     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 1 of 23

     

    COMPANY PROFILE   History   

    Projem is a Gladstone based engineering and project Management Company that offer specialised

    mechanical services to various industries. Projem was established in 2011 as a partnership between

    Nathan Peachey and Daniel Crocker and by combining their knowledge and experience, Projem was

    created to focus on bolting and onsite machining, backed by a fully equipped workshop facility. In

    addition to frontline work, Projem offers project management services to assist clients achieve their

    goals when delivering a project scope.

      Contact Details   

    Gladstone Workshop – Head Office

    5 Anson Close or PO Box 796, Gladstone, Queensland, 4680

    Ph. (07) 4979 0770

    Directors

    Nathan Peachey

    E-mail: [email protected]

    E-mail: [email protected]

    Web: www.projem.com.au

    Mobile: 0429 130 482

    Daniel Crocker E-mail: [email protected] Mobile: 0400 979 224

      Management System   

    Projem are committed to continually improving our management systems and have comprehensive policies

    and procedure, maintaining our ISO accreditation in the following applicable standards:

    Quality – ISO 9001

    Environmental – ISO 14001

    Occupational Health and Safety – AS/NZS 4801

    Occupational Health and Safety – OHSAS 18001

    All our documentation for our management systems are available upon request.

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 2 of 23

     

    Okuma LB300‐MY 

    Okuma MB‐56VA 

      Capabilities   We have two main fronts of business, what we can do in our workshop and what we can do on site.

    Combined this offers a complete shutdown or breakdown service to get plants back in operation faster.

    Workshop

    The Gladstone workshop is situated on a 4000m2 fully secured industrial allotment with 625m2 of

    warehouse/workshop along with 85m2 of office. The workshop is setup for fitting, machining and

    fabricating components with the following equipment:

    Okuma CNC Mill/Turn Lathe – Capacity Dia. 350mm x 950mm long with 120mm Y-axis

    Okuma CNC Lathe with bar feeder – Capacity Dia 350mm x 500mm long

    Okuma CNC Mill with 4th axis – Capacity X – 1050mm Y - 560mm Z – 500mm

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 3 of 23

     

    Mazak CNC Mill with 4th axis – Capacity X – 1000mm Y – 500mm Z – 500mm

    Kiheung Point U7 Milling Machine Point – Capacity X – 2000mm Y – 1000mm, Z – 800mm

    3 x Conventional Lathes – Capacity Dia. 900mm swing x 6000mm long

    TOS 100 Horizontal Borer

    Slotter – Internal keyways up to bore Dia. 500mm x 300mm stroke

    Mig, Stick and Tig welders up to 350amps

    Automatic Bandsaws – Capacity 400mm with compound vice

    20ton Punch and Shear

    5T and 15T pipe rotators

    10T Overhead Gantry throughout workshop

    10T, 12T and 20T mobile cranes

    3.5T and 5T Forklifts

    270cfm Diesel Compressor

    Site Standard Vehicles

    Kiheung Point U7 Milling Machine 

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 4 of 23

     

    MECOF CNC Mill - Capacity 3000mm x 2000mm x 1000mm

     

    MECOF CNC Mill 

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 5 of 23

     

    ON-SITE Services

    Projem carry a complete range of flange facing machines to

    cover flange diameters from 0-2000mm, including RTJ

    machining capability. Machines available are as follows:

    External Mount 0”-12”

    Internal Mount 2”-24”

    Internal Mount 6”-40”

    Internal Mount 12”-60”

    Internal Mount 24”-80”

    All flange facing machine specifications and capabilities are

    available from our website. Projem also have access to portable X-

    Y milling machines with capacity up to 3000mm x 6000mm, please

    contact for further details.

    M2000i Portable Flange Facer – Machining 60” 300lb Flange 

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 6 of 23

     

    Clamshell Cutting 1

    Clamshell Cutting 2

    Clamshell Cutting 3

    Flange Facing 1

    Flange Facing 2

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 7 of 23

     

    Tensioning

    Projem has a range of tensioning equipment to cover stud sizes up to 3-1/2” and with access to larger

    sizes as required. To support the use of tensioners, Projem offer complete engineering support to

    calculate correct procedures to ensure accurate bolt tension. Our well-trained crews will apply these

    tools and technique to achieve accurate bolt loads with leak free connections on critical joints. All

    equipment is intrinsically safe for use in the oil and gas industry.

