265 boiler control - three modulating boiler and dhw / setpoint
TRANSCRIPT
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
1/36
- Data BrochureBoiler Control 265
D 26512/08
1 of 36 2008 D 265 - 12/08
The tekmar Boiler Control 265 can control the supply water temperature on up to three modulating boilers based on outdoor
temperature or setpoint requirements. The control can be set to control up to two modulating boilers based on outdoor temperatureor domestic hot water requirements. A large easy to read display provides current system temperatures and operating status. The
control has outputs for a primary pump, individual boiler pumps, and either a combustion air damper or an alarm.
Additional functions include:
Outdoor Reset
Sequential or Parallel Modulation
Installer and Advanced access levels
Primary pump output
Individual boiler pump outputs
Pump purging
Boiler demand for space heating loads
DHW demand for domestic hot water loads
Setpoint demand for setpoint loads
0 10 V (dc) BAS / EMS input
Test sequence to ensure proper component operation
Setback input for energy savings
CSA C US certified
Pump exercising
InputUniversalSensorIncluded
InputUniversalSensorIncluded
InputOutdoorSensorIncluded
or
Input0-10 V (dc)External Signal
InputBoiler
Demand
OutputModulating
Boiler
OutputBoiler
Enable
OutputPump
OutputBoiler
Enable
or
Pump
InputSetpointor DHWDemand
Input115 V (ac)
Power Supply
OutputPrimaryPump
InputTimer or Switch
Optional
OutputCombustion Air
or Alarm
1Com
2BoilSup
3BoilRet
4Out+
5UnOSw
6
+
7
+ +
8Mod2 mAMod1 mA
9 10 11 12 13PrimP1 L
14
N
15 16 17
1
18
1
19
2
20
2
21 22 23 24 25 26 27 28 29BoilDem
30ComDem
31Setp/DHW
Boiler Control 265Three Modulating Boiler & DHW / Setpoint
Do not apply power
Mod3 mA Power Boiler BoilerC.A./Alarm
Boiler 3 /DHW
BoilerPump 1
BoilerPump 2
BoilerPump 3
H2037B
Menu Item
Boiler Demand
DHW / Setpoint Demand
WWSD
Modulation
Boiler Output (x10,000 BTU/hr)
External Input Signal
Offset / Priority Override
Test
off not testingred testingred testing paused
For maximum heat,press & hold Test for3 seconds.
Meets Class B:
Canadian ICESFCC Part 15
DateCode
Made in Canada bytekmar Control Systems Ltd.
Power 115 V 10% 60 Hz 600 VARelays 230 V (ac) 5 A 1/3 hp, pilot duty 240 VADemands 20 to 260 V (ac) 2 VA
Stand Alone
AdvancedExternal Input
OffCA.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
S of t Stop RotateParallel
Installer
ExerciseSequential
OutputModulating
Boiler
OutputModulating
Boiler
or
Signal wiring must be rated at least 300 V.
Note:Boiler, DHW,or setpointdemand mustbe powered with20 to 260 V (ac)before the boiler
is able to fire.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
2/36
2008 D 265 - 12/08 2 of 36
How To Use The Data Brochure
User Interface
Table of Contents
Installation .......................................................Pg 19
DIP Switch Settings ........................................Pg 26
Control Settings ..............................................Pg 28
View Menu..............................................Pg 28
Adjust Menu...........................................Pg 29
Testing the Control .........................................Pg 34
Error Messages ...............................................Pg 35
Technical Data .................................................Pg 36
Limited Warranty ............................................Pg 36
User Interface ..................................................Pg 2
Display .............................................................Pg 3
Sequence of Operation ..................................Pg 4
Section A: General Operation..............Pg 4
Section B: Boiler Operation..................Pg 6
Section C: Outdoor Reset.....................Pg 10
Section D: DHW Operation...................Pg 13
Section E: Setpoint Operation.............Pg 16Section F: External Input Operation....Pg 17
Section G: Pump Operation..................Pg 18
This brochure is organized into four main sections. They are: 1) Sequence of Operation, 2) Installation, 3) Control Settings, and4) Testing and Troubleshooting. The Sequence of Operation section has seven sub-sections. We recommend reading Section A:
General of the Sequence of Operation, as this contains important information on the overall operation of the control. Then read thesub sections that apply to your installation.
The Control Settings section (starting at DIP Switch Settings) of this brochure describes the various items that are adjusted and
displayed by the control. The control functions of each adjustable item are described in the Sequence of Operation.
The 265 uses a Liquid Crystal Display (LCD) as the method of supplying information. You use the LCD in order to setup and monitor
the operation of your system. The 265 has four push buttons (Menu, Item,, ) for selecting and adjusting settings. As you
program your control, record your settings in the ADJUST Menu table which is found in the second half of this brochure.
MenuAll of the items displayed by the control are organized into various menus. These menusare listed on the left hand side of the display (Menu Field). To select a menu, use the
Menubutton. By pressing and releasing the Menubutton, the display will advance tothe next available menu. Once a menu is selected, there will be a group of items that can
be viewed within the menu.
ItemThe abbreviated name of the selected item will be displayed in the item field of the
display. To view the next available item, press and release the Itembutton. Once youhave reached the last available item in a menu, pressing and releasing the Itembutton
will return the display to the first item in the selected menu.
The items can be quickly scrolled through by holding the Itembutton and then pressingthe button. To rapidly scroll through the items in the reverse order, hold the Itembutton
and press the button.
AdjustTo make an adjustment to a setting in the control, begin by selecting the appropriate
menu using the Menubutton. Then select the desired item using the Itembutton. Finally,use the and / or button to make the adjustment.
Additional information can be gained by observing the Status field of the LCD. The status
field will indicate which of the controls outputs are currently active. Most symbols in thestatus field are only visible when the VIEW Menu is selected.
Menu Item
Menu Item
Menu Item
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
3/36
3 of 36 2008 D 265 - 12/08
Display
Symbol Description
Boiler Demand
DHW / Setpoint Demand
WWSD
Modulation
Boiler Output (x10,000 BTU/hr)
External Input Signal
Offset / Priority Override
Menu FieldDisplays thecurrent menu
Item FieldDisplays anabbreviatedname of theselected item
Status FieldDisplays the
current statusof the control'sinputs, outputsand operation
Number FieldDisplays the current value of the selected item
ButtonsSelects Menus, Itemsand adjust settings
Stage
Displays which boiler relays are turned on.
UnOccupied Schedule
Displays when the control is in
UnOccupied Mode.
Primary PumpDisplays when the primary pump relay is
turned on.
Occupied Schedule
Displays when the control is in Occupied Mode.
Boiler Pump
Displays which boiler pump relays areturned on.
Installer Access Level
Displays when the Advanced / Installer Dip switchis set to Installer.
Combustion Air Damper
Displays when the Combustion Air Damper
relay is turned on.
Pointer
Displays the control operation as indicated by the
text.
Delta TThe current difference between the supply
and return temperatures.
Warning / AlarmDisplays when an error exists or the alarm relay
is turned on.
F, C, min, hr
Units of measurement.
Modulating Output Scale
Displays the total modulation output level of theboilers.
DHW
Displays when the DHW relay is turned
on.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
4/36
2008 D 265 - 12/08 4 of 36
Section AGeneral
OperationPage 4 - 6
Section BBoiler
OperationPage 6 - 10
Section COutdoorReset
Page 10 - 12
Sequence of Operation
Section A: General Operation
The following defined terms and symbols are used throughout this manual to bring attention to the presence of hazards of various risklevels, or to important information concerning the life of the product.
- Warning Symbol: Indicates presence of hazards which can cause severe personal injury, death or
substantial property damage if ignored.
- Double insulated
- Local level, appliancesINSTALLATION
CATEGORY II
Definitions
Section DDHW
OperationPage 13 - 15
Section ESetpointOperationPage 16
Section FExternalInput Operation
Page 17 - 18
Section GPumpOperation
Page 18 - 19
POWERING UP THE CONTROLWhen the control is powered up, all segments in the LCD are turned on for 2 seconds. Next, the control displays the control typenumber in the LCD for 2 seconds. Next, the software version is displayed for 2 seconds. Finally, the control enters into the normal
operating mode.
BOILER TARGET TEMPERATUREThe control operates up to three modulating boilers to control the supply water temperature to a hydronic space heating system
or setpoint. When using the control to provide Domestic Hot Water (DHW) requirements, only two modulating boilers can beoperated. The supply water temperature is based on boiler reset, an external 0 10 V (dc) signal, DHW requirements, or a
setpoint temperature.
Boiler Reset(Stand Alone)When a boiler demand signal from the heating system is present,
the control operates the boiler(s) to maintain the supply temperaturebased on the outdoor air temperature and the Characterized Heating
Curve settings. Refer to section C.
DHW
When a DHW demand is present, the control operates the boiler(s)to maintain the supply water temperature at least as hot as the DHWexchange setting. Refer to section D.
SetpointWhen a setpoint demand signal is present, the control operates the boiler(s) to maintain the supply water temperature at least as
hot as the Setpoint setting. Refer to section E.
External Input 0 10 V (Dc) or 2 10 V (Dc)When an external input signal is present, the control converts the signal to a target supply temperature. The control operates theboiler(s) to maintain the required supply water temperature. Refer to section F.
