1SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 1
-- --
2SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 2
1. 2. Inventory3. BOM4. MPS5. MRP6. CRP7. Scheduling
3SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 3
1-1.Reorder Point( )
(Order Point) = +
1.
4SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 4
1-2.MRP(Material Requirement Planning) :
- (What), (When), (How Much) .
MPS( )
MRP( )Inventory( ) BOM( ) BOM;Bill of Materials
MPS;Master Production Schedule
5SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 5
1-3.CLOSED LOOP MRP( MRP)- Feed back .
NO
YES
Closed Loop
MPS
MRPInventory( ) BOM
?
6SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 6
1-4.MRP II(Manufacturing Resource Planning) : - , , ,
.
MPS
Inventory BOM
CRP
RCCP
NO
YES
MRP
RCCP:
MPS;Master Production ScheduleRCCP;Rough-cut Capacity Plan,
, , ,
MRP;Material Requirements PlanBOM;Bill of MaterialsCRP;Capacity Requirements Plan
CRP:
7SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 7
1-5. MRP/ERP(Enterprise Resource Planning) : “ ”
- ( , , , , , , , ) , .
-1970 (MRP mrp: Material Requirement Planning),1980 (MRPII MRP: Manufacturing Resource Planning)
.
- .- 1980 , (Supply Chain) , ,
” .
- / ,- , , , Light Sizing
, ERP .
- , , , ,
(ABC Costing)” , ,
.
8SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 8
MRP/ERP
– MRP.
– MRP (BOM, Bi l l of Mat er i al s) ,
(Rout i ng Sheet ) ,
(MPS, Mast er Pr oduct i on Schedul e) ,
( I nvent or y Recor d)
) , , ,
. ”
MRP MRP II ERP
9SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 9
1-6.ERP(Enterprise Resource Planning)
MPS
MRP BOM
CRP
RCCP
NO
YES
( )
10SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 10
1-7. (Manufacturing Strategy)
Inventory
Engineering-To-Order( )
Make-To-Order( )
Assemble-To-Order( )
Make-To-Stock( )
1.1 Manufacturing strategy and lead time
(delivery lead time)
Design AssembleManufacturePurchase Ship
11SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 11
2-1. , , stocks Items
2-2. - Raw Materials (RAW)- Work in Process (WIP)- Finished Goods (FG) = end items- Maintenance, Repair, and Operating Supplies (MRO)
2-3.-Lot For Lot (L4L) : - : Fixed Order Quantity (FOQ) :
) FOQ = 1001 100 100101 100 200
- : Period Order Supply (POS) ; - (Minimum Order Quantity) - (EOQ : Economic Order Quantity)EOQ = (2AS) /( IC)
A = (Annual Usage)S = (Setup Cost)I = (Annual Carry Cost)C = (Unit Cost)
- (Reorder Point)- (Safety Stock) :
2. Inventory Management( )
12SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 12
2-4. (Lead Time : )
- LT
, ,
- LT :
- Queue + Setup + Run + Wait + MoveQueue Time : .Setup Time : Run Time : , , = Run Time X Lot SizeWait Time : , Move Time :
- Order Release :
Queue WaitRunSetup Queue WaitRunSetup
Queue WaitRunSetupQueue WaitRunSetup
Move
Move
Move
Move
13SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 13
2-4. (Lead Time : )
- (Operation Time) = (Setup Time) + (Run Time) = (Load)
- Lead Time Offset( )
- (Manufacturing Calendar)
(Day) , .
(Manufacturing or M-day Calendar). .
4 .
14SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 14
2-5. (Inventory Status Data)
- (On Hand) : , - (Scheduled Receipt)
(Release) Open Order( , ) . .
