45 th ave s shared street

12
45 th Ave S Shared Street Design Commission September 17 th , 2009 Megan Hoyt SDOT Traffic Operations

Upload: elliot

Post on 25-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

45 th Ave S Shared Street. Design Commission September 17 th , 2009 Megan Hoyt SDOT Traffic Operations. 2009 Sidewalk Development Program. 25 blocks constructed in 2009 under Bridging the Gap Standard sidewalk construction (6’ sidewalk, planting strip, curb and gutter) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 45 th  Ave S Shared Street

45th Ave S Shared Street

Design CommissionSeptember 17th, 2009

Megan HoytSDOT Traffic Operations

Page 2: 45 th  Ave S Shared Street

2009 Sidewalk Development Program

• 25 blocks constructed in 2009 under Bridging the Gap

• Standard sidewalk construction (6’ sidewalk, planting strip,

curb and gutter)• Prioritization criteria highlights

LRT and proximity to services

Page 3: 45 th  Ave S Shared Street

Project Background• Ranks high in both original and revised

(Pedestrian Master Plan) criteria

Rainier Beach H.S.

Link Light Rail

Station Mapes Creek

Dunlap Elementary

South Shore K-8

45th A

ve S

S Cloverdale St

S HendersonSt

Rai

nier

Ave

S

MLK

Jr.

Way

S

Page 4: 45 th  Ave S Shared Street

45th Ave S details• Zoning is Single Family• Right-of-Way is only 40’• No existing drainage facilities• RPZ parking zones installed summer 2009

Page 5: 45 th  Ave S Shared Street

Original Options

Page 6: 45 th  Ave S Shared Street

Original Options

Page 7: 45 th  Ave S Shared Street

Public Outreach• Residents of 45th Ave S

– Meeting in late May– Significant outreach throughout summer

• Seattle Fire Department• Seattle Public Utilities• SDOT Neighborhood Traffic Program

Page 8: 45 th  Ave S Shared Street

Shared Street Details• 13’ of access maintained• Asphalt paving, established parking stalls, landscaping

Page 9: 45 th  Ave S Shared Street

Parking space and crosswalk delineation

• Stamped asphalt delineates 7’ x 20’ parking space

• Stamped colored asphalt crosswalks at entries

Page 10: 45 th  Ave S Shared Street

Curbless Street – Edge Treatment

• Asphalt edge ends at landscaping

• Need spot treatment to discourage illegal parking. Options include:– Short concrete curbs– Thickened asphalt edge– Wheelstops

Page 11: 45 th  Ave S Shared Street

Landscaping• Eight new trees planted• Approx. 3000 SF of new landscaped area• Planting scheme:

– Kelsey Dogwood (groundcover) – Geranium (groundcover) – English Lavender – Red flowering Currant – Sword Fern – Orchid Rockrose – Lipstick Strawberry (groundcover)

Page 12: 45 th  Ave S Shared Street

Timeline

• Construction scheduled to begin Sept 28th

• Expected completion end of October.