Decreasing Outdoor TemperatureIncrea
singWaterTemperatureTerminal UnitTerminal Unit
Indoor DesignIndoor Design Outdoor DesignOutdoor Design
Design SupplyDesign Supply
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
5/36
5 of 36 2008 D 265 - 12/08
SETBACK (OCC and UNOCC)To provide greater energy savings, the control has a setback feature. With setback, thesupply water temperature in the system is reduced when the building is unoccupied. By
reducing the supply water temperature, the air temperature in the space may be reducedeven when thermostat(s) are not turned down. Any time the UnO Sw(5) and the Com(1)
terminals are shorted together, the control operates in the unoccupied mode. When in the
unoccupied mode, the UNOCCsegment is displayed in the LCD. The control adjusts thesupply water temperature based on the UNOCCsettings in the control.
COMBUSTION AIR OR ALARM CONTACTThe control has an isolated contact that can be used as either a combustion air damper contact or an alarm contact. This selection
is made using the C.A. / Alarm DIP switch.
Combustion Air (C.A.)When the DIP switch is set to C.A., terminals 15 and 16 can be used as a switch to operate a combustion air damper. This contac
closes prior to the first boiler operating on the control. The amount of time that the contact closes prior to the first boiler firing isset using the combustion delay setting.
The combustion air contact remains closed for a minimum of 15 seconds after the last boiler is turned off.
AlarmWhen the DIP switch is set to Alarm, terminals 15 and 16 can be used as a switch to operate an alarm circuit. This contact closes
whenever an error message is present on the control display. When the alarm contact is activated, refer to the Error Messages
section of this brochure to determine the cause of the alarm. Once the fault has been fixed, pressing either the Menu, Item or button will clear the alarm.
Boiler AlarmThe control can monitor the boiler supply temperature and provide an alarm if the temperature does not increase within a
certain amount of time. The amount of time can be set using the Boiler Alarm setting. This alarm can be used to determine ithe boilers have failed to fire. To reset the alarm, press and hold the and buttons for 5 seconds while in the VIEW menu.
ROTATIONThe control includes an Equal Run Time feature which changes the firingorder of the boilers whenever one boiler accumulates 48 hours more
running time than any other boiler. After each rotation, the boiler with the
least running hours is the first to fire and the boiler with the most runninghours is the last to fire. This function ensures that all of the boilers that
are being rotated receive equal amounts of use. When the Rotate/OffDIP switch is set to the Offposition, the firing sequence always begins
with lowest boiler to the highest boiler.
Fixed Lead RotationIn some applications, it may be desirable to have the first boiler fire first
at all times while the firing sequence of the remaining boilers is changedusing Equal Run Time Rotation. This rotation option is selected by
setting the Fixed Lead/OffDIP switch to the Fixed Leadposition.
First On / Last Off or First On / First OffWhen using the Fixed Lead rotation option, a selection must be made between First On/LastOff and First On/FirstOf
using the DIP switch. When FirstOn/LastOff is selected, the lead boiler is always modulated first and shut off last. When
FirstOn/FirstOffis selected, the lead boiler is always modulated first and shut off first. This DIP switch is only read by the controwhen the FixedLead/OffDIP switch is set to Fixed Lead.
Resetting the Rotation SequenceTo reset the rotation sequence, set the Rotate/OffDIP switch to the Offsetting for 5 seconds and then return the DIP switch to
the Rotatesetting.
RUNNING TIMESThe control displays the accumulated running time of each boiler in the VIEW menu.
Resetting the Running TimesTo reset the running time for each boiler, select the appropriate running time in the VIEW menu. Next press the and buttons
simultaneously until CLris displayed.
1 2 3 45
Com
BoilSup
BoilRet
Out+
UnOSw
Timer Switch
1 2
720 hours 672 hours
2 1
672 hours 720 hours
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
6/36
2008 D 265 - 12/08 6 of 36
Section B1: Boiler Modulation
Section B: Boiler Operation
EXERCISINGThe control has a built-in exercising feature that is selected through the Exercise/Off DIPswitch. To enable the exercising feature set
the Exercise/OffDIP switch to Exercise. If exercising is enabled, the control ensures that each pump is operated at least once every
3 days. If a pump has not been operated at least once every 3 days, the control turns on the output for 10 seconds. This minimizesthe possibility of the pump seizing during a long period of inactivity. While the control is exercising, the TestLED flashes quickly.
Note:The exercising function does not work if power to the control or pumps is disconnected.
FACTORY DEFAULTSThe control comes preset with several factory defaults. These defaults are based on the terminal unit selection (see section C).
To fine-tune building requirements, these defaults may be changed.To reload the factory defaults listed in the ADJUST Menu, power down the control and wait for 10 seconds. Power up the controlwhile simultaneously holding the Menuand buttons. An E01 error occurs forcing the installer to go through the ADJUST menu
to ensure the settings are correct.
MODULATIONThe control provides three modulating output signals, three boiler enable contacts, and three boiler pumps contacts to operate up
to three modulating boilers. The boiler enable contact may not be required, depending on the make and model of the boiler(s).
The control operates a boiler by first closing the boiler pump contact. The boiler enable contact is closed next and then the control
provides a modulating output signal to the boiler.
The modulation output signal is then modulated from the minimum modulation using Proportional, Integral and Derivative (PID)logic in order to satisfy the boiler target temperature.
SEQUENTIAL MODULATION
Boiler 1 Boiler 2 Boiler 3
100% MOD OFF
PARALLEL MODULATION
Boiler 1 Boiler 2 Boiler 3
MOD MOD MOD
SEQUENTIAL MODULATIONThe control offers a sequential modulation option. This is selected by setting theSequential/ParallelDIP switch to Sequential. Sequential modulation should be used onboilers that are more efficient when operating at high fire.
In sequential modulation, the first boiler is turned on and is modulated to satisfy light loads.
Once the first boiler does not have enough capacity to satisfy the load, the first boilerreduces its modulation to provide a smooth transition when the second boiler fires at low
fire. The first boiler then modulates up to maximum modulation as the load increases. Only
then is the second boiler able to increase its output as the load continues to increase.When the third boiler is required, the second boiler reduces its modulation to allow the
third boiler to operate at low fire. As the load continues to increase, the second boiler ismodulated to its maximum and then the third boiler is modulated. The operation is reversed
when shutting off the boilers.
PARALLEL MODULATIONThe control offers a parallel modulation option. This is selected by setting the
Sequential/ParallelDIP switch to Parallel. Parallel modulation should be used on boilersthat are more efficient when operating at low fire.
In parallel modulation, the first boiler turns on at low fire and begins to increase its
modulation. Once the first boilers output is greater than the combined output of the firstand second boilers low fire, the first boiler is modulated down to low fire and the second
boiler is fired at low fire. The two boilers now modulate together. Once the two boilerscombined output is greater than the combined output of all three boilers operating at low
fire, the first and second boilers are modulated down to low fire, and all three boilers are
operated at low fire. The boilers are then modulated as the load increases. The operationis reversed when shutting off the boilers.
Section B1Boiler
Modulation
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
7/36
7 of 36 2008 D 265 - 12/08
To calculate the Minimum Modulation, use the following formulae:
For 4 to 20 mA:
Minimum Modulation = 4 mA Boilers Minimum Input Signal x 100%4 - 20 mA
For 0 to 10 V (dc):
Minimum Modulation = 0 V (dc) Boilers Minimum Input Signal x 100%0 10 V (dc)
For 2 to 10 V (dc):
Minimum Modulation = 2 V (dc) Boilers Minimum Input Signal x 100%2 10 V (dc)
Example 1:A boiler requires a 1.8 V (dc) signal to fire the boiler at low fire. The boiler can be modulated to 10 V (dc) where it reaches high fire.
This means the boilers input signal range is 1.8 to 10 V (dc). The 265 control has an output signal range of 0 to 20 mA which can beexternally converted to 0 to 10 V (dc) using a 500 resistor (Refer to Modulation Output section in Step 4 of the Installation section).
To make the two signal ranges the same, the Minimum Modulation required is:
Minimum Modulation = 0 V 1.8 V x 100% = 18%0 V 10 V
Example 2:If the boilers input signal range is 6 to 20 mA the required Minimum Modulation is:
Minimum Modulation= 4 mA 6 mA x 100% = 13%4 mA 20 mA
MAXIMUM MODULATIONThe maximum modulation defines the maximum output signal from the control to the boiler burner. It is based on a percentage of
the controls output signal range.
The maximum modulation setting for boilers with power burners is typically set to 100%.
For boilers with electronic operators, the boilers input signal range may not match the output signal range of the 265 control. The
Maximum Modulation setting limits the control output range in order to match the boilers input range.
To calculate the Maximum Modulation, use the following formulae:
For 4 to 20 mA:
Maximum Modulation = 4 mA Boilers Maximum Input Signal x 100%4 20 mA
For 0 to 10 V (dc):
Maximum Modulation = 0 V (dc) Boilers Maximum Input Signal x 100%0 10 V (dc)
For 2 to 10 V (dc):
Maximum Modulation = 2 V (dc) Boilers Maximum Input Signal x 100%2 10 V (dc)
MINIMUM MODULATION
18%
0%0 V (dc)
1.8 V (dc)
100%10 V (dc) 10 V (dc)
Control'sOutputSignalRange
MinimumModulation
Boiler's MinimumInput Signal
Boiler'sInputSignalRange
MODULATION RANGE (4 to 20 mA or 0 to 20 mA)The modulation output (Mod 1, Mod 2, and Mod 3) for each boiler can be adjusted from a 4 to 20 mA output range to a 0 to 20 mA
output range using the Boil Modulation 1, Boil Modulation 2, or Boil Modulation 3setting. The resulting modulation output signacan be converted to a 0 to 5 V (dc), 1 to 5 V (dc), 0 to 10 V (dc), and 2 to 10 V (dc) output using external resistors. The modulation
output signal can be converted to a 0 to 135 (W R B) output using a 0 - 135 Converter 005. Refer to the Modulation Outputsection in Step 4 of the Installation section.