- (Scheduled Issue)- = + -- (Reservation)- (Allocation)
(Pick List) MRP
- (Backflush)
2-4.- 1 - 1
23
2 - 135
2-5. - (Cycle Counting) : , - (Physical Inventory)
15SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 15
2-4.Item Identification
•••••••• (Description)
16SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 16
3-1.BOM(Bill of Material) , ,
, 3-2.Level LLC
3-3.BOM
- , , , , , ,
3. BOM( :Bill of Material)
Ass’y Ass’y
Roll Ass’y
LEVEL 0
LEVEL 1
LEVEL 2
LEVEL 3
17SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 17
3-4. BOM( :Bill of Material)BOM
Job Shop
Repetitive
Flow Shop
One of AKind
One of A Kind Job Shop Repetitive Flow Shop
, , ,
BOM
(Project, One of a kind): build
Batch
18SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 18
3-5. BOM
BOM ,
?
?
?
19SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 19
A X
B C
)
. . )
(capaci t y)
* - (Single level)- (Multi-level, Indented)- (Explosion)- (Implosion) Where-used : .
- (Summarized)
-Pegging : , MRP (Explosion)
source.
(Bi l l Of Mat er i al s)
3-5. BOM
20SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 20
3-5. BOM
21SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 21
3-6. BOM
22SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 22
BOM
23SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 23
BOM
•A/S
24SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 24
3-7.BOM
-Engineering BOM E-BOM BOM . (Function)
. , BOM . , A, . ,
EBOM Manufacturing BOM .
- ( )--
BOM Manufacturing BOM Production BOM . MRP BOM . M-BOM P-BOM . M-BOM
E-BOM . , Item.
-
25SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 25
3-7.BOM
- BOM (Planning BOM ; Planning Bills)
Planning BOM (Master Production Scheduling) . , . ,
BOM .
Planning BOM1) Modular BOM2) Common Part BOM ( or KIT BOM)3) Super Bill ( )
Table
Common Parts Legs Sides Tops
Leg A 40%
Leg B 35%
Leg C 25%
Side A 55%
Side B 30%
Side C 15%
Top A 45%
Top B 30%
Top C 25%
100%
3 X 3 X 3 = 27
26SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 26
Modular BOM ( BOM)
Modular BOM Feature/Option . Assemble-To-Order .
, . - :1800cc, 2000cc, 2500cc, 3000cc- : , Graphic Equalizer , CD - ABS- , +--- : , - Room Mirror . - 10- . (combination) BOM BOM .
, A 3 , B 10 , C 5 , D 5 , E 10 , 3 * 10 * 5 * 5 * 10 = 7500 BOM .
, , 3 + 10 + 5 + 5 + 10 = 33 BOM . Modular BOM(Common Parts) . Modular BOM , BOM
. , Master Production Scheduling Option, .
(Final Product) 7500, 33 Common Parts .
27SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 27
Common Part BOM ( or KIT BOM)( , ) BOM , BOM
Item (Pseudo) Item Number .
BOM ; Super Bill ( )- Modular BOM Common Parts BOM Child BOM- ( )Planning BOM . BOM .
) Color TV 14 , 15 , 17 Color TV , 20%, 30%, 50%, Modular BOM BOM .
1800cc 60%, 2000cc 40%, 30%, Graphic Equalizer 30%, CD Player 50% Modular BOM BOM .
(MPS) . BOM .
.
Planning BOM-------
28SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 28
BOM / , (tree). , ( )
. , BOM Inverted BOM . BOM (Parent Child Relationship) , Parent Item Child Item, (Cycle) .
(1) Multilevel BOM , BOM Display . BOM Parent Child , Child Child ( ) BOM Multilevel BOM
. , BOM Multilevel BOM Parent Child , BOM Indented BOM .
(2) Phantom BOM Phantom Item BOM . Phantom Item, Item . Phantom Item BOM Phantom BOM . ,
Phantom JIT MRP , Engineering BOM Manufacturing BOM. Phantom BOM blow-through, pseudo BOM, transient BOM . Pseudo BOM
Planning BOM , .
