1 M. RUSTAM ABADI Address : Daeng Tata No.9. Makassar, South Sulawesi Phone Number : 08114 111167 – 082336 111167 Email Address : [email protected] Nationality : Indonesia Place / Date of Birth : Makassar, October 31 st 1967 Area Of Expertise : Civil Works (Construction, Monitoring, Supervision), Procurement Engineer / Document Specialist, Publik Services and Community Development Local Public Service Specialist Kinerja (USAID) Project – Jakarta, Indonesia March – Dec 2014 Contract by : Kemitraan Associate with RTI International, based in Barru District The specific duties and activities of the Public Service Specialist are to be implemented under the direct supervision of the Provincial Coordinator and overall supervision of the Deputy Chief of Party and reporting to Kemitraan. The duties include : 1. Function as the coordinator of KINERJA activities implemented in the district where he/she is assigned. 2. Maintain good working relationships with the executive, legislative and all other stakeholders connected to the local government. Support the establishment of a district working group for Kinerja. 3. Provide assistance in preparing the annual work plan based on the district priorities and needs relevant to the KINERJA menu. 4. Encourage the districts to improve the priority public service including the strategy for its sustainability supported by the available resources and policy in the districts. 5. Coordinate the services of KINERJA with other USAID project field teams and other related projects working with the local government where he/she is working. 6. Monitor the execution of the Memorandum of Understanding with the local government where he/she is working. 7. Monitor the implementation of services being provided to the local government by Implementing Partners. 8. Provide input for materials to be published as best/good practices or innovations and other related topics of interest to the Provincial Coordinator. 9. Attend all coordination and planning meetings called by the PC. 10. Coordinate Kinerja Monitoring & Evaluation activities at the district level, including (a) the collection of data information from Implementing Partners and local government, and (b) regular reporting of information on project activities. 11. Prepare periodic progress reports and submission to the PC and Partnership as requested. 12. Carry out other related duties as assigned by the Provincial Coordinator. Province Sanitation Development Advisor (ProSDA) January 2012 – Dec 2014 Province Sanitation Development Advisor (ProSDA) – Urban Sanitation Development Program (USDP) for “Percepatan Pembangunan Sanitasi Permukiman (PPSP), South Sulawesi, Southeast Sulawesi & West Sulawesi, Contract by : Royal Haskoning DHV 1. Campaigns, Education, Advocacy : Bring in PIU- and USDP-based support for designing and implementing campaign, education and advocacy activities; USDP to complete AE Toolkits. 2. Organizational Development, Budgeting and Operational Mechanisms : Establish (and maintain) relationship with the Pokja Province, the Governor, Mayor/Bupati, Sekda, the PF, the SKPD. 3. Quality Assessmen and BPS/SSK Preparation : Actively support the Pokja Province with the establishment and operationalization of the QA Tim Panel, including ToR ; Monthly review and assess possible needs from Pokja Kab/Kota in completing BPS/SSK. 4. MPS Preparation : Organize a workshop for Pokja Prov.and Kab/Kota members including CF about mobilizing (non)government financial resources 5. Implementation : Support the Provincial Pokja and SKPD on implementation preparations covering socialization activities, land preparation, environmental impact assessments, FS, Master Plan, DED, etc. 6. Monev : With assistance from PMU and USDP Jkt based consultants, organize provincial workshop on the Nawasis use, operations and reporting formats for Pokja Prov and Kab/Kota members. PROFESIONAL EXPERIENCE

Upload: muhammad-sabena

Post on 10-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

1

M. RUSTAM ABADI

Address : Daeng Tata No.9. Makassar, South Sulawesi Phone Number : 08114 111167 – 082336 111167 Email Address : [email protected] Nationality : Indonesia Place / Date of Birth : Makassar, October 31

st 1967

Area Of Expertise : Civil Works (Construction, Monitoring, Supervision), Procurement

Engineer / Document Specialist, Publik Services and Community Development

Local Public Service Specialist Kinerja (USAID) Project – Jakarta, Indonesia March – Dec 2014

Contract by : Kemitraan Associate with RTI International, based in Barru District

The specific duties and activities of the Public Service Specialist are to be implemented under the direct supervision of the Provincial Coordinator and overall supervision of the Deputy Chief of Party and reporting to Kemitraan. The duties include :

