3.itp electrical

28
INSPECTION AND TEST PLAN BI NO./JO: 10-03563 Discipline: Electrical ITEM NO. QC PROC. REF. RESPONSIBILITY INSPECTION AUTHORITY MRK SAPMT WRPIS CODE CODE CODE CODE 1 Material Receiving 1.1 MRK-15-01 N/A R/M S S Visual 1.2 MRK-13-01 N/A W S W Visual 1.3 MRK-15-01 product Labels N/A R/M S S Visual 2.0 Conduit, junction box and sealing fittings installation 2.1 Conduit Installation above ground a. MRK-WI-07 & MRK-WI-001 SATIP-P-104-05 N/A W S W Visual b. MRK-WI-07 & MRK-WI-001 N/A H S H Visual c. MRK-WI-07 & MRK-WI-001 N/A W S W Visual d. MRK-WI-07 & MRK-WI-001 N/A H S H Visual 2.2 Fixing of supports for junction b MRK-WI-07 & MRK-WI-001 MRK/QC/052 N/A M S W Visual 2.3 MRK-WI-07 & MRK-WI-001 MRK/QC/052 N/A M S W Visual 2.4 Conduit Installation under ground a. Trenching excavation depth MRK-WI-07 & MRK-WI-001 SAES-A-114 SATIP-P-104-07 N/A W S W Visual b. MRK-WI-07 & MRK-WI-001 N/A H S H Visual c. MRK-WI-07 & MRK-WI-001 N/A W S W Visual d. MRK-WI-07 & MRK-WI-001 N/A W S W Visual e. MRK-WI-07 & MRK-WI-001 N/A W S W Visual CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1 Document No. : ITP/EW/01 Rev.:0 Dt.:Nov.'06 Pages :1-2 Description: CONDUIT, JUNCTION BOX AND SEALING FITTINGS INSTALLATION CONTRACTOR: M. R. AL-AL-KHATHLAN EST. PROCESS DESCRIPTION QUALITY CONTROL ACTIVITY ACCEPTANCE CRITIRIA VERIFYING DOCUMENT Method of inspection SUB- CONTRACTOR Material handled carefully and properly. a) Electrical specification b) Manufacture's instruction Product Labels & Name plate details Contractor QC Material Rep. Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately. a) Purchase Order b) Electrical Specification Product Labels & Name plate details/c)MRK/PRO/S TO/006 Contractor QC Material Rep. Store all items in a safe place free from dust and direct sunlight exposure. a) Electrical specification b) Manufacture's instruction Contractor QC Material Rep. Installation of angle bar/channel supports. SAES-P-104, NEC 310/346/348/370-16. Contractor QC Electrical Inspector Installation of RGS PVC coated/RGS conduits and fittings. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-05 SAIC-P-3321 Contractor QC Electrical Inspector Bonding jumpers for conduit bushing with earth clamp connectors. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-05 SAIC-P-3321 Contractor QC Electrical Inspector Boundary seals installation and low point drain. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-05 SAIC-P-3321 Contractor QC Electrical Inspector SAES-P-104, NEC 310/346/348/370-16. Contractor QC Electrical Inspector Fixing of junction boxes, pull boxes. SAES-P-104, NEC 310/346/348/370-16. Contractor QC Electrical Inspector Contractor QC Electrical Inspector Installation of conduit stub-up support and fittings. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-07 SAIC-P-3333 Contractor QC Electrical Inspector Installation of PVC/RGS conduits reinforce steel duct banks, bell ends and bushing. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-07 SAIC-P-3333 Contractor QC Electrical Inspector Spare ducts/sleeves and permanent plug installation. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-07 SAIC-P-3333 Contractor QC Electrical Inspector Direct buried PVC/RGS PVC coated conduits installation clearances. SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-07 SAIC-P-3331 Contractor QC Electrical Inspector

Upload: joel-alcantara

Post on 09-Jul-2016

217 views

Category:

Documents


36 download

DESCRIPTION

Electrical ITP

TRANSCRIPT

Page 1: 3.Itp Electrical

INSPECTION AND TEST PLAN

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1 Material Receiving1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A W S W Visual

1.3MRK-15-01 product Labels N/A R/M S S Visual

2.0 Conduit, junction box and sealing fittings installation2.1 Conduit Installation above ground

a.MRK-WI-07 & MRK-WI-001 SATIP-P-104-05 N/A W S W Visual

b.

MRK-WI-07 & MRK-WI-001 N/A H S H Visual

c.MRK-WI-07 & MRK-WI-001 N/A W S W Visual

d.MRK-WI-07 & MRK-WI-001 N/A H S H Visual

2.2 Fixing of supports for junction bMRK-WI-07 & MRK-WI-001 MRK/QC/052 N/A M S W Visual

2.3 MRK-WI-07 & MRK-WI-001 MRK/QC/052 N/A M S W Visual

2.4 Conduit Installation under ground

a.Trenching excavation depth

MRK-WI-07 & MRK-WI-001 SAES-A-114 SATIP-P-104-07 N/A W S W Visual

b.MRK-WI-07 & MRK-WI-001 N/A H S H Visual

c. MRK-WI-07 & MRK-WI-001 N/A W S W Visual

d. MRK-WI-07 & MRK-WI-001 N/A W S W Visual

e. MRK-WI-07 & MRK-WI-001 N/A W S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/01 Rev.:0

Dt.:Nov.'06Pages :1-2

Description: CONDUIT, JUNCTION BOX AND SEALING FITTINGS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification

Product Labels & Name plate details/c)MRK/PRO/STO/006

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Installation of angle bar/channel supports.

SAES-P-104, NEC 310/346/348/370-16.

Contractor QC Electrical Inspector

Installation of RGS PVC coated/RGS conduits and fittings.

SAES-P-104, NEC 310/346/348/370-16.

SATIP-P-104-05 SAIC-P-3321

Contractor QC Electrical Inspector

Bonding jumpers for conduit bushing with earth clamp connectors.

SAES-P-104, NEC 310/346/348/370-16.

