Request for Statement of Interest (SOI) Kane County Division of Transportation (KDOT)
2022 Structure Inspections Sec. 21-00541-00-BR
The Kane County Division of Transportation is in need of professional services from a qualified engineering
firm to conduct NBIS inspections of county and township structures in 2022. The work will also include
load rating and various structural on-call services.
This work will begin in early 2022, with a duration of approximately twelve months. At the County’s
discretion, the County may pursue a 2023 inspection contract and 2024 inspection contract, without again
advertising the work.
The 2–page Statement of Interest document shall be submitted electronically via KDOT QBS no later
than 4:00 pm on September 10, 2021. If you plan to enter into a joint venture with another firm for this
project please note this on your Statement of Interest, including the name of the firm you are entering
into a joint venture with for this project. The Short-listed firms will be posted on our Consultant Selection
Summary Table website at http://kdot.countyofkane.org/Pages/SOI-Summary.aspx .
Any new firm interested in doing work with the Kane County in regards to this or any other future
professional service, must first submit their Prequalification Document to Kane County by following the
instructions found at http://kdot.countyofkane.org/Shared%20Documents/QBS.pdf. The
prequalification document will be reviewed and approved in a short period of time if the appropriate
documentation was provided. Each firm must first be prequalified in order to electronically submit their
Statement of Interest via KDOT QBS no later than the deadline described above.
More information regarding the Qualifications Based Selection process may be found at
http://kdot.countyofkane.org/Shared%20Documents/QBS.pdf.
Firms interested in providing services to Kane County are hereby notified of the Kane County’s Ethics
Ordinance No. 10-206, in particular, Section 10, page 15. Only the firm that is ultimately selected for these
professional services will be required to provide the Ethic Ordinance information directly to the Kane
County Division of Transportation as part of the consultant services agreement. The complete Ethics
Ordinance No. 10-206 document is available online at the following link Kane County Ethics Ordinance.
A Statement of Interest (SOI) received after the above noted deadline will not be used as part of our
consultant selection process.
![Page 2: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/2.jpg)
PRELIMINARY SCOPE OF SERVICES
2022 STRUCTURE INSPECTIONS
A. History
The Surface Transportation Assistance Act of 1978 required that all public bridges over 20 feet in length
be inspected and inventoried in accordance with the National Bridge Inspection Standards by December
31, 1980. In October 1988, NBIS was modified to require special inspections of fracture critical details and
underwater features of bridges. Since then, changes have been made to address increased focus on scour
inspections, timely reporting, inspector qualification, and other issues. Qualified personnel must typically
inspect bridges every two years and have their findings submitted to IDOT for inclusion in the state and
national databases.
B. Qualifications
The Consultant shall provide personnel qualified to perform the bridge inspections. An IDOT approved
Team Leader shall supervise, in the field, all inspection activities.
The Consultant shall also supply an IDOT approved staff member to act as Program Manager for all
inspections.
The Consultant shall also provide, on an as needed basis, a structural engineer registered in the State of
Illinois to review any bridges that are determined to be structurally deficient.
The Consultant shall provide the specific qualifications for all members on the inspection team, and for all
related work.
C. Scope of Work
The Consultant shall inspect all structures necessary, in accordance with the National Bridge Inspection
Standards and the Illinois Department of Transportation Structure Information and Procedure Manual.
The Consultant shall submit the following to the County for each major structure inspected:
1) IDOT Bridge Inspection Report, BBS-RIR
2) Bridge Inspection Report Narrative (in a format similar to the attached).
In addition, the consultant will provide a detailed cost estimate for each structure that includes the costs
of all repairs mentioned in the report’s recommendations.
![Page 3: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/3.jpg)
The Consultant shall also provide a plan of access for inspection of the bridges. It is anticipated that
specialized equipment such as snooper trucks or rigging may be required to allow the inspector to closely
examine the bridge elements. Generally, the inspector must be within arm’s reach to adequately inspect
a bridge element. Safety of the inspector is of extreme importance to the County and is the responsibility
of the Consultant. The Consultant is solely responsible for the safety practices and methods used to
perform any and all inspections.
The consultant shall coordinate all inspections over railroads with the appropriate railroad. Any costs for
licenses and permits shall be included in this work.
The consultant will provide on-call design services, review services, and inspection services to be billed
against the on-call item in the contract.
The consultant will assist in any other needs as defined by the county to comply with the requirements of
NBIS.
D. Schedule
The notice to proceed will be issued on approximately January 1, 2022.
CONTACT INFORMATION
Any questions regarding the requested services or the Qualifications Based Selection Process should be
directed to Michael Zakosek, P.E., Chief of Design, by email at [email protected].