1. Function as the coordinator of KINERJA activities implemented in the district where he/she is assigned. 2. Maintain good working relationships with the executive, legislative and all other stakeholders connected to the

local government. Support the establishment of a district working group for Kinerja. 3. Provide assistance in preparing the annual work plan based on the district priorities and needs relevant to the

KINERJA menu. 4. Encourage the districts to improve the priority public service including the strategy for its sustainability supported

by the available resources and policy in the districts. 5. Coordinate the services of KINERJA with other USAID project field teams and other related projects working with

the local government where he/she is working. 6. Monitor the execution of the Memorandum of Understanding with the local government where he/she is

working. 7. Monitor the implementation of services being provided to the local government by Implementing Partners. 8. Provide input for materials to be published as best/good practices or innovations and other related topics of

interest to the Provincial Coordinator. 9. Attend all coordination and planning meetings called by the PC. 10. Coordinate Kinerja Monitoring & Evaluation activities at the district level, including (a) the collection of data

information from Implementing Partners and local government, and (b) regular reporting of information on project activities.

11. Prepare periodic progress reports and submission to the PC and Partnership as requested. 12. Carry out other related duties as assigned by the Provincial Coordinator.

Province Sanitation Development Advisor (ProSDA) January 2012 – Dec 2014

Province Sanitation Development Advisor (ProSDA) – Urban Sanitation Development Program (USDP) for “Percepatan Pembangunan Sanitasi Permukiman (PPSP), South Sulawesi, Southeast Sulawesi & West Sulawesi,

Contract by : Royal Haskoning DHV

1. Campaigns, Education, Advocacy : Bring in PIU- and USDP-based support for designing and implementing campaign, education and advocacy activities; USDP to complete AE Toolkits.

2. Organizational Development, Budgeting and Operational Mechanisms : Establish (and maintain) relationship with the Pokja Province, the Governor, Mayor/Bupati, Sekda, the PF, the SKPD.

3. Quality Assessmen and BPS/SSK Preparation : Actively support the Pokja Province with the establishment and operationalization of the QA Tim Panel, including ToR ; Monthly review and assess possible needs from Pokja Kab/Kota in completing BPS/SSK.

4. MPS Preparation : Organize a workshop for Pokja Prov.and Kab/Kota members including CF about mobilizing (non)government financial resources

5. Implementation : Support the Provincial Pokja and SKPD on implementation preparations covering socialization activities, land preparation, environmental impact assessments, FS, Master Plan, DED, etc.

6. Monev : With assistance from PMU and USDP Jkt based consultants, organize provincial workshop on the Nawasis use, operations and reporting formats for Pokja Prov and Kab/Kota members.

PROFESIONAL EXPERIENCE

Page 2: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

2

City Facilitator MPSS (Memorandum Program Sektor Sanitasi) July 2011 – Dec 2011

For “Percepatan Pembangunan Sanitasi Permukiman (PPSP), Kota Balikpapan, East Kalimantan.

Contract by PT. Cilaki Studio Empatlima

1. Providing intensive support and guidance to the Pokja District in the preparation of MPS , 2. Together with the PF conducting training workshops related to the preparation of MPS 3. Ensure that documents are periodically uploaded to the MPS system nawasis.info nawasis through the site . 4. Ensure that programs and activities are proposed in accordance with the criteria of readiness (readiness criteria) ,

logically constructed and the size / volume they are calculated based on the standard of sanitation coverage 5. Ensure that programs and activities , location and size / volume of the proposed Investment Plan in the table ,

based on the previously identified sanitation issues and the development objectives set 6. Ensure programs and activities in accordance with the rules of budgeting MPS and in accordance with the order

SIDLACOM ( Study, Investigation , Design , Land Acquisition , Construction , Operational & Maintenance ) . 7. Facilitate Pokja District in mapping potential sources of funding . 8. Facilitate Pokja District meeting that the Pokja District with sources of potential funding in the district in order to

socialize and marketing of programs and activities . 9. Facilitate Pokja District in preparing the description of Programs & Activities and Funding Proposal