SATIP-P-104-05 SAIC-P-3321

Contractor QC Electrical Inspector

Boundary seals installation and low point drain.

SAES-P-104, NEC 310/346/348/370-16. SATIP-P-104-05

SAIC-P-3321

Contractor QC Electrical Inspector

SAES-P-104, NEC 310/346/348/370-16.

Contractor QC Electrical Inspector

Fixing of junction boxes, pull boxes.

SAES-P-104, NEC 310/346/348/370-16.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Installation of conduit stub-up support and fittings.

SAES-P-104, NEC

310/346/348/370-16.

SATIP-P-104-07 SAIC-P-3333

Contractor QC Electrical Inspector

Installation of PVC/RGS conduits reinforce steel duct banks, bell ends and bushing.

SAES-P-104, NEC 310/346/348/370-16.

SATIP-P-104-07 SAIC-P-3333

Contractor QC Electrical Inspector

Spare ducts/sleeves and permanent plug installation. SAES-P-104, NEC

310/346/348/370-16.SATIP-P-104-07

SAIC-P-3333Contractor QC Electrical

Inspector

Direct buried PVC/RGS PVC coated conduits installation clearances.

SAES-P-104, NEC 310/346/348/370-16.

SATIP-P-104-07 SAIC-P-3331

Contractor QC Electrical Inspector

Page 2: 3.Itp Electrical

f. MRK-WI-07 & MRK-WI-001 N/A H S W Visual

INSPECTION AND TEST PLAN

BI NO./JO: 10-03563 Discipline: Electrical

g. MRK-WI-07 & MRK-WI-003 N/A H S W Visual

3.0 Conduit Sealing Fitting3.1 Installation MRK-SWP-002 SATIP-P-104-05 N/A M S W Visual

3.1.1Fixing of seal fitting MRK-SWP-002 SAIC-P-3209 N/A M S W Visual

3.2 MRK-SWP-002 SAIC-P-3209 N/A M S W Visual

3.2.1 Filling with sealing compound MRK-SWP-002 SAES-P-104 SAIC-P-3209 N/A H S W Visual

3.2.2Seal fitting properly located. MRK-SWP-002 SAIC-P-3209 N/A H S W Visual

3.2.3MRK-SWP-002 SAIC-P-3209 N/A M S W Visual

3.2.4 Final inspection MRK-SWP-002 SAES-P-104 SAIC-P-3209 N/A M S W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Cable entry in ducts sealed with sealing foam. SAES-P-104, NEC

310/346/348/370-16SATIP-P-104-07

SAIC-P-3331Contractor QC Electrical

Inspector

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/01 Rev.:0

Dt.:Nov.'06Pages :2-2

Description: CONDUIT, JUNCTION BOX AND SEALING FITTINGS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

Cable entry in RGS PVC coated stub-ups entering bldg. sealed with fire retardant sealant.

SAES-P-104, NEC 10/346/348/370-16.

SATIP-P-104-07 SAIC-P-3331

Contractor QC Electrical Inspector

SAES-P-104, NEC

310/346/348/370-16

Contractor QC Electrical Inspector

SAES-P-104, NEC 310/346/348/370-16, Art. 501-5 & 15-SAIP-

50

Contractor QC Electrical Inspector

Cable dressing and separation of conductors.

SAES-P-104, NEC-310/346-348

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

15-SAIP-50, NEC- Art. 501-5 & SAES-P-

111

Contractor QC Electrical Inspector

Area classification drawings checked for seal fitting requirements.

15-SAIP-50, NEC- Art. 501-5 & SAES-P-

104.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 3: 3.Itp Electrical

INSPECTION AND TEST PLAN

Pages : 1-1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3MRK-15-01 product Labels N/A R/M S S Visual

2.0 Grounding Cable2.1 Installation MRK-WI-07 SATIP-P-111-01 N/A M S W Visual

2.2 Trenches MRK-WI-07 AD-036874 Sh-1 SATIP-P-111-01 N/A W W H Visual

2.3. MRK-WI-07 AD-036383 Sh-2,10,12 SAIC-P-3713 N/A H W H Visual

2.4 MRK-WI-07 DD-950022 SATIP-P-111-01 N/A W W H Visual

2.5 MRK-WI-07 AD-036383, Sh-7 SATIP-P-111-01 N/A M W H Visual

2.6 MRK-WI-07 AD-036383, Sh-7 SATIP-P-111-01 N/A M W H Visual

2.7 Ground connection to fence. MRK-WI-07 AD-036383, Sh-3 SATIP-P-111-01 N/A M W H Visual

2.8 MRK-WI-07 AD-036383, Sh-8 SATIP-P-111-01 N/A M W H Visual

2.9 MRK-WI-07 SATIP-P-111-01 N/A W W H Testing

2.10 MRK/WI/07 Vendor Specs.NEC-250 SATIP-P-111-01 N/A M/W S W Visual

2.11 MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01 N/A M S W Visual

2.12 MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01 N/A M S W Visual

2.13 MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01 N/A W S W Visual

2.14 MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01 N/A W S W Visual

2.15 Final inspection MRK/QC/07 SAES-P-111/ NEC-250 SATIP-P-111-01 N/A M S H Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/02 Rev.:0

Dt.:Nov.'06

Description: GROUNDING INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTIO

N

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification

Product Labels & Name plate

details/c)MRK/PRO/STO/006

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical

specification

b) Manufacture's

instruction

Contractor QC Material Rep.

SAES-P-104, NEC 310/346/348/370-16

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Ground rod installation, ground grid cad weld prior to backfill. Contractor QC Electrical

Inspector

Ground connection to equipments.

Contractor QC Electrical Inspector

Ground connection to panel boards.

Contractor QC Electrical Inspector

Ground connection to light poles.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Ground connections to cable trays

Contractor QC Electrical Inspector

Ground testing and reading records.

SAES-P-111 & DD-950022

Contractor QC Electrical Inspector

Installation of grounding cables to equipments and local grids. Contractor QC Electrical

Inspector

Size of grounding grid conductor checked.

Contractor QC Electrical Inspector

Verification of the size of equipment grounding conductor.

