipur & Crossing works of 765KV D/c Raipur-Champa WRTS-I WRTS-I C

    2 765/400 765/400 kV ICT-1 at Bina 20-Feb-14 9:00:00 AM 21-Feb-13 6:00:00 PM Continuous CSD commissioning for 400kV Side CB of 765/400 kV ICT-1 WRTS-II POWERGRID C

    3 400 Nagda - Dehgam 1&2 20-Feb-14 8:00:00 AM 28-Feb-14 17:00 DailyOnline PID testing to insulators in both circuits. A/R shall be kept in non auto mode in both circuits.

    WRTS-II POWERGRID

    4 400 Itarsi - Indore # 1 20-Feb-14 8:00:00 AM 28-Feb-14 17:00 DailyOnline PID testing to insulators in both circuits. A/R shall be kept in non auto mode in both circuits.

    WRTS-II POWERGRID

    5 400 Indore - Nagda # 1 20-Feb-14 8:00:00 AM 28-Feb-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II MPPTCL

    6 220 220kV Astha - Berchha SC line of MPPTCL(Loc 108 & 109)20-Feb-14 8:00 21-Feb-14 18:00 Continous Crossing of Bhopal -Indore 765 kv S/C Line MPPTCL BDTCL

    7 400 Vapi-Boisar & Boisar-Padghe 21-Feb-14 8.00 28-Feb-14 18.00 Daily For OPGW installation, Line in service with A/R in non-auto mode.WRTS-I & WRTS-II

    WRTS-I For IO

    8 400 Tarapur-Boisar # 1 & 2 21-Feb-14 8.00 28-Feb-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    9 400 Tarapur-Padghe # 1 & 2 21-Feb-14 8.00 28-Feb-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    10 220 Tarapur-Boisar S/C 21-Feb-14 8.00 28-Feb-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    11 220 M/C Waluj-Chitegaon & Waluj-Jalna 21-Feb-14 7:00 21-Feb-14 19.00 DailyCrossing work of 400kv M/C Aurangabad - Aurangabad & Akola-A'bad

    MSETCL WRTS-I C

    12 220 D/C Ambetti (PGCIL-Vapi)- Bhilad (GETCO) # 1& 2 21-Feb-14 7:00 22-Feb-14 18.00 Conti. Crossing work of 400kv M/C Vapi-Khudus line GETCO WRTS-I C

    13 765 Bus-2 at Wardha 21-Feb-14 8:00 21-Feb-14 20.00 Daily Extesion of Bus for connection to 765KV Raipur 1 & 2 line. WRTS-I WRTS-I C

    14 400 Raipur-Sipat 1 & 2 21-Feb-14 8:00 3-Mar-14 18.00 Conti. Diversion of line for Lafarge Railway track. WRTS-I Lafarge C15 400 Mouda-Wardha # 2 21-Feb-14 8:00 21-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R16 220 Kakrapar-Haldarwa#1 21-Feb-14 10:00 Hrs 21-Feb-14 16:00 Hrs Daily AMP POWERGRID WRTS-II R17 400 Bus-1 at Wardha 22-Feb-14 8:00 22-Feb-14 18.00 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I C18 400 Bus-1 at Raigarh 22-Feb-14 8:00 22-Feb-14 18.00 Daily AMP Work WRTS-I WRTS-I R

    19400 & 220 & 132

    400KV D/C Aurangabad-Pune & 132kv S/C Padegaon - Gangapur 400KV Akola-Aurangabad(PG)# 2 & Aurangabad(PG)-Aurangabad(MSETCL)

    22-Feb-14 7:00 22-Feb-14 19.00 Daily Crossing work of 400kv M/C Aurangabad - Aurangabad & Akola-A'badMSETCLWRTS-I WRTS-I C

