3b portfolio 160909

Upload: rochdy-zoghlami

Post on 04-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 3B Portfolio 160909

    1/19

    ARCHITECTURE & DESIGNS e l e c t e d P o r t f o l i o 2 0 1 0

    LEON LAI ww w.l hl ai .c om

  • 8/13/2019 3B Portfolio 160909

    2/19

    2

    CAREER ABSTRACT

    Leon Lai is a Self-motivated and contributingarchitecture student seeking for his 5tharchitectural internship at an innovativedesign rm that encourages collaborativeenvironment and the duality of research andexperiment.

    resume | 10 Permanent: Suite #1205 168 Bonis Avenue Scarborough, ON Ca nada | Curr ent: 88 Piazza Della Rovere, Rome, Italy | H:416.335.1779 | C:334.8www.lhlai.com | le

    RECOGNITION PROFESSIONAL EXPERIENCE

    Awards

    Publications

    EDUCATION

    University of WaterlooCandadate for Honors Bachelor of

    Architectural Studies, graduating 2011

    Albert Campbell C. I.2006 O.S.S.D. with Honor Standing

    Assisted in the Schematic Design, Design Development and Site Plan drawings for Trinity Lofts and 90 Niagara Condominiums, with direct coordi

    client, structural, marketing and visualization consultants Involved in the master-planning and design of a large-scale mixed-use develoBrampton, Ontario and responsible for an 80 page design booklet presented to

    Conceptual design and presentations for various hospitality projects includiLees restaurant, The Keg and OCAD diner

    Involved with the Drywall and Millwork Tenders as well as the Constructionfor Maple Leaf Square Fine Dining Restaurant

    Participated in the design of various small scale residential renovation projresponsible for a small interior custom renovation millwork and detail packa

    Assisted in the St. Thomas Elgin Hospital renovation mast er-planning busiincluding hospital room templates, area calculati ons, decanting & phasing drawell as consultant coordination.

    Responsible for the St. Josephs Diagnostic Imaging department design set, sptackled challenges regarding structure, circulation, code requirements, areequipment layouts.

    Assisted in the CDs and interior nish presentations for the Canadian ChKazakhstan.

    Created the AIA awards submission drawing set for Assuta hospital in Tel Av

    Responsible for helping 1st year students with their work during class time. Evaluated assignments and answered questions during the rest of the week. FormZ 6.5 and the Adobe Creative Suite 3.

    Involved with the master-planning and schematics design for the West Side Rproject, created presentation drawings, renders, physical models, booklecalculations as well as zoning and rewall regulation drawings.

    Assisted in the early stage of concept design for the Boston Jumeirah Hotel Pfrom massing development to schematics design including iterative studydiagrams and presentation drawings.

    Produced various interior nish and equipment tender packages for condominiums.

    Involved with the schematics designs of 2 sales centers, including site measurdemolition inspections, 2D design drawings and 3D renderings.

    Created the Green Living Show Booth construction drawing set, from concepmillwork detailing to assisting on-site for the construction of the booth.

    QUALIFICATION HIGHLIGHTS

    PERSONAL INTERESTSREFERENCES

    EnglishCantoneseMandarinItalian (basic)

    Fine Art & Photographycontinue to practice at adrawing studio outsideof school

    Reliable & Positive Attitude Adept LearnerSelf-motivatedIndependentOutstanding Team-playerCritical Thinker24/7 Energetic Artist

    Travelvisited much of bigNorth (Canada), fromBanff to PeggysCove; Italy is just thebegining for Europe

    Hand Drafting &Model MakingMS Ofce 07DreamWeaver & CSSPhotoshop, InDesign,Illustrator CS4

    Adobe Premiere AutoCAD 07-10

    Activeracquetsports:badminton,tennis, squash

    3D Studio Max 2007-9FormZ 6.5Rhinoceros 4RhinoScript &Grasshopper

    Vray R3 for 3DS & RhinoGoogle SketchUP 7

    Film & Cinematographyan avid movie watcher,enjoys writings onlms, also interestedin creating shortanimations and shortlms

    Available upon request.