(5) BOM( BOM) , BOM BOM BOM(Add), BOM (Delete)
(6) Add/Delete BOM . Bill of Activity Bill of Process BOM, Routing , , /NC /
. .
29SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 29
3-6.BOM
---- (Phantom)- (Backflush)
3-7. BOM -- : ( )
30SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 30
4. MPS(Master Production Schedule; )
: 26K (Periods)
1 2 3 4 5 6 7 8Sales Forecast 150 160 180 180 180 150 160 160Interplant Order 10 10 20Special Engineering Needs 20 10Service Part Requirements 10 10 10Special Promotion( ) 50Safety Stock Increase 10 10Anticipation build up 10 10 10Total 170 230 200 210 190 170 170 180
MPS ( Sources of MPS Requirements)
* Anticipation build up : ( : )
= 80Lot size = 100
(Periods)
1 2 3 4 5 6 7 8Sales Forecast 60 60 60 60 60 60 60 60
20 60 0 40 80 20 60 0MPS 100 100 100 100
MPS
31SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 31
4-1. MPS (Schedule)
4-2. (Independent Demand, Dependent Demand)
4. MPS(Master Production Schedule; )
Make-to-Stock Make-to-Order Assemble-to-Order
(END ITEM) (End Product)
(Raw material)
MPS
MPS
MPS FASFAS
FAS ; Final assembly schedule
, , ,
, (Sub Ass’y),
(Raw Material)
32SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 32
4-3.
. Planning Horizon ( )MRP MRP
.
A
B C D
E F
G
(LT = 1)
(LT = 5) (LT = 2)
(LT = 3)
(LT = 6)
(LT = 6)
1 + 2 + 3 + 6 = 12 12 .
33SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 33
4-3.
. Time Bucket MRP 1 1
; daily time bucket, weekly time bucket
· Time Phased, Time Slotted, Time Series
· Time FenceDTF ; Demand Time Fence
(master schedule) ..
.
PTF ; Planning Time Fence (master schedule) .
..
0 3 days
Due date Demand Time Fence
PlanningTime Fence
7 days
34SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 34
4-3.
ATP (Available To Promise ; ) CTP (Capable TO Promise ; )
MPS ATP CTP .
,
.
ATP CTP.
35SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 35
4-3.
. ATP (Available to Promise; )
. .
ATP = ARCP – (ACO + DDURD)ARCP = Amount of the Receipt in the Current PeriodACO = All Customer orders up until the next Receipt is DueDDURD = Dependent Demand up until the next Receipt is Due
1 2 3 4 5
10 20 10 30 20
MPS 10 60 110
ATP 40 50
36SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 36
4-3.
. CTP (Capable To Promise)
ATP (Resource), . ATP MPS CTP
. .
APS(Advanced Planning Scheduling) .
. Planner ; MPS/MRP ,
Planner : - ( i.e. launch purchase order or shop order )- open order- System Planning Factor ,
( , , scrap allowances, )- , -- ( )
37SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 37
4-4. MPS/MRP
.
= ( + ) -
= (MPS)
= + (
)
: Lot Size
= –
= –
38SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 38
4-5. MPS
· PAB (Projected Available Balance; )
DTF( ) :PAB = PAB + MPS –
:PAB = PAB + MPS – ( > or )
: 78100 DTF( ) : 3: ( , ) PTF( ) : 8Size : 50 : 50 : 2 periods
Period
(Sales Plan, Forecast)
)
; PAB 50
Available-to-Promise
; MPS
1 2 3 4 5 6 7 8 9
20 22 21 25 24 23 21 21 25
19 17 15 11 9 5 2 1 0
31 14 49 24 0 27 6 35 10
50 50 50
Calculate the PAB & the MPS for period 1-9
39SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 39
4-5. MPS
(MPS) "Time-Phased Grid" "Time-Slotted", "Time-Series", "Tableau" . MPS MRP (Time Bucket) , (Planning
Horizon) .