    Controlled Bolting 1

    Controlled Bolting 2

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 8 of 23

     

    RSL Cassettes

    Pneumatic Torque Guns 

    Torque Products

    Projem carries a range of hydraulic torque wrenches to cover most

    applications. The wrenches come with square drive that can be used with

    impact sockets or interchangeable low-profile cassettes can be supplied

    to nominated size to suit the nuts. All hydraulic power packs are

    pneumatically driven so equipment is intrinsically safe. Range includes:

    RSL2 – Up to 1909Nm

    RSL4 – Up to 4176Nm

    RSL8 – Up to 10659Nm

    RSL14 – Up to 15123Nm

    RSL30 – Up to 37965Nm

    In addition to hydraulic torque equipment, we offer pneumatic torque

    guns for nut running and torqueing. Our range:

    RAD 10GX – 300Nm to 1250Nm

    RAD 25GX – 1000Nm to 3300Nm

    RAD 60GX – 3000Nm to 6800Nm

     Pneumatic Torque 1

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 9 of 23

     

      Projem Flange Management Tagging System   

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 10 of 23

     

    Pipe Cutting and Weld Preparation

    Projem can carry out pipe cutting and machining of

    weld preps on pipe sizes ranging from 100NB to

    1000NB. Clamshell machines are available in various

    sizes and a boring attachment can also be used to

    match bore pipes to suit fittings. All clamshell

    machines are pneumatically operated for intrinsic

    safety and form tools can be supplied to suit any weld

    prep specification.

    Project Management

    Projem can offer technical and management support on

    projects in the following areas:

    Joint Integrity Management

    Capital project development and planning

    Capital project execution

    QA system development and implementation

    Manage engineering design and certification

    Construction estimates and methodology

    Lift studies and transport logistics

    Maintenance engineering

    Manage and expedite contractors

    Problem solving

    Machine design for specific applications

    Planning and Scheduling

    Drafting – Autodesk Inventor

     

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 11 of 23

     

     

      Recent Projects    

    RTA Yarwun - Digestion Shutdown Units 1-4 (2019)

      Location – Gladstone, QLD   Principal Contractor ‐ UGL 

    PROJEM’S SCOPE – 18 Technicians over 8 weeks  

    To provide Technicians, Tensioning & Torqueing Equipment throughout entire project of all 4 units:  Unbolting & Bolting of Pipe Work.

    Technical Support in the form of Fitters/Machinists

    Flange facing repairs including Ring Groove Machining.

    Workshop machining of Orifice Plates.

    Supervision of principal contractors Plant Services Technicians.

    De-tension studs on all high-pressure vessels and associated pipework.

    Assist with QA on Flange Faces and re-machine if required.

    Assist with assembly and Torque or Tension of all joints.

    Completed with leak free Start Up

    Rio Tinto Aluminium Refinery ‐ Yarwun 1

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 12 of 23

     

      

    Queensland Nitrates (QNP) - Turn-Around (2018)

    Location – Kianga, QLD Principal Contractor ‐ QNP 

    PROJEM’S SCOPE – 20 Technicians over 3 Months 

    Engaged to set up and manage a Flange Management System that was used to assist with the tracking and joint integrity for the complete shut: 

    Work pack development

    Scope of all high pressure and problematic joints and send all information for bolt and

    flange stress engineering calculations.

    Checking stock levels and sourcing non-standard material (Studs, Gaskets and process

    material)

    Setting up and going through plant isolation lists with operators and setting up confined

    space entry isolations

    The Supply of 4 men to complete QA inspections of all flanged joints completed by all

    contractors.

    The Supply of 16 Men to complete all bolting and machining tasks including:

    Pipe cutting and prepping using cold cut machines

    Machining off welded gaskets and fitting new ones on

    Tensioning all required joints

    Spading and De-spading under BA because of pipelines under nitrogen purge

    Confined space entry

    Complete torque of all standard piping using Hydraulic and pneumatic bolting equipment

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 13 of 23

     

    Queensland Nitrates Plant (QNP) 1 

    Queensland Nitrates Plant (QNP) 2

    Queensland Nitrates Plant (QNP) 3 

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 14 of 23

     

    RTA Yarwun - Digestion Shutdown Units 1 - 4 (2016, 2017, 2018)

    Location – Gladstone, QLD Principal Contractor ‐ MHPS  

    PROJEM’S SCOPE – Between 8 – 10 Technicians 

    To provide Technicians, Tensioning & Torqueing Equipment every year: 

    Unbolting & Bolting of Pipe Work.

