308 east green street revit project book

22
Scale: Project: Date: Drawn: Checked: 5/5/2015 12:56:44 PM 12" = 1'-0" 308 East Green Street G.100 Project 4 5.05.15 Thomas McCormick Rebecca Brouk 308 East Green Street Exterior Perspective Rendering 12" = 1'-0" 1 Exterior Perspective

Upload: thomas-mccormick

Post on 12-Feb-2017

370 views

Category:

Documents


0 download

TRANSCRIPT

Scal

e:

Proj

ect:

Dat

e :D

raw

n:

Che

cked

:

5/5/

2015

12:

56:4

4 PM

12"

= 1

'-0"

3 08

East

Gre

en S

tr eet

G.1

0 0

Proj

e ct 4

5.0 5

.15

Thom

as M

cCor

mic

k

Re b

ecca

Bro

uk

3 08

E ast

Gre

en S

tree t

Exte

rior P

ersp

ectiv

e R

ende

ring

12" = 1'-0"1 Exterior Perspective

Scal

e:

Proj

ect:

Dat

e :D

raw

n:

Che

cked

:

5/5/

2015

12:

57:1

1 PM

12"

= 1

'-0"

3 08

East

Gre

en S

tr eet

G.1

0 2

Proj

e ct 4

5.0 5

.15

Thom

as M

cCor

mic

k

Re b

ecca

Bro

uk

3 08

E ast

Gre

en S

tree t

3D V

iew

1

12" = 1'-0"1 3D Render 1 Copy 1

Scal

e:

Proj

ect:

Dat

e :D

raw

n:

Che

cked

:

5/5/

2015

12:

57:1

4 PM

12"

= 1

'-0"

3 08

East

Gre

en S

tr eet

G.1

0 3

Proj

e ct 4

5.0 5

.15

Thom

as M

cCor

mic

k

Re b

ecca

Bro

uk

3 08

E ast

Gre

en S

tree t

3D V

iew

2

12" = 1'-0"1 3D Render 2

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:02

PM

308

Eas

t Gre

e n S

tre e

t

A.0

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Site

Pla

n

1 Site Plan

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2B

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:03

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

00

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Fou

ndat

ion

Pla

n

1/16" = 1'-0"1 Foundation

UP

UP

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2

16' - 3 1/8" 16' - 3 3/8" 8' - 11 5/8"8' - 7 3/8" 16' - 7 5/8"1' - 2 3/8" 17' - 7" 8' - 11 5/8"8' - 10 3/8" 18' - 0" 3' - 0" 14' - 5" 5' - 9" 7' - 6" 4' - 2" 16' - 0"

B

8' -

4 1

/8"

5' -

7 7

/8"

21' -

10

1/8"

7' -

5"

10' -

5"

6' -

10"

10' -

9"

17' -

7"

20' -

8"

6' -

0"

1' -

6"

20' -

2"

E2

E2

E2

D

EE

D

D K

ED

E

E

E2

D

D5

F3D5

D5D5

DE

AA2

A

D5

B2

D5

A2D5

D5A2

A2D5

D

DD

D

DD

D

D5

D

D5A2

A2

D5

A2

C1

B2F3

B2

KF3

E2

E2

C1

C1

C1

A

B2

B2F

A1

F

K

F

K

F

A1

F

K

B2

FA2

K

A2

C1

C1

A

A2

A2

E

E2

D5

F3F3

F3

D5 F3

K

A2

C1

C1

C1

A2

D5D5E2

K

B2

D

1

A.501

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:06

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Firs

t Flo

or P

lan

1/16" = 1'-0"1 1st Floor Slab

DNUP

DN

UP

UP

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2

B

1

A.501

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:09

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

02

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Sec

ond

Flo

or P

lan

1/16" = 1'-0"1 2nd Floor Slab

DNUP

DN

DN

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2B

1

A.501

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:11

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

03

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Thi

rd F

loor

Pla

n

1/16" = 1'-0"1 3rd Floor Slab

DN

UP

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2B

1

A.501

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:13

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

04

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Fou

rth

Flo

or P

lan

1/16" = 1'-0"1 4th Floor Slab

DNUP

UP

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2B

1

A.501

A.2011

A.2013

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:17

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

05a

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Fift

h F

loor

Pla

n

1/16" = 1'-0"1 5th Floor Slab

DN

UP

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9

A

C

D

E

E.6

F

G

H

H.8

J

K

10 10.3 10.8 11 12

B.2B

1

A.501

A.2012

A.2014

1

A.502

1

A.503

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:20

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.1

05b

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Fift

h F

loor

Inte

rmed

iate

Pla

n

2 2.2 3 3.3

C

D

2' - 8"