MPS SourceMPS (MTS ; Make To Stock) (Forecast), (MTO ; Make To Order)
(Customer Order) . (Interplant Order),
(Special Engineering Needs), (Service Part Requirements) .
, MPS . , , (Special Promotion)
MPS . (Stock Out)(Safety Stock Increase) , ,
(Anticipation Build Up) , MPS .
MPSMPS (Gross Requirements) . (Release)
(Scheduled Receipts) . (Bucket) (Net Requirements) . ,
.(Lot Sizing) (Planned Order
Receipts) . (Scheduled Receipts) (Planned Order Receipts) MRP MPS .
MRP MPS , RCCP MRP MPS .
40SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 40
MPS
(Engineering To Order), (Make To Order), (Assemble To Order), (Make To Stock) . (ETO)
(Critical Path) . , , MRP (Project Management) , (MTO) MPS
. (MTO) MPS(MTO) . MPS .
(Backlog) , MPS . , .
(MTO) , MPS (Planning Horizon) ., BOM .
, MPS .
(MTS) MPS,
. MPS , (Forecast)MPS .
, . .
BOM , .
(ATO) MPS,
. , .
1 , 2 . 1 MPS , 2 MPS
. 2 (FAS:Final Assembly Schedule). (Modular BOM)
.
41SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 41
5. MRP
:MRP (Right Time), ( Right Place), (Right
Part), (Right Amount) .
MRP
– MPS( )– BOM( :Bill of Material)– Routing( )– IR( ;Inventory Record)
:
“ MPS( : Master Production Schedule),
.”
MRP 4
42SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 42
1.MRP -Net Change( , )
-Regeneration( , )
2.LLC
3.MRP - , , , , ,
4.
-GR(Gross Requirement) :
-NR(Net Requirement) :
-Scheduled Receipt( )
-Projected Available( )
-Planned Order( )Planned order release( ) : Lead Time Offset Planned order receipt( ) : Lot Size
-Firm Planned Order( )Planned Order
5. MRP
43SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 43
5.-MPS (GR)- = - -- = - GR + -NR = - (Lot Size) - Offset -BOM
6.-A 7/15 7/20 100
B 1 , .: 100, : 50, 3 , Lot for Lot
-B : 100: 100 - 50 = 50: 50 - 100 = -50: 50
- 50 (Planned order receipt)-7/15 50 3 , 7/12
- 7/12 50 (Planned order release)
7.MRP 3--- (Exception message)
44SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 44
MRP
1. (Gross Requirements) 2. (Inventory)
- (Scheduled Receipts)-- (Projected On Hand)
3. (Net Requirements)
4. (Planned Order Receipts) - (Lot Size)
5. (Planned Order Releases) - (Lead Time Offset)
6. MRP (Part Explosion Procedure)--
Level 1 ( ) After Service (
) .,
..
Level 1 Level 2 .
45SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 45
A
B
E
D
C
Period1 2 3 4 5
Gross requirement 20Scheduled receiptsOn hand 6 6 6 36 36 36Planned order releases 50
Period1 2 3 4 5
Gross requirement 50Scheduled receipts 25On hand 30 55 5 5 5 5Planned order releases
A
B
C
Lead time=2Lot size = 20
Lead time=1Lot size = 50
Lead time=1Lot size = 25
Period1 2 3 4 5
Gross requirement 10 20Scheduled receipts 5On hand 5 5 10 0 0 0Planned order releases 20
MRP
: 5
: 6
: 30
46SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 46
< >
A
C
ED
B
(1) (2)
(1) (1)
LT
A 200 0 L4L 1 10/30
B 30 FOQ(100 ) 10
C 0 L4L 2
D 30 POS(10 ) 5
E 100 FOQ(200) 20
POS : Period of Supply FOQ : Fixed Order Quantity
47SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 47
MRP
MRP .