    20 400 Mouda-IEPL(Mouda-Wardha # 1) 22-Feb-14 8:00 22-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    21 400/220 315MVA ICT, Bina 22-Feb-14 9:00:00 AM 22-Feb-14 6:00:00 PM Daily Installation of Online dry out system WRTS-II POWERGRID C22 765 Bus - II at Indore 22-Feb-14 9:00:00 AM 23-Feb-14 6:00:00 PM Daily For bay extension works WRTS-II POWERGRID C23 220 Kakrapar-Haldarwa#2 22-Feb-14 10:00 Hrs 22-Feb-14 16:00 Hrs Daily AMP POWERGRID WRTS-II R

    24 132 132 kV Dhule Dondaicha line CKT 2 (Sec 14/1-15)22-Feb-14 8:00 22-Feb-14 18:00 Continous Crossing of Dhule-Vadodara 765 kv S/C Line MSETCL BDTCL

    25 220 220kV Sukhisewaniya Ashta DC line of MPPTCL(Loc 124& 125)22-Feb-14 8:00 23-Feb-14 18:00 Continous Crossing of Bhopal -Indore 765 kv S/C Line MPPTCL BDTCL

    26 220 220 kV Bhopal - Bina Line(Tower no 375 & 376) 22-Feb-14 8:00 23-Feb-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line MPPTCL BDTCL

    27 220 220 kV Bhopal - Vidisha Line(Tower no 375 & 376)22-Feb-14 8:00 23-Feb-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line MPPTCL BDTCL

    Agency Type

    ANNEXURE‐3.2A

    Outages Proposal of Transmission elements during the month of  FEBRUARY‐2014

    SN KV Line       From To   

    Basis Reason System 

  • 28 400& 220

    400KV Akola-Aurangabad(PG)# 2 & Aurangabad(PG)-Aurangabad(MSETCL) and 220KV Chitegaon-Shendra

    23-Feb-14 7:00 23-Feb-14 19.00 Daily Crossing work of 400kv M/C Aurangabad - AurangabadMSETCLWRTS-I WRTS-I C

    29 400 Bus-2 at Raigarh 23-Feb-14 8:00 23-Feb-14 18.00 Daily AMP Work WRTS-I WRTS-I R30 400 Mouda-Wardha # 2 23-Feb-14 8:00 23-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    31 220 D/C Jalna-Aurangabad 24-Feb-14 7:00 24-Feb-14 19.00 Daily Crossing work of 400kv M/C Aurangabad - Aurangabad & Akola-A'bad MSETCL WRTS-I C

    32 400 Mouda-IEPL(Mouda-Wardha # 1) 24-Feb-14 8:00 24-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    33 765kV Main Bus-1BBay 10 - Jack Bus 24-Feb-14 8:00 Hrs 2-Mar-14 19:00 Hrs ContinuousDia.-4(Bay-10) :- SCC/OCC Test of Unit # 4 GT

    Sasan Sasan

    34 400 Vindhyachal-Satna#1 24-Feb-14 10:00 24-Feb-14 18:00 Daily Commissioning of CSD Relay in ABB make main CB at Satna WRTS-II POWERGRID C

    35 765 Bus - I at Indore 24-Feb-14 9:00:00 AM 25-Feb-14 6:00:00 PM Daily For bay extension works WRTS-II POWERGRID C

    36 765 765 KV Bina-Indore Line 24-Feb-14 09:00 Hrs 24-Feb-14 18:00 Hrs DailyFor taking spare reactor unit in service & checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

    POWERGRID WRTS-II C

    37 132 132kV Astha - Polai SC line of MPPTCL(Loc 38 & 39)24-Feb-14 8:00 25-Feb-14 18:00 Continous Crossing of Bhopal -Indore 765 kv S/C Line MPPTCL BDTCL

    38 400 Kasor - GPEC 24-Feb-14 8:00 25-Feb-14 18:00 Daily PMM Work GETCO GETCO

    39 400 D/C Akola-Aurangabad 1 & 2 25-Feb-14 7:00 28-Feb-14 19.00 Conti.Charing of M/C Aurangabad - Aurangabad & Shifting of Akola-A'bad old line to M/c line. & DGA of Bushing oil at Akola