Contractor QC Electrical Inspector

Grounding conductor run with power conductors.

Contractor QC Electrical Inspector

Conduit and cable tray properly grounded.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 4: 3.Itp Electrical

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Page 5: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF.

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1 MRK-15-01 Product Labels N/A R/M S S Visual

1.2 MRK-13-01 N/A R/M S W Visual

1.3 MRK-15-01 Product Labels N/A R/M S S Visual

2.0 Cable Trays2.1 Installation MRK-WI-07 & MRK-SWP-001 SATIP-P-104-03 N/A M S W Visual

2.2 MRK-WI-07 & MRK-SWP-001 SAIC-P-3307 N/A W W W Visual

2.3 MRK-WI-07 & MRK-SWP-001 SAIC-P-3307 N/A W W W Visual

2.4 Cable tray properly grounded. MRK-WI-07 & MRK-SWP-001 SAES-P-111 SAIC-P-3307 N/A M S H Visual

2.5 MRK-WI-07 & MRK-SWP-001 SAIC-P-3307 N/A H S W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/03 Rev.:0 Dt.:Nov.'06

Description: CABLE TRAYS CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

RESPONSIBILITY

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification

Contractor QC Electrical Inspector

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c) NEMA-VE-1

Product Labels /MRK/PRO/STO/006

Contractor QC Electrical Inspector

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification

Contractor QC Electrical Inspector

SAES-P-104 NEMA-VE-2

Contractor QC Electrical Inspector

Installation of cable tray supports and associated hardware's.

SAES-P-104, NEC310/346/348/370

-16/NEMA VE-2

Contractor QC Electrical Inspector

Installation of cable trays and fittings per NEMA Latest std. SAES-P-104,

NEC310/346/348/370-16/NEMA VE-2

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Final inspection prior to cable pulling

SAES-P-104 NEMA-VE-2

Contractor QC Electrical Inspector

Page 6: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1-2

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material

1.1 MRK-15-01 Product Labels N/A R/M S S Visual

1.2 MRK-13-01 N/A R/M S W Visual

1.3 MRK-15-01 Product Labels N/A R/M S M Visual

2.0 Cable Laying

2.1 Under ground cable laying MRK-WI-07 SATIP-P-104-01 N/A W S W Visual

2.1.1 Cable trenches. MRK-WI-07 SATIP-P-104-01 N/A M S W Visual

2.1.2 Trench preparation MRK-WI-07 SATIP-P-104-01 N/A M S w Visual

2.1.3 MRK-WI-07 SATIP-P-104-01 N/A M S W Visual

2.1.4 MRK-WI-07 SATIP-P-104-01 N/A W S W Visual

2.1.5 MRK-WI-07 SATIP-P-104-01 N/A M W W/H Visual

2.1.6 Cleaning of ducts. MRK-WI-07 SAES-P-104 SATIP-P-104-01 N/A W S W Visual

2.1.7 Cable pulling MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M W W/H Visual

2.1.8 MRK-WI-07 AD-036874 Sh-1 SATIP-P-104-01 N/A W S W Visual

2.1.9 MRK-WI-07 AD-036874 Sh-1 MRK/TEC/QAD/041 N/A W S W Visual

2.1.10 MRK-WI-07 15-SAMSS-502 SAIC-P-3207 N/A M W H Test

2.1.11 MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M W W/H Visual

2.1.12 MRK-WI-07 SATIP-P-104-01 N/A M S W Visual

2.1.13 MRK-WI-07 MRK/QAD/056 N/A M S W Visual

2.1.14 MRK-WI-07 MRK/QAD/047 & 56 N/A W S W Visual

2.1.15 Final Inspection MRK-WI-07 AD-036874 Sh-1 MRK/QAD/056 N/A M W W/H Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/04

Rev.:0 Dt.:16 Mar-05

Description: CABLES AND WIRES CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification

Contractor QC Electrical Inspector

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification Product Labels

/MRK/PRO/STO/006Contractor QC Electrical

Inspector

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification

Contractor QC Electrical Inspector

As per AD036874 Sh-1 , SAES-P-104

Contractor QC Electrical Inspector

AD-036874 Sh-1 and SAES-P-104

Contractor QC Electrical Inspector

AD-036874 Sh-1 and SAES-P-104

Contractor QC Electrical Inspector

Sand bedding for direct buried cables duct.

AD-036874 Sh-1 and SAES-P-104

Contractor QC Electrical Inspector

Installation of conduit for direct/encased buried ducts.

AD-036874 Sh-1 and SAES-P-104

Contractor QC Electrical Inspector

Concrete works for encased buried ducts.

AD-036874 Sh-1 and SAES-P-104

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Sand cover of direct buried cables and ducts.

Contractor QC Electrical Inspector

Laying of red tile and warning tape.

Contractor QC Electrical Inspector

Megger test of LV/Control cables.

Contractor QC Electrical Inspector

Termination of LV/Control cables.

Contractor QC Electrical Inspector

Installation of above ground cable markers.

SAES-P-104, AB-036273

Contractor QC Electrical Inspector

The top layer of concrete encased conduits is marked with red dye.

SAES-P-104, AD-036874 Sh-1

Contractor QC Electrical Inspector

Bell end or protective bushings provided on each duct where it terminates.

SAES-P-104, AD-036874

Sh-1

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 7: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 2 of 2

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

RemarksMRK SAPMT WRPIS

CODE CODE CODE CODE

2.2 Above Ground Cable Laying

2.2.1 MRK-WI-07 SATIP-P-104-01 N/A W S W Visual

2.2.2 Installation of cable trays MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M S W Visual

2.2.3 Megger test of cables MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M S W Test

2.2.4 Cable pulling MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M S W Visual

2.2.5 Cable dressing MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A M S W Visual

2.2.6 MRK-WI-07 SAES-P-104 SAIC-P-3207 N/A W S W Visual

2.2.7 MRK-WI-07 SAES-P-104 SATIP-P-104-01 N/A M S W Visual

2.2.8 MRK-WI-07 SAES-P-104 SATIP-P-104-05 N/A M S W Visual

2.2.9 MRK-WI-07 SAES-P-104 SATIP-P-104-05 N/A M S W Visual

2.2.10 Conduit cleared of rubble. MRK-WI-07 SAES-P-104 SATIP-P-104-05 N/A W S W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/04 Rev.:0

Dt.:16 Mar-05

Description: CABLES AND WIRESCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

SUB-CONTRACTOR

Fixing of rigid steel conduit /PVC coated rigid steel conduit.