![Page 4: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/4.jpg)
Bridge Inspection Report
STRUCTURE NO. 045-3001
West County Line Road (CH 1) over Young’s Creek
Prepared For
Kane County Division of Transportation
INSPECTION TYPE: In-Depth DATE: January 22, 2020
Hampton, Lenzini and Renwick, Inc. Civil Engineering • Structural Engineering • Environmental Services • Land Surveying www.hlrengineering.com
![Page 5: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/5.jpg)
Bridge Inspection Report for SN 045-3001; January 22, 2020
2
I. ADMINISTRATIVE DATA
Region / District: 1 / 1 County: Kane Feature Carried: West County Line Road (CH 1) Feature Crossed: Young’s Creek Latitude / Longitude: 41.8545°N, 88.6019°W Inspection Team: Scott Shoup, Joshua Burdin Weather: 25° F, Cloudy
II. ROADWAY/STRUCTURE DATA
ADT (current): 2,500 (2018 – IDOT Master Structure Report) ADTT (current): 8% (2018 – IDOT Master Structure Report) Inventory Rating Factor: 0.75 IDOT 2016 (LFR) Inventory Rating Factor: 0.79 HLR 2018 (LFR) Operating Rating Factor: 1.26 IDOT 2016 (LFR) Operating Rating Factor: 1.32 HLR 2018 (LFR) Functional Classification: 6 – Minor Collector Existing Clear Width: 40’-0” CONSTRUCTION / RECONSTRUCTION / REPAIR HISTORY Year Constructed: 1931 – Two simple span concrete slab bridge (Unknown
Design Live Load) Year(s) Reconstructed: 1981 – Superstructure replacement on widened abutments
and conversion from two span to single span PPCDB structure, with PC channel beam spans on approach shoulders (HS 20 Design Live Load)
Year(s) Rehabilitated: 2005 – Installed PCC Pavement between shoulders in approach span, reinforced concrete (RC) wearing surface, guardrail improvements, and substructure repairs
STRUCTURE DESCRIPTION Type: PPC Deck Beams (10 – 17”x 48”) with Precast Concrete
Channel Beam (4 – 18”x45”) approach spans and 4” RC concrete wearing surface
Span Arrangement: 36’-1” Single Span/ 2 Appr. Span Shoulders: 17’-0⅛”, 17’-0⅛” Structure Length: 39’-11” back-to-back of abutments, 74’-10 1/4” back-to-back
approach spans Deck Width: 40’-0” out-to-out of deck and face-to-face rail
Skew: 42°35’ Right Forward
Abutments: Closed reinforced concrete abutments on untreated timber pile supported spread footings
![Page 6: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/6.jpg)
Bridge Inspection Report for SN 045-3001; January 22, 2020
3
INSPECTION HISTORY (NBIS Ratings) Year Deck Super Sub 2020 6 6 6 2018 6 6 6 2016 6 6 6
III. INSPECTION PROCEDURES This In-Depth inspection was performed by a certified NBIS Team Leader and reviewed by a Structural Engineer / NBIS Program Manager. The structure was observed for new and additional deterioration since the previous inspection. A Routine Inspection Report (BBS-BIR) was completed and submitted to IDOT.
IV. STRUCTURE CONDITION FINDINGS
APPROACH ROADWAY The HMA approach roadway is in satisfactory condition (Photos 3 and 4).
There are longitudinal and transverse cracks, some of which have been sealed, throughout the approach roadways.
APPROACH SPANS The Portland cement concrete pavement (8”) and precast concrete channel beam shoulders have a 4” reinforced concrete overlay. The approach spans are in satisfactory condition (Photos 5 and 6).
There are longitudinal cracks in both approach span pavements and a 1’x2’ spall in the south approach span pavement.
BRIDGE RAILING The Type S-1 side mounted steel bridge railing is in good condition (Photo 7).
There are no notable deficiencies in the bridge railing.
The bridge railing does not meet current IDOT requirements for height. Given the ADT and operating speed, a higher performance bridge rail may be considered.
DECK / SUPERSTRUCTURE Wearing Surface The 4” reinforced concrete wearing surface is in satisfactory condition (Photo 8).
There are multiple full length longitudinal cracks in the wearing surface (Photo 9).
There are two 1’x1’ spalls with exposed reinforcement in the wearing surface (Photo 10).
Beams The PPC deck beams are in satisfactory condition (Photos 11 and 12).
A majority of the keyway joints have water leakage with efflorescence (Photo 13).
There is an 18”x6” spall with exposed reinforcement on Beam 9 near the north abutment (Photo 14).
![Page 7: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/7.jpg)
Bridge Inspection Report for SN 045-3001; January 22, 2020
4
SUBSTRUCTURE The substructure is in satisfactory condition (Photos 15 and 16).
Abutments
The abutments have some vertical hairline cracks with efflorescence and map cracking at the west end of the south abutment (Photo 17).
There is a 2’x2’ spall on the back of the south abutment cap near the east end (Photo 18).
Wingwalls
The wingwalls are sound with no notable deficiencies.
SCOUR
Scour was evaluated in 1996 by Rational Analysis and found to be “8 – Stable for Scour”.
There is a 1’ deep scour hole at the east end of the south abutment; the footing is not exposed.
CHANNEL CONDITION The channel is in very good condition (Photos 19 and 20).
Slope Protection
The channel banks are moderately sloped and well vegetated.