    WRTS-I WRTS-I C

    40 220 220 kV Kumbari line-I 25-Feb-14 9:00 25-Feb-14 17:00 Daily AMP works MSETCL WRTS-I R41 400 Mouda-Wardha # 2 25-Feb-14 8:00 25-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R42 400 315 MVA ICT#2 at Gwalior 25-Feb-14 9:00:00 AM 25-Feb-14 1:00:00 PM Daily For AMP WRTS-II POWERGRID R

    43 400 400KV S/C AKOLA AURANGABAD(Sec 64/0-64/0)25-Feb-14 8:00 26-Feb-14 18:00 Continous Crossing of Dhule-Aurangabad 765 kv S/C Line MSETCL BDTCL

    44400/132 KVVindhyachal ICT-2 25-Feb-14 9:00 28-Feb-14 19:00 Coninuous Basis ICT Overhauling NTPC NTPC

    45 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 10:00 25-Feb-14 20:00 Daily Basis AMP NTPC NTPC46 400 Raipur-Wardha # 1 26-Feb-14 8:00 26-Feb-14 20.00 Daily Balance construction works at Wardha end. WRTS-I WRTS-I C47 220 220 kV Kumbari line-II 26-Feb-14 9:00 26-Feb-14 17:00 Daily AMP works MSETCL WRTS-I R

    48 400 Mouda-IEPL(Mouda-Wardha # 1) 26-Feb-14 8:00 26-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    49 400 Bus -I at Indore 26-Feb-14 9:00:00 AM 26-Feb-14 6:00:00 PM Daily For bay extension works WRTS-II POWERGRID C50 400 315 MVA ICT#3 at Gwalior 26-Feb-14 9:00:00 AM 26-Feb-14 1:00:00 PM Daily For AMP WRTS-II POWERGRID R51 400 400 kV D/C Damoh - Bhopal Line 26-Feb-14 8:00 26-Feb-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line PGCIL BDTCL52 400 Chorania-Kasor 26-Feb-14 8:00 26-Feb-14 18:00 Daily PMM work GETCO GETCO

    53 400 Koradi-Satpura s/c 26-Feb-14 8:00 26-Feb-14 16:00 Daily 765KV Tiroda Koradi Transmission LineII crossing works POWERGRID MEGPTCL C

    54 400 Raipur-Wardha # 2 27-Feb-14 8:00 27-Feb-14 20.00 Daily Balance construction works at Wardha end. WRTS-I WRTS-I C55 400 Mouda-Wardha # 2 27-Feb-14 8:00 27-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    56 400 Vindhyachal-Satna#2 27-Feb-14 10:00 27-Feb-14 18:00 Daily Commissioning of CSD Relay in ABB make main CB at Satna WRTS-II POWERGRID C

    57 400 Bus -II at Indore 27-Feb-14 9:00:00 AM 26-Feb-14 6:00:00 PM Daily For bay extension works WRTS-II POWERGRID C58 400 315 MVA ICT#1 at Rajgarh 27-Feb-14 9:00:00 AM 27-Feb-14 1:00:00 PM Daily For AMP WRTS-II POWERGRID R59 400 Sipat 400KV-Pathadi(LANCO) line 27-Feb-14 9:00 28-Feb-14 19:00 Continous Annual Preventive maintenance job NTPC NTPC60 220 Pune- Talegoan 28-Feb-14 8:00 28-Feb-14 18:00 Daily AMP Work MSETCL WRTS-I R

    61 400 Mouda-IEPL(Mouda-Wardha # 1) 28-Feb-14 8:00 28-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    62 400 315 MVA ICT#2 at Rajgarh 28-Feb-14 9:00:00 AM 28-Feb-14 1:00:00 PM Daily For AMP WRTS-II POWERGRID R

  • Date Time Date Time

    1 400 Satna-Bina#1 1-Mar-14 10:00 Hrs 1-Mar-14 18:00 Hrs Daily Commissioning of CSD Relay in ABB make Main CB at Satna POWERGRID WRTS-II C