SAES-P-104, C-318/346

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Megger test of LV/Control cables.

Contractor QC Electrical Inspector

Termination of LV Control cables.

Contractor QC Electrical Inspector

Conduit properly installed prior to cable pulling.

Contractor QC Electrical Inspector

Conduit completely installed prior to cable pulling.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 8: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Pre-Installation1.1

MRK-SWP-001, 003 & WI-07 N/A R/M S W Visual

1.2MRK-SWP-001, 003 & WI-07 N/A R/M S W Visual

1.3 Meggering of the cables.

MRK-SWP-001 & WI-07/08 N/A R/M S W Test

2.0 Cable Laying

2.1Pulling/laying of the cables

MRK-SWP-001, 003 & WI-07 N/A M S W Visual

2.2 MRK-SWP-001, 003 & WI-07 SATIP-P-104-01 N/A W S W Visual

2.3 MRK-SWP-001, 003 & WI-07 SATIP-P-104-01 N/A W S W Visual

3.0 Cable Termination

3.1Preparation of cables

MRK-SWP-001, 003 & WI-07 SATIP-P-104-01 N/A W S W Visual

3.2 SATIP-P-104-01 N/A W S W Visual

3.3Bolt torquing Tightening Test

MRK-SWP-001, 003 & WI-07 N/A W W H Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/05 Rev.:0

Dt.:Nov.'06

Description: CABLE PULLING AND INSTALLATION CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Check trench to be free of water, rocks, and enough depth.

a) SAES-P-104 b) Construction specification

a) Drawing b) procedure c) Inspection Forms

Contractor QC Electrical Inspector

Sand bedding and sweet rock should be free of rocks and having a depth at least 150mm .

a) SAES-P-104 b) Construction specification

a) Drawing b) procedure c) Inspection Forms

Contractor QC Electrical Inspector

a) SAES-P-104 b) Construction specification

a) Drawing b) procedure c) Inspection Forms

Contractor QC Electrical Inspector

a) SAES-P-104 b) Construction specification

SATIP-P-101-01 SAIC-P-3207

Contractor QC Electrical Inspector

Sand cushion at least 300mm (clean sand) hand compaction.

a) SAES-P-104 b) Construction specification

Contractor QC Electrical Inspector

Laying of red tiles and warning tapes.

a) SAES-P-104 b) Construction specification

Contractor QC Electrical Inspector

a) SAES-P-104 b) Construction specification

Contractor QC Electrical Inspector

Cable lugs technical specification MRK-SWP-001, WI-07 &

Vendor specifications

a) SAES-P-104 b) Construction specification

Contractor QC Electrical Inspector

a) SAES-P-104 b) Construction specification

a) Drawing b) procedure c) Torque Report

Contractor QC Electrical Inspector

Page 9: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3

MRK-15-01 product Labels N/A R/M S S Visual

2.0 Fire Alarm 2.1 MRK-08-01 SAES-B-014, NEC-760 NMR Details N/A R/M S W

2.2 Receiving inspection MRK-10-01 SAES-B-014, NEC-760 RFI/MTC/MRIR N/A R/M S W Visual

2.3 Fixing Conduits MRK-WI-07 & SWP-02&03 MRK/QAD/044 N/A M S W Visual

2.3.1 Wire pulling MRK-WI-07 & SWP-02&03 MRK/QAD/050 N/A M S W Visual

2.3.2Fixing of devices

MRK-WI-07 & SWP-02&03 MRK/QC/059 N/A M S W Visual

2.3.3 Termination of wires MRK-WI-07 & SWP-02&03 MRK/QAD/057 N/A M S W Visual

2.3.4Testing MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/050 N/A M S H Test

2.3.5 MRK-WI-07 & SWP-02&03 SAES-P-111 MRK/QAD/049 N/A M S W Visual

2.3.6Torque all bolts within units. MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/091 N/A M S W Test

2.3.7 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059 N/A M S W Visual

2.3.8 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059 N/A H H Test

2.3.9 Inspection. MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059 N/A H S H Visual

2.3.10MRK-WI-07 & SWP-02&03 SAES-B-019 N/A H S W Test

2.3.11MRK-WI-07 & SWP-02&03 SAES-B-019 MRK/QAD/059 N/A H S H Test

2..3.12 MRK-WI-07 & SWP-02/03 MRK/QAD/059 N/A H S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/06 Rev.:0

Dt.:Nov.'06

Description: FIRE ALARM SYSTEM CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification Product Labels &

Name plate detailsContractor QC Material

Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Manufacturer data and submittal

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

SAES-P-104, SAES-B-014

Contractor QC Electrical Inspector

SAES-P-104, SAES-B-014

Contractor QC Electrical Inspector

SAES-P-104, SAES-B-014

Contractor QC Electrical Inspector

SAES-P-104, SAES-B-014

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

All equipment properly grounded

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

All equipment properly identified and labeled.

Contractor QC Electrical Inspector

Functional testing of fire alarm system.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

conduct testing and commissioning of the complete fire protection system.

VENDOR TEST PROCEDURE/REPO

RT/MRK/QAD/059

Contractor QC Electrical Inspector

• Perform testing and commissioning of all fire extinguishing system.