11' - 0 25/32"

2' - 11 1/8"6' - 0"2' - 8"2' - 8"

7' - 9 7/8"7' - 6 1/2" 18' - 5 15/16"

1

A.502

2 2.2 3 3.3

C

D

7' - 6 3/16" 8' - 10 3/8" 3' - 6 3/32"

2' -

10"

7' - 6 3/16" 8' - 1 29/32"

1

A.502

2.2 3 3.3 4 5

A

B.2

B

0' - 0 5/8" 11' - 0 25/32"

18' - 1 5/16" 7' - 9 7/8" 9' - 0 3/16"

3' -

5 3

/8"

11' -

3 7

/32"

2.2 3 3.3 4 5

A

B

12' - 11 5/32" 7' - 4 15/16"

7' - 4 15/16"8' - 10 3/8"

3' -

7 3

/8"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

6:22

PM

1/8

" =

1 '-0

"

308

Eas

t Gre

e n S

tre e

t

A.2

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Enl

arge

d P

lan

Uni

ts A

and

B

1/8" = 1'-0"1 Typical Unit A

1/8" = 1'-0"2 Typical Unit A Intermediate

1/8" = 1'-0"3 Typical Unit B

1/8" = 1'-0"4 Typical Unit B Intermediate

1st Floor Slab0' - 0"

2nd Floor Slab14' - 8"

T.O. Footing-5' - 0"

B.O. Footing-6' - 0"

1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

Penthouse Parapet259' - 0"

Foundation WallBottom

-5' - 7 15/16"

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

9th Floor Slab115' - 10"

10th Floor Slab133' - 10"

11th Floor Slab151' - 10"

12th Floor Slab169' - 10"

13th Floor Slab187' - 10"

14th Floor Slab205' - 10"

15th Floor Slab223' - 10"

Roof Slab243' - 10"

Penthouse Decking257' - 10"

5th Floor SlabIntermediate

52' - 4"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

8:30

PM

1/3

2" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.3

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Sou

th E

leva

tion

1/32" = 1'-0"1 South

1st Floor Slab0' - 0"

2nd Floor Slab14' - 8"

T.O. Footing-5' - 0"

B.O. Footing-6' - 0"

A C D E E.6 F G H H.8 J KB.2

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

B

Penthouse Parapet259' - 0"

Foundation WallBottom

-5' - 7 15/16"

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

9th Floor Slab115' - 10"

10th Floor Slab133' - 10"

11th Floor Slab151' - 10"

12th Floor Slab169' - 10"

13th Floor Slab187' - 10"

14th Floor Slab205' - 10"

15th Floor Slab223' - 10"

Roof Slab243' - 10"

Penthouse Decking257' - 10"

5th Floor SlabIntermediate

52' - 4"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

9:11

PM

1/3

2" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.3

02

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Eas

t Ele

vatio

n

1/32" = 1'-0"1 East

2nd Floor Slab14' - 8"

A C D E E.6 F G H H.8 J KB.2

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

B

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

5th Floor SlabIntermediate

52' - 4"

1

A.503

2nd Floor Slab14' - 8"

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

1

A.501

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

5th Floor SlabIntermediate

52' - 4"

1

A.502

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

9:34

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.4

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Enl

arge

d E

leva

tion

Flo

ors

2-5

1/16" = 1'-0"1 East Floors 2-5

1/16" = 1'-0"2 South Floors 2-5

A C D E E.6 F G H H.8 J KB.2B

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

1

A.503

1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12

1

A.501

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

1

A.502

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:0

9:59

PM

1/1

6" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.4

02

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Enl

arge

d E

leva

tion

Flo

ors

6-7

1/16" = 1'-0"1 East Floors 6-7

1/16" = 1'-0"2 South Floors 6-7

1st Floor Slab0' - 0"