    2010

    2008

    2007

    2006

    2005

    2010

    2009

    2008

    2007

    3B Studio Outstanding Design Award

    SSEF UP! Steel Tower Competition Award of Merit

    Canadian Arch. Assoc.s Ignition Competition 1st Team Prize

    University of Waterloo Entrance Scholarship

    Grade 9 Piano and History with Honors

    Exhibitor in 10 Waterloo Year-End Project Review: Abrupt(ure): P.S.1

    Canadian Architecture Students Association National Portfolio

    Publication: Amplifying RareSpace Exhibitor in the 09 Waterloo Year-End Project Review: A ConjointCultural Identity

    Refer to Detail: 08 Visual Communication Class Publication

    Advantage Steel Magazine SSEF UP! Steel Tower Award of Merit

    2010 January - AugustGiannone Petricone Associates Architects Toronto-Internship

    2009 April - AugustZeidler Partnership Architects Toronto- Internship

    2009 January - AprilTeacher Assistant Visual Comm. 113 University of Waterloo Course Professor: Mark Cichy

    2008 August - DecemberKohn Pederson Fox Associates New York- Internship

    2008 January - AprilTAS DesignBuild Toronto- Intern Designer

    LEON LAI

  • 8/13/2019 3B Portfolio 160909

    3/19

    3

    PROFESSIONAL WORK

    p.12Bringing Green HomeTAS DesignBuild, Toronto

    p.133 Wells Hill- House AdditionGiannone Petricone Associates, Toronto

    p. 14Eastern & Trinity LoftsGiannone Petricone Associates, Toronto

    p. 15Boston Jumeirah HotelKohn Pedersen Fox, NY

    p.16-17The West Side Rail YardsKohn Pedersen Fox, NY

    OTHER

    p.18New York Times Building Study3rd Year Philip Beesley Studio

    ACADEMIC PROPOSALS

    p. 4-5Porous Densication2nd Year Kathy Velikov Studio

    p.6 Abrupt(ure): P.S.1 MoMa3rd Year Maya Przybylski Lab/Studio

    p. 7-8 Amplication of rareSpace2nd Year Geoffrey Thun Studio

    p. 9 Atlantic City Holocaust Memorialcompetition 10

    p. 10-11 A Conjoint Cultural Identity3rd Year Philip Beesley Studio

  • 8/13/2019 3B Portfolio 160909

    4/19

    residential complex | 2nd year studio 07 4 | architecture | urbanism | landscape | designbuild | resear

    PorousDensicationLocation: Queen Street Eas t, TorontoTypology: Residential Complex____________________________2nd year Kathy Velikov studio

    Composed of volumes and voids,groupings of townhouses and3-5 storey mid-rise apartmentdwelling units allow sunpenetration into the city block.The ow of courtyards shared byevery 2 units express a uniquecommunal urban lifestyle. Inorder to provide light for the rearend of the courtyards and diffuse

    UNDERGROUND PARKING

    GROUND FLOOR

    2ND FLOOR

    3RD FLOOR

    4TH FLOOR

    5TH FLOOR

    6TH FLOOR

    7TH FLOOR

    Form & Spatial Concepts

    Circulation Diagram (Illustrator)

    Massing Block Courtyard Opening Liberated Ground Plane Overall Building Slope Sunken Public Space Site Plan (CAD + Illustrator)

    Ground Floor Plan

    Typical Floor Plan (CAD & Photoshop)

    East & North Elevation (FormZ & Photoshop)

    light into corridors, light wellsare introduced. Deep terracesprovide an immense amountof natural light for the building,making all adjacent units intocorner suites; encouraging activegardening, vegetable cultivation,and social interaction betweenneighbors.

  • 8/13/2019 3B Portfolio 160909

    5/19

  • 8/13/2019 3B Portfolio 160909

    6/19

    6 | architecture | urbanism | landscape | designbuild | researcourtyard intervention | 3rd year computational studio 09

    Abrupt(ure): P.S.1 MoMaLocation: Long Island Cit y, New York Typology: Temporary Installat ion___________________________3rd year Maya Przybylski lab/ studio

    The courtyard installation is a continuousartifact that creates a uid transitionalarea where the ground begins to eruptand split, creating various elevationdifferentiations, achieving an articial,

    artistic landscape. We are interested in

    ti tiC n i t nt u r f nt r CurvC n i t n t u r f C n t r l in t r Cu rvC n tr l i n t c n v r l : T t l u r f C n t r l i nt r c ti n v r i