Contractor QC Electrical Inspector

Install fire protection and detection system

SAES-B-070/SAES-B-107

Contractor QC Electrical Inspector

Page 10: 3.Itp Electrical

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Page 11: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3

MRK-15-01 product Labels N/A R/M S S Visual

2.0 MOV & UPS Power Panel & Low Voltage Panel Boards

2.1 MRK-08-01 SAES-P-104, NEC-384 N/A M S W Visual

2.2Receiving inspection

MRK-10-01 N/A M S W Visual

2.3Installation

MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual

2.3.1 Fixing Supports MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual

2.3.2 Installation of panel boards. MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual

2.3.3 Termination of wires. MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A W S W Visual

2.3.4 Megger Test MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Test

2.3.5 Panel properly grounded. MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual

2.3.6 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S H Visual

2.3.7Panel properly labeled. MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual

2.3.8 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A W S W Visual

2.3.9MRK-WI-07, SWP-02& 03 S.A. CHECKLIST N/A W S W Visual

2.3.10Final Inspection MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A W S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/07 Rev.:0

Dt.:Nov.'06

Description: PANEL BOARDS & UPS POWER PANEL, LOW VOLTAGE PANEL BOARDSCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

c)16-SAMSS-518

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c)16-SAMSS-518 d)NEMA PB-1

Product Labels & Name plate details

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction c)16-SAMSS-518

Contractor QC Material Rep.

Manufacturer data and submittal NMR Details/technical

specs./SATIP-P-116-07

Contractor QC Electrical Inspector

16-SAMSS-518/SAES-P-104, NEC-384

NMR Details & technical specs.

/MRIR

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Connections tightened with torque wrench.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Panel circuit directly properly filled in.

Contractor QC Electrical Inspector

install 125 VDC distribution panel SAES-P-104/ARAMCO

approved drwg.Contractor QC Electrical

Inspector

Contractor QC Electrical Inspector

Page 12: 3.Itp Electrical

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Page 13: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S W Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3MRK-15-01 product Labels N/A R/M S W Visual

2.0 Lighting Fixtures

2.1 MRK-08-01 N/A M S W Visual

2.2Receiving inspection

MRK-10-01 N/A M S W Visual

2.3 Installation MRK-WI-07 & SWP-002 MRK/QC/061 N/A M S W Visual

2.3.1 MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A M S W Visual

2.3.2Fixing devices and connection

MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A M S W Visual

2.3.3Megger test

MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A M S W Visual

2.3.4 MRK-WI-07 & SWP-002 SATR-P-3610 N/A H S H Visual

2.3.5 MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A H S W Visual

2.3.6Install stairway lighting

MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A H S W Visual

2.3.7Final Inspection

MRK-WI-07 & SWP-002 SATIP-P-123-01 N/A H S H Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/08 Rev.:0

Dt.:Nov.'06

Description: INTERIOR/EXTERIOR(TASK AREA LIGHTING) LIGHTING FIXTURES AND WIRING DEVICES

CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification Product Labels &

Name plate detailsContractor QC Material

Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Manufacturer data and submittal

SAES-P-123, SAES-P-104, NEC-410.

NMR Details & technical specs.

Contractor QC Electrical Inspector

SAES-P-123, SAES-P-104, NEC-410.

NMR Details & technical specs.

Contractor QC Electrical Inspector

SAES-P-123/Vendor Standard

Contractor QC Electrical Inspector

Fixing lighting fixtures and connections.

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

Install outdoor lighting pole with 250W HPS

Illumination level check of indoor lighting inspection. SAES-P-123/SAES-P-

104Contractor QC Electrical

Inspector

Install Lighting and receptacles for the new tank

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

SAES-P-123/SAES-P-104

Contractor QC Electrical Inspector

Page 14: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material 1.1

MRK-15-01 N/A R/M S S

1.2

MRK-13-01 N/A W S W

1.3MRK-15-01 product Labels N/A R/M S S

2.0 Molded Case Circuit Breaker

2.1 MRK-08-01 N/A W S W

2.2Receiving inspection

MRK-10-01 N/A W S W

2.3 Installation MRK-WI-07 & SWP-002 Vendor Standard MRK/QC/063 N/A W S W

2.3.1

Breaker properly grounded

MRK-WI-07 & SWP-002 SAES-P-111 MRK/QC/049 N/A W S W

2.3.2 MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063 N/A W S W

2.3.3 Breaker properly labeled MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063 N/A W S W

2.3.4 MRK-WI-07 & SWP-002 SAES-P-104 PRE-COM-006 N/A W S H

2.3.5 MRK/QC/063 N/A W S W

2.3.6 Final Inspection MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063 N/A H S W

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/09 Rev.:0

Dt.:Nov.'06

Description: MOLDED CASE CIRCUIT BREAKERCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification Product Labels &

Name plate detailsContractor QC Material

Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Manufacturer data and submittal SAES-P-123, SAES-P-

104, NEC-410.NMR Details &

technical specs.

Contractor QC Electrical Inspector

SAES-P-123, SAES-P-104, NEC-410.

NMR Details & technical specs.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Connections tightened with torque wrench.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Conduct overcurrent trip test, contact resistance test and megger test.

Contractor QC Electrical Inspector

Modification fo MCC-RB1/RB2 & Installation of new breakers Project Quality Plan/MRK-

SWP-001

project drawings./SAES-O-107, SAES-O-108,

SAES-O-109, SAES-O-110

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 15: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

Discipline: Electrical

Material

Visual

Visual

Visual

Molded Case Circuit Breaker

Review

Visual

Visual

Visual

Test

Visual

Visual

Test

Test

Method of inspection

Page 16: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material 1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A W S W Visual

1.3MRK-15-01 product Labels N/A R/M S S Visual

2.0 Batteries

2.1 MRK-08-01 SAES-P-103 SATIP-P-103-01 N/A M S R Review

2.2Receiving inspection

MRK-10-01 SAES-P-103 SATIP-P-103-01 N/A M S W Visual

2.3Installation

MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A M S W Visual

2.3.1 Termination of cables/ wires. MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Visual

2.3.2 Test of battery and system MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A H W H Test

2.3.3 Torque all bolts within units. MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Test

2.3.4 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Visual

2.3.5 Grounding of all units. MRK-WI-07, SWP-002&003 SAES-P-111 SATIP-P-103-01 N/A W W W Visual

2.4Inspection MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A M W W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/10 Rev.:0

Dt.:Nov.'06

Description: BATTERY SYSTEMCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c) 17-SAMSS-S71

Product Labels & Name plate details

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Manufacturer data and submittal

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

All equipment properly identified and labeled.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 17: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S W Visual

1.2

MRK-13-01 N/A W S W Visual

1.3MRK-15-01 product Labels N/A R/M S W Visual

2.0 UPS

2.1 MRK-08-01 N/A R/M W W Review

2.2Receiving inspection

MRK-10-01 N/A W W W Visual

2.3Installation

MRK-WI-07, SWP-002&003 SAES-P-103 N/A W S W Visual

2.3.1Termination of cables/ wires.