MINIMUM MODULATIONThe minimum modulation defines the minimum output signal from the control to the boiler burner. It is based on a percentage o
the controls output signal range.
The minimum modulation setting for boilers with power burners is typically set to 0%.
For boilers with electronic operators, the boilers input signal range may not match the output signal range of the 265 control. TheMinimum Modulation setting limits the control output range in order to match the boilers input range.
MAXIMUM MODULATION
88%
0%2 V (dc) 2 V (dc)
100%10 V (dc)
9 V (dc)
Control'sOutputSignalRangeMaximum
ModulationBoiler's
MaximumInput Signa
Boiler'sInputSignalRange
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
8/36
2008 D 265 - 12/08 8 of 36
BOILER MASSThe boiler mass setting allows the installer to adjust the control to the thermal mass of the type of heat sources used in the
application. There is a boiler mass setting for each boiler. The modulation of the boiler can become unstable if the incorrect BoilerMass setting is chosen. A key sign of the boiler modulation being unstable is the flame will continue to increase and then decrease
in short periods of time. By choosing a lower boiler mass setting, the boiler response will become more stable.
Lo (1)The Lo setting is selected if the boiler that is used has a low thermal mass. This means that the boiler has a very small water
content and has very little metal in the heat exchanger. A boiler that has a low thermal mass comes up to temperature quiterapidly when fired. This is typical of many copper fin-tube boilers.
The Lo mass setting provides a fast response to the heating system.
number into the Maximum Boiler Output setting.
For example, if a boiler has a maximum output of 100 MBH:
Maximum Boiler Output = 100,000 BTU/hr = 10 x 10,000 BTU/hr10,000
MOTOR SPEEDThe Motor Speed is the amount of time the boiler requires to go from 0%modulation to 100% modulation. The control includes a Motor Speed
setting for each individual boiler.
Gas valve actuating motors have a design time from fully closed to fullyopened which can be found in the manufacturers manual. The Motor
Speed should be set to this time.
The Motor Speed setting for a Variable Frequency Drive (VFD) is theamount of time required to go from a stopped position to 100% fan
speed. Since a VFD has a very quick response rate, it may be necessaryto increase the Motor Speed setting in order to increase the stability of
the boiler modulation.
Example 1:A boilers input signal range is 2 to 9 V (dc). The 265 control has an output signal range of 2 to 10 V (dc). To make the two signal
ranges the same, the Maximum Modulation required is:
Maximum Modulation = 2 V 9 V x 100% = 88%2 V 10 V
Example 2:If the boilers input signal range is 6 to 19 mA the required Maximum Modulation is:
Maximum Modulation = 4 mA 19 mA x 100% = 94%
4 mA 20 mA
MINIMUM BOILER OUTPUTIn order to accommodate different boiler capacities in the same system, a minimum boiler output for each boiler can be set. This
allows the control to properly operate the boilers using either sequential or parallel modulation. The minimum boiler output rangeis from 10,000 BTU / hour to 19,990,000 BTU / hour.
Each boiler typically has a rating plate that specifies the minimum output. This information is also available in the boiler manual. The
Minimum Boiler Output setting has units of 10,000 BTU / hour. Divide the minimum output rating by 10,000 and enter the numberas the Minimum Boiler Output setting.
For example, if a boiler has a minimum output of 20 MBH:
Minimum Boiler Output = 20,000 BTU/hr = 2 x 10,000 BTU/hr10,000
MAXIMUM BOILER OUTPUTIn order to accommodate different boiler capacities in the same system, there is a maximum boiler output for each boiler. This
allows the control to properly operate the boilers using either sequential or parallel modulation. The maximum boiler output rangeis from 10,000 BTU / hour to 19,990,000 BTU / hour.
Each boiler typically has a rating plate that specifies the maximum output. This information is also available in the boiler manual.
The Maximum Boiler Output setting has units of 10,000 BTU / hour. Divide the maximum output rating by 10,000 and enter the
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
9/36
9 of 36 2008 D 265 - 12/08
MIN Segment On
Med (2)The Med setting is selected if the boiler that is used has a medium thermal mass. This means that the boiler either has a largewater content and a low metal content or a low water content and a high metal content. This is typical of many modern residentia
cast iron boilers or steel tube boilers.
The Med mass setting provides a moderate response to the heating system.
Hi (3)The Hi setting is selected if the boiler that is used has a high thermal mass. This means that the boiler has both a large water
content and a large metal content. A boiler that has a high thermal mass is relatively slow in coming up to temperature. This is
typical of many commercial cast iron and steel tube boilers.
The Hi mass setting provides a slow response to the heating system.
DIFFERENTIALA modulating boiler must be operated with a differential while operating in low fire. The boiler differential is divided around the boiletarget temperature. The boiler starts at low fire when the supply water temperature is of the differential setting below the boiler
target temperature. The boiler is shut off in low fire as the supply temperature reaches at least of the differential above the boilertarget temperature. With the control, either a fixed or an auto differential may be selected.
When the boiler is modulating above low fire, the differential does not apply. Instead, the modulation output signal is determined
using Proportional, Integral and Derivative (PID) logic in order to satisfy the boiler target temperature.
Fixed DifferentialIf the user desires to have a fixed differential, this is set using theboiler differential setting in the ADJUST menu.
Auto DifferentialIf the Auto Differential is selected, the control automatically determines
the best differential as the load changes. This reduces potential shortcycling during light load conditions.
BOILER MINIMUMThe boiler minimum is the lowest temperature that the control is allowed
to use as a boiler target temperature. During mild conditions, if the control
calculates a boiler target temperature that is below the boiler minimumsetting, the boiler target temperature is adjusted to at least the boiler
minimum setting. During this condition, if the boiler(s) is operating, theminimum segment is turned on in the display when viewing either the
boiler supply temperature or the boiler target temperature. Set the boiler
minimum setting to the boiler manufacturers recommended temperature.
BOILER MAXIMUMThe boiler maximum is the highest temperature that the control is
allowed to use as a boiler target temperature. If the control does target
the boiler maximum setting, and the boiler temperature is near the boilermaximum temperature, the maximum segment will be turned on in the
display while either the boiler target temperature or the boiler supplytemperature is being viewed. At no time does the control operate the
boiler(s) above 248F (120C).MAX Segment
OnMAX Segment
On
Tem
pera
turefa
llTe
mpe
ratu
rerise
Time
Desired temperature160F (71C)
Differential10F (6C)Boiler Off
Boiler On
155F (68C)
165F (74C)
IncreasingL
o
ad
Time
Differential On
Off
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
10/36
2008 D 265 - 12/08 10 of 36
Section C1: Boiler Reset (Stand Alone)
FIRE DELAYThe Fire Delay is the time delay that occurs between the time that the
control closes a boiler enable contact to fire a boiler and when the boilerfires at low fire.
STAGE DELAYThe stage delay is the minimum time delay between the firing of stages.
After this delay has expired the control can fire the next stage if it isrequired. This setting can be adjusted manually or set to an automatic
setting. When the automatic setting is used, the control determines the
best stage delay based on the operation of the system.
Boiler Reset operation only applies when the Stand Alone/External InputDIP switch is set toStand Alone.
BOILER DEMANDA boiler demand is required in order for the control to provide heat to the heating system. A boiler
demand is generated by applying a voltage between 24 and 230 V (ac) across the BoilDem
and ComDemterminals (29 and 30). Once voltage is applied, the BoilerDemandpointer isdisplayed in the LCD. If the control is not in Warm Weather Shut Down (WWSD), the control
closes the primary pump contact. The control calculates a boiler target supply temperaturebased on the outdoor air temperature and the characterized heating curve settings. The control
then fires the boiler(s), if required, to maintain the target supply temperature.
29 30Boil
DemComDem
24 to 230 V (ac)
Stage Delay
Stage Delay
Boiler 1Contact Closes
Boiler 1Fires
FireDelay 1
FireDelay 3
FireDelay 2
Boiler 2Contact Closes
Boiler 2Fires
Boiler 3Contact Closes
Boiler 3Fires
Time
SOFT STOPIt is possible to thermally shock a boiler when it is shut off at high fire. The Soft Stopfeature forces the boiler to modulate down to
minimum before turning off. This is designed to prevent large volumes of cold air being introduced into the combustion chamber ofthe boiler when it is shut off. This can occur in applications where the burner includes a fan.
Once all demands are removed, the control allows for the firing rate to be modulated down to the MIN Modulationsetting prior to
turning off the burner. This feature is enabled by setting the Soft Stop/OffDIP switch to the Soft Stopposition. If the Soft Stop/OffDIP switch is in the Offposition, the control turns off the boiler at the current firing rate once all demands are removed.
