400+ terms with English translation and definitions, showing citations to source documents
Compiled by
Baker & Associates, Energy Consultants
Houston
Section I: Terms sorted by their English translation
Section II: Terms sorted by the original Spanish, showing citations to source documents
Section III: Terms sorted by legal hierarchy, law or legal disposition, and alphabetically for each document, with definitions or extracts from original sources
Section IV: List of sources used in the Glossary
Section V: Subscriber Edition: Both Spanish and English definitions or extracts, as in Section III
June 2016
Page 141 of 147
Lexical EntryTranslation
Section I
Terms from off ic ia l documents, sorted by Engl ish translat ions
See Section II for citation to original sources
BILINGUAL GLOSSARY OF MEXICO'S POWER INDUSTRY
A
ExtranjeroAbroad, outside of Mexico; foreigner1
Abrogación de las leyes del CRE y CNHAbrogation of CRE Act of 1995 and CNHAct of 2008
2
Oferta de Compra AceptadaAccepted purchase offer3
Oferta de Compra Aceptada de los Suministradoresde Servicios Básicos
Accepted Purchase Offer issued by theBasic Services Suppliers
4
AmpliaciónAdditional [capacity]5
Provisión de cualquier servicio adicional Additional commercial services6
Consejo ConsultivoAdvisory Council (for the Electric Sector)7
Consejo consultivo [del sector eléctrico]Advisory Council for the Electric Sector[membership]
8
Empresa filial (CFE)Affiliated CFE companies9
Recurso de Demanda Controlable AgregadoAggregated Controllable Demand Resource10
Central Eléctrica AgregadaAggregated electricity generation station11
Responsabilidad Estimada AgregadaAggregated Estimated Liability12
NodoP AgregadoAggregated price node (PNode)13
Convenios y contratosAgreements and contracts14
Asignación de Unidades de Central Eléctrica en elMercado del Día en Adelanto
Allocation of Power Plant Units in the DayAhead Market
15
Productos AsociadosAncillary products16
Servicios ConexosAncillary services17
Audiencia Appointment [with regulators]18
Found Set: 428 records in search string: GCPA/2Page 16 of 147
Lexical EntryTranslation
Section I
See Section II for citation to original sources
Terms from official documents, sorted by English translations
Derechos a Ingresos por SubastasAuction revenue /income rights19
Calendario de la SubastaAuction schedule20
Disposiciones de austeridadAusterity measures21
Control Automático de GeneraciónAutomated generation control22
Control Automático de GeneraciónAutomatic Control of Generation23
Servicios Conexos Auxiliary services24
Disponibilidad de Entrega FísicaAvailability of Physical Delivery 25
Disponibilidad de Producción FísicaAvailability of Physical Production26
Capacidad disponibleAvailable capacity27
FalloAward (in an auction)28
B
Capacidad de respaldoBackup capacity29
Sistema Interconectado Baja CaliforniaBaja California Interconnected System30
Sistema Interconectado Baja California SurBaja California Sur Interconnected System31
Bases del Mercado EléctricoBaselines / Basis Rules / ElectricityMarket Rules
32
Bases del Mercado EléctricoBaselines / Market Basis Rules / rules ofthe electricity market
33
Garantía de Cumplimiento BásicaBasic Compliance Guarantee34
Suministro BásicoBasic Supply, Basic Service Supply35
Práctica PrudenteBest practices36
Garantía de SeriedadBid Security / Earnest money guarantee37
LicitanteBidder38
Bases de LicitaciónBidding Bases39
Bi l ingual Glossary of Mexico's Power IndustrySearch: GCPA/2 Page 17 of 147
Lexical Entry Translation ArticleSource
Section II
Terms from off ic ia l documents, with c itat ions to sources
See Section III for definitions or extracts
Bilingual Glossary of Mexico's Power Industry
A
Abasto aislado Inside the fence self-supply3
1 Reglamento - Ley IndustriaEléctrica (2014)
Abasto Aislado Inside the fence self-supply2.1.1
2 Acuerdo ... Bases del MercadoElectrico (2015)
Abrogación de las leyesdel CRE y CNH
Abrogation of CRE Act of 1995and CNH Act of 2008 T2
3 Ley de Organos Reguladores ...Energética (2014)
Acceso abierto Open Access61
4 Ley de CFE (2014)
Acceso abierto /2 Open accessConsid
5 Decreto CENAGAS (2014)
Acceso abierto /3 Open access2
6 Decreto CENACE (2014)
Acceso abierto ... noindebidamentediscriminatorio
Non-discriminatory access6
7 Decreto CENAGAS (2014)
Acreditación deParticipantes
Market Participant Compliance3.3.2
8 Acuerdo ... Bases del MercadoElectrico (2015)
Acto de autoridad Official Act [by a public agency]119
9 Ley de AsociacionesPúblico-Privadas
Adiestramiento técnico Technical training26, 28
10 Decreto CENAGAS (2014)
Administrador de GasNatural
Natural Gas Administrator2.1.2
11 Acuerdo ... Bases del MercadoElectrico (2015)
Alertas Críticas Critical alerts3
12 Decreto CENAGAS (2014)
Found Set: 428 records in search stringSearched for: GCPA/2
Page 38 of 147
Lexical Entry Translation ArticleSource
Section II
Terms from official documents, with citations to sources