MRK-WI-07, SWP-002&003 SAES-P-103 N/A W W W Visual

2.3.2Megger testing

MRK-WI-07, SWP-002&003 SAES-P-104 S.A. CHECKLIST N/A H W W Test

2.3.3 Test of battery and system MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST N/A H W W Test

2.3.4 Torque all bolts within units. MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST N/A W W W Test

2.3.5 MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST N/A W W W Visual

2.3.6Grounding of all units. MRK-WI-07, SWP-002&003 SAES-P-111 S.A. CHECKLIST N/A W W W Visual

2.4 Inspection MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST N/A W W W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/11 Rev.:0

Dt.:Nov.'06

Description: Uninterruptible Power Supply (UPS) CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical specification b) Manufacture's instruction

Product Labels & Name plate details

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c) 17-SAMSS-518

Product Labels & Name plate details

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction

Contractor QC Material Rep.

Manufacturer data and submittal 17-SAMSS-514,

SAES-P-103

SATIP-P-103-01/ NMR Details & technical

specs.

Contractor QC Electrical Inspector

17-SAMSS-514, SAES-P-103

NMR Details & technical specs.

Contractor QC Electrical Inspector

NMR Details & technical specs.

Contractor QC Electrical Inspector

NMR Details & technical specs.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

All equipment properly identified and labeled.

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Contractor QC Electrical Inspector

Page 18: 3.Itp Electrical

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Page 19: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material 1.1

MRK-15-01 H R/M S S

Visual

1.2

MRK-13-01 H R/M S W

Visual

1.3

MRK-15-01 N/A R/M S S

Visual

2 Cathodic protection system for plant facilities

2.1 H W S HVisual

2.2Final inspection

H H W HTest

3 Cathodic protection system for buried pipes

3.1H W S W

Visual

3.2H W S W

Visual

3.3

Pre-commissioning

H H W H

Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Note: 1.All vendor related works records will be prepared & submitted by Saudi Aramco approved Vendor 2. Above activities shall be done & monitored by aramco approved inspector

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/12 Rev.:0

Dt.:16 Mar-05

Description: CATHODIC PROTECTION SYSTEM FOR PLANT FACILITIES & BURIED PIPESCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

C)17-SAMSS-

006/008/017

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification C)17-SAMSS-006/008/017

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction c)17-SAMSS-006/008/017

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Installation of cathodic protection system for plant facilities

Vendor approved Procedure/SAEP

SAES-X-500,SAES-X-600/Aramco approved Drg.

Third party report/SATIP-X-600-02

Contractor QC Electrical Inspector

Vendor approved Procedure/SAEP

SAES-X-500,SAES-X-600/Aramco approved Drg.

Third party report/SATIP-X-600-02

Contractor QC Electrical Inspector

Installation of cathodic protection system buried pipeline

SAEP-332/SAEP-333/Vendor approved Procedure/SAEP

SAES-X-400/Aramco approved Drg./GI-

428.001

Third party report/SATIP-X-600-02

Contractor QC Electrical Inspector

Installation of Cathodic protection for short segment buried pipes & fire hydrants

SAEP-332/SAEP-333/Vendor approved Procedure/SAEP

SAES-X-400/Aramco approved Drg./GI-

428.001

Third party report/SATIP-X-600-02

Contractor QC Electrical Inspector

SAEP-332/SAEP-333/Vendor approved Procedure/SAEP

SAES-X-400/Aramco approved Drg./GI-

428.001

Third party report/SATIP-X-600-02

Contractor QC Electrical Inspector

Page 20: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 4

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material 1.1

MRK-15-01 N/A R/M S W Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3

MRK-15-01 N/A R/M S W Visual

2 Motor/Generator Installation

2.1 Project Quality Plan N/A W S W Visual

2.2 Project Quality Plan N/A W S W Visual

2.3 Project Quality Plan N/A W S W Visual

2.3.1 Project Quality Plan N/A W S W Visual

2.3.2 Project Quality Plan N/A W S W Visual

2.4 Project Quality Plan N/A W S W Visual

2.4.1 Project Quality Plan N/A W S W Visual

2.4.2 Project Quality Plan N/A W S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/13 Rev.:0

Dt.:Nov.'06

Description: MOTORS/GENERATOR SETS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly. a) Electrical

specification b) Manufacture's instruction c)17-SAMSS-503

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report

a) Purchase Order b) Electrical Specification c)17-SAMSS-503

Product Labels & Name plate tails/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction c17-SAMSS-503

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Installation of all motors rated 480V below and up to & including 185KW (250Hp)

SAES-P-113,SEAS-P-114/Aramco approved Drg.

Motor Installation Checklist

Contractor QC Electrical Inspector

Installation of Motors rated less than 0.746 kW (1 HP) NEMA MG 1 /SAES-P-

113,SEAS-P-114/Aramco approved Drg.