Procurement Specialist, June 2010 – June 2011

For “Urban Sector Development Reform Project (USDRP), IBRD Loan No. 4766-IND /PHRD Grant No. TF 053555-IND”, World Bank, Barru District, South Sulawesi

Contract by . PT. Kogas Driyap Konsultan – Irmasia, Pty, Ltd

1. Institutional reform by developing a Procurement Anchor Unit (PAU);

2. Regulatory reform affecting procurement, including streamlining all existing local procurement regulations;

3. Improving information systems on procurement;

4. Improving controlling, auditing, feetback system at the district level;

5. Improving the procurement management capacity.

Supervisor Engineer (Enviroment Specialist) Feb 2010 – May 2010

For “Neighborhood Upgrading and Shelter Sector Project (NUSSP), ADB Loan No. 2072/2073 (SF)-INO,

Contract by : PT. Widya Graha Asana

1. Responsible for monitored the watersupply and sanitation quality covering execution systems, quality of material and other supporting management

2. Strengthening capacity of regional government in facilitating participative development Improving information systems on procurement;

3. Provision and maintenance of socio economic infrastructure.

Procurement Engineer Nov 2009 – Jan 2010

For “Rehabilitation of Drainage Systems of Banda Aceh – Loan No. CID 3004 01 B” Agency French Development (AFD), Contrac by : Egis BCEOM International Consultants, French

1. Limited design review and bidding documents review

2. Assistance for procurement, tendering

3. Provide training on procurement procedures and monitoring

4. Minor modifications to the basic design

5. On-going records and reports

6. Information management

7. Monitoring social and Environmental aspect

8. Preparation of O&M manuals, training sessions and transfer of knowledge

Procurement Reform, Sept 2008 – August 2009

For “Urban Sector Development Reform Project (USDRP) PHRD TF 053555”.

Contract by : Individual Consultant PU Cipta Karya – World Bank

1. Institutional reform by developing a Procurement Anchor Unit (PAU);

2. Regulatory reform affecting procurement, including streamlining all existing local procurement regulations;

3. Improving information systems on procurement;

Page 3: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

3

4. Improving controlling, auditing, feetback system at the district level;

5. Improving the procurement management capacity.

Construction Specialist, July 2007 – August 2008

For “Grant 0002-INO. Earthquake and Tsunami Emergency Support Project (ETESP) Package 31”.

Contract by : HB. Consultants Ltd, Bangladesh

1. Monitoring and evaluation coordinator supervision construction Puskesmas NAD (8 Puskesmas)

2. Oversight the rehabilitation and construction of health centre health facilities in Aceh to a standard that complies with all relevant Indonesian legislation

3. Design and undertake activities that have been thoroughly consulted with key stakeholder including users and consumers so as to obviously reflect their inputs.

4. Ensuring that construction is completed on time and within budget to an approved quality standard and observes environmental considerations.

5. Collaboration with the procurement specialist to ensure a match between the equipment and the facility.

Procurement Engineer April – June 2007

For “Aceh & Nias Tsunami and Earthquake Reconstruction Program (ANTERP 02) Technical Assistance (INFTA 02) To BRR. Sector Water Supply, Sanitation, Drainage and Road.

Contrak by : Sogreah Consultant . French

1. Standard prequalification and advertisement documents;

2. Prepare standard documentation for international and national procurement based on Nasional/World Bank guidelines for procurement contracts and assist BRR to carry out the prequalifications and process.

3. Standard tender documents including specifications and contract conditions; Prepare standard documentation of goods and services based on Nasional/World Bank guidelines and assist BRR to carry out the contract award process including assist to BRR with negotiation of contracts.

4. Quality Control, management and consistency;

5. Program Management team will recommend quality parameters and appropriate standards for each parameter within the system.

Field Monitors Sept 06 – April 2007

For “Australia-Indonesia Basic Education Program (AIBEP) is delivered for AusAID” for Construction Management Services for the Block Grant of Junior Secondary Schools and One Roof Elementary-And Junior Secondary School Construction by Community Participation Mechanism.

Contract by : Cardno Acil, Pty Consultant . Australia

1. Monitoring and evaluation of all CDCs (Construction Development Consultants) by auditing their activities at a number of school both on a one off basis and on a continuous basis for the duration of the CDCs engagement, for the purpose of :

2. Confirming the physical progress of the construction works and compliance with the design and specification of the approved Technical Proposal.

