  • 20to2T5m100cm Images

    Van Graves

    February 13, 2014

  • 2 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Overall View with 5 Cryostats• Beam extends to Z=1-0m

    • Target chamber extends to Z=-5m

    • Placeholder focusing magnet shown near Z=-5m

  • 3 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 4 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Target Region• Chamber extension would require supports and helium channels

  • 5 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 6 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Target Extraction• Beam path to focusing magnets is at slight angles to the magnetic axis

    • Upstream end of main cryostat Z=-2.3m, target length 3.6m inside cryostat

    • Target cannot be extracted without first removing focusing magnet(s)

  • 7 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Front Elevation Views

  • 8 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 9 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 10 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Target Chamber Views

  • 11 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 12 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Target Chamber Isometrics

  • 13 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

  • 14 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Downstream Beam Windows• Double Be windows at both ends of each cryo module

    • 23cm IR, 1mm thick, 1cm gap

    • All these are replaceable maintenance items

  • 15 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Window Close-up

  • 16 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

    Window AttachmentTungsten shield module

    Gasket requires precise surface on shielding

    Be windows

    Interstitial gap requires monitoring(line not shown)