COPY BOILER 1 SETTINGSMany boiler installations will have multiple identical boilers. To reduce the number of settings required, the settings of boiler 1(Fire Delay, Boiler Mass, Motor Speed, Minimum Boiler Output, Maximum Boiler Output, Boiler Modulation, Minimum Modulation,
Maximum Modulation, and Purge Boiler Pump) are copied to boiler 2 by setting the Boiler 2 setting to CP1. Likewise, setting Boiler 3to CP1 copies the settings of boiler 1 to boiler 3. Boiler 2 and Boiler 3 settings are set to CP1 by default.
The setting of CP1 allows the control to enable the boiler similar to the set ting of Au (automatic). If a boiler is set to OFF, the control
disables that boiler.
If required, each of the three modulating boilers can have individual boiler settings. This allows for three different type, size,and make of modulating boilers. To select individual boiler settings for boiler 2, set Boiler 2 to Au (automatic). Likewise, to select
individual boiler settings for boiler 3, set Boiler 3 to Au (automatic).
Section C: Outdoor Reset
Section C1Boiler Reset
(Stand Alone)
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
11/36
11 of 36 2008 D 265 - 12/08
BOILER DESIGN TEMPERATUREThe boiler design supply temperature is the supply water temperaturerequired to heat the building when the outdoor air temperature is as cold
as the outdoor design temperature.
BOILER INDOOR DESIGN TEMPERATUREThe indoor design temperature is the room temperature that was used in the original heat loss calculations for the building. This
setting establishes the beginning of the characterized heating curve.
ROOMThe ROOMsetting is the desired room temperature for the building and provides a parallel shift of the heating curve. The room
temperature desired by the occupants is often different from the design indoor temperature. If the room temperature is not correct,adjusting the room setting increases or decreases the amount of heat available to the building. A room setting is available for both
the occupied (day) and unoccupied (night) periods.
BOILER TARGET TEMPERATUREThe boiler target temperature is determined from the characterized heating curve settings and the outdoor air temperature. The
control displays the temperature that it is currently trying to maintain as the boiler supply temperature. If the control does notpresently have a requirement for heat, it does not show a boiler target temperature. Instead, is displayed in the LCD.
TERMINAL UNITSThe control provides for a selection between six different terminal unit types: two types of radiant floor heat, fancoil, fin-tube
convector, radiator and baseboard. When a terminal unit is selected, the control automatical ly loads the design supply temperaturemaximum supply temperature, and minimum supply temperature. The factory defaults are listed below. These factory defaults can
be changed to better match the installed system.
Terminal Unit High Mass
Radiant (1)
Low Mass
Radiant (2)
Fancoil
(3)
Fin-Tube
Convector (4)
Radiator
(5)
Baseboard
(6)
BOIL DSGN 120F (49C) 140F (60C) 190F (88C) 180F (82C) 160F (71C) 150F (66C)
BOIL MAX 140F (60C) 160F (71C) 210F (99C) 200F (93C) 180F (82C) 170F (77C)
BOIL MIN OFF OFF 140F (60C) 140F (60C) 140F (60C) 140F (60C)
High Mass Radiant (1)
This type of a hydronic radiant floor is embedded in either a thick concrete or gypsum
pour. This heating system has a large thermal mass and is slow acting.
Low Mass Radiant (2)
This type of radiant heating system is either attached to the bottom of a wood sub-floor,suspended in the joist space, or sandwiched between the sub-floor and the surface.
This type of radiant system has a relatively low thermal mass and responds faster thana high mass system.
CHARACTERIZED HEATING CURVEThe control varies the supply water temperature based on the outdoor air
temperature. The control takes into account the type of terminal unit thatthe system is using. Since different types of terminal units transfer heat
to a space using different proportions of radiation, natural convectionand forced convection, the supply water temperature must be controlled
differently. Once a terminal unit is selected, the control varies the supplywater temperature according to the type of terminal unit. This improves
the control of the air temperature in the building.
OUTDOOR DESIGN TEMPERATUREThe outdoor design temperature is the outdoor air temperature that is
the typical coldest temperature of the year where the building is located.This temperature is used when doing the heat loss calculations for the
building. If a cold outdoor design temperature is selected, the boiler
supply temperature rises gradually as the outdoor temperature drops.If a warm outdoor design temperature is selected, the boiler supply
temperature rises rapidly as the outdoor temperature drops.
BOIL MAXBOIL DSGN
OUT DSGN
ROOM OCC
ROOM UNOCC
210(99)
190(88)
170(77)
150(66)
130(54)
110(43)
90(32)
70(21)
50F(10C)
-20(-29)
0(-18)
20(-7)
40(5)
60(16)
80(27)
Outdoor Air Temperature
SupplyWaterTemperature
Boiler CharacterizedHeating Curve
Boiler CharacterizedHeating Curve
BOIL MIN
BOIL INDR
WWSD OCC
WWSD UNOCC
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
12/36
2008 D 265 - 12/08 12 of 36
Self AdjustingWater Temperature
Boil Target (Occupied)
Boost
Boil Target (UnOccupied)
Boost setting - 20 minutes to 8 hours
Time
Fancoil (3)
A fancoil terminal unit or Air Handling Unit (AHU) consists of a hydronic heating coil andeither a fan or blower. Air is forced across the coil at a constant velocity by the fan or
blower, and is then delivered into the building space.
Fin-Tube Convector (4)
A convector terminal unit is made up of a heating element with fins on it. This type of
terminal unit relies on the natural convection of air across the heating element to deliver
heated air into the space. The amount of natural convection to the space is dependanton the supply water temperature to the heating element and the room air temperature.
Radiator (5)
A radiator terminal unit has a large heated surface that is exposed to the room. A radiator
provides heat to the room through radiant heat transfer and natural convection.
Baseboard (6)
A baseboard terminal unit is similar to a radiator, but has a low profile and is installed at
the base of the wall. The proportion of heat transferred by radiation from a baseboard is
greater than that from a fin-tube convector.
WARM WEATHER SHUT DOWN (OCC and UNOCC)The Warm Weather Shut Down (WWSD) disables the space heating system during warm outdoor weather. There is a separate WWSDfor both the occupied and the unoccupied periods. When the outdoor air temperature rises above the WWSD setting, the control turns
on the WWSDpointer in the display. When the control is in WWSD, the Boiler Demandpointer is displayed if there is a boiler demand.
However, the control does not operate the heating system to satisfy this demand. The control does respond to a DHW demand or asetpoint demand and operates as described in sections D and E. WWSD is not active when using an external input signal.
BOOSTWhen the control changes from the unoccupied mode to the occupied mode,
it enters into a boosting mode. In this mode, the supply water temperature to
the system is raised above its normal values for a period of time to provide a
faster recovery from the setback temperature of the building. The maximumlength of the boost is selected using the BSTsetting.
Typical settings for the boost function vary between 30 minutes andtwo hours for buildings that have a fast responding heating system. For
buildings that have a slow responding heating system, a setting betweenfour hours and eight hours is typical. After a boost time is selected, the
setback timer must be adjusted to come out of setback some time in
advance of the desired occupied time. This time in advance is normallythe same as the BSTsetting.
If the building is not up to temperature at the correct time, the BSTsetting should be lengthened and the setback timer should beadjusted accordingly. If the building is up to temperature before the required time, the BSTsetting should be shortened and the setback
timer should be adjusted accordingly. If the system is operating near its design conditions or if the supply water temperatures are being
limited by settings made in the control, the time required to bring the building up to temperature may be longer than expected.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
13/36
13 of 36 2008 D 265 - 12/08
Section D1Domestic HotWater (DHW)
Section D2DHW w/ LowTemp Boilers
Section D: Domestic Hot Water Operation
Section D1: Domestic Hot Water (DHW)
DHW operation is available during Boiler Reset (Stand Alone) and External Input operation.
The DHW operation requires the use of the Boiler 3/DHWcontact; therefore, only 2 boilers can be connected to the control. The
BOIL 3 setting must be set to OFFbefore the DHW MODE item will be available.
DHW DEMANDA DHW Demandis required in order for the control to provide heat to the DHW system. A
DHW aquastat or setpoint control is used as a switch in the DHW demand circuit. Oncethe control detects a DHW demand, the DHW Demandpointer turns on in the LCD and the
control operates the boiler to provide a sufficient boiler supply water temperature to theDHW tank. The control operates the pumps as described below.
The control registers a DHWDemandwhen a voltage between 24 and 230 V (ac) is appliedacross the Setp/DHWand ComDemterminals (31 and 30).
BOILER TARGET DURING DHW GENERATIONThe boiler target temperature is at least as hot as the DHW exchange setting (DHWXCHG). The DHW demand overrides the boilereset target temperature, except when the boiler reset target is higher than the DHW Exchange setting.
DHW MODE AND PRIORITY OPERATIONThe control has five different settings available for DHW MODE. The required DHW MODE setting will depend on the pipingarrangement of the DHW tank.
It is often desirable to have a priority for the DHW allowing for quick recovery of the DHW tank temperature. This is achieved by
limiting or even stopping the flow of heat to the heating system when the DHW tank calls for heat.
DHW Mode Off No DHWThe DHW feature is not selected.