3. Ensuring the CDCs meet their procedural and performance requirements set out in the MoNE handbook and guidelines for the socialization, training, management and construction of Block Grant funded.

4. Ensuring the CDCs meet their contractual requirements for the amount of work to be completed priod to claims for payment from the MCPM-AIBEP for their sevices have been meet.

5. Identifying and systemic weaknesses in the field implementation procedures of the CDCs and KP-USB and P2SATAPs

Procurement Engineer May – August 2006

For “Aceh & Nias Tsunami and Earthquake Reconstruction Program (ANTERP 01) Technical Assistance (INFTA 01) To BRR. Sector Water Supply, Sanitation, Drainage and Road.

Contract by : Sogreah Consultant . French

1. Standard prequalification and advertisement documents;

2. Prepare standard documentation for international and national procurement based on Nasional/World Bank guidelines for procurement contracts and assist BRR to carry out the prequalifications and process.

Page 4: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

4

3. Standard tender documents including specifications and contract conditions; Prepare standard documentation of goods and services based on Nasional/World Bank guidelines and assist BRR to carry out the contract award process including assist to BRR with negotiation of contracts.

4. Quality Control, management and consistency;

5. Program Management team will recommend quality parameters and appropriate standards for each parameter within the system.

Document Specialist, January - April 2006

For “Earthquake and Tsunami Emergency Support Project (ETESP), Road and Bridge Component ADB Grant TA No. 0002-INO”.

Contract by : Dainichi Consultant Inc. Japan

Preparing project administration covering notice to tender, praqualification, bidding document, award of winner to process execution and work finish.

Team Leader July - Dec 2005

For “Fasilitation of Self-Supporting Housing Society through Banking Fasilitation” in Kolaka District, North Kolaka District,and Bombana District, South-East Sulawesi Province

Contract by : MAEGA PHANREENA Consultant, PT

1. Management of housing community development which concerning policy analyst, organization system and development of basic to medium infrastructure.

2. Executing the program of social bangking facilitation.

3. Mapping of housing condition and settlement of target location.

4. Coordinate to Local / District Government for networking and relationship.

5. Determination of target location banking program facilitation

Project Manager Feb - June 2005

For “Development and Rehabilitation Lusiana Hotel Sorowako” South Sulawesi,

Contract by : Lusiana Group Indonesia (LGI)

Reponsibility to all processes execution of and physical of managemen, covering Quality / Quantity Work.

Quality Engineer July - Nov 2004

For “Rehabilitation Road and Bridge Unaaha”, Particular A. Yani Road, Southeast Sulawesi

Contract by : Planologi Engineering Consultant. PT

Reponsibility to quality covering execution systems, quality of material and other supporting management.

Site Engineer May 2003 - June 2004

For “Construction Management, Junior Secondary Education Project (JSEP), Loan 4042-IND”, South Sulawesi (

Contract by : Karya Utama Citramandiri Consultant. PT

1. Assisting JSEP committee in preparing technical proposal of JSEP, including adjustment of JSEP desain, general and technical specification and Bill of Quantity (BOQ) based on school condition.

2. Assisting execution of training for Committee Development of JSEP, preparing training materials, and also become training instructor concerning ( i) technical drawings, ( technical matter ii) which influence the quality of the work ( iii) progress of work, ( administration iv) of[is project of, financial statement and bookkeeping ( v) building maintenance

3. Assisting JSEP Committee on the job training service for : technical drawings, quality of work, proress of work, project administration, financial report and building maintenance.

Technical Management Specialist Feb - April 2003

For Kindergarten Development Project ( PADU) IBRD Loan No.4378 - IND. South Sulawesi

Contract by : Indra Karya. PT

Evaluation and monitoring of work, execution Physical and Non Physical projects.

Page 5: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

5

Structure Engineer January - Dec 2002

For Second Sulawesi Urban Development Project (Sulawesi II UDP) IBRD Loan No. 4105 – IND, All Sulawesi ( South Sulawesi, Central Sulawesi, North Sulawesi and Southeast Sulawesi).