See Section III for definitions or extracts
Bilingual Glossary of Mexico's Power Industry
Alta Tensión High voltage2
13 Reglamento - Ley IndustriaEléctrica (2014)
Ampliación Additional [capacity]3-II
14 Reglamento LSPEE -Aportaciones (2011)
Ampliación ymodernización
Expansion and modernization14
15 Ley de la Industria Eléctrica(2014)
Análisis costo beneficiointegral
Comprehensive cost-benefitanalysis 5.VI
16 Reglamento - Ley IndustriaEléctrica (2014)
Aportación Contribution2.ii
17 Reglamento - Ley IndustriaEléctrica (2014)
Aportación [en efectivo oen especie]
Contribution [in cash or in kind]2, 3-III
18 Reglamento LSPEE -Aportaciones (2011)
Aprovechamiento The right of use or profit 2, 4
19 Ley ... de Energías Renovables(2008, 2013)
Área de control Network Control Area2
20 Decreto ... Reglamento de laLSPEE (2012)
Asignación de Unidadesde Central Eléctrica en elMercado del Día enAdelanto
Allocation of Power Plant Unitsin the Day Ahead Market 2.1.3
21 Acuerdo ... Bases del MercadoElectrico (2015)
Asignación de Unidadesde Central Eléctrica enTiempo Real
Real time commitment ofgeneration units 2.1.6
22 Acuerdo ... Bases del MercadoElectrico (2015)
Asignación de Unidadesde Central Eléctrica paraConfiabilidad en el Día enAdelanto
Day Ahead Reliability UnitCommitment 2.1.4
23 Acuerdo ... Bases del MercadoElectrico (2015)
AsignaciónSuplementaria deUnidades de CentralEléctrica paraConfiabilidad
Supplementary Allocation ofPower Plants for Reliability 2.1.5
24 Acuerdo ... Bases del MercadoElectrico (2015)
Searched for: GCPA/2 Page 39 of 147
DICTONARY OF MEXICAN ENERGY 5/24/2016
Article/ sectionTransla on†Lexical entry
Section III
Translated def ini t ions or extracts where a term occurs , sorted byclass and legal disposi t ion
To facilitate study of individual documents
BILINGUAL GLOSSARY OF MEXICO'S POWER INDUSTRY
INSTITUTIONAL DISPOSITIONS
ACUERDO ... BASES DEL MERCADO ELECTRICO (2015)
Abasto Aislado Inside the fence self-supply 2.1.11
The generation or importing of electricity to satisfy own needs or for export, without transmitting suchenergy by the National Network of Transmission or the General Distribution Network. The use of energygenerated at a power plant to supply the needs of the same Powerplant is not considered IsolatedSupply.
Acreditación de Participantes Market Participant Compliance 3.3.22
The process of accreditation of Market Participants before the CENACE include, inter alia, a record ofphysical assets, proof of interface with CENACE, capacity and training of personnel required, access toan electronic communication network, proof of electronic connection and an interconnection contract.
Administrador de Gas Natural Natural Gas Administrator 2.1.23
The CENAGAS, other administrators of integrated transport systems for natural gas, and other naturalgas transporters and distributors of natural gas.
Asignación de Unidades de CentralEléctrica en el Mercado del Día enAdelanto
Allocation of Power Plant Units in theDay Ahead Market
2.1.34
The process of commitment and dispatch of Power Plants by which the CENACE determines, based onthe buying and selling offers received, the starts and stops of Power Plant Units. It represents one ofthe results pertaining to the Day Ahead Market which also determines the generation levels, theAncillary Services levels, the Power Local Marginal Prices, and the prices for the Ancillary Services andwhich target function is to maximize the economic excess according to the offers submitted within theDay Ahead Market.
Asignación de Unidades de CentralEléctrica en Tiempo Real
Real time commitment of generationunits
2.1.65
The process of commitment and dIspatch of Power Plant Units scheduling and dispatch process themain function of which is to incrementally increase the capacity of the Power Plant Units commitmentfor the operation in real time, considering the allocation previously calculated in such manner that thereal time commitment is set up according to fifteen minutal-dispatch intervals.
†Disclaimer: Translations of definitions are provisional and are subject to revision.
Page 73 of 147
Article/ sectionTranslation†Lexical entry
Section III
To facilitate study of individual documents
Translated definitions or extracts where a term occurs, sorted by class and legal disposition
BILINGUAL GLOSSARY OF MEXICO'S POWER INDUSTRY
Asignación de Unidades de CentralEléctrica para Confiabilidad en el Día enAdelanto
Day Ahead Reliability Unit Commitment 2.1.46
The process of allocating and dispatching Power Plant Units at the market second stage by means ofwhich the Power Plant Units starts and stops are determined by the CENACE based upon the purchaseand sales offersreceived and the demand forecastsalong with excludingvirtual offers.Said starts andstops are those corresponding to the Power Plant Units minimum commitment. The target function isequivalent to that one as on the Day Ahead Market and is conducted before the latter.