30 31ComDem
Setp/DHW
24 to 230 V (ac)
Aquastat
DHWPump
PrimaryPump Boiler
Pump
DHWPump
PrimaryPump Boiler
Pump
DHW MODE 1 - DHW in Parallel no PriorityWhen a DHW Demand is present, the Boiler3/DHW contact
(terminals 21 and 22) closes with the DHW demand. The primary
pump contact does not turn on, but may operate based on a BoilerDemand, or an External Input Signal.
It is assumed that the DHW pump will provide adequate flowthrough the heat exchanger and the boiler.
DHW MODE 2 - DHW in Parallel with Priority
When a DHW Demandis present, the Boiler 3 /DHWcontact (terminals21 and 22) closes and the primary pump contact is opened.
It is assumed that the DHW pump will provide adequate flow
through the heat exchanger and the boiler.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
14/36
2008 D 265 - 12/08 14 of 36
DHWPump
PrimaryPump Boiler
Pump
DHWPump
PrimaryPump Boiler
Pump
DHW MODE 3 - DHW in Primary / Secondary no PriorityWhen a DHW Demandis present, the Boiler3/DHWcontact (terminals
21 and 22) is closed and the primary pump contact is closed.
This mode can be used if a DHW tank is piped in direct return and
a DHW valve is installed.
DHW PRIORITY OVERRIDEThe DHW Priority Overrideapplies to DHW MODE2and 4. To prevent the building from cooling off too much or the possibility ofa potential freeze up during DHW priority, the control limits the amount of time for DHW priority. The length of DHW priority time
is determined using the Priority Overridesetting. Once the allowed time for priority has elapsed, the control overrides the DHWpriority and resumes space heating.
To provide external DHW priority, the space heating zones must be interlocked with the Boiler 3 / DHW contact. During DHW
demands, the Boiler 3 / DHW contact must remove any power to all space heating zone valves or zone pumps.
CONDITIONAL DHW PRIORITYThe Conditional DHW Priority Override applies to DHW MODE 2and 4. If the boiler supply temperature is maintained at or abovethe required temperature during DHW generation, this indicates that the boiler(s) has enough capacity for DHW and possibly
heating as well. As long as the boiler supply temperature is maintained near its target and the heating and DHW targets are similar,DHW and heating occurs simultaneously.
DHW POST PURGEAfter the DHW Demand is removed, the control performs a purge (PURG) on the boiler(s). The control shuts off the boiler(s) andcontinues to operate either the DHW pump or the DHW valve and the system and boiler pump if applicable. This purges the residual
heat from the boiler(s) into the DHW tank. The control continues this purge for a maximum of two minutes or until the boiler supply
water temperature drops 20F (11C) below the boiler target temperature during the DHW operation. The control also stops thepurge if the boiler supply temperature is close to the current boiler target temperature.
DHW MIXING PURGEAfter DHW operation, the boiler(s) is extremely hot. At the same time,
the heating zones may have cooled off considerably after being off fora period of time. To avoid thermally shocking the boiler(s) after DHW in
parallel with priority (DHW MODE 2), the control shuts off the boiler(s), butcontinues to operate the DHW while restarting the heating system. This
allows some of the DHW return water to mix with the cool return water
from the zones and temper the boiler return water.
DHWPump
PrimaryPump Boiler
Pump
DisableUsing External
Wiring
DHW MODE 4 - DHW in Primary / Secondary with Priority
When a DHW Demandis present, the Boiler3/DHWcontact (terminals 21 and 22) is closed and the primary pump contact isclosed. Priority can only be obtained using external wiring. During a priority override, the Boiler3/DHWcontact is opened until
the heating system has recovered before returning to DHW operation.
This mode can be used if a DHW tank is piped in direct return and a DHW valve is installed.
DHW MODE 4External PrioritInterlock
Power to ExternalBoiler Zones
N.C.
L
DHWPump
N
N.O.
L
N
COIL
Power fromDHW Pump / Vlv
Contact
DHW DURING UNOCCUPIEDIf the control receives a DHW Demandduring an unoccupied period, the control can either continue operation of the DHW systemas it would during the occupied period or the control can ignore a DHW Demand for the duration of the unoccupied period.
NUMBER OF BOILERS USED FOR DHW GENERATIONThe number of boilers used for DHW generation can be selected to either one or two using the BOIL DHW setting. This applies whenonly a DHW Demand is present. If there are other demands present, the control does not limit the number of boilers operated.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
15/36
15 of 36 2008 D 265 - 12/08
If DHW is to be incorporated into a low temperature system such as aradiant heating system, a mixing device is often installed to isolate the high
DHW supply temperature from the lower system temperature. If a mixing
device is not installed, high temperature water could be supplied to thelow temperature system while trying to satisfy the DHW demand. This may
result in damage to the low temperature heating system. The control iscapable of providing DHW in such a system while maximizing the chance
that the temperature in the heating system does not exceed its allowedmaximum setting.
To prevent high temperature water from being introduced into the heating
system, the primary pump (Prim P1) must be turned off during a call forDHW. To do this, the control must be set to DHW MODE 2 or DHW MODE 4
and Boil MIN must be set to OFF.
DHWPump
PrimaryPump BoilerPump
Section D2: DHW with Low Temperature Boilers
DHW MODE 2 OPERATION
On a call for DHW, the control provides DHW priority by shutting off the primary pump (Prim P1) for a period of time. This time is
based on the DHW Priority Override setting. However, if the DHW Demand is not satisfied within the allotted time, the boiler(s) shuts
off and the heat of the boiler is purged into the DHW tank.
Once the boiler supply temperature is sufficiently reduced, the Boiler 3 / DHW contact shuts off. The heating system is turned on
for a period of time to prevent the building from cooling off. After a period of heating, and if the DHW Demand is still present, the
control shuts off the heating system and provides heat to the DHW tank once again.
For correct operation, close attention must be paid to the mechanical layout of the system. When the control turns off the primary
pump (Prim P1), flow to the heating system must stop. If flow is not stopped, the temperature in the heating system can exceed the
maximum desired temperature and can result in damage to the heating system.
DHW MODE 4 OPERATION
In DHW MODE 4, the space heating zones must be prevented from coming on during DHW demands using external wiring. This
can be done using an external relay to remove power from zone pumps or zone valves while a DHW Demand is present. Thisexternal relay is interlocked with the Boiler3/DHW contact.
During a DHW Demand, the control closes the primary pump (Prim P1) contact and the Boiler 3 / DHW contact. Once the DHW
Demand is removed, or during a DHW priority override, the Boiler 3 / DHW contact is opened, and the external wiring should allowthe space heating zones to operate.
There is no mixing purge available in DHWMODE4. After DHW priority, the boiler supply water temperature may exceed the designwater temperature of the space heating system and can result in damage to the heating system.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
16/36
2008 D 265 - 12/08 16 of 36
Section E1: Setpoint
Note:Setpoint operation is only available when DHW MODE is set to OFF.
SETPOINTThe control can operate to satisfy the requirements of a setpoint load in addition to a space heating load. A setpoint load overridesthe current outdoor reset temperature and WWSD setting in order to provide heat to the setpoint load.
SETPOINT DEMANDA Setpoint Demand is required in order for the control to provide heat to the setpoint load.
The control registers a setpoint demand when a voltage between 24 and 230 V (ac) is
applied across the Setp/DHW Demand Com Demterminals (31 and 30). Once voltageis applied, the Setpoint Demand pointer turns on in the LCD. The control operates the
boiler(s) to maintain at least the setpoint setting.
BOILER TARGET DURING SETPOINTThe boiler target temperature during a setpoint demand is increased to at least the Setpointsetting. This temperature is maintained as long as the control has a setpoint demand.
SETPOINT MODE
SETP MODE 1 - Setpoint in ParallelWhenever a setpoint demand is present, the boiler(s) is operated to maintain the setpoint target. The primary pump contact does not
close, but may operate based on a Boiler Demand or on an external input system.
It is assumed that the Setpoint pump will provide adequate flow through the heat exchanger and the boiler.
SETP MODE 2 - Setpoint in Parallel with PriorityWhenever a setpoint demand is present, the boiler(s) is operated tomaintain the setpoint target and the primary pump (Prim P1) contact
is opened.
It is assumed that the Setpoint pump will provide adequate flowthrough the heat exchanger and the boiler.
SETP MODE 3 Primary Pump during SetpointWhenever a setpoint demand is present, the primary pump (Prim P1) is turned on and the boiler(s) is operated to maintain thesetpoint target.
SETPOINT PRIORITY OVERRIDEThe setpoint has a Priority Override while in SETP MODE 2. In order to prevent the building from cooling off too much or thepossibility of a potential freeze up during setpoint priority, the control limits the amount of time for setpoint priority. The length of
Setpoint priority is determined by the Priority Override setting. Once the allowed time for priority has elapsed, the control overridesthe setpoint priority and operates setpoint and heating simultaneously by turning on the primary pump (Prim P1).
CONDITIONAL SETPOINT PRIORITYIf the boiler(s) supply temperature is maintained at or above the required temperature during setpoint generation, this indicates thatthe boiler(s) has enough capacity for setpoint and possibly heating as well. As long as the boiler target temperature is maintained
and the heating and setpoint targets are similar, setpoint and heating occur at the same time.
30ComDem
31Setp/Dem
24 to 230 V (ac)
Setpoint Device
BoilerPumps
PrimaryPump
Section E1Setpoint
Section E: Setpoint Operation
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
17/36
17 of 36 2008 D 265 - 12/08
Section F1: External Input
DHW or Setpoint operation is available during External Input operation. Boiler Demands are not active when the Stand Alone/ExternaInput DIP switch is set to External Input.