Contract by :GKW Consult (Germany) and PCO Consultant

Evaluation and monitoring execution of construction physical of water installation processing and supported buildings ie : like operational office building, laboratory and guardhouse Soppeng Distric, Maros and Jeneponto (South Sulawesi). Construction Terminal and infrastructure facilities like operational office, room and corridor await, religious service place and facility park at Kolaka Region ( Southeast Sulawesi). Construction of IPLT support facilities like guardhouse, office, operational and sewage treatment plant at Minahasa Region (North Sulawesit).

Water Supply & Sanitation Engineer August - Dec 2001

For “Second Sulawesi Urban Development Project (Sulawesi II UDP) IBRD Loan No. 4105 – IND”, North Sulawesi

Contract by : Moot Macdonald (USA) and PPIS Consultant

Supervise execution of construction physical of sector clean water like construction of water pipe processing installation and complement building of covering operational building, reservoir, broncaptering, pipe bridge ( sypon) and also house connection. Supervise execution for IPAL

Water Supply & Sanitation Engineer January - July 2001

For “Second Sulawesi Urban Development Project (Sulawesi II UDP) IBRD Loan No. 4105 – IND”, Central Sulawesi

Contract by : PCI (Philipine) and PPIS Consultant

Supervise execution of construction physical of sector clean water like construction of water pipe processing installation and complement building of covering operational building, reservoir, broncaptering, pipe bridge ( sypon) and also house connection. Supervise execution for IPA

Assistant Municipal Engineer Dec 1998 - Dec 2000

For “Second Sulawesi Urban Development Project (Sulawesi II UDP) IBRD Loan No. 4105 – IND”, All Sulawesi ( South Sulawesi, Central Sulawesi, North Sulawesi and Southeast Sulawesi).

Contract by : GKW Consult (Germany) and PCO Consultant

1. Conduct site visit for the agenda of test for Quality Control, supervision to ensure that the work is follow the standard of technical specification.

2. Making report evaluate performance each;every Local government pursuant to support progress of execution to his region.

3. Making report evaluate elegibility of executed project pursuant to requirement of local society.

4. Performing a contract evaluation work some natural work projects of change order, good of addition and reduction of work pursuant to request / forwarding of from consultant supervise and planning.

5. Performing a evaluation affect to improvement of level live and also the make-up of service of adequate environment with existence of SSUDP

Assistant Water Supply Engineer Dec 1996 - October 1998

For “ Ujung Pandang Water Supply Development Project (Stage I). OECF Loan IP – 415”. South Sulawesi

Contract by : Nihon Suido Consultants Co, Ltd (Japan)

1. Supervise the construction work to ensure that contractor execute the work compliance to the contract and specification.

2. Making weekly and monthly progress and quality of work to senior engineer.

3. Check and approve shop drawings / As Build drawing for site construction.

4. Check and approve material used base on standard specification.

5. Witness any test to ensure the installation is accepted by the client.

Quality Control July 1994 – March 1996

For “Building and Drainage Development”, South Sulawesi

Contract by : Asbarindo Utama, PT (Contractor)

Controling the quality of work and also estimate usage of materials to be used according to needed materials quality.

Page 6: 3f8d1a6f-a7c1-4e50-8de1-c7825a50b212.pdf

6

Education

Institution : Major Graduate Degree Country

Moeslim University of Indonesia Civil Engineer 1996 Bachelor (S1) Indonesia

Training

Institution : Area Year Country

Cardno Acil. Pty (JSEP) Recognition of Society Participation 2003 Indonesia

Program to the Project of Extension

and Improvement of Quality

Public Work Department Investment Depelopment Program of 2001 Indonesia

Enableness of Community Development

BOT Syariah Pattern

World Bank & SUDP II Road Operation Urban and 2000 Indonesia

Maintenance for Urban Infrastructur

Development Program (P3KT)

Nihon Suido Consultants Co. Ltd Ductile Iron Pipe Installation 1997 Indonesia

Hasanuddin Universiry Role of Techinic Civil in Town 1996 Indonesia

Perspectif of Free Floods

East Regional of PSL Training for Computer Accountancy 1992 Indonesia

Languages Mother Tongue : Indonesia Other Languages : English

Group proces fasilitation

Interactive even design

Training/Instructional material development