2nd Floor Slab14' - 8"

T.O. Footing-5' - 0"

B.O. Footing-6' - 0"

A C D E E.6 F G H H.8 J KB.2

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

B

Penthouse Parapet259' - 0"

Foundation WallBottom

-5' - 7 15/16"

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

9th Floor Slab115' - 10"

10th Floor Slab133' - 10"

11th Floor Slab151' - 10"

12th Floor Slab169' - 10"

13th Floor Slab187' - 10"

14th Floor Slab205' - 10"

15th Floor Slab223' - 10"

Roof Slab243' - 10"

Penthouse Decking257' - 10"

5th Floor SlabIntermediate

52' - 4"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:1

0:01

PM

1/3

2" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.5

01

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Sec

tion

1

1/32" = 1'-0"1 Section 1

1st Floor Slab0' - 0"

2nd Floor Slab14' - 8"

T.O. Footing-5' - 0"

B.O. Footing-6' - 0"

ACDEE.6FGHH.8JK B.2

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

B

Foundation WallBottom

-5' - 7 15/16"

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

9th Floor Slab115' - 10"

10th Floor Slab133' - 10"

11th Floor Slab151' - 10"

12th Floor Slab169' - 10"

13th Floor Slab187' - 10"

14th Floor Slab205' - 10"

15th Floor Slab223' - 10"

Roof Slab243' - 10"

5th Floor SlabIntermediate

52' - 4"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:1

0:06

PM

1/3

2" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.5

02

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Sec

tion

2

1/32" = 1'-0"1 Section 2

2nd Floor Slab14' - 8"

T.O. Footing-5' - 0"

B.O. Footing-6' - 0"

1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12

3rd Floor Slab23' - 6"

4th Floor Slab32' - 4"

5th Floor Slab43' - 10"

Penthouse Parapet259' - 0"

Foundation WallBottom

-5' - 7 15/16"

5th Floor SlabCourtyard

43' - 0"

6th Floor Slab61' - 10"

7th Floor Slab79' - 10"

8th Floor Slab97' - 10"

9th Floor Slab115' - 10"

10th Floor Slab133' - 10"

11th Floor Slab151' - 10"

12th Floor Slab169' - 10"

13th Floor Slab187' - 10"

14th Floor Slab205' - 10"

15th Floor Slab223' - 10"

Roof Slab243' - 10"

Penthouse Decking257' - 10"

5th Floor SlabIntermediate

52' - 4"

Sca

le:

Pro

ject

:

Dat

e:

Dra

wn:

Che

cked

:

3/6/

2016

1:1

0:09

PM

1/3

2" =

1'-0

"

308

Eas

t Gre

e n S

tre e

t

A.5

03

Pro

ject

4

5.05

.15

Tho

mas

Mc C

orm

ick

Reb

ecc a

Bro

uk

308

Ea s

t Gre

en S

tree

t

Sec

tion

3

1/32" = 1'-0"1 Section 3

3 5/8" METAL STUD @ 16"O.C.

3" BATT INSULATION INWALLS

(1) LAYER 5/8" GYPSUMBOARD EACH SIDE16

" O

.C.

5" TYPICAL U.N.O. HORIZONTAL SECTION

16"

O.C

.

7 1/4" TYPICAL U.N.O. HORIZONTAL SECTION

6" METAL STUD @ 16"O.C.

(1) LAYER 5/8" GYPSUMBOARD EACH SIDE

24"

O.C

.

5" HORIZONTAL SECTION

3 5/8" METAL STUD @ 24"O.C.3" MIN. BATT INSULATION INSHAFT WALLS ADJACENT TOUNITS

(1) 1/2" RC ONE SIDE @ 24" O.C.SCREW AT STUDS

(1) LAYER 3/4" GYPSUMBOARD

(1) LAYER 3/4" GYPSUM BOARD

16"

O.C

.