Motor Installation Checklist

Contractor QC Electrical Inspector

Install pump motors for oily water lift stations

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install motors for storm water pumps.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Page 21: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 2 of 4

BI NO./JO: 10-03563 Discipline: Electrical

2.5 Project Quality Plan N/A W S W Visual

2.5.1 Project Quality Plan N/A W S W Visual

2.5.2 Project Quality Plan N/A W S W Visual

2.6 Project Quality Plan N/A W S W Visual

2.6.1 Project Quality Plan N/A W S W Visual

2.6.2 Project Quality Plan N/A W S W Visual

2.7 Project Quality Plan N/A W S W Visual

2.7.1 Project Quality Plan N/A W S W Visual

2.7.2 Project Quality Plan N/A W S W Visual

2.8 Project Quality Plan N/A W S W Visual

2.8.1 Project Quality Plan N/A W S W Visual

2.8.2 Project Quality Plan N/A W S W Visual

2.9 Project Quality Plan N/A W S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/13 Rev.:0

Dt.:Nov.'06

Description: MOTORS/GENERATOR SETS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

Install motors for sludge pumps.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install motors for API oil pumps.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install motors for filtered feed pumps. SAES-P-113,SAES-P-

114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work) SAES-P-113,SAES-P-

114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Page 22: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 3 of 4

BI NO./JO: 10-03563 Discipline: Electrical

2.9.1 Project Quality Plan N/A W S W Visual

2.9.2 Project Quality Plan N/A W S W Visual

2.10 Project Quality Plan N/A W S W Visual

2.10.1 Project Quality Plan N/A W S W Visual

2.10.2 Project Quality Plan N/A W S W Visual

2.11 Project Quality Plan N/A W S W Visual

2.11.1 Project Quality Plan N/A W S W Visual

2.11.2 Project Quality Plan N/A W S W Visual

2.12 Project Quality Plan N/A W S W Visual

2.12.1 Project Quality Plan N/A W S W Visual

2.12.2 Project Quality Plan N/A W S W Visual

2.13 Project Quality Plan N/A W S W Visual

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/13 Rev.:0

Dt.:Nov.'06

Description: MOTORS/GENERATOR SETS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Page 23: 3.Itp Electrical

2.13.1 Project Quality Plan N/A W S W Visual

INSPECTION AND TEST PLAN

Page : 4 of 4

BI NO./JO: 10-03563 Discipline: Electrical

2.13.2 Project Quality Plan N/A W S W Visual

2.14 Project Quality Plan N/A W S W Visual

2.14.1 Project Quality Plan N/A W S W Visual

2.14.2 Project Quality Plan N/A W S W Visual

2.15 Project Quality Plan N/A W S W Visual

2.15.1 Project Quality Plan N/A W S W Visual

2.15.2 Project Quality Plan N/A W S W Visual

2.16Final inspection

Project Quality Plan N/A H W H Test

3.0 Project Quality Plan SATR-P-3407 N/A H S W Visual

3.1 Project Quality Plan SATIP-P-113-01 N/A H S W Visual

4.0 Project Quality Plan N/A W S W Visual

4.1 Project Quality Plan N/A H S W Visual

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/13 Rev.:0

Dt.:Nov.'06

Description: MOTORS/GENERATOR SETS INSTALLATIONCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

as per para. 7.1.3.5 (scope of work)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Install power/control cables from s/s RB to new and interconnection wiring to new local control station.

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct pre-commissioning(Insulation Resistance and Functional Testing SATR-P-3407)

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

SAES-P-113,SAES-P-114/VA-444701sht001-011

Motor Installation Checklist

Contractor QC Electrical Inspector

Conduct no load test, vibration, temperature and winding resistance test(pre-commissioning)

Motor Installation Checklist

Contractor QC Electrical Inspector

Final inspection prior to energization. Motor Installation

ChecklistContractor QC Electrical

Inspector

Install one generator set 350KW, 3ph, 50hz, 4w, 0.8pf 380/220V.

SAIC-P-3422/SATIP-P-113-03/GEN.SPECS/DWG.no.VA-132415sht.001 & VA-444701 sht.001

Motor Installation Checklist

Contractor QC Electrical Inspector

Precommissioning genset in coordination fo job phase 800 & Gsaset vendor.

SATIP-P-113-01/SATR-P-3143

Motor Installation Checklist

Contractor QC Electrical Inspector

Page 24: 3.Itp Electrical

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Page 25: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1 Sub- station Demolishing Works

1.1 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.1 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.2 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.3 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.4 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.5 Project Quality Plan SCOPE OF WORK N/A W S S Visual

1.1.6 Project Quality Plan SCOPE OF WORK N/A W S S Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

* Note: Above activities will be done & monitored by aramco approved vendor

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/14 Rev.:0

Dt.:Nov.'06

Description: SUB STATION RB DEMOLITION/RELOCATION WORKSCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

See below for Demolition Scope of Works

Contractor QC Electrical Inspector

Demolish both power and control cables including related control stations for existing pumps and motors as shown on Demolition Drawing no VA-132415sht.001 and SK-444700.001

Contractor QC Electrical Inspector

Isolate and remove vertical section nos 6&7 of MCC#RB1 Contractor QC Electrical

Inspector

Relocate of breaker units 6F and &A to units 5E & 5F. Associated cables rerouting is shown per drawing no. VA132415sht.001 & VA-444700sht.007

Contractor QC Electrical Inspector

Disconnect and remove existing units complete with doors of MCC RB1 sections 3D, 3E &3F, MCC RB2 sections 7A to 7F, 3A & 3B.refer Demolition drawing VA-132415sht.001 & SK-444700sht.001

Contractor QC Electrical Inspector

Demolition of Existing FACP and accessories for API control room and S/S RB.Demolition drawing VA-149524sht.001

Contractor QC Electrical Inspector

Demolish the existing 2kVA UPS located at API control room after commissioning the new 15kVA UPS.