Asignación Suplementaria de Unidadesde Central Eléctrica para Confiabilidad
Supplementary Allocation of PowerPlants for Reliability
2.1.57
The Electric Power Units commitment and dispathcing process by means of which the CENACEdetermines the additional starts required to guarantee the reliability. Such determination is based uponthe updated information on the Power Plant Units availability, the demand forecasts and the changes inthe National Transmission Grid topology and the changes in the components of the General DistributionPower Grids corresponding to the wholesale Electric Market or other changes in the system conditions.The target function is the minimization of the costs related to the additional committed units and isconducted subsequently to the Day Ahead Market.
Autoridad de Vigilancia del Mercado Market Oversight Authority 2.1.78
The Authority responsible for monitoring the Market Participants, the operation of the WholesaleElectric Market and the resolutions reached by the CENACE in order to guarantee the efficient operationof said market and the due compliance with the Market Rules. It is responsible as well for supervisingthe compliance with the obligations provided for by the Act (article 104) and those in the Market Rules.Said faculty shall be exercised by CRE through its Board of Directors as soon as the Wholesale ElectricMarket first year of operation is completed. Before then, [authority will be exercised] by the Ministrythrough its National Electricity System and Nuclear Policy Unit or through the unit that replaces it, withCRE technical support.
Base Market Basis, Baseline, Market Rule 2.1.89
Any of the articles contained in the [19] sections of the Wholesale Market Principles of the ElectricityMarket.
Bases del Mercado Eléctrico Baselines / Market Basis Rules / rulesof the electricity market
1.1.110
The Electricity Market Baselines are composed of general administrative provisions containing theprinciples of design and operation of the wholesale electricity market, including auctions to which theElectricity Industry Act refers.
†Disclaimer: Translations of definitions are provisional and are subject to revision.
Page 74 of 147
Issued Amended Total: 29
Section IV
Glossary of Mexico's Power Industry
GLOSSARY OF MEXICO'S POWER INDUSTRY
CONSTITUTION 1
CONGRESO GENERAL
Reformas a la Constitución Dec 20, 20131
LAWS 8
CÁMARA DE DIPUTADOS
Ley Reglamentaria del Artículo 27 Constitucional enMateria Nuclear
Feb 04, 1985 4/09/152
Ley de Inversión Extranjera Dec 27, 1993 8/11/143
Ley para el Aprovachamiento Sustentable de la Energía Oct 28, 20084
Ley de Asociaciones Público Privadas Jan 16, 2012 8/11/145
Ley de Energía Geotérmica Aug 11, 20146
Ley de la Comisión Federal de Electricidad Aug 11, 20147
Ley de la Industria Eléctrica Aug 11, 20148
Ley de Transición Energética Dec 24, 20159
BY-LAWS (Reglamentos) 7
PRESIDENCIA
Reglamento de la Ley de Servicio Público de EnergíaEléctrica
May 31, 1993 8/24/1210
Reglamento de la Ley del Servicio Público de EnergíaEléctrica, en Materia de Aportaciones
Nov 10, 1998 12/16/1111
Search: GCPA/2GCPA Bilingual Glossary of Mexico's Power IndustryPage 131 of 147
Issued Amended Count
Glossary of Mexico's Power Industry
Section IV
Reglamento de la Ley para el aprovechamiento deenergías renovables y el financiamiento de la transiciónenergética
Nov 28, 2008 6/07/1312
REGLAMENTO de la Ley para el AprovechamientoSustentable de la Energía
Sep 11, 200913
Reglamento de la Ley de Energía Geotérmica Oct 31, 201414
Reglamento de la Ley de la Comisión Federal deElectricidad
Oct 31, 201415
Reglamento de la Ley de la Industria Eléctrica Oct 31, 201416
DECREES 4
PRESIDENCIA
DECRETO por el que se reforman, adicionan y derogandiversas disposiciones del Reglamento de la Ley deInversión Extranjera
Sep 08, 1998 10/31/1417
DECRETO por el que se reforman y derogan diversasdisposiciones del Reglamento de la Ley del ServicioPúblico de Energía Eléctrica.
Nov 30, 201218
DECRETO por el que se crea el Centro Nacional deControl de Energía
Aug 28, 201419
DECRETO por el que se crea el Centro Nacional deControl del Gas Natural
Aug 28, 201420
INSTITUTIONAL DOCUMENT 9
Search: GCPA/2GCPA Page 132 of 147
An additional Section V that includes, for each of the entries in the glossary, the original Spanish text with the English translation be useful to developers and their attorneys who are ready for a close up assessment of opportunity and risk.
his th glossary
The original Spanish text may be accessed by reference to the source document (and article) shown in Section II.
Section V present and future sponsors of this database project. Contact [email protected] for sponsorship opportunities.
Page 134 of 147
BAKER&ASSOCIATES,ENERGYCONSULTANTS
Management consulting
Industry, policyand regulatory reports
(832) 434-3928 (text/cell)
Mailing Address:
Box 271506
Houston TX 77277‐1506
To learn about our reporting,consult the title lists, by year or category, at
www.energia.com