1 BOM ,( ) 1 .
2 = ( / ) * ( BOM ) +
3 =- ( )
MRP.
, , .4
48SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 48
6-1.
-Load( ) : ,
-Capa.( ) : .
-Backward( ) ( )
-Forward( )
-Infinite( ) : , ,
-Finite( ) : ,
- (Shop Calendar or Shop Planning Calendar) : Gregorian calendar,
- (Work Center)
6. CRP
49SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 49
MONTH WEEK MON. TUES. WED. THURS. FRI. SAT. SUN
27
28
JULY29
30
31
2 3 5 6 123 124 125 126
9 10 11 12 13 127 128 128 130 131
16 17 18 19 20 21 22
132 133 134 135 136
23 24 25 26 27 28 29
137 138 139 140 141
30 31 1 2 3
142 143 144 145 146
2123
JULY WORK DAY 123
• (DEFINES NON-WORK DAYS)
(Shop Planning Calendar)
50SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 50
010 020 030
Lead Time
BACKWARD SCHEDULING
Lead Time
FORWARD SCHEDULING
010 020 030
(Scheduling Techniques)
51SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 51
6-2 CRP
: MPS
RCCP :
52SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 52
6-3.CRP Input
- (Routing), , ,
( ) (Routing Sheet Operation Sheet)
- (Work Center)or , , , shift, Utilization( ), Efficiency( )
* Shift : * Utilization( ) = / , 1 * Efficiency( ) = / , 1
: Pin : 12-562: 1020 C.R.S : 12-562-D
: ST-100 : 07-12-4 : N:
Set-up
Drill.
Grind
LT 100
DR 132
GR 83
V-200
-
40
20
30
0.01
0.10
0.30
10
20
30
53SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 53
6-4.CRP flow
(( , , ))
, ,
//
1Utilization
Routing Routing
BOM BOM
(tool)(fixture)
((Loa
d)
Loa
d)
((Cap
acity
) C
apac
ity)
54SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 54
4.CAPA
- 6, 8hr, 2 , 85%, 90%, 6-
Capa = 6 * 8 * 2 * 0.85 * 0.9 * 6 = 440.64 hr
5.Load
A Hr Hr 10 A 0.5 0.1 10 0.5 + 1.0 = 1.5 20 B 1.0 0.1 10 1.0 + 1.0 = 2.0
B 10 C 0.5 0.5 20 0.5 + 10.0 = 10.520 A 1.0 0.2 20 1.0 + 4.0 = 5.0
A = 1.5 + 5 = 6.5 HrB = 2.0HrC = 10.5Hr
55SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 55
•.
• ,.
3/30 A 38.8 3/29 A 15.2 . WC1 A 3/29 ~ 3/30
B 23.6 B 3/28 ~ 3/293/28 B 5.4
3. : J001 3/30 1 , J002 3/30 2
7. Scheduling
J001 A 100 10 WC1 4hr 0.5 4+0.5 * 100 = 54hr2. 20 - 0.01 0.01 * 100 = 1hr
J002 B 50 10 WC1 4hr 0.5 4+0.5 * 50 = 29hr20 - 0.01 0.01 * 50 = 0.5hr
WC1 = 54 + 29 = 83hr= 1 + 0.5 = 1.5hr
1. CAPA : 3 , 2 , 1 8hr 85%, 100%.1 CAPA = 3 * 2 * 8 * 0.85 * 1 = 38.8 hr
56SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 56
1
WC1
28 29 30
38.8 Hr
38.8 Hr
J001
J002 15.2 Hr
23.6 Hr
5.4 Hr
57SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 57
INFINITE ( )
OVER OVER OVER
CAPACITY(120 HRS)
FINTE ( )
OVER
CAPACITY(120 HRS)
&
58SUCCESS IN SUCCESS OUTSUCCESS IN SUCCESS OUTI - 58
Backward, Finite
BOM
Yes
No
BOM