Contractor QC Electrical Inspector

Page 26: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material Receiving1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3

MRK-15-01 N/A R/M S S Visual

2 SWITCH GEARS LOW VOLTAGE CONTROL GEARS INSTALLATION/AUTOMATIC TRANSFER SCHEME (ATS)

2.1 SATIP-P-116-04 N/A W S W Visual

2.2 Install new 3-units VFD's SATIP-P-116-13 N/A W S W Visual

2.3 Install ATS SATIP-P-116-01 N/A W S W Visual

2.4Install feeder cables on ATS

SATIP-P-116-01 N/A W S W Visual

2.5 SATIP-P-116-04 N/A H W H Visual

2.6 SAES-P-116 N/A H W H Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

* Note: Above activities will be done & monitored by aramco approved vendor

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/15 Rev.:0

Dt.:Nov.'06

Description: LOW VOLTAGE CONTROL GEAR/VARIABLE FREQUENCY DRIVES/AUTOMATIC TRANSFER SCHEME (ATS)

CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

c)16-SAMSS-510,

16-SAMSS-513

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c)16-SAMSS-510, 16-SAMSS-513 d)MCC specs.VFD//ATS

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical specification b) Manufacture's instruction C)16-SAMSS-510, 16-SAMSS-513

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Install low voltage control gear Y54-RB-MCC-01 RB substation

Project Quality Plan/WI/SWWP-002 & 003

SAES-P-116/16-SAMSS-503/DWG # VA-44470.001 & MCC specs.

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWWP-002 & 003

SAES-P-116/VFD specs.

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWWP-002 & 003

SAES-P-116/ATS specs

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWWP-002 & 003

DWG VA-132415.001

Contractor QC Electrical Inspector

Install new power supply each pump VFD from existing MCC-RB1&2

Project Quality Plan/WI/SWWP-002 & 003

SAES-P-116/VA-444701.011

Contractor QC Electrical Inspector

Precommissioning of new installed LV controlgear, VFD & ATS.

Project Quality Plan/WI/SWWP-002 & 003

SATIP-P-116-04/SATIP-P-116-

13/SATIP-P-114-01

Contractor QC Electrical Inspector

Page 27: 3.Itp Electrical

INSPECTION AND TEST PLAN

Page : 1 of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material

1.1

MRK-15-01 N/A R/M S W Visual

1.2

MRK-13-01 N/A R/M S W Visual

1.3

MRK-15-01 N/A R/M S W Visual

2 Power Transformer

2.1 N/A W S W Visual

2.2 • Wiring and interconnection N/A W S W Visual

2.3 N/A W S W Visual

2.4

Final inspection

SATIP-P-121-01 N/A H S H Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/16 Rev.:0

Dt.:Nov.'06

Description: DRY TYPE POWER TRANSFORMER INSTALLATION CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITIRIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

c)14-SAMSS-531

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification c)14-SAMSS-531

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical

specification

b) Manufacture's

instruction

c)14-SAMSS-531

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Install dry-type power transformer.

Project Quality Plan/WI/SWP-002 & 003

SAES-P-121/DWG # VA-132415.001

MRK /QC/054 & QC-EL-4

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWP-002 & 003

SAES-P-121/SAES-P-104

MRK /QC/054 & QC-EL-4

Contractor QC Electrical Inspector

Conduct pre-commissioning and functional testing. Project Quality Plan/WI/SWP-

002 & 004VA-444701.011/VA-

444734.015-020

SATIP-P-121-01/SATR-P-

3907/Form#P-024

Project Quality Plan/WI/SWP-002 & 003

SAES-P-121/SAES-P-104/VA-284681

and VA-284682/DWG # VA-

284650 and VE-284667

Contractor QC Electrical Inspector

Page 28: 3.Itp Electrical

INSPECTION AND TEST PLAN

Pages : 1of 1

BI NO./JO: 10-03563 Discipline: Electrical

ITEM NO. QC PROC. REF. RESPONSIBILITY

INSPECTION AUTHORITY

MRK SAPMT WRPIS

CODE CODE CODE CODE

1.0 Material 1.1

MRK-15-01 N/A R/M S S Visual

1.2

MRK-13-01 N/A W S W Visual

1.3

MRK-15-01 N/A R/M S S Visual

2 UPS PANEL Y54-UPS-PP-02/UPS CABINET Y54-UPS-PP-01

2.1 SATIP-P-103-01 N/A W S W Visual

2.2Install interconnection wiring.

SATIP-P-103-01 N/A W S W Visual

2.3 SATIP-P-103-01 N/A W S W Visual

2.4

Inspection of power panel.

SATIP-P-103-01 N/A W S W Visual

2.5 SATIP-P-103-01 N/A W S W Visual

2.6 SATIP-P-103-01 N/A H W H Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

* Note: Above activities will be done & monitored by aramco approved vendor

CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY AND MARINE AREA, PHASE-1

Document No. : ITP/EW/17 Rev.:0

Dt.:Nov.'06

Description: UPS DISTRIBUTION PANEL/CABINETCONTRACTOR: M. R. AL-AL-KHATHLAN EST.

PROCESS DESCRIPTION

QUALITY CONTROL ACTIVITY

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Method of inspection

SUB-CONTRACTOR

Material handled carefully and properly.

a) Electrical

specification

b) Manufacture's

instruction

c)16-SAMSS-518.

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Check all materials received for conformance to all standard requirements. Record and report all discrepancies and damage immediately.

a) Purchase Order b) Electrical Specification C)16-SAMSS-518.

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Store all items in a safe place free from dust and direct sunlight exposure.

a) Electrical

specification

b) Manufacture's

instruction

c)16-SAMSS-518.

Product Labels & Name plate details/Mt. Receiving Inspection Report/Catalogues

Contractor QC Material Rep.

Installation • 400V UPS panel/cabinet.

Project Quality Plan/WI/SWP-002&003

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWP-002&003

16-SAMSS-518. /SAES-P-104/Aramco

approved Drg.

Contractor QC Electrical Inspector

Install Battery Bank along with battery rack and disconnect switch.

Project Quality Plan/WI/SWP-002&003

SAES-P-103/Aramco approved Drg.

Contractor QC Electrical Inspector

Project Quality Plan/WI/SWP-002&003

16-SAMSS-518./SAES-P-

113,SEAS-P-114/as per aramco approved

drg.

Contractor QC Electrical Inspector

Install power connection to the MOV's from new power panel which are fed from the existing switch rack

Project Quality Plan/WI/SWP-002&003

SAES-P-103,SEAS-P-114

Contractor QC Electrical Inspector

Final inspection of UPS distribution panel.

Project Quality Plan/WI/SWP-002&003

SAES-P-103,SEAS-P-114

Contractor QC Electrical Inspector