    2 220220KV D/C Vapi (PG) - Bhilad (GETCO) Ckt.1 & 220kV Vapi (GETCO) -Bhilad (Both circuits are on same towers)

    1-Mar-14 08:00 Hrs 2-Mar-14 18:00 Hrs Continous LILO of Navsari - Boisar line at Magarwada GIS GETCO WRTS-II C

    3 400 Damoh - Birsinghpur # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    4 400 Indore - Nagda # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II MPPTCL

    5 400 Bina - Shujalpur # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    6 400 Gandhar - Navsari # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    7 400 Khandwa - Rajgarh # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    8 400 Mundra -Bhacnau # 1 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    9 400 LILO portion of Itarsi - Dhule at Khandwa 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode WRTS-II POWERGRID

    10 400 Itarsi - Khandwa Ckt. 1&2 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 DailyHotline replacement of defective insulator strings. A/R shall be kept in inon-mode in both circuits

    WRTS-II POWERGRID

    11 400 Nagda - Dehgam 1&2 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 DailyOnline PID testing to insulators in both circuits. A/R shall be kept in non auto mode in both circuits.

    WRTS-II POWERGRID

    12 220 Kakrapar - Vapi # 1&2 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 Daily Online PID testing to insulators in both circuits. WRTS-II POWERGRID

    13 400 Satna - Bina 1&2 1-Mar-14 8:00:00 AM 31-Mar-14 17:00 DailyOnline PID testing to insulators in both circuits. A/R shall be kept in non auto mode in both circuits.

    WRTS-II POWERGRID

    14 400 Bhilai-Koradi 1-Mar-14 8.00 31-Mar-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO

    15 400 D/C Korba-Birsingpur 1-Mar-14 8.00 31-Mar-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO

    16 400 Korba-Bhilai # 2 1-Mar-14 8.00 31-Mar-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO

    17 220 Korba-Budhipadar # 3 1-Mar-14 8.00 31-Mar-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO

    18 400 Akola-Wardha # 1& 2 1-Mar-14 8.00 31-Mar-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO

    19 400 Vapi-Boisar & Boisar-Padghe 1-Mar-14 8.00 31-Mar-14 18.00 Daily For OPGW installation, Line in service with A/R in non-auto mode.WRTS-I & WRTS-II

    WRTS-I For IO

    20 400 Raipur-Raigarh # 1 & Raipur-KSK-DBPL-Raigarh 1-Mar-14 8.00 31-Mar-14 18.00 DailyFor OPGW installation, Line in service with A/R in non-auto mode.

    WRTS-I WRTS-I For IO

    21 400 Tarapur-Boisar # 1 & 2 1-Mar-14 8.00 31-Mar-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    22 400 Tarapur-Padghe # 1 & 2 1-Mar-14 8.00 31-Mar-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    23 220 Tarapur-Boisar S/C 1-Mar-14 8.00 31-Mar-14 18.00 Daily Line in service with A/R in non-auto mode only on need basis during earth wire connection. WRTS-I WRTS-I For IO

    24 400 Mouda-Wardha # 2 1-Mar-14 8:00 1-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    25 220 220 KV Sakri Jamde Dondaicha line(Sec 19/0 - 20)1-Mar-14 8:00 2-Mar-14 18:00 Continous Crossing of Dhule-Vadodara 765 kv S/C Line MSETCL BDTCL

    26 400KV Korba Tie Transformer#1 1-Mar-14 9:00 15-Mar-14 19:00 5 days continuoTie Transformer replacement with new one. NTPC NTPC

    Outages Proposal of Transmission elements during the month of  MARCH‐2014

    Type

    ANNEXURE‐3.2B

    SN KV Line       From To   

    Basis Reason System  Agency

  • 27 400 315 MVA 400/220Kv X-mer IV At Indore s/s 1-Mar-14 8.00 1-Mar-14 17.00 daily For maintenance work MPPTCL EHT -M&I28 400kv Lonikand-Lnkd-II, ckt. Il 1-Mar-14 9:00 06.03.2014 17:00 Daily CB replacement work under JICA-2 MSETCL MSETCL