EXTERNAL INPUTThe control can accept an external DC signal in place of the outdoor sensor. The control converts the DC signal into the appropriateboiler target temperature between 50F (10C) and 210F (99C) based on the External Input Signal and Offset settings. To use
the external input signal, the External Input / Stand Alone DIP switch must be set to External Input.
When operating in the external input mode, an external signal is required in order for the control to provide heat to the heatingsystem. An external signal is generated by applying a voltage between 0V(dc) and 10V(dc) across the Out +and Com terminals
(4 and 1). Voltages that exceed 10V(dc) will still be considered a 10V(dc) signal. Once voltage is applied, the control closes theprimary pump contact and the control calculates a boiler target supply temperature based on the external input signal and the
settings made in the control. The control then fires the boiler(s), if required, to maintain the target supply temperature. If the externa
signal goes below the minimum voltage, the boiler target temperature is displayed as to indicate that there is no longer a calfor heating. The primary pump and boiler pumps operate as described in section G.
INPUT SIGNALThe control can accept either a 0 - 10 V (dc) signal or a 2 - 10 V (dc) signal. The External Input Signal setting must be set to the
proper setting based on the signal that is being sent to the control.
0 - 10 V (dc) or 0 - 20 mAWhen the 0 - 10 V (dc) signal is selected, an input voltage of 1V(dc) corresponds to a boiler target temperature of 50F (10C)
An input voltage of 10 V (dc) corresponds to a boiler target temperature of 210F (99C). As the voltage varies between 1 V(dcand 10 V (dc) the boiler target temperature varies linearly between 50F (10C) and 210F (99C). If a voltage below 0.5V(dc) is
received the boiler target temperature is displayed as indicating that there is no longer a call for heating.
A 0 - 20 mA signal can be converted to a 0 - 10 V (dc) signal by installing a 500
W resistor between the Out +and Com terminals (4 and 1).
2 - 10 V (dc) or 4 - 20 mAWhen the 2 - 10 V (dc) signal is selected, an input voltage of 2V(dc) corresponds to a boiler target temperature of 50F (10C)
An input voltage of 10 V (dc) corresponds to a boiler target temperature of 210F (99C). As the voltage varies between 2 V(dc
and 10 V (dc) the boi ler target temperature varies linearly between 50F (10C) and 210F (99C). If a voltage below 1.5V(dc) isreceived the boiler target temperature is displayed as indicating that there is no longer a call for heating.
A 4 - 20 mA signal can be converted to a 2 - 10 V (dc) signal by installing a 500 resistor between the Out +and Com
terminals (4 and 1).
Section F1External
Input
Section F: External Input Operation
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
18/36
2008 D 265 - 12/08 18 of 36
Section G1: Pump Operation
PRIMARY PUMP OPERATIONThe primary pump operates under the following conditions:
A boiler demand is present and the control is not in Warm Weather Shut Down (WWSD). An external input signal is present.
A DHW demand is present and DHW MODE is set to 3 or 4. A setpoint demand is present and Setpoint MODE is set to 3.
Primary Pump PurgeAfter all demands are removed, the control continues to operate the primary pump for a period of time. The maximum length of time
that the primary pump continues to run is adjustable using the Purge setting. The primary pump continues to run until either thepurging time has elapsed or the boiler supply temperature drops more than of the differential below the boiler minimum setting.
PrimaryPump
BoilerPumps
PrimaryPump
BoilerPumps
PrimaryPump
BoilerPumps
OR
Example Range = 0 - 10 V (dc)
Input = 7 V (dc) 157F (69C)
Offset = +5F (3C) +5F (3C)
Boiler Target = 162F (72C)
CONVERSION TABLE 0 - 10
0 - 20 mA* 0 - 10 V (dc) Boiler Target
0 0 (OFF)
2 1 50F (10C)
4 2 68F (20C)
6 3 86F (30C)
8 4 103F (39C)
10 5 121F (49C)
12 6 139F (59C)
14 7 157F (69C)
16 8 174F (79C)
18 9 192F (89C
20 10 210F (99C)
*Requires 500 Resistor in Parallel
*Requires 500 Resistor in Parallel
CONVERSION TABLE 2 - 10
4 - 20 mA* 2 - 10 V (dc) Boiler Target
0 0 (OFF)
4 2 50F (10C)
6 3 70F (21C)
8 4 90F (32C)
10 5 110F (43C)
12 6 130F (54C)
14 7 150F (66C)
16 8 170F (77C)
18 9 190F (88C)
20 10 210F (99C)
OFFSETThe Offset setting allows the boiler target temperature to be fine tuned to the external input signal. The control reads the external
input signal and converts this to a boiler target temperature. The Offset setting is then added to the boiler target temperature
Section G1Pump
Operation
Section G: Pump Operation
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
19/36
19 of 36 2008 D 265 - 12/08
CAUTIONImproper installation and operation of this control could result in damage to the equipment and possibly even personal injury. It is
your responsibility to ensure that this control is safely installed according to all applicable codes and standards. This electroniccontrol is not intended for uses as a primary limit control. Other controls that are intended and certified as safety limits must be
placed into the control circuit. Do not open the control. Refer to qualified personnel for servicing. Opening voids warranty and could
result in damage to the equipment and possibly even personal injury.
STEP ONEGETTING READYCheck the contents of this package. If any of the contents listed are missing or damaged, please contact your wholesaler or tekmarsales representative for assistance.
Type 265 includes: One Boiler Control 265, One Outdoor Sensor 070, Two Universal Sensors 071, Data Brochures D 265, D 070
D 001, Application Brochure A 265, Four 500 resistors.
Note: Carefully read the details of the Sequence of Operat ion to ensure that you have chosen the proper control foyour application.
STEP TWOMOUNTING THE BASERemove the control from its base by pressing down on the release clip in the wiring chamber and sliding the control away from it
The base is then mounted in accordance with the instructions in the Data Brochure D 001.
STEP THREE ROUGH-IN WIRINGAll electrical wiring terminates in the control base wiring chamber. The base has standard 7/8 (22 mm) knockouts which accep
common wiring hardware and conduit fittings. Before removing the knockouts, check the wiring diagram and select those sections
of the chamber with common voltages. Do not allow the wiring to cross between sections as the wires will interfere with safetydividers which should be installed at a later time.
Power must not be applied to any of the wires during the rough-in wiring stage.
All wires are to be stripped to a length of 3/8 (9 mm) to ensure proper connection to the control. If an Outdoor Sensor 070 is used, install the sensor according to the installation instructions in the Data Brochure D 070 and run
the wiring back to the control.
Install the Boiler Supply Sensor 071 according to the installation instructions in the Data Brochure D 070 and run the wiring backto the control.
If a Boiler Return Sensor 071 is used, install the sensor according to the installation instructions in the Data Brochure D 070 andrun the wiring back to the control.
Run wire from other system components (pumps, boilers, etc.) to the control. Run wires from the 115 V (ac) power to the control. Use a clean power source with a 15 A circuit to ensure proper operation
Multi-strand 16 AWG wire is recommended for all 115 V (ac) wiring due to its superior flexibility and ease of installation into
the terminals.
Installation
BOILER PUMP OPERATIONThe control can operate a boiler pump on each boiler in addition to the primary pump. The boiler pump turns on prior to the boiler
firing and continues to run after the boiler is turned off. The amount of time that the boiler pump turns on prior to the boiler firing isdetermined by the boiler mass setting. As the boiler mass setting is increased, the boiler pump pre-purge time of the also increases
However, if the control is operating only on a setpoint demand, the boiler pump turns on immediately before the boiler fires.
Boiler Pump PurgeThe amount of time that the boiler pump continues to run after the boiler turns off is adjustable using the boiler pump purge setting(PURG Boil Pmp).
PrimaryPump Boiler
Pump
PrimaryPump Boiler
Pump
PrimaryPump Boiler
Pump
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
20/36
2008 D 265 - 12/08 20 of 36
29 30Boil
DemComDem
24 to 230 V (ac)
30 31ComDem
Setp/DHW
24 to 230 V (ac)
Aquastat
STEP FOURELECTRICAL CONNECTIONS TO THE CONTROL
GeneralThe installer should test to confirm that no voltage is present at any of the wires. Push the control into the base and slide it downuntil it snaps firmly into place.
115 V (dc)
PrimP1
PowerL
14
N
12 13
N
L
Powered Input Connections
115 V (ac) PowerConnect the 115 V (ac) power supply to the PowerL and PowerNterminals (13 and 14).
This connection provides power to the microprocessor and display of the control. Aswell, this connection provides power to the PrimP1 terminal (12) from the PowerL
terminal (13).
Boiler DemandTo generate a Boiler Demand, a voltage between 24 V (ac) and 230 V (ac) must beapplied across the BoilDemand ComDemterminals (29 and 30).
DHW DemandTo generate a DHW Demand, a voltage between 24 V (ac) and 230 V (ac) must be
applied across the Setp/DHW Demand Com Demterminals (31 and 30). The Boil 3setting must be set to OFF and DHW MODE must also be set to 1 through 4.
Setpoint DemandTo generate a Setpoint Demand, a voltage between 24 V (ac) and 230 V (ac) mustbe applied across the Setp/DHWDem and ComDem terminals (31 and 30). The
DHW MODE must also be set to OFF.
