21 a final review of reply
DESCRIPTION
Review of ReplyTRANSCRIPT
Reply to Queries:
S.No Clause No. / Page No. Comment Reply
1Cl. No.- 2.1 / (f), Page no.-6
All three pumps as there are three pumps not two
Accepted. But at any given point of time only two pumps are required to operate and the third will be a standby
2Cl. No.- 2.1 / (h), Page no.-6
MCC / VFD panels should be placed at Pump House E Room
Accepted, The Motor control centre (MCC) shall be housed in the pump house Electrical room (E room)
3Cl. No.- 2.1 / (t), Page no.-8
Are Cleaning up at site of all debris and temporary structures in the contractors scope
Yes, This is in contractor’s scope.