Trend is increasing or decreasing pattern.
First, plot data to verify trend.
If trend exists, then moving averages and exponential smoothing will always lag.
Forecasting a TrendForecasting a Trend
![Page 3: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/3.jpg)
4-3
Plot DataPlot Data
Period
Actual
4 532 1 6
8
4
12
16
20
![Page 4: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/4.jpg)
4-4
MA = 3 period Moving Average
Moving Averages for a TrendMoving Averages for a Trend
Period MA
1 8 2 11 3 13 4 15 10.67 4.33 5 19 13.00 6.00
MAError
6 15.67 ?
Sales
![Page 5: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/5.jpg)
4-5
Trend Graph – Moving AverageTrend Graph – Moving Average
Period
Actual
MA Forecast
4 532 1 6
8
4
12
16
20
![Page 6: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/6.jpg)
4-6
ES = Exponential Smoothing with =0.5 (F2=11)
Exponential Smoothing for a Exponential Smoothing for a TrendTrend
?
Period ES
1 8 2 11 3 13 11 4 15 12 3.0 5 19 13.5 5.5
ESError
6
11
16.25
Sales
![Page 7: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/7.jpg)
4-7
Trend Graph – Exponential Trend Graph – Exponential Smoothing and Moving AverageSmoothing and Moving Average
Period
Actual
MA Forecast
4 532 1 6
8
4
12
16
20ES Forecast
![Page 8: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/8.jpg)
4-8
Moving Averages and (simple) Exponential Smoothing are always poor.
For a linear trend can use: Exponential Smoothing with Trend Adjustment
(pp. 115-117). Linear Trend Projection (linear regression).
For non-linear trend can use: Non-linear regression techniques.
Forecasting a TrendForecasting a Trend
![Page 9: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/9.jpg)
4-9
Used for forecasting linear trend line.
PLOT TO VERIFY LINEAR RELATIONSHIP
Assumes linear relationship between response variable, Y, and time, X.
Y = a + bX
a = y-axis intercept; b = slope
Estimated by least squares method.
Minimizes sum of squared errors.
Linear Trend ProjectionLinear Trend Projection
![Page 10: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/10.jpg)
4-10
Plot of X,Y DataPlot of X,Y Data
Time (x)
Valu
es o
f Dep
ende
nt V
aria
ble
(Y)
Actual observation
![Page 11: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/11.jpg)
4-11
Least SquaresLeast Squares
Deviation
Deviation
Deviation
Deviation
Deviation
Deviation
Deviation
Time (x)
Valu
es o
f Dep
ende
nt V
aria
ble
(Y)
bxaY ˆ
Actual observation
Point on regression line
![Page 12: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/12.jpg)
4-12
Least SquaresLeast Squares
Least squares line minimizes sum of squared deviations. This reduces large errors. Similar to MSE.
Deviations around least squares line are assumed to be random.
![Page 13: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/13.jpg)
4-13
Least Squares EquationsLeast Squares Equations
Equation: y = a + bx
Slope (p. 119):
xnx
yxnyxb
i
n
i
ii
n
i
Y-Intercept: xbya
![Page 14: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/14.jpg)
4-14
Linear Trend Projection ExampleLinear Trend Projection Example
5
Period
(x) 1 8 2 11 3 13 4 15
19
Sales(y)
Given the sales for last 5 periods, forecast future sales using trend projection.
![Page 15: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/15.jpg)
4-15
Linear Trend Projection ExampleLinear Trend Projection Example
5
4.55
156.2
5
666.2
3555
2.13352242
ab
Period
(x) 1 8 2 11 3 13 4 15
19
Sales(y) xy
6095
8 22 39
xy=224
x2
9 16 25
4 1
x2=55x=3 y=13.2
![Page 16: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/16.jpg)
4-16
TP = Trend Projection: Y = 5.4 + 2.6x
Linear Trend Projection ExampleLinear Trend Projection ExamplePeriod
(x) MA ES
1 2 3 4 5
811131519
MAErr.
6
10.6713.0015.67
11 12
13.5
11
16.25
4.336.00
Sales(y)
3.05.5
ESErr.
TPErr.TP
21.018.415.8 -0.8
0.6
Small errors!
![Page 17: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/17.jpg)
4-17
Trend GraphTrend Graph
MA Forecast
ES Forecast
Period
Actual
4 532 1 6
8
4
12
16
20
TP Forecast
![Page 18: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/18.jpg)
4-18
Models with SeasonalityModels with Seasonality
Use if data exhibits seasonal patterns.
Daily, weekly, monthly, yearly.
Compute seasonal component.
Remove seasonality and forecast.
Factor in seasonal component.
See pages 120-124.
