4/26/2018 (7) cpec - posts · 4/26/2018 (7) cpec - posts 1/6 cpec home posts photos about...

6
4/26/2018 (7) CPEC - Posts https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 1/6 CPEC Home Posts Photos About Community Notes Create a Page Privacy · Terms · Advertising · · Cookies · More Facebook © 2018 Community Invite your friends to like this Page 11,787 people like this 11,840 people follow this See All Community Send Message www.facebook.com Community · Government Official Suggest Edits See All About English (US) · Español · Português (Brasil) · Français (France) · Deutsch Ad Choices CPEC CPEC Projects, Chakdara Kalam Expressway 133 KM 4 Lane Chakdara Kalam Expressway In China Pakistan Economic Corridor CPEC the 3000 KMs long connectivity lines will connect Gawadar deep sea with kashgar, a city of Xinjiang autonomous region in China. Apart from this 3000 KMs rout, there would be numbers of routs and line to connect this main rout. Ckakdara Kalam Expressway is also the part of CPEC Project, Construction of 4 Lane Chakdara Kalam Expressway 133 km. It will linked with 81 km swat Motorway under developing kpk Consultanc services for Feasibilit study and Detailed. Design for Construction of 4-Lane Expressway From Chakdara To Kalam- N 95 (133Km) allocated to Highest Ranked Bidder: M/s EA Consulting (Pvt.)Ltd.( Lead Firm) in JV with M/s Partners in Development (PlD). The proposed project is located in Swat valley, KP Province. The proposed Expressway will connect the Nowshera – Chitral Road (N-45) with kalam town. Expressway starts form Chakdara to terminated at Kalam town while passing through Fatehpur Mingora and Bahrain towns. The swat valley is famous for its scenic and natural beauty. It is a main attraction for the locaI and international tourists. Many historical and world famous archaeological sites of Ghandara Civilization are also located in this area. Tourism in this area will be improve. And hope that infrastructure will develop and will bring prosperity for the region. Route Map for the Chakdara Kalam Expressway is starting from Karnel Sher Khan exchange To Chakdara. Six Planned interchanges are there in this expressway, Dobian Interchange, Islamia Interchange, Bakhshali Interchange, Katlange Interchange, Palai Interchange and Chakdara Interchange. Chakdara Kalam Expressway CPEC Projects Chakdara Kalam Expressway CPEC Projects CPEC Western Route:D I Khan Islamabad Motorway is also Under construction 285 km near Paikhail Mianwali. The project will be completed July 2018 March 10, 2017 · Send Message Like Follow Share Chat Reconnecting Home Find Friends 7 CPEC

Upload: others

Post on 14-Jul-2020

36 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 1/6

CPEC

Home

Posts

Photos

About

Community

Notes

Create a Page

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

Community

Invite your friends to like this Page

11,787 people like this

11,840 people follow this

See AllCommunity

Send Message

www.facebook.com

Community · Government Official

Suggest Edits

See AllAbout

English (US) · Español · Português (Brasil) ·Français (France) · Deutsch

Ad Choices

CPEC

CPEC Projects, Chakdara Kalam Expressway 133 KM 4 Lane Chakdara Kalam Expressway

In China Pakistan Economic Corridor CPEC the 3000 KMs long connectivitylines will connect Gawadar deep sea with kashgar, a city of Xinjiangautonomous region in China. Apart from this 3000 KMs rout, there would benumbers of routs and line to connect this main rout.

Ckakdara Kalam Expressway is also the part of CPEC Project, Constructionof 4 Lane Chakdara Kalam Expressway 133 km. It will linked with 81 kmswat Motorway under developing kpk Consultanc services for Feasibilitstudy and Detailed. Design for Construction of 4-Lane Expressway FromChakdara To Kalam- N 95 (133Km) allocated to Highest Ranked Bidder: M/sEA Consulting (Pvt.)Ltd.( Lead Firm) in JV with M/s Partners in Development(PlD). The proposed project is located in Swat valley, KP Province. Theproposed Expressway will connect the Nowshera – Chitral Road (N-45) withkalam town. Expressway starts form Chakdara to terminated at Kalam townwhile passing through Fatehpur Mingora and Bahrain towns. The swat valley is famous for its scenic and natural beauty. It is a mainattraction for the locaI and international tourists. Many historical and worldfamous archaeological sites of Ghandara Civilization are also located in thisarea. Tourism in this area will be improve. And hope that infrastructure willdevelop and will bring prosperity for the region.