    29 765 Gwalior-Bina # 2 2-Mar-14 10:00 Hrs 2-Mar-14 18:00 Hrs Daily Complete commissioning checks of line reactor & associated terminal equipment POWERGRID WRTS-II C

    30 400 Mouda-IEPL(Mouda-Wardha # 1) 2-Mar-14 8:00 2-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    31 220 Navsari (PG) - Navsari (Getco) # 1 3-Mar-14 08:00 Hrs 5-Mar-14 18:00 Hrs Daily Replacement of defective insulator strings with Polymer insulators POWERGRID WRTS-II R

    32 400 Bus -I at Rajgarh 3-Mar-14 9:00:00 AM 3-Mar-14 6:00:00 PM Daily AMP WRTS-II POWERGRID R

    33 400 IEPL-Wardha (Mouda-Wardha # 1) 3-Mar-14 8:00 3-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    34 400 Bus-1 at Parli 3-Mar-14 8:00 3-Mar-14 18:00 Daily AMP Work WRTS-I WRTS-I R35 400 80MVAr Bus Reactor at Raipur 3-Mar-14 9:00 3-Mar-14 14:00 Daily AMP Work at Raipur WRTS-I WRTS-I R36 220 Raipur - Urla 3-Mar-14 9:00 3-Mar-14 18:00 Daily AMP Work at Raipur CSPTCL WRTS-I R

    37 400 Raigarh- Raipur # 4 & Raigarh-Kotra PS # 2 3-Mar-14 8:00 13-Mar-14 18:00 Conti. Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh WRTS-I WRTS-I C

    38 765kV Main Bus-1A 3-Mar-14 8:00 Hrs 9-Mar-14 19:00 Hrs Continuous

    Dia.-1(Bay-1) :- Interconnetion of Main Bus Stringing, Jumpering & Droppers by PGCIL with existing system

    Sasan Sasan

    39 400 Mundra-Jetpur-1 3-Mar-14 3-Mar-14 8AM 6PM Daily Suspension Insulator replcement and routine ma PGCIL CGPL40 220 I'pore-Kawas-1 3-Mar-14 8:00 3-Mar-14 18:00 Daily PMM work PGCIL GETCO41 400 400 KV Indore-Isp Ckt-I 3-Mar-14 8.00 3-Mar-14 17.00 daily For maintenance work MPPTCL EHT- M& I42 220 Omkareshwar-Khandwa Ckt 3-Mar-14 9.00 3-Mar-14 16.00 daily For maintenance work MPPTCL EHT -M&I

    43 400 KV Main Bus-I at 400 KV S/s Khedamara 3-Mar-14 9:00 6-Mar-14 17:00 Daily Connecting pantograph after erection below the Bus CSPTCL CSPTCL C

    44 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV S/s Khedamara 3-Mar-14 9:00 6-Mar-14 17:00 DailyConnecting pantograph after erection below the Bus

    PGCIL CSPTCL C

    45 400 KV D.C. Sipat -Raipur DC line loc No.44-45 3-Mar-14 8:00 4-Mar-14 17:00 Daily Over head Stringing Work on CSPTCL LILO line to MARWA T.P.P PGCIL CSPTCL C