8 1/2" HORIZONTAL SECTION

6" METAL STUD @ 16"O.C

(2) LAYERS 5/8" GYPSUMBOARD EACH SIDE

3" MIN. BATT INSULATION INSHAFT WALLS ADJACENT TOUNITS

16"

O.C

.

8" HORIZONTAL SECTION

6" METAL STUD @ 16"O.C.

(1) LAYER 1/2" GYPSUMBOARD

5" MIN. BATT INSULATION INSHAFT WALLS ADJACENT TOUNITS

(2) LAYERS 1/2'' GYPSUMBOARD

(1) 1/2" RC ONE SIDE @ 24"O.C. SCREW AT STUDS

24"

O.C

.

7 1/2" HORIZONTAL SECTION

6" METALSTUD @ 24"O.C.

(1) LAYER 5/8"GYPSUM BOARDSCREW-ATT TOSTUDS*

3" MIN. BATTINSULATION INSHAFT WALLSADJACENT TO UNITS

(1) LAYER 5/8"GYPSUM BOARDSCREW-ATT TOCHAN

RC-1 CHAN ONE SIDE24" O.C. SCREW-ATTTO STUDS

24"

O.C

.

9 3/4" HORIZONTAL SECTION

6" METAL STUD @ 24"O.C.

(1) LAYER 5/8" GYPSUMBOARD SCREW-ATT TOSTUDS*

3 1/2" MIN. BATT INSULATION

(1) LAYER 5/8" GYPSUMBOARD CORRIDOR SIDE

RC-1 CHAN ONE SIDE 24" O.C.SCREW-ATT TO STUDS

16"

O.C

.

9 3/4" HORIZONTAL SECTION

6" METAL STUD @ 16" O.C.

(1) LAYER 5/8" GYPSUMBOARD ON UNIT SIDE

3 1/2" MIN. BATTINSULATION

(1) LAYER 5/8" GYPSUMBOARD CORRIDOR SIDE

RC-1 CHAN ONE SIDE24" O.C. SCREW-ATT TOSTUDS

16"

O.C

.

10 1/2" HORIZONTAL SECTION

6" METAL STUD @16" O.C.

(2) LAYERS5/8" GYPSUMBOARD ONUNIT SIDE

3 1/2" MIN. BATTINSULATION

(2) LAYERS 5/8"GYPSUM BOARDCORRIDOR SIDE

Pro

ject

:

Dat

e:

Dra

wn

By:

Che

cked

By:

Sca

le:

1"

= 1'

-0"

3/6/

2016

1:1

0:11

PM

RE

BE

CC

A B

RO

UK

THO

MA

SM

CC

OR

MIC

K

A.9

01

308

Eas

t Gre

enS

tree

tT

HO

MA

S M

CC

OR

MIC

K

PR

OJE

CT

2

1" = 1'-0"1 A

1" = 1'-0"2 A4

1" = 1'-0"3 B2

1" = 1'-0"4 B3

1" = 1'-0"5 B4

1" = 1'-0"6 C1

1" = 1'-0"7 C3

1" = 1'-0"8 C4

1" = 1'-0"9 C5

7 5/8" VERTICAL SECTION

8" CMU TYPE D BLOCK, 2 HR

3/8" MORTAR JOINT

9 3/4" VERTICAL SECTION

8" CMU TYPE D BLOCK, 2 HR

3/8" MORTAR JOINT

2"X3" STUDS, 1 SIDE ONLY

2" SPRAY FOAM AT ALL BETWEENTEMPERED AND UNTEMPERED LOCATIONS, R-13

(1) LAYER OF 5/8" GYP BD.*

9" VERTICAL SECTION

8" CMU SPLIT FACE BLOCK, 2 HR

3/8" MORTAR JOINT

3" SEMI-RIGID MINERALWOOL BOARD INSULATION

10 1/4" VERTICAL SECTION

8" CMU SPLIT FACEBLOCK, 2 HR

3/8" MORTAR JOINT

(1) LAYER OF 5/8"DENSGLASS ONINTERIOR SIDE & 2"SPRAY FOAM (R-14).