External Input (0 -10 V dc)To generate an external input signal, a voltage between 0 and 10 V (dc) must beapplied to the Com and Out +terminals (1 and 4).
A 0 - 20 mA signal can be converted to a 0 - 10 V (dc) signal by installing a 500 resistor between the Com and Out +terminals (1 and 4).
A 4 - 20 mA signal can be converted to a 2 - 10 V (dc) signal by installing a 500
resistor between the Com and Out +terminals (1 and 4).
Output Connections
Primary Pump Contact (Prim P1)The PrimP1 output terminal (12) is a powered output. When the relay in the control
closes, 115 V (ac) is provided to the PrimP1 terminal (12) from thePowerL terminal (13).
To operate the primary pump, connect one side of the primary pump circuit to terminal(12) and the second side of the pump circuit to the neutral (Power N) side of the
115 V (ac) power supply.
1Com
2
DoNotApplyPower
BoilSup
3BoilRet
4Out+
0 - 10 V (dc)or
2 - 10 V (dc)
+
1Com
2
DoNotApplyPower
BoilSup
3BoilRet
4Out+
0 - 20 mA
or4 - 20 mA
500
+
13 14
115 V (ac)
L
N
PowerL N
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
21/36
21 of 36 2008 D 265 - 12/08
15 16
M
24 to 230 V (ac)
or Low Voltage Alarm
C.A./
Alarm
23 24
BoilerPump1
24 to 230 V (ac)
2122
Boiler3/DHW
24 to 230 V (ac)
17 18Boiler
1 1
Connection to Operatea 4 - 20 or 0-20 mA Device
+
4-20or0-20mA
ActuatingMotor
6
+
7
Mod1mA
Combustion Air / Alarm Contact (C.A./Alarm)The Combustion Air / Alarm Contact (C.A./Alarm) terminals (15 and 16) are an iso-lated output in the control. There is no power available on these terminals from the
control. These terminals are to be used as a switch to either make or break power to
the combustion air damper or alarm. Since this is an isolated contact, it may switch avoltage between 24 V (ac) and 230 V (ac).
Boiler 1 and Boiler 2 ContactsThe Boiler1 and Boiler2 terminals (17 and 18, 19 and 20) are isolated outputs in
the control. There is no power available on these terminals from the control. Theseterminals are to be used as a switch to enable the modulating boiler. Since this is an
isolated contact, it may switch a voltage between 24 V (ac) and 230 V (ac).
Boiler 3 / DHW Contact
Boiler OperationThe Boiler3/DHWterminals (21 and 22) are isolated outputs in the control. There
is no power available on these terminals from the control. These terminals are to beused as a switch to enable the modulating boiler. Since this is an isolated contact, itmay switch a voltage between 24 V (ac) and 230 V (ac).
DHW OperationThe Boiler3/DHWterminals (21 and 22) are an isolated output. There is no poweravailable on these terminals from the control. These terminals are to be used as a
switch to either make or break power to the DHW pump or the DHW valve. Since this
is an isolated contact, it may switch a voltage between 24 V (ac) and 230 V (ac).
Boiler Pump 1 to Boiler Pump 3 Contacts
The BoilerPump1 to BoilerPump3terminals (23 and 24, 25 and 26, 27 and 28) areisolated outputs in the control. There is no power available on these terminals from the
control. These terminals are to be used as a switch to either make or break power toa boiler pump. Since these are isolated contacts, they may switch a voltage between
24 V (ac) and 230 V (ac).
Note:When a Boiler is set to OFF, the Boiler Pump contact becomes inactive.
Mod 1 to Mod 3 Outputs
The Mod 1 to Mod 3 outputs (Mod1, Mod2, Mod3) on terminals (6 and 7, 8 and 9, 10 and11) provide a 4 to 20 mA or a 0 to 20 mA output to each boiler. The modulating outputsreplace any mechanical operator such as a T991. Observe polarity when connecting the
control to the boiler.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
22/36
2008 D 265 - 12/08 22 of 36
Converting the 0 - 20 mAOutput to Operate a0 - 10 V (dc) Device
6
+
7
Mod1mA
0-10Vdc
ActuatingMotor
500 resistor0 - 20 mA converted
to 0 - 10 V (dc) outputOR
250 resistor0 - 20 mA convertedto 0 - 5 V (dc) output
The 4 to 20 mA output can be converted to 1 to 5 V (dc) using anexternal 250 resistor across the Mod1 (Mod 2, Mod 3) terminals.
The 4 to 20 mA output can be converted to 2 to 10 V (dc) using an
external 500 resistor across the Mod1 (Mod 2, Mod 3) terminals.
The 0 to 20 mA output can be converted to 0 to 5 V (dc) using an
external 250 resistor across the Mod1 (Mod 2, Mod 3) terminals.
The 0 to 20 mA output can be converted to 0 to 10 V (dc) using an
external 500 resistor across the Mod1 (Mod 2, Mod 3) terminals.
The 4 to 20 mA output can be converted to a 0 - 135 output for
a Modutrol IV gas valve actuating motor using a 0 - 135 tekmarConverter 005 (sold separately).
The 4 to 20 mA output can be converted to a 0 - 135 output for
a V9055 gas valve actuating motor using a 0 - 135 tekmarConverter 005 (sold separately).
6
+
7
Mod1mA
500 resistor4 - 20 mA converted
to 2 - 10 V (dc) outputOR
250 resistor4 - 20 mA convertedto 1 - 5 V (dc) output
Converting the 4 - 20 mAOutput to Operate a
1 - 5 or 2 - 10 V (dc) Device
+
1-5or2-10Vdc
ActuatingMotor
Modutrol IV
tekmar
B
R
W
+
-
tekmar
V9055
+
-
B
R
W
Modutrol IV0 - 135 Actuating
Motor
B
R
W
6Mod1mA+
7
Modutrol IV
tekmar
B
R
W
+
-
tekmar
V9055
+
-
B
R
W
6
+
7
Mod1mA
B
R
W
V90550 - 135 ActuatingMotor
Modutrol IV and V9055 are trademarks of Honeywell, Inc.
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
23/36
23 of 36 2008 D 265 - 12/08
SENSOR AND UNPOWERED INPUT CONNECTIONSDo not apply power to these terminals as this will damage the control.
Outdoor SensorConnect the two wires from the Outdoor Sensor 070 to theComandOutterminals (1 and 4).
The outdoor sensor is used by the control to measure the outdoor air temperature.
Boiler Supply SensorConnect the two wires from the Boiler Supply Sensor 071 to the Com and BoilSup
terminals (1 and 2). The boiler supply sensor is used by the control to measure the boilersupply water temperature.
Boiler Return SensorConnect the two wires from the Boiler Return Sensor 071 to the Comand Boilterminals
(1 and 3). The boiler return sensor is used by the control to measure the boiler returnwater temperature.
UnOccupied SwitchIf an external timer (tekmar Timer 032) or switch is used, connect the two wires from the
external switch to the Comand UnO Swterminals (1 and 5). When these two terminalsare shorted together, the control registers an unoccupied (UNOCC) signal.
2BoilSup
3BoilRet
4Out+
1Com
2BoilSup
1Com
1Com
2BoilSup
3BoilRet
1 2 34 5
Com
BoilSup
BoilRet
Out+
UnOSw
Timer Switch
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
24/36
2008 D 265 - 12/08 24 of 36
STEP FIVETESTING THE WIRING
General
Each terminal block must be unplugged from its header on the control before power is applied for testing. To remove the terminalblock, pull straight down from the control.
The following tests are to be performed using standard testing practices and procedures and should only be carried out by
properly trained and experienced persons.
A good quality electrical test meter, capable of reading from at least 0 300 V (ac) and at least 0 2,000,000 Ohms, is essential
to properly test the wiring and sensors.
2Boil
Sup
1Com
Test the SensorsIn order to test the sensors, the actual temperature at each sensor
location must be measured. A good quality digital thermometer witha surface temperature probe is recommended for ease of use and
accuracy. Where a digital thermometer is not available, a spare sensorcan be strapped alongside the one to be tested and the readings
compared. Test the sensors according to the instructions in the DataBrochure D 070.
Test the Power SupplyMake sure exposed wires and bare terminals are not in contact with otherwires or grounded surfaces. Turn on the power and measure the voltage
between the PowerL and PowerN terminals (13 and 14) using an ACvoltmeter, the reading should be between 103.5 and 126.5 V (ac).
Test the Powered Inputs
Boiler DemandIf a boiler demand is used, measure the voltage between the
BoilDem and ComDem terminals (29 and 30). When the boilerdemand device calls for heat, a voltage between 20 and 260 V (ac)
should be measured at the terminals. When the boiler demanddevice is off, less than 5 V (ac) should be measured.
DHW DemandIf a DHW demand is used, measure the voltage between the
Setp/DHW and the ComDem terminals (31 and 30). When theDHW demand device calls for heat, a voltage between 20 and
260 V (ac) should be measured at the terminals. When the DHWdemand device is off, less than 5 V (ac) should be measured.
Setpoint DemandIf a setpoint demand is used, measure the voltage between the
Setp/DHW and the ComDem terminals (31 and 30). When thesetpoint demand device calls for heat, a voltage between 20 and
260 V (ac) should be measured at the terminals. When the setpointdemand device is off, less than 5 V (ac) should be measured.