Route Map for the Chakdara Kalam Expressway is starting from Karnel SherKhan exchange To Chakdara. Six Planned interchanges are there in thisexpressway, Dobian Interchange, Islamia Interchange, BakhshaliInterchange, Katlange Interchange, Palai Interchange and ChakdaraInterchange.

Chakdara Kalam Expressway CPEC Projects

Chakdara Kalam Expressway CPEC Projects

CPEC Western Route:D I Khan Islamabad Motorway is also Underconstruction 285 km near Paikhail Mianwali. The project will be completedJuly 2018

March 10, 2017 ·

Send MessageLike Follow Share

Chat

Reconnecting Home Find Friends 7CPEC

Page 2: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 2/6

CPEC

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

Comment Share

5454 Oldest

3 Shares 4 Comments

· Reply · 1y

Bilal Ahmad Yaqoob Khail Cpec kya mujy job mel sakta hy es my..my ny civil deploma kya hy 3 years ...

Like

· Reply · 1y

Suliman Khan https://www.facebook.com/cpecjobs/

Like

· Reply · 1y

Atta Muhammad Qureshi Pakchinadostizandaabad

Like

ITC UMT According to a report, three major hydropower projects,including the Karot station, have been included in the #CPEC. https://www.facebook.com/ITC.UMT/

· Reply · 30wLike

Press Enter to post.

Write a comment...

Write something on this Page...

CPEC updated their cover photo.March 16 ·

Status Photo/Video

1

Like

Send MessageLike Follow Share

Chat

Page 3: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 3/6

CPEC

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

Comment Share

99

Press Enter to post.

Write a comment...

CPEC

Swat moterway tunnel in progress. Tunnel update!

535 m by FWO and 210 m by Chinese. Total work done = 745m/1250 m

March 16 · Habib Abad, Pakistan ·

Comment Share

2626 Oldest

Fahim Ud Din Amanullah Khan

· Reply · 5wLike

Press Enter to post.

Write a comment...

CPECMarch 16 · Habib Abad, Pakistan ·

1

Like

Like

Send MessageLike Follow Share

Chat

Page 4: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 4/6

CPEC

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

如何在BBS中找到加固的切割长度。 以及使用多少公式? How to find cutting length of reinforcment in BBS. and how many formulas are used??

Comment Share

11

Press Enter to post.

Write a comment...

CPEC

Shimla hill tunnel, E35 Hazara Motorways Hassanabdal -Havelian-Thakot,,

November 7, 2017 ·

Comment Share

3232 Oldest

1 Share

Rana SanaUllah Khan Fida Rehman

· Reply · 24wLike

Shoaib Ahmad Awais Khan Marwat...

· Reply · 24wLike

Press Enter to post.

Write a comment...

CPEC

E-35 Hassan Abdal Motorway , Package-1, company GRC The Construction work of Hassanabdal-Havelian Motorway, commonlyknown as Hazara Motorway, is in full swing, and it would become operationalat end of this year. The 20 kilometer Package-I, starts from Burhan and ends at Jarikas and the20 kilometer Package-II starts from Jarikas and ends at Sarai Saleh. He saidthe construction work of Sarai Saleh-Havelian section started late but now it

June 3, 2017 ·

1

Like

Like

Send MessageLike Follow Share

Chat

Page 5: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 5/6

CPEC

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

has been built on fast pace. Total l... See More

+2

Comment Share

4848 Oldest

4 Shares

View 2 more comments

Noor Ullah Nice works

· Reply · 20wLike

Noor Ullah I am DAE civil engineer any job 03430920229

· Reply · 18wLike

Press Enter to post.

Write a comment...

CPEC

CPEC: 180 km Hazara Motorway E-35 under construction. 40 km will becompleted in August 2017.Hassan abdal Havelien Motorway (60 Km) willcompleted in Dec 2017

May 22, 2017 ·

Like

Send MessageLike Follow Share

Chat

Page 6: 4/26/2018 (7) CPEC - Posts · 4/26/2018 (7) CPEC - Posts  1/6 CPEC Home Posts Photos About Community

4/26/2018 (7) CPEC - Posts

https://www.facebook.com/permalink.php?story_fbid=727212937446847&id=684419381726203 6/6

CPEC

Privacy · Terms · Advertising · ·Cookies · MoreFacebook © 2018

See More

Comment Share

4747 Oldest

4 Shares

Rana SanaUllah Khan Fida Rehman

· Reply · 48wLike

Fida Rehman Insha Allah

· Reply · 48wLike

Press Enter to post.

Write a comment...

Like

Send MessageLike Follow Share

Chat