2"X2" STUDS ONINTERIOR SIDE

4 3/4" HORIZONTAL SECTION

GALV STEEL 'C-H' STUDS2 1/2" DEEP @24" O.C.

1" GYPSUM WALLBOARD LINER PANEL

3" MIN. BATT INSULATION IN SHAFTWALLS ADJACENT TO UNITS

2 LAYERS OF 5/8" GYPSUM BOARD

4 3/4" HORIZONTAL SECTION

GALV STEEL 'C-H' STUDS2 1/2" DEEP @24" O.C.

1" GYPSUM WALLBOARDLINER PANEL3" MIN. BATT INSULATION INSHAFTWALLS ADJACENT TO UNITS2 LAYERS OF 5/8" GYPSUMBOARD1 LAYER OF 5/8"GYPSUM BOARD(INTERIOR OF STAIRWELL)

8 1/2" HORIZONTAL SECTION

3 1/2" MTL SDS @12" O.C. MIN25 GAUGE STD

2 LAYERS OF 5/8" GYPSUM BOARD

12"

O.C

.

1/2" HAT CHANNELSCONTINUOUS VAPOR BARRIER

2" INSULATED METAL PANEL

16"

O.C

.8"

O.C

.

VARIES, SEE PLAN HORIZONTAL SECTION

(1) LAYER 5/8"GYPSUM BOARDEACH SIDE

4" MIN BATT INSULATION

3 5/8" METAL STUD@ 16" O.C.

1'-0" VERTICAL SECTION

12" CONCRETEFOR PAINT-SEE STRUCTDWGS

ELASTOMERICCOATINGAT EXTERIORLOCATIONS

Pro

ject

:

Dat

e:

Dra

wn

By:

Che

cked

By:

Sca

le:

1"

= 1'

-0"

3/6/

2016

1:1

0:13

PM

RE

BE

CC

A B

RO

UK

THO

MA

SM

CC

OR

MIC

K

A.9

02

308

Eas

t Gre

enS

tree

tT

HO

MA

S M

CC

OR

MIC

K

Pro

ject

2

1" = 1'-0"1 D

1" = 1'-0"2 D5

1" = 1'-0"3 E

1" = 1'-0"4 E2

1" = 1'-0"5 F 1" = 1'-0"

6 F3

1" = 1'-0"7 G3

1" = 1'-0"8 H

1" = 1'-0"9 K

VARIES VERTICAL SECTION

2"X 3" METAL STUDS, 24" O.C.

12" CONCRETE FOR PAINT- SEESTRUCT DWGS

3" SPRAY FOAM @EXTERIOR WALLS ANDBETWEEN TEMPERED ANDUNTEMPERED SPACESONLY.(1) LAYER OF 5/8" GYP BD

ELASTOMERIC COATING ATEXTERIOR LOCATIONS

9 1/4 HORIZONTAL SECTION

24"

O.C

.

6" METAL STUD @24" O.C.

4"MINERAL FIBERINSULATION (R-15 MAX)TO EXTEND 6" ABOVEUPTURN BEAMS

5/8" DENSGLASSEXT. SHEATHING

1/2" AIR SPACE

2" INSULATEDMETAL PANEL(R-14)

9 3/4 HORIZONTAL SECTION

24"

O.C

.

6" METAL STUD @ 24"O.C.

4"MINERAL FIBERINSULATION (R-15 MAX)TO EXTEND 6" ABOVEUPTURN BEAMS

5/8" DENSGLASS EXT.SHEATHING

1/2" AIR SPACE

2" INSULATED METALPANEL (R-14)

5/8" GYP. BD.

CONT. VAPORBARRIER (6 MIL)

FLUID APPLIED AIRBARRIER

Pro

ject

:

Dat

e:

Dra

wn

By:

Che

cked

By:

Sca

le:

1"

= 1'

-0"

3/6/

2016

1:1

0:14

PM

Reb

ecc a

Bro

uk

THO

MA

SM

CC

OR

MIC

K

A.9

03

308

Eas

t Gre

enS

tree

tT

HO

MA

S M

CC

OR

MIC

K

Pro

ject

2

1" = 1'-0"1 K4

1" = 1'-0"2 N1

1" = 1'-0"3 N2