    D. PERENCANAAN PLAT LANTAI

    Structural Model :

    Type Slab = S1 ly 6.3 1.3 < 2.5 ( two way slab )

    Thickness = 120 mm lx 5

    Material :

    fc' = 200 kg/cm2

    from SKSNI T-15-1991-03 table, we find :

    fy = 2400 kg/cm2

    Mlx = Mtx 0.001 q lx * 68

    Mly = Mty 0.001 q lx2 * 55

    Loading : a. Dead Load - Selfweight of Slab = 288 kg/m2

    - Tile , t - 2 cm = 48 kg/m2

    - Mortar, t - 3 cm = 63 kg/m2

    - Ceiling, ( Asbes Cement + hanger ) = 18 kg/m2

    - M & E = 3 kg/m2

    q dl = 420 kg/m2

    b. Live Load q ll = 250 kg/m2

    c. Ultimate Load q u = 1.2 q dl + 1.6 q ll = 904 kg/m2

    Moment :

    Mlx = - Mtx = 1536.8 kg m

    Mly = - Mty = 1243 kg m

    a. Rebar Required :

    a.1 ( x - dirrection )

    m = fy = 14.118 ; Rn = Mu = 32.4 kg/cm2

    d = 77 mm ; = 0.8

    0.85 fc' b d2

    b = 1000 mm

    r req = 1 1 - 1 - 2 m Rn = 0.0151 > r min

    m fy

    r min = 1.4 = 0.0058 rmin = 0.00583

    fy As = r o * b * d = 11.64 cm2

    r r = 1.33 * rreq r o = 0.01511

    = 0.0201

    a.2 ( y - dirrection )

    m = fy = 14.118 ; Rn = Mu = 19.6 kg/cm2 d = 89 mm ; = 0.8

    0.85 fc' b d2

    b = 1000 mm

    r req = 1 1 - 1 - 2 m Rn = 0.0087 > r min

    m fy

    r min = 1.4 = 0.0058 rmin = 0.00583

    fy As = r o * b * d = 6.71 cm2

    r r = 1.33 * rreq r o = 0.00871

    = 0.0116

    b. Shrinkage and Temperaturer m n = 0.0018

    As min = 0.0018 * b * d = 1.4 cm2

    A so = 11.64 cm2

    x - dirrection

    A so = 6.71 cm2

    y - dirrection

    c. Re-bar Selection

    D = 12 mm ; Ab = 1.13 cm2

    Longitudinal Re-bar ( for Shorter span ) S max = 3 * h = 360 mm

    Transversal Re-bar ( for Longer span ) S max = 5 * h = 600 mm

    No. of Re-bar per meter, n = A so / Ab

    n x = 10.3

    n y = 5.9

    Spacing of Re-bar, s = 1000/(n-1)

    s x = 100 mm use D 12 @ 100 mm

    s y = 200 mm use D 12 @ 200 mm

    SKETCH :

    12 @ 100 mm

    120

    lx

    ly

    = ==

    +

  • 7/26/2019 3.plat

    2/3

    d. Crack Control

    Chose "1" or "2" : 2 INTERIOR EXPOSURE

    1 EXTERIOR EXPOSURE

    2 INTERIOR EXPOSURE

    s = 100 mm ; b = 1.35 for Slab

    bw = 1000 mm

    dc = 31 mm

    A = 2 * s* dc = 6200 mm2

    fs = 0.6 * fy = 144 MPaz = fs * ( dc * A)

    1/3= 8310.2 N/mm

    = 8.3102 MN/m < 30 MN/m OK !!

    w = 11*b*fs* (dc*A)1/3

    = 0.1234 mm < 0.4 mm OK !!

    100000

    Structural Model :

    Type Slab = S2 ly 5 2.1 < 2.5 ( two way slab )

    Thickness = 120 mm lx 2.4

    Material :

    fc' = 200 kg/cm2

    from SKSNI T-15-1991-03 table, we find :

    fy = 2400 kg/cm2

    Mlx = Mtx 0.001 q lx * 82

    Mly = Mty 0.001 q lx2 * 53

    Loading : a. Dead Load - Selfweight of Slab = 288 kg/m2

    - Tile , t - 2 cm = 48 kg/m2

    - Mortar, t - 3 cm = 63 kg/m2

    - Ceiling, ( Asbes Cement + hanger ) = 18 kg/m2

    - M & E = 3 kg/m2

    +

    q dl = 420 kg/m2

    b. Live Load q ll = 250 kg/m2

    c. Ultimate Load q u = 1.2 q dl + 1.6 q ll = 904 kg/m2

    Moment :

    Mlx = - Mtx = 426.98 kg m

    Mly = - Mty = 275.97 kg m

    a. Rebar Required :

    a.1 ( x - dirrection )

    m = fy = 14.118 ; Rn = Mu = 9 kg/cm2

    d = 77 mm ; = 0.8

    0.85 fc' b d2

    b = 1000 mm

    r req = 1 1 - 1 - 2 m Rn = 0.0039 < r min

    m fy

    r min = 1.4 = 0.0058 rmin = 0.00513

    fy As = r o * b * d = 3.95 cm2

    r r = 1.33 * rreq r o = 0.00513

    = 0.0051

    a.2 ( y - dirrection )

    m = fy = 14.118 ; Rn = Mu = 4.36 kg/cm2

    d = 89 mm ; = 0.8

    0.85 fc' b d2

    b = 1000 mm

    r req = 1 1 - 1 - 2 m Rn = 0.0018 < r min

    m fy

    r min = 1.4 = 0.0058 rmin = 0.00245

    fy As = r o * b * d = 1.88 cm2

    r r = 1.33 * rreq r o = 0.00245

    = 0.0024

    b. Shrinkage and Temperature

    r min = 0.0018

    As min = 0.0018 * b * d = 1.4 cm2

    A so = 3.95 cm2

    x - dirrection

    A so = 1.88 cm2

    y - dirrection

    c. Re-bar Selection

    D = 12 mm ; Ab = 1.13 cm2

    lx

    ly

    =

    +

  • 7/26/2019 3.plat

    3/3

    Longitudinal Re-bar ( for Shorter span ) S max = 3 * h = 360 mm

    Transversal Re-bar ( for Longer span ) S max = 5 * h = 600 mm

    No. of Re-bar per meter, n = A so / Ab

    n x = 3.5

    n y = 1.7

    Spacing of Re-bar, s = 1000/(n-1)

    s x = 400 mm use D 12 @ 375 mm

    s y = 1500 mm use D 12 @ 1475 mm

    SKETCH :

    12 @ 375 mm

    d. Crack Control

    Chose "1" or "2" : 2 INTERIOR EXPOSURE

    1 EXTERIOR EXPOSURE

    2 INTERIOR EXPOSURE

    s = 400 mm ; b = 1.35 for Slab

    bw = 1000 mm

    dc = 31 mm

    A = 2 * s* dc = 24800 mm2

    fs = 0.6 * fy = 144 MPa

    z = fs * ( dc * A)1/3

    = 13192 N/mm

    = 13.192 MN/m < 30 MN/m OK !!

    w = 11*b*fs* (dc*A)1/3

    = 0.1959 mm < 0.4 mm OK !!

    100000

    120