Project Summary: Challenges Faced: Time constraints – as we were given 1 week notice to engage the vessel Loading and unloading was done at a private berths Client Profile: Client outline: Engineering, procurement, construction and installation (EPIC) company specializing in complex offshore oil and gas projects Client Relationship: Started in September 2014 - Customs clearance, vessel chartering, inland trucking for 600cbm of cargo. Resulting BLA being involved in all tenders since September Project Profile: BLA was appointed to move a 75 ton Hammer (offshore equipment) from Batam (Indonesia) to Jebel Ali (UAE). We engaged a multipurpose vessel (MPP) for the move and a crawler crane to lift the item from shore base. HAMMER SHIPMENT www.benlineagencies.com

Upload: duong-truong

Post on 21-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

Packing list

TRANSCRIPT

Page 1: 283971 Hammer Shipment

Project Summary: Challenges Faced:

• Time constraints – as we were given 1 week notice to engage the vessel

• Loading and unloading was done at a private berths

Client Profile: Client outline: Engineering, procurement, construction and installation (EPIC) company specializing in complex offshore oil and gas projects

Client Relationship: Started in September 2014 - Customs clearance, vessel chartering, inland trucking for 600cbm of cargo. Resulting BLA being involved in all tenders since September

Project Profile: BLA was appointed to move a 75 ton Hammer (offshore equipment) from Batam (Indonesia) to Jebel Ali (UAE). We engaged a multipurpose vessel (MPP) for the move and a crawler crane to lift the item from shore base.

HAMMER SHIPMENT

www.benlineagencies.com