![Page 19: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/19.jpg)
4-19
Identify Independent and Dependent variables. Dependent variable (y): Entity to be forecast (demand). Independent variable (x): Used to predict (or explain)
dependent variable. Determine relationship.
Plot data. Consider time lags.
Calculate parameters. Forecast. Monitor.
Associative Forecasting Methods Associative Forecasting Methods
![Page 20: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/20.jpg)
4-20
Linear relationship between dependent & explanatory variables. Example: Sales in month i (Yi ) depends on advertising
in month i (Xi ) (eg. number of ads)
Sales may also depend on advertising in previous months!
Independent variable (number of ads).
Y Xi i= +a b
Dependent variable (sales).
Linear RegressionLinear Regression
![Page 21: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/21.jpg)
4-21
Least SquaresLeast Squares
Deviation
Deviation
Deviation
Deviation
Deviation
Deviation
Deviation
Values of Independent Variable (x)
Valu
es o
f Dep
ende
nt V
aria
ble
(Y)
bxaY ˆ
Actual observation
Point on regression line
![Page 22: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/22.jpg)
4-22
Linear Regression EquationsLinear Regression Equations(same as before)(same as before)
Equation: ii bxaY
Slope:
xnx
yxnyxb
i
n
i
ii
n
i
Y-Intercept: xbya
![Page 23: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/23.jpg)
4-23
Slope (b): Y changes by b units for each 1 unit increase in X. If b = +2, then sales (Y) is forecast to increase by 2
for each 1 unit increase in advertising (X).
Y-intercept (a): Average value of Y when X = 0. If a = 4, then average sales (Y) is expected to be 4
when advertising (X) is 0.
Interpretation of CoefficientsInterpretation of Coefficients
![Page 24: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/24.jpg)
4-24
Least SquaresLeast Squares Plot data to verify linearity!
If curve is present, use non-linear regression.
Forecast only in (or near) range of observed values!
May need future values of independent variable to make forecast. Example: Summer hotel demand may depend on
summer gasoline price.
![Page 25: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/25.jpg)
4-25
Monthly Sales vs. Number of AdsMonthly Sales vs. Number of Ads
Number of TV ads per month
Sale
s
0
![Page 26: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/26.jpg)
4-26
Least Squares LineLeast Squares Line
Number of TV ads per month
Sale
s
bxaY ˆ0
What is sales forecast for small number of ads?
![Page 27: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/27.jpg)
4-27
Forecasting Outside Range of Forecasting Outside Range of Observed Values is UnreliableObserved Values is Unreliable
Number of TV ads per month
Sale
s
bxaY ˆ0
Forecast is for negative sales!
![Page 28: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/28.jpg)
4-28
Answers: ‘How strong is the linear relationship between the variables?’
Coefficient of correlation - r Measures degree of association; ranges from -1 to +1
Coefficient of determination - r2
Amount of variation explained by regression equation
CorrelationCorrelation
![Page 29: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/29.jpg)
4-29
Sample Coefficient of CorrelationSample Coefficient of Correlation
n
i
n
iii
n
i
n
iii
n
i
n
i
n
iiiii
yynxxn
yxyxnr
![Page 30: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/30.jpg)
4-30
r = +1 r = -1
r = .89 r = 0
Y
X
Y
X
Y
XX
Coefficient of CorrelationCoefficient of Correlation
Y
![Page 31: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/31.jpg)
4-31
A good forecast has: No pattern or direction in forecast error.
Error = Actual - Forecast
A small forecast error. Mean square error (MSE). Mean absolute deviation (MAD). Mean absolute percentage error (MAPE).
Guidelines for Selecting Guidelines for Selecting Forecasting ModelForecasting Model
![Page 32: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/32.jpg)
4-32
Time
Error
0
Desired Pattern
Time
Error
0
Trend Not Fully Accounted for
Pattern of Forecast ErrorPattern of Forecast Error
![Page 33: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/33.jpg)
4-33
Suppose you have forecast sales with a linear regression model & exponential smoothing. Which model do you use?