    46 400 Bus -II at Rajgarh 4-Mar-14 9:00:00 AM 4-Mar-14 6:00:00 PM Daily AMP WRTS-II POWERGRID R47 400 Mouda-Wardha # 2 4-Mar-14 8:00 4-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R48 400 Bus-2 at Parli 4-Mar-14 8:00 4-Mar-14 18:00 Daily AMP Work WRTS-I WRTS-I R49 220 Raipur - Khedamara 4-Mar-14 9:00 4-Mar-14 18:00 Daily AMP Work at Raipur CSPTCL WRTS-I R50 400 Mundra-Jetpur-2 4-Mar-14 4-Mar-14 8AM 6PM Daily Suspension Insulator replcement and routine ma PGCIL CGPL51 400 Sipat 400KV Bay - 16 4-Mar-14 9:00 4-Mar-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC52 220 I'pore-Kawas-2 4-Mar-14 8:00 4-Mar-14 18:00 Daily PMM work PGCIL GETCO53 400 400 KV Indore-Isp Ckt-II 4-Mar-14 8.00 4-Mar-14 17.00 daily For maintenance work MPPTCL EHT- M& I54 400 400 KV Nagda-Rajgarh Ckt-II 4-Mar-14 9.00 4-Mar-14 18.00 daily For maintenance work MPPTCL EHT- M& I55 400 400 KV Birsinghpur-Katni Ckt-I 4-Mar-14 9.00 4-Mar-14 18.00 daily For maintenance work MPPTCL EHT- M& I56 220 Damoh(PGCIL) - Tikamgarh Ckt 4-Mar-14 9.00 4-Mar-14 18.00 daily For maintenance work MPPTCL EHT -M&I57 400 315 MVA 400/220Kv X-mer I At Bhopal s/s 4-Mar-14 9.00 4-Mar-14 17.00 daily For maintenance work MPPTCL EHT -M&I58 400 Tarapur -Padghe-2 4-Mar-14 8:00 Hrs 5-Mar-14 17:00 Daily Maintenance work POWERGRID NPCIL R

    59 400 Satna-Bina#2 5-Mar-14 10:00 Hrs 5-Mar-14 18:00 Hrs Daily Commissioning of CSD Relay in ABB make Main CB at Satna POWERGRID WRTS-II C

    60 220 Bus -I at Rajgarh 5-Mar-14 9:00:00 AM 5-Mar-14 6:00:00 PM Daily AMP WRTS-II POWERGRID R

    61 400 IEPL-Wardha (Mouda-Wardha # 1) 5-Mar-14 8:00 5-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    62 765 765/400kv AT # 2 at Wardha 5-Mar-14 10:00 5-Mar-14 14:00 Daily AMP Work WRTS-I WRTS-I R63 220 Raipur - Bhilai # 3 5-Mar-14 9:00 5-Mar-14 18:00 Daily AMP Work at Raipur CSPTCL WRTS-I R64 220 220 kV D/C Sukha - Narsinghpur Line 5-Mar-14 8:00 6-Mar-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line MPPTCL BDTCL

    65 400KV Korba-Mahan line 5-Mar-14 9:00 6-Mar-14 19:00 days continuou

    Testing of LBB, auto re-close, M-I & 'M-II relays (Approved for 29th & 30th Jan '14 in last OCCM, but could not be availed due to permit in Bus Sectionalizer 2.)

    NTPC NTPC

    66 220 Ranasan-Dehgam (PG) line - 1 5-Mar-14 8:00 5-Mar-14 18:00 Daily PMM work GETCO GETCO67 220 Navsari - Nasik - 1 5-Mar-14 8:00 6-Mar-14 18:00 Daily PMM work GETCO / MSETCLGETCO68 400 400 KV Nagda-Isp 5-Mar-14 9.00 5-Mar-14 18.00 daily For maintenance work MPPTCL EHT- M& I

  • 69 400 Sipat 400KV Bay - 6 6-Mar-14 9:00 6-Mar-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC

    70 220 Navsari (PG) - Navsari (Getco) # 2 6-Mar-14 08:00 Hrs 8-Mar-14 18:00 Hrs Daily Replacement of defective insulator strings with Polymer insulators POWERGRID WRTS-II R

    71 220 Bus -II at Rajgarh 6-Mar-14 9:00:00 AM 6-Mar-14 6:00:00 PM Daily AMP WRTS-II POWERGRID R72 400 Mouda-Wardha # 2 6-Mar-14 8:00 6-Mar-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R

    73 400 Tiroda -Warora (Quad) D/