External InputIf an external input is used, measure the voltage between theCom and the Out +terminals (1 and 4). When the external input
device calls for heat, a voltage between 0 and 10 V (dc) should bemeasured at the terminals.
14
Power13
V
103.5 to 126.5 V (ac)
NL
20 to 260 V (ac)3029BoilDem
ComDem
20 to 260 V (ac)3130ComDem
Setp/Dem
1 23 4
Com
BoilRet
Out+Bo
ilSup
500
0 - 10 V (dc) 0 - 20 mAOR
V
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
25/36
25 of 36 2008 D 265 - 12/08
1412 13
PrimP1
PowerL N
N
L
115 V (ac)
1615C.A./
Alarm
M
24 to 230 V (ac)
or Low Voltage Alarm
Test the Outputs
Primary Pump (Prim P1)If a primary pump is connected to the PrimP1 terminal (12), make sure that power to theterminal block is off and install a jumper between the PowerL and PrimP1 terminals (13
and 12). When power is applied to the PowerL and PowerNterminals (13 and 14), theprimary pump should start. If the pump does not turn on, check the wiring between the
terminal block and pump and refer to any installation or troubleshooting information
supplied with the pump. If the pump operates properly, disconnect the power andremove the jumper.
Combustion Air or Alarm (C.A./Alarm)If a combustion air damper or an alarm is connected to the C.A./Alarm
terminals (15 and 16), make sure power to the damper or alarm circuit is off andinstall a jumper between terminals (15 and 16). When the circuit is powered up, the
combustion air damper should open or the alarm should activate. If the damper orthe alarm fails to operate, check the wiring between the terminals and the damper
or the alarm and refer to any installation or troubleshooting information supplied with
these devices. If the damper or the alarm operates properly, disconnect the power andremove the jumper.
Boiler 1 and Boiler 2 ContactsIf a boiler is connected to the Boiler1 and / or Boiler2contacts (17 and 18, 19 and
20), make sure power to the boiler circuit(s) is off, and install a jumper between theterminals. When the boiler circuit is powered up, the boiler should fire. If the boiler does
not turn on, refer to any installation or troubleshooting information supplied with theboiler. (The boiler may have a flow switch that prevents firing until the primary pump
(Prim P1) or boiler pumps (Boiler Pump 1, 2) are running). If the boiler(s) operates
properly, disconnect the power and remove the jumper.
Boiler 3 / DHW Contact
Boiler OperationIf a boiler is connected to the Boiler3/ DHW contact (21 and 22), make sure power
to the boiler circuit is off, and install a jumper between the terminals. When the boilercircuit is powered up, the boiler should fire. If the boiler does not turn on, refer to any
installation or troubleshooting information supplied with the boiler. (The boiler may
have a flow switch that prevents firing until the primary pump (PrimP1) or boiler pump(BoilerPump3) is running). If the boiler operates properly, disconnect the power and
remove the jumper.
DHW OperationIf a DHW pump or DHW valve is connected to the Boiler3/DHWcontact (21 and 22),
make sure the power to the pump or valve circuit is off and install a jumper between
those terminals. When the DHW circuit is powered up, the DHW pump should turnon or the DHW valve should open completely. If the DHW pump or valve fails to
operate, check the wiring between the terminals and the pump or valve and refer toany installation or troubleshooting information supplied with these devices. If the DHW
pump or valve operates correctly, disconnect the power and remove the jumper.
Boiler Pump 1 to Boiler Pump 3 ContactsIf a boiler pump is connected to BoilerPump1 contact (23 and 24), make sure thatpower to the terminal block is off and install a jumper between the terminals. When
power is applied to circuit, the boiler pump should start. If the pump does not turn on,check the wiring between the terminal block and pump and refer to any installation
or troubleshooting information supplied with the pump. If the pump operates properly,disconnect the power and remove the jumper.
Repeat the same procedure for Boiler Pump 2contacts (25 and 26) and for Boiler Pump 3
contacts (27 and 28) as necessary.
2221Boiler3/DHW
24 to 230 V (ac)
Mor
L
N
1817
Boiler
1 1
2221Boiler3/
DHW
Boiler 3
2423Boiler
Pump1
24 to 230 V (ac)
L
N
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
26/36
2008 D 265 - 12/08 26 of 36
Connecting the ControlMake sure all power to the devices and terminal blocks is off, and remove any remaining
jumpers from the terminals.
Reconnect the terminal blocks to the control by carefully aligning them with their
respective headers on the control, and then pushing the terminal blocks into the headers.The terminal blocks should snap firmly into place.
Install the supplied safety dividers between the unpowered sensor inputs and the
powered or 115 V (ac) wiring chambers.
Apply power to the control. The operation of the control on power up is described in the
Sequence of Operation section of the brochure.
32 415
Com-
BoilSup
BoilRet
Out+
UnOSw
Test the Modulating OutputsConnect an ammeter to the modulating output Mod1 terminals (6 and 7)and observe the current reading during operation or during the Test
Sequence in the Test the Control section. For example, when using
a 4 - 20 mA output, the initial percentage output is zero and themeter should read 4 mA. As the Boiler 1 Modulation increases in the
VIEW menu, the meter reading should increase until 100% Boiler 1Modulation is reached at which point the meter should read 20 mA.
When the 4 - 20 mA modulation decreases, the meter should start at
20 mA and eventually reach 4 mA when the display shows 0% Boiler 1Modulation.
Repeat the same procedure for modulating output Mod2terminals (8 and 9) and Mod3terminals (10 and 11).
mA
76
Mod1mA-+
The controls exterior can be cleaned using a damp cloth. Moisten the cloth with water and wring out prior to wiping the control. Do
not use solvents or cleaning solutions.
Cleaning The Control
Dip Switch Settings
GENERAL
The DIP switch settings on the control are very important and shouldbe set to the appropriate settings prior to making any adjustmentsto the control through the User Interface. The DIP switch settings
change the items that are available to be viewed and / or adjusted inthe User Interface.
If a DIP switch is changed while the control is powered up, the
control responds to the change in setting by returning the display tothe VIEW menu.
Advanced / Installer
The Advanced / Installer DIP switch selects the access level of thecontrol. In the Installer access level, a limited number of items may beviewed and / or adjusted. In the Advanced access level, all items may
be viewed and / or adjusted.
External Input / Stand AloneThe External Input / Stand Alone DIP switch selects whether a tekmarOutdoor Sensor 070 or an external 0 - 10 V (dc) input signal is to be
connected to the Com and the Out +terminals (1 and 4).
DIP Switches
Boiler Control 265
Men u I te m
BoilerDemand
DHW/ SetpointDemand
WWSD
Modulation
BoilerOutput(x10,000 BTU/hr)
External InputSignal
Offset/Priority Override
Test
off not testingred testingred testingpa used
Formaximumheat, press&holdTest f or3
seconds.
MadeinCanadabytekmarControl SystemsLtd.
Power 115V 10%50/60Hz600VARelays 230V (ac)5A 1 /3hp , p ilo t du ty240VADem ands 20 to260V (ac)2VA
StandAlone
AdvancedExternal Input
OffCA.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
S o f tS to p Ro ta teParallel
Installer
ExerciseSequential
ol 265Boiler Co
Item
oilerDemand
HW/ SetpointDemand
WWSD
Modulation
oilerOutput(x10,000 BTU/hr)
External InputSignal
Offset/Priority Overrideff not testingred testingred testingpaused
Formaximumheat, press&
holdTest for3
Made in Canada bytekmarControl SystemsLtd.
Power 115 V 10%50/60Hz600VARelays 230V (ac)5A 1 /3hp , p ilo t duty240 VADem ands 20 to260V (ac)2VA
xed Leadt On / Last Off
n / First Off
otate
)
ffre
xet O
n
Ro
Stand Alone
Advanced
External Input
OffCA.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
-
8/8/2019 265 Boiler Control - Three Modulating Boiler and DHW / Setpoint
27/36
27 of 36 2008 D 265 - 12/08
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Stand Alone
Advanced
External Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Soft Stop RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed Lead
First On / Last Off
First On / First Off
Soft Stop RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Stand Alone
AdvancedExternal Input
OffC.A.
OffAlarm
Fixed LeadFirst On / Last Off
First On / First Off
Sof t S top RotateParallel
Installer
ExerciseSequential
Alarm / Combustion AirThe Alarm / Combustion Air DIP switch selects whether a combustion
air damper or alarm device is to be connected to the C.A./Alarmterminals (15 and 16).
Off / Exercise
The Off / Exercise DIP switch selects whether or not the control is toexercise the primary pump and boiler pumps. If the DIP switch is setto Exercise, the pumps are operated for 10 seconds after every three
days of inactivity.
Parallel / SequentialThe Parallel / Sequential DIP switch selects whether to modulate
the boilers using parallel modulation or sequential modulation when
operating multiple boilers.
Soft Stop / OffThe Soft Stop / Off DIP switch selects whether or not to provide
the boiler with a Soft Stop. If the switch is set Soft Stop, the controlmodulates the burner down to minimum and holds it at the minimum
for an amount of time before shutting off the burner. If the switch is setto Off, the control turns off the burner at the current firing rate once a
demand is removed.
Rotate / OffThe Rotate / Off DIP switch selects whether or not the control is to
provide Equal Run Time Rotation of the boilers. If the switch is set