Linear Regression Exponential Actual Model Smoothing
Year Sales Forecast Forecast (.9)1 1 0.6 1.002 1 1.3 1.003 2 2.0 1.004 2 2.7 1.905 4 3.4 1.99
Selecting Forecasting Model Selecting Forecasting Model ExampleExample
![Page 34: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/34.jpg)
4-34
MSE = Σ Error2 / n = 1.10 / 5 = 0.220MAD = Σ |Error| / n = 2.0 / 5 = 0.400MAPE = Σ[|Error|/Actual]/n = 1.2/5 = 0.24 = 24%
Linear Regression ModelLinear Regression Model
1.10
Year Actual F’cast
1 1 0.6 0.4 0.16 0.4 2 1 1.3 -0.3 0.09 0.3 3 2 2.0 0.0 0.00 0.0 4 2 2.7 -0.7 0.49 0.7 5 4 3.4 0.6 0.36 0.6Total 0.0 2.0
Error Error2 |Error|
![Page 35: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/35.jpg)
4-35
1.99
MSE = Σ Error2 / n = 5.05 / 5 = 1.01
MAD = Σ |Error| / n = 3.11 / 5 = 0.622
MAPE = Σ[|Error|/Actual]/n = 1.0525/5 = 0.2105 = 21%
Exponential Smoothing ModelExponential Smoothing Model
Year Y i F’cast
1 1 1.00 0.0 0.00 0.0 2 1 1.00 0.0 0.00 0.0 3 2 1.00 1.0 1.00 1.0 4 2 1.90 0.1 0.01 0.1 5 4 2.01 4.04 2.01Total 0.3 5.05 3.11
Error Error2 |Error|
![Page 36: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/36.jpg)
4-36
Which is Better???Which is Better???
Linear Regression Model:MSE = Σ Error2 / n = 1.10 / 5 = 0.220MAD = Σ |Error| / n = 2.0 / 5 = 0.400MAPE = Σ[|Error|/Actual]/n = 1.2/5 = 0.24 = 24%
Exponential Smoothing Model:MSE = Σ Error2 / n = 5.05 / 5 = 1.01MAD = Σ |Error| / n = 3.11 / 5 = 0.622MAPE = Σ[|Error|/Actual]/n = 1.0525/5 = 0.2105 = 21%
![Page 37: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/37.jpg)
4-37
Measures how well the forecast is predicting actual values.
To use: Calculate tracking signal each time period.
Ratio of running sum of forecast errors (RSFE) to mean absolute deviation (MAD).
Plot tracking signal on graph. Signal should be within upper and lower control
limits based on MAD.
Tracking SignalTracking Signal
![Page 38: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/38.jpg)
4-38
Plot of a Tracking SignalPlot of a Tracking Signal
Time
Lower control limit
Upper control limit
Signal exceeded limit
Tracking signal
Acceptable rangeMAD
+
0
-
![Page 39: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/39.jpg)
4-39
Tracking Signal EquationTracking Signal Equation
MAD
error
MAD
yy
MAD
RSFETS
n
iii
1
ˆ
)(
![Page 40: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/40.jpg)
4-40
Based on Normal Distribution of forecast errors: 1 MAD = approximately 0.8 standard deviations. Limits at ±3 MAD (±2.4 std. dev.) mean that 98% of
values should be within limits. Limits at ±4 MAD (±3.2 std. dev.) mean that 99.9% of
values should be within limits.
Use smaller limits to better control important items. (For example: ±2 MAD)
Patterns, even if within limits, indicate better forecasts can be made.
Tracking Signal LimitsTracking Signal Limits
![Page 41: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/41.jpg)
4-41
Tracking Signal - Month 1Tracking Signal - Month 1
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
CumCum|Error||Error|
![Page 42: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/42.jpg)
4-42
Tracking Signal - Month 1Tracking Signal - Month 1
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090 -10-10 -10-10
CumCum|Error||Error|
RSFE = Errors = -10RSFE = Errors = -10
Error = Actual - Forecast = 90 - 100 = -10
Error = Actual - Forecast = 90 - 100 = -10
![Page 43: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/43.jpg)
4-43
Tracking Signal - Month 1Tracking Signal - Month 1
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090 -10-10 -10-10 1010
CumCum|Error||Error|
Cum |Error| = |Errors| = 10
Cum |Error| = |Errors| = 10
![Page 44: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/44.jpg)
4-44
Tracking Signal - Month 1Tracking Signal - Month 1
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090 -10-10 -10-10 1010 10.010.0
CumCum|Error||Error|
MAD = |Errors|/n = 10/1 = 10
MAD = |Errors|/n = 10/1 = 10
![Page 45: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/45.jpg)
4-45
Tracking Signal - Month 1Tracking Signal - Month 1
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090 -10-10 -10-10 1010 10.010.0 -1-1
CumCum|Error||Error|
TS = RSFE/MAD = -10/10 = -1
TS = RSFE/MAD = -10/10 = -1
![Page 46: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/46.jpg)
4-46
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 99 99 9494
-10-10 -10-10 1010 10.010.0 -1-1
CumCum|Error||Error|