    Technical Support in the form of Fitters/Machinist

    Flange facing repairs including Ring Groove Machining.

    Workshop machining Orifice Plates.

    Manufacture & Supply Isolation Orifice Plates

    Supervision of principal contractors Plant Services

    Technicians.

    De-tension studs on all high-pressure vessels and associated

    pipework.

    Assist with QA on Flange Faces and re-machine if required.

    Assist with assembly and Torque or Tension of all joints.

    Completed with leak free Start Up

    Rio Tinto Aluminium Refinery ‐ Yarwun 2

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 15 of 23

     

    Windsor TRS Upgrade – Gas supply to the greater Sydney region (2017)

    Location – Sydney, NSW Principal Contractor ‐ Jemena 

    PROJEM’S SCOPE ‐ To upgrade the Windsor Trunk Receiving Station’s capacity to meet 

    the forecasted 2023 load of 13,000 scmh @ 3700kPag minimum inlet pressure: 

    Supply all fabricated pipe spools

    All lifting and rigging projects

    Remove all existing pipework and install new pipework.

    Install all new small-bore pipework (Tubing)

    Complete all structural requirements

    Commission each Run (2 of)

     

              

    Windsor TRS Upgrade 1

    Windsor TRS Upgrade 2 

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 16 of 23

     

    Hot Tapping 1

    Hot Tap Rail Tankers (January 2016)

    Location – Julia Creek, QLD Principal Contractor – Incitec Pivot 

    PROJEM’S SCOPE ‐ Supply Equipment and Labor to complete 4” Hot Tap on 18 Railway Tankers 

    Modify new valves to allow for acid service.

    Design & Manufacture a Hot Tap machine to suit the capability of drilling into Vessels while under Nitrogen purge including installing a ball valve to assist with purge for welding.

    Develop JHA’s & Risk assessments to mitigate the risks associated with drilling into the pressurized vessel that may contain traces of Hydrogen vapor.

    Mobilize to site & performed trial run for all interested parties and confirm risk assessments.

    Drill & tap to suit ¼” BSP hole with small hot tap machine under Nitrogen purge, continue gas monitoring until satisfactory LEL (Lower Explosive Limit) is achieved.

    Prep area to weld 4” stab onto vessel while continuing purging.

    Set up & cut 4” Hot Tap hole with T101 Hot Tap Machine whilst still purging.

    Remove machine and hand to customer for decanting.

     

    Hot Tapping 2

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 17 of 23

     

    Jemena – Moura Meter Station (October 2015)

    Location – Moura, QLD Principal Contractor – Jemena 

    PROJEM’S SCOPE ‐ Supply Equipment and Labor for Installation of New Gas Pipeline 

    Engage Piping contractor – To Fabricate and Supply Pipework.

    Removal of redundant pipework

    Perform Standard Flange Management Tasks – Machining of Flanges as required including

    insulated gasket faces.

    Install all new pipework.

    Perform leak test on completion of installation of new pipework.

    Sign off & hand over completed project to Client.

    Moura Meter Station 1

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 18 of 23

     

    APA Pipeline (May 2015)

    Location – Wallumbilla, QLD Principal Contractor – Energy Works 

    PROJEM’S SCOPE ‐ Installation of Pipework for APA. This consisted of removal of NRV at four pigging/pig launcher stations between Wallumbilla Compressor Station through to Ballera. This was to allow for Flow Reversal on the main 18” 900lb gas line. 

    Installation of Pup Spools

    Flange Management i.e. Bolting

    Machine flanges as required

    Re-energize pipeline and assist with leak test. Bechtel PJET (December 2013/2014)

    Location – Gladstone, QLD Principal Contractor – Bechtel Australia Pty Ltd 

    PROJEM’S SCOPE – 8 Technicians Full Time 

    Supply of Equipment and Technicians to reface damaged flanges before they were sent to the gas projects for Santos, APLNG and QCLNG  

    Machining Blinds up to 2mtrs in diameter to achieve ASME standard raised face finish.

    Machining special seals in batches of 100 to suit high pressure valves for the three LNG Projects.