    Tt l fC ntr l int:* c lu i n c n r y h n r i l u l

    Tt l fC ntr l int:

    Tt l fC ntr l int:

    Tt l fC ntr l int:* in cl u i n c n r y h n r i l

    9Handrail Module 1

    Bridge Module 1

    GroundModule

    Bridge Module 2

    Handrail Module 2

    Secondary Handrail Modules

    9 9

    7

    9

    7

    9

    ti tiC n i t nt u r f nt r CurvC n i t n t u r f C n t r l in t r Cu rvC n tr l i n t c n v r l : T t l u r f C n t r l i nt r c ti n v r i

    Tt l fC ntr l int:* c lu i n c n r y h n r i l u l

    T tl # of Control Points: 28

    Tt l fC ntr l int:

    Tt l fC ntr l int:* in cl u i n c n r y h n r i l

    n r i l ul

    ri ul

    G r u n u l

    r i ul

    n r i l u l

    c n r y n r i l ul

    ti tiC n i t nt u r f nt r CurvC n i t n t u r f C n t r l in t r Cu rvC n tr l i n t c n v r l : T t l u r f C n t r l i nt r c ti n v r i

    Tt l fC ntr l int:* c lu i n c n r y h n r i l u l

    Tt l fC ntr l int:

    Tt l fC ntr l int:

    Total # ofControl Points: 45*including 2 secondary handrails

    n r i l u l

    ri ul

    G r u n u l

    c n r y n r i l ul

    ti tiC n i t nt u r f nt r CurvC n i t n t u r f C n t r l in t r Cu rvC n tr l i n t c n v r l : T t l u r f C n t r l i nt r c ti n v r i

    Tt l fC ntr l int:* c lu i n c n r y h n r i l u l

    Tt l fC ntr l int:

    Ttal # of Control Points: 32

    Tt l fC ntr l int:* in cl u i n c n r y h n r i l

    n r i l ul

    ri ul

    G r u n u l

    r i ul

    n r i l u l

    c n r y n r i l u l

    AnchorSections

    Surface Panels- 2xCopperMesh, distortedMoire pattern

    Panel Framing- providessupportforlighting andmist

    RibStructure

    Rendered Plan + Interior of Installation (Rhino + Grasshopper, 3DS, Photoshop)

    Form Computation + Generation (Grasshopper + Rhino, 3DS)

    Form Evolution

    Form Components

    Structure Generation

    Surface Subdivision

    Exploded Structure StudySurface Morphology Analysis

    Geometry Generation Framework

    Longitudinal Section

    1:50 Physical Model- 1459 pieces of laser-cut sectio

    Skin + Structure Studyhow a surface or form could be generatedand inferred by an underlying set of systemsso that it is responsive to the site and inthe end how those systems could manifestthemselves spatially to facilitate interaction

    with and between the occupants.[ ]

    [ ]

    [ ]

    [K]

    [ ]

    [C]

    [1]

    [2]

    [4]

    [5]

    [6]

    [7]

    [8]

    [9]

    [10]

    [11]

    [12]

    [13]

    [14][15]

    % L E

    100% PLANE

    U JECT

    T I T [ J ]

    [S]

    [A]

    [R]

    [K]

    [W]

    [C]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ 3]

    [ ][ ]

    100% PLANE

    % L E

    SUBJECTS

    TRAITS[J]

  • 8/13/2019 3B Portfolio 160909

    7/19

    7 | architecture | urbanism | landscape | designbuild | researperformance landscape | 2nd year studio 07

    Amplication ofRareSpace

    Location: Cambridge, CanadaTypology: Outdoor PerformanceLandscape__________________________2nd year Geoffrey Thun Studio

    The amplication of the experiencesof rareSPACE exploits our 3 dominantsenses--audition of sound, sight andtouch. Employing these 3 elementsas a design structure, a frameworkof open-ended experiences are setup for the users.

    The uniqueness of the material paletteand the uctuating, sometimes limitedvisibility in the eld constitute to anemphasis of a constant acoustical datum.Controlled by visibility and materiality ofthe spaces, users wander and listen tothe landscape, moving from one soundto the next.