![Page 47: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/47.jpg)
4-47
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
-10-10 -10-10 1010 10.010.0 -1-1
-5-5
CumCum|Error||Error|
Error = Actual - Forecast = 94 - 99 = -5
Error = Actual - Forecast = 94 - 99 = -5
![Page 48: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/48.jpg)
4-48
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15
CumCum|Error||Error|
RSFE = Errors = (-10) + (-5) = -15
RSFE = Errors = (-10) + (-5) = -15
![Page 49: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/49.jpg)
4-49
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15 1515
CumCum|Error||Error|
Cum Error = |Errors| = 10 + 5 = 15
Cum Error = |Errors| = 10 + 5 = 15
![Page 50: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/50.jpg)
4-50
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15 1515 7.57.5
CumCum|Error||Error|
MAD = |Errors|/n = 15/2 = 7.5
MAD = |Errors|/n = 15/2 = 7.5
![Page 51: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/51.jpg)
4-51
Tracking Signal - Month 2Tracking Signal - Month 2
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15 1515 7.57.5 -2-2
CumCum|Error||Error|
TS = RSFE/MAD = -15/7.5 = -2
TS = RSFE/MAD = -15/7.5 = -2
![Page 52: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/52.jpg)
4-52
Tracking Signal - Month 3Tracking Signal - Month 3
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
33 9898 113113
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15 1515 7.57.5 -2-2
1515 00 3300
1100
00
CumCum|Error||Error|
![Page 53: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/53.jpg)
4-53
Tracking Signal - Months 4-6Tracking Signal - Months 4-6
MoMo F’cstF’cst ActAct ErrorError RSFERSFE MADMAD TSTS
11 100100 9090
22 9999 9494
33 9898 113113
44 105105 9595
55 104104 119119
66 110110 140140
-10-10 -10-10 1010 10.010.0 -1-1
-5-5 -15-15 1515 7.57.5 -2-2
1515 00 3300
1100
00
-10-10 -10-10 4400
1010 -1-1
1515 55 5555
1111
.45.45
3030 3535 8855
14.214.2 2.472.47
CumCum|Error||Error|
![Page 54: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/54.jpg)
4-54
Demand and ForecastDemand and Forecast
708090
100110120130140
0 1 2 3 4 5 6 7
Month
Forecast
Actual demand
![Page 55: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/55.jpg)
4-55
Tracking SignalTracking Signal
0 1 2 3 4 5 6 7
Time
-3
-2
-1
0
1
2
3
Tra
ckin
g Si
gnal
98% of points should be between these limits.
![Page 56: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/56.jpg)
4-56
Suppose you have forecast sales with a linear regression model & exponential smoothing. Which model do you use?
Linear Regression Exponential Actual Model Smoothing
Year Sales Forecast Forecast (.9)1 1 0.6 1.002 1 1.3 1.003 2 2.0 1.004 2 2.7 1.905 4 3.4 1.99
Selecting Forecasting Model Selecting Forecasting Model Example - RevisitedExample - Revisited
![Page 57: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/57.jpg)
4-57
Linear Regression Model Linear Regression Model Tracking SignalTracking Signal
Year Y i F’cast
1 1 0.6 0.4 0.4 1.0 2 1 1.3 -0.3 0.35 0.29 3 2 2.0 0.0 0.233 0.43 4 2 2.7 -0.7 0.35 -1.71 5 4 3.4 0.6 0.40 0.0
Error MAD TS
![Page 58: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/58.jpg)
4-58
Exponential Smoothing Model Exponential Smoothing Model Tracking SignalTracking Signal
1.99
Year Y i F’cast
1 1 1.00 0.0 0.0 0.0 2 1 1.00 0.0 0.0 0.0 3 2 1.00 1.0 0.33 3.0 4 2 1.90 0.1 0.275 4.0 5 4 2.01 0.622 5.0
Error MAD TS
![Page 59: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/59.jpg)
4-59
Tracking SignalsTracking Signals
50 1 2 3 4
Year
-3
-2
-1
0
1
2
3
Tra
ckin
g Si
gnal
Exponential Smoothing
Linear Regression
![Page 60: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/60.jpg)
4-60
Forecasting in the Service SectorForecasting in the Service Sector
Examples: For staffing hospitals, fast-food restaurants, banking, etc.
Presents unusual challenges: Large variability (during day, week, etc.). Special need for short term forecasting. Needs differ greatly as function of industry and
product. Issues of holidays and calendar.
![Page 61: 4-1 Operations Management Forecasting Chapter 4 - Part 2](https://reader035.vdocuments.us/reader035/viewer/2022062517/56649f2a5503460f94c44c91/html5/thumbnails/61.jpg)
4-61
Forecasting SummaryForecasting Summary
Determine purpose of forecast first.
Plot data.
Use several appropriate methods.
Continually monitor, evaluate and adjust methods to improve forecasts.