    Flange facing of damaged faces as required workshop/onsite up to 1800mm diameter, both raised face and ring type joint flanges

     Ring Type Joint 14” 1500#                                                      Raised Face Flange 42” 900#

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 19 of 23

     

    GLNG Upstream Project Injune (February to August 2014)

    Location – Injune, QLD Principal Contractor – CDJV (Clough Downer Joint Venture) 

    PROJEM’S SCOPE – 20 Technicians over 7 Months 

    Supply of equipment and technicians to complete Flange Management and bolting on the GLNG Upstream project. We were involved from well pads to transmission to Gladstone, including PCS‐01, Hub 4 and Hub. All Projem joints were 100% leak free during purge testing: 

    Inspection of flange faces to meet ASME standard

    Development of flange management register for QA

    Flange facing of damaged faces as required onsite up to 1200mm diameter

    Tensioning of joints with studs sizes up to 3.1/2”

    Torqueing of joints using pneumatic and hydraulic equipment up to 25,443Nm

    Pipe cutting to site fit and repair defect welds up to 1200mm diameter

    Coordination of hydro testing

    Drilling and tapping blind flanges

    Project manage schedule and completions

    GLNG Upstream Injune 1

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 20 of 23

     

    Santos CSG Compressor Station (July – December 2013

    Location – Fairview, QLD Principal Contractor – CDJV (Clough Downer Joint Venture) 

    PROJEM’S SCOPE – 6 Technicians for 5 Months 

    Cutting and machining weld preparations on heavy wall pipe for fabrication workshop delivering pipe spools to the Santos CSG compressor stations at Fairview: 

    Use of clamshell machines to suit range from 200NB to 1200NB with wall thickness of up to 50mm.

    Approximately 760 pipes cut and beveled

     

    Clamshell Cutting 1

    Clamshell Cutting 2

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 21 of 23

     

    Rio Tinto Yarwun 2 Project (April to June 2012)

    Location – Gladstone, QLD Principal Contractor – Bechtel Australia Pty Ltd 

    PROJEM’S SCOPE – 2 Supervisors for 6 Weeks 

    Assist Bechtel with the commissioning of 8 x area 330 filters as part of RTA Yarwun 2 project. Asses defects on filters and rectify as required. Design and manufacture new bolts and conical washers to apply even load on warped flanges. Install and test various seal designs on lids by hydrostatic testing. Provide detailed procedure and pricing to machine Dia. 4500mm flanges to rectify defects: 

    Use of large torque equipment to break over-tightened lid bolts

    Use of Mag base drill to bore clearance on bolt holes in lid.

    Design and manufacture new bolts and conical washers

    Use of correct guns to torque bolts and torque to correct load

    Hydrostatic testing of pressure vessel Rio Tinto Yarwun 2 Project – Area 210 Disc Filters (December 2011 – March 2012)

    Location – Gladstone, QLD Principal Contractor – Bechtel Australia Pty Ltd 

    PROJEM’S SCOPE – 2 Supervisors, 16 Technicians for 4 Months 

    Area 210 disc filter sectors installed as part of RTA Yarwun 2 project were found to be over size by 0.03mm on the journals that had to fit into the outlet bore (BSI) Our task was to develop a procedure for repairs and custom build machines to complete work on and off site. Total number of filter sectors 6,660:  

    Manufacture test gauges to check tolerances

    Design and manufacture chamfer tool using pneumatic die grinder

    Design and manufacture of a machine to linish each of 6,660 filter sectors

    Asses and repair alignment issues with control heads, gearboxes and bearings.

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 22 of 23

     

     Projem Custom Built ‐ Linishing Machine

  •  

     DOCUMENT NUMBER: DOCUMENT TITLE: REVISION: STATUS: PAGE:

    2.03.6 COMPANY PROFILE 5 APPROVED Page 23 of 23

     

      Professional References   

    Tom King

    Shut down Superintendent

    Rio Tinto

    M. 0438 588 644

    E. [email protected]

    Luke Walker

    Purchasing Manager

    APLNG Project Bechtel

    Phone: +1 281 686 8332

    Alex Ross

    Technology and Innovation

    Rio Tinto

    M. 0409 726 803

    Rod Burge

    Rotating Equipment - Superintendent

    Rio Tinto Yarwun

    M. 0429 568 376

    Lawrie McIntosh

    Superintendent

    Clough Downer (PCS01 Santos)

    M. 0439 955 035