    Sound

    So

    Sound Absorption

    Sound Reection

    Sound Amplication

    W

    An i

    Concrete walls

    Insulated buildwith perfo

    Perforated copper sheets diffuse andcollect sound

    Hollow concrete walls with glulamstructure increase reverberation ofsound

    Curving wall composed galvanized steel pipes ofdifferent lengths

    Diagrammatic Plan- architectural components and their materiality

    Concept Experiential Section- lter, approach, reveal and enclose

    Initial Natural Phenomenon Studies- observe, isolate, enhance and iterate Relationship to river and nearby park trails

  • 8/13/2019 3B Portfolio 160909

    8/19

    8 performance landscape | 2nd year studio 07

    Entry Sound Box Tunnel Multi-purpose Auditorium Vocal and Dance Hall

    Longitudinal Site Section

    Performance Space Section

    | architecture | urbanism | landscape | designbuild | resear

    a guideds equence ofe xperientialp erformancespaces

    1:200 Physical Site Model

  • 8/13/2019 3B Portfolio 160909

    9/19

    9 | architecture | urbanism | landscape | designbuild | researatlantic city holocaust memorial | competition 10

    Re-claimingScarred SpaceLocation: Boardwalk, Atlantic CityTypology: Public Memorial_________________________

    Atlantic City Holocaust MemorialCompetition

    We began by accepting the axiom that the scars left by the Holocaustare permanent in spite of continual attempts to deemphasize it throughtime. But there must be hope nevertheless, and means by which theHolocaust survivor - burdened with the responsibility to summon andretell their stories lest our societies fall into the same inhumane pathagain - can reconcile their paradoxical desires to move on and to notforget concurrently.

    Thus we must reclaim the scar.

    I I I I I I

    Emergence of VoidsSeparation of Past & PresentUnyielding Grid of Atlantic City

    Atlantic Boardwalk- Existing Pavillion on Site

    Voids Emerge from the Historical Grid- City Connects with the Past once more (Rhino + 3DS + Photoshop) Plan- Mitigating Zone between City and Nature

    Extent of Site

    Permanent Yielding of Scars Puncturing of the Fragile Present Layer

    The site is envisioned as a zone of anti-life wheretime can be paused, convention inversed and theconsequences of the past - the scars - resurfaced asa grid of voids that emerges from an equally static,historical and unyielding grid of the city. The void tous is the anti-architecture that accurately depicts adeconstructed and absented past where all ephemeralqualities accumulated are eradicated.

    A fragile presenthe elusive exteboardwalks winvites the pedthe site, to the vthe layer is denied, tand re-orientconfronting thof the absented(Rhino + 3DS

  • 8/13/2019 3B Portfolio 160909

    10/19

    10 | architecture | urbanism | landscape | designbuild | researministry of culture | 3rd year studio 09

    A ConjointCultural IdentityLocation: Queens Park, TorontoTypology: Ofce + Retail Complex__________________________3rd year Philip Beesley Studio

    A proposed centre for the Ministry andother cultural education facilities, thebuidling redenes the idea of a trulypublic civic complex, also including retail,restaurants, library and an exhibitionspace. The liberated ground oor

    gallery welcomes pedestrian trafc; thesuspended, interconnected programsabove are spatially attached to theground. This project explores the poeticidentity and experience of working in acity.

    Circulation Diagram

    Diagrammatic Massing ModelGround Plan (CAD & Photoshop)

    Site Plan

    Extension of Existing

    Suspend interconnecte

    Enclosed with a Trans

    3rd Floor Plan 4th Floor Plan

    Massing Model featuring transparent skin

  • 8/13/2019 3B Portfolio 160909

    11/19

    11

    the u nrestricted and c ivilnature of the ministry ofculture encourages aninterconnected, m ulti-leveledpublic realm

    View from the 3rd oor looking down (Rhino, Vray & Photoshop)

    | architecture | urbanism | landscape | designbuild | researministry of culture | 3rd year studio 09

    View from Ground Floor Green Lane (Rhino, Vray & Photoshop)

    Program Organization Studies

    Exploded Building Axo (Rhino & Illustrator)

    Conguration of the major Columns, Boxes and supporting Trusses (CAD & Illustrator)

    The Facade gives a Transparent Reading of the Building (CAD & Photoshop)

    The Section demonstrates the layered public realm (CAD & Photoshop)

