4/30/20151 universal design – remodel kitchen and bath tom muxie

18
11/03/22 1 Universal Design – Universal Design – Remodel Kitchen and Remodel Kitchen and Bath Bath Tom Muxie

Upload: parker-tollett

Post on 15-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 1

Universal Design – Remodel Universal Design – Remodel Kitchen and BathKitchen and Bath

Tom Muxie

Page 2: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 2

Project GoalsProject Goals

Allow easy wheelchair access and usability.

Design to reflect my style and taste.Non institutional look in all aspects

to maintain maximum resale value.

Page 3: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 3

Project GoalsProject Goals

Maximize counter and reachable cabinet space.

Remain within $25,000 budget.Minimize amount of time areas are

unusable .

Page 4: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 4

DescriptionDescription

Completely gut existing kitchen and bath. Kitchen – Add custom designed cabinets

and inserts, add valance for new recessed lighting, Add Silestone countertops, relocate some electrical for accessibility, replace vinyl floor in kitchen and dining area with porcelain tile, add tile backsplash, replace sink and faucet, replace existing appliances, replace old baseboard moldings.

Page 5: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 5

DescriptionDescription

Bath – Replace shower/tub unit with barrier free shower unit, replace sink and faucet, redo sink drain for more leg room, replace vinyl floor with porcelain tile and replace old baseboard moldings.

Page 6: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 6

DescriptionDescription

General work – Replaced all door hardware with lever type handles and replaced all outlet and switch covers to match new design, repaint kitchen, dining area, hallway and bathroom walls and ceilings and add new window treatments.

Page 7: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 7

ContractorsContractors

General Contractor – Ralph Rosato, Wenham. Removal of all existing items, added valance, tile work and baseboard moldings. Sub contracted electrical and Silestone countertop work. Also pulled required permits and scheduled work to be done with other contractors to minimize downtime.

Page 8: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 8

ContractorsContractors

Cabinet Maker – J.D. Custom Woodworking, Peabody. Design, fabrication and installation of all cabinets and window framing.

Plumber – Jeff VanKnowe, Danvers. All plumbing for new shower unit, bathroom sink, kitchen sink, gas cooktop and waterline for refrigerator.

Page 9: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 9

Before and After PhotosBefore and After Photos

Kitchen

Slide out towel rack

Page 10: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 10

Before and After PhotosBefore and After Photos

Kitchen

Page 11: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 11

Before and After PhotosBefore and After Photos

Kitchen

Pull down shelf from Revashelf

Page 12: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 12

Before and After PhotosBefore and After Photos

Kitchen

All lower units pull out completely for easy access to back of unit.

Page 13: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 13

Before and After PhotosBefore and After Photos

Kitchen

Repositioned hood control switch

Front access cook top controls

Page 14: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 14

Before and After PhotosBefore and After Photos

Kitchen

3 piece faucet unit allows custom positioning.

Page 15: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 15

Before and After PhotosBefore and After Photos

Bath

90 degree elbow at drain for added leg room.

Duel water controls. 1 for handheld unit and 1 for the regular shower head. Can run either one or both.

Page 16: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 16

Before and After PhotosBefore and After Photos

Bath

Page 17: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 17

Before and After PhotosBefore and After Photos

Bath

Page 18: 4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie

04/18/23 18

Before and After PhotosBefore and After Photos

HallwayHallway carpet was replaced with tile

for ease of rolling my wheelchair. The thicker the carpet and pad is the more difficult it is to roll and/or turn on. Where desired, Berber type Carpets work best.