2b portfolio-in progress
DESCRIPTION
portfolio in progress, 2B termTRANSCRIPT
architectural portfoliocurtis jaron lai
table of contents| architectonics | housing unit | barnes house model | prefabrication housing project | ssef design competition | oasis project | housing complex | ecohouse | work term |
KPMB Architects Toronto, ONArchitectural Intern January - April 2010
T.S. Chu Architects Ltd. Kowloon, Hong KongArchitectural Intern July - August 2008
Church Intern Toronto, ONIntern June - August 2007 World-link Communications Inc. Markham, ONOffice Intern June - August 2006
Experience in an architectural environmentCommitted work ethic; ability to work independently as well as in a team environmentExcellent physical modelling, rendering, and drafting skillsTechnical proficiency in: AutoCAD Google Sketchup Form-Z Adobe Photoshop Adobe InDesign Microsoft Office Suite Mac and Windows operating systems
University of Waterloo, School of Architecture, Waterloo, ONCandidate for Bachelor of Architecture, Honours, Cooperative Program Sep 2008-Present
University of Toronto Schools, Toronto, ONOntario Secondary School Diploma, Honour Roll Graduate June 2008
Playing in a band (Guitar, Bass, Cello)Composing musicVolleyball, Basketball, Soccer
Curriculum Vitae
Work Experience
Relevant Skills
Education
Interests
References Ms. Annette ChuArchitectural DesignerT.S.Chu Architects [email protected]
Curtis Jaron Lai
19 Gemini Crescent, Richmond Hill, ON, L4S [email protected]
(C): 226-339-2207(H): 905-770-2207
Mrs. Peggy ChiuOwner, Senior ArchitectPeggy Chiu [email protected]
1a studioarchitectonics
This particular structure aims to create a place of repose using the most basic of architectural elements while maintaing a sense of fluidity in its circulation.
This particular structure aims to create a place of repose using the most basic of architectural elements while maintaing a sense of fluidity in its circulation. physical modelling, google sketchup, adobe photoshop
1a studiohousing for gallery owner
This particular home, designed with row-housing restrictions, caters to a gallery owners need to meet with clientele in a well lit work and exhibit environment. The upper floor of this home provides for that need, while the lower acts as a loft living space.
physical modelling, hand drafting, google sketchup, adobe photoshop, autoCAD
1b studioBarnes House Case Study Model, Group Project
physical modelling
1b studioprefab housing group project
This project takes a prefabrication design concept, and develops it to a point of feasible construction.Our group’s particular design was based on a series of capsules, each of which held one important component of a house’s amenities.
physical modelling, hand drafting
SSEF Design Competitiongroup submission with dorothy leung
As the rate of development in the 21st Century rapidly accelerates, much of the Earth’s environment is given little more than apathetic response. Altura is an attempt to breach the impassivity of the general populous providing a 21st Century experience within the natural beauty of Earth’s landscapes.
In this particular location on the cliffs of Moher, Ireland, Altura provides an exciting opportunity to experience the landscape in full, while allowing visitors to also use the structure as a means of “heightening” their embrace of the surrounding views.
Though Altura’s purpose is two-fold and radically opposite, it provides visitors with the potential to wholly experience the landscape’s natural dimension.
ALTURA
formZ rendering, adobe photoshop, adobe indesign
Steel tension cables bolted to connection plates (prefab welded into column)
Tubular steel support beam prefab welded into column
Tubular steel column with prefab welded connection plate bolted into angled concrete footing (anchored into cliff side)
Steel tension cables passed through steel cover plate, into anchorage unit (cover plate is bolted through steel angles)Unit is anchorbolted into concrete footing, reinforced with steel rebars
Tens
ion
Cab
leC
onne
ctio
n D
etai
lFl
oor
Plat
e Su
ppor
t D
etai
lFo
otin
g C
onne
ctio
n D
etai
lTe
nsio
n C
able
A
ncho
rage
Det
ail
1b environmental designoasis project
This structure is intended to act as an oasis for a traveller in a hot arid climatic region.
This structure is intended to act as an oasis for a traveller in a hot arid climatic region. formZ rendering, google sketchup, hand drafting, adobe photoshop
1b studiohousing complex
This project tries to provide a housing complex that engages the surrounding landscape while providing a communal experience for its inhabitants.
hand drafting, google sketchup, adobe photoshop
1b studiohousing complex
1b enviroeco-house
This ecohouse project requires the design of a housing unit designed to LEED Platinum standards.
autoCAD, adobe Illustrator, adobe photoshop, FormZ, maxwell render
2a work termKPMB Architects, Toronto, ON
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
3
1
2 4
5
?
4 LEVELS3 LEVELS
FRONT ST E
FRONT ST E
WELLINGTON ST
JAR
VIS
ST
LOW
ER
JAR
VIS
ST
GE
OR
GE
ST
FR
ED
ER
ICK
ST
LOW
ER
SH
ER
BO
UR
NE
ST
SH
ER
BO
UR
NE
ST
MA
RK
ET
ST
MA
RK
ET
LAN
E
CH
UR
CH
ST
SC
OT
T S
T
TOR
ON
TO S
T
LEA
DE
R LN
THE ESPLANADE
THE ESPLANADE
KING ST E
COLBORNE ST
ADELAIDE ST
ST JAMES PARK
autoCAD, adobe illustrator, adobe photoshop, physical modelling, t-shirt design
2a work termKPMB Architects, Toronto, ON