  • 8/13/2019 3B Portfolio 160909

    12/19

    12 | architecture | urbanism | landscape | designbuild | researpresentation booth | TAS DesignBuild 08

    Bringing green Home

    Center Lattice Wall Detail

    Millwork Details

    Plan from CD set Photos of Finished Booth Interior

    Concept Renders and Elevation (CAD & SketchUP)

    Location: Toronto, CanadaTypology: Presentation BoothSq. Footage: 3000 sq. ftPhase: Complete design andconstruction_______________________TAS DesignBuild, Toronto

    initial research and conceptualpresentation

    2D and 3D design drawings produced much of the construction

    package structural and millwork detailing on-site assistance and coordination

  • 8/13/2019 3B Portfolio 160909

    13/19

    | architecture | urbanism | landscape | designbuild | resear13 house addition | Giannone Petricone 10

    Location: TorontoTypology: Residential AdditionSq. Footage: 1,500 sq. ft.Phase: Design Development__________________________Giannone Petricone Assocs, Toronto

    Ground Floor Plan

    Overall Massing- addition wraps around cornor of hoSection showing existing house + addition

    Elevations

    3 Wells Hill-House Addition

    Wood ceiling folds into back of entrance seating; moving plains leave traces of light (Rhino + 3DS)

    deliberate play of intersecting volumnes, surfacesand materials; the layered addition anchors into theexisting buidling

    conceptual and design development of house additionusing both CAD and 3D visualizations

    assisted with building permit application drawing set

  • 8/13/2019 3B Portfolio 160909

    14/19

    | architecture | urbanism | landscape | designbuild | researresidential complex | 2nd year studio 0714

    Eastern & TrinityLofts

    Curved facade esblishes a sinuous setback at street intersection

    Convergence point of 2 major streets (3DS)Ground Floor

    Unit Plans- 20 Layouts in Total

    View towards Toronto Downtown- image done by visualization consultant

    East Elevation

    Typical 2-4 Floor

    Location: Toronto, CanadaTypology: Residential CondoSq. Footage: 62,000 sq. ftPhase: Schematic and DesignDevelopment__________________________Giannone Petricone Assocs, Toronto

    assisted from massing conceptto detailed building design

    delegated closely withdeveloper and variousconsultants including planning,structural, mechanical,visualization and marketing

    Site Plan Approval packagefor City of Toronto

  • 8/13/2019 3B Portfolio 160909

    15/19

    15 | architecture | urbanism | landscape | designbuild | researhotel residence | Kohn Pedersen Fox 08

    BostonJumeirah HotelLocation: Boston, MassachusettsTypology: HotelClient: Jumeirah HotelSq. Footage: 730,000 sq. ftPhase: Schematics Design__________________________Kohn Pedersen Fox, NY

    plans and sections drawings

    for client meetings prepared quick 3D exterior

    massing renderings constructed iterative massing

    study models and site forpresentation and analysis

    prepared engaging conceptualdiagrams

    Massing / Views Diagram (CAD, Illustrator & Photoshop)Plans (CAD & Photoshop)

    Programmatic section (Cad + Illustrator) A series of massing iterations focus on the irregularity of t he site,sightlines and draw major massing inuences from adjacent buildings

  • 8/13/2019 3B Portfolio 160909

    16/19

    17 | hit t | b i | l d | d i b ild |b d l t | K h P d F 08

  • 8/13/2019 3B Portfolio 160909

    17/19

    17 | architecture | urbanism | landscape | designbuild | researurban development | Kohn Pedersen Fox 08

    Plaza Level

    Level 2

    Level 3

    Level 4

    Level 5

    Skylobby

    Roof Garden

    Typical Tower Low

    East YardsP odium + Towers

    West Elevation (CAD and Photoshop)

    Typical Ofce Tower Layouts

    1:50 Master-planning Model: East Yards Superblock and Tow

    1:50 Physical Model (Museum Board and Laser-cut Plexi)

    CAD plans red-lining + typical oor layouts construction of a component-based physical model rendered elevations high-lighting the juxtaposition of the

    tower volumes programming development + area calculations various retail proposal booklets

  • 8/13/2019 3B Portfolio 160909

    18/19

  • 8/13/2019 3B Portfolio 160909

    19/19

    Thank you for view

    Please visitwww.lhlai.comfor more work samp