Reply to Queries:

S.No Clause No. / Page No. Comment Reply

1Cl. No.- 2.1 / (f), Page no.-6

All three pumps as there are three pumps not two

Accepted. But at any given point of time only two pumps are required to operate and the third will be a standby

2Cl. No.- 2.1 / (h), Page no.-6

MCC / VFD panels should be placed at Pump House E Room

Accepted, The Motor control centre (MCC) shall be housed in the pump house Electrical room (E room)

3Cl. No.- 2.1 / (t), Page no.-8

Are Cleaning up at site of all debris and temporary structures in the contractors scope

Yes, This is in contractor’s scope.