WATERWAY ADEQUACY
The chance of overtopping the approach roadway is remote.
TRAFFIC SAFETY Pavement markings are present and visible.
Guardrail
The approach guardrails are in good condition.
The Traffic Barrier Terminals Type 5A, Steel Plate Beam Guardrail Type A, and Traffic Barrier Terminals Type 1 (Special) Tangent meet current IDOT standards.
There is impact damage at the southeast approach rail.
Signage / Posting
Terminal end markers are present on the end terminals.
GEOMETRY / UTILITIES
The structure is located on a tangent horizontal alignment and a relatively level vertical profile grade from south to north.
No utilities are attached to the structure.
![Page 8: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/8.jpg)
Bridge Inspection Report for SN 045-3001; January 22, 2020
5
STRUCTURE RATING The condition of the structure is still reflected by the load rating performed in 2018 by HLR.
The load rating information is shown below. No changes have been made.
The load rating results for the HS20 load are as follows:
o Inventory Rating Factor (IDOT 2016): 0.75
o Inventory Rating Factor (HLR 2018): 0.79
o Operating Rating Factor (IDOT 2016): 1.26
o Operating Rating Factor (HLR 2018): 1.32
The structure is adequate for legal loads and IDOT routine permit loads.
The Kane County Standard special permitted vehicles KC-1, KC-2, and KC-3 have restricted gross vehicle weights. The rating factors and permitted gross vehicle weights are listed in the table below.
Permit Vehicle GVW (lbs) Rating Factor Permitted GVW (lbs)
KC-1 170,000 0.83 141,100
KC-2 165,000 0.83 136,900
KC-3 140,000 0.84 117,600
KC-4 115,000 1.07 115,000
V. CONCLUSIONS AND RECOMMENDATIONS
CONCLUSIONS
The bridge was originally constructed in 1931 and reconstructed in 1981, removing the pier and thereby converting the structure from a two-span structure to a single span structure, replacing the superstructure with PPC deck beams on widened abutments, and installing PC channel beams on the shoulders of the approaches. In 2005, the bridge was rehabilitated by constructing a reinforced concrete wearing surface, PCC pavement approaches between the channel beams, guardrail improvements, and substructure repairs. The structure is in overall satisfactory condition. No notable change was observed since the previous inspection. There is one small spall with exposed reinforcement on Beam 9 of the PPC deck beams. The top of the approach spans and bridge concrete wearing surface have multiple longitudinal cracks and a few areas of spalls with exposed reinforcement. This is allowing water infiltration through the shear keyways, causing deterioration of the joints. This will lead to the joint failure and cause the beams to deteriorate and lose load carrying capacity. It is recommended to repair the spalled areas, and seal the concrete wearing surface and approaches to extend the life of the superstructure. The substructure has some deficiencies, including vertical cracking, map cracking, and 1 spall on the back of the abutment cap. Sealing the wearing surface will help limit water infiltration to the abutments, which will slow the deterioration and prolong the life of the substructure. A 1’ scour hole was observed at the east end of the south abutment with no exposed footing. No scour countermeasures are required at this time. The scour progression should be monitored as part of future inspections.
![Page 9: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/9.jpg)
Bridge Inspection Report for SN 045-3001; January 22, 2020
6
RECOMMENDATIONS
Short Term (1-3 Years)
Perform deck slab repairs (partial depth) repairs to the concrete wearing surface.
Apply concrete sealer to the concrete wearing surface and approach spans. Long Term (4-8 Years)
Recommend full structure replacement due to the age, condition and potential for a load posting in the near term due to continued PPC beam deterioration. The existing abutments will not be suitable for rehabilitation due to the footings being supported by timber piles.
ATTACHMENTS
Attachment A. Routine Inspection Report (BBS-BIR) Attachment B. IDOT Master Structure Report Attachment C. Structure Sketches Attachment D. Structure Photos Attachment E. Cost Estimates Attachment F. Structure Load Rating Summary (SLRS)
![Page 10: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/10.jpg)
Attachment A
![Page 11: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/11.jpg)
Attachment A
![Page 12: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/12.jpg)
Illinois Department of Transportation
Structures Information Management System
Master Structure Report (S-107)
Date: 2/14/2020
Structure Number: 045-3001 District: 1
Page 1
Inventory Data
Facility Carried: W. COUNTY LINE RD
Feature Crossed: YOUNG'S CREEK
Bridge Remarks:
Bridge Status: 1
Status Remarks:
Maint County: 045
Maint Responsibility: 03
Service On/Under: 1 5
Bridge Name:
Location: 3.5 MI S MAPLE PARK
StatusDate: 4/1/1988
KANE
OPEN - NO RESTRICT
COUNTY
/HIGHWAY WATERWAY
Reporting Agency: 3 COUNTY
Main Span Matl/Type: 5 PRESTRESS CONCRETE 05 BOX BEAM OR GIRDER-MULTIPLE/
Maint Township: 11 KANEVILLE
Nbr Of Main Spans: 1 Nbr Of Approach Spans: 2
***Approaches***
Near #1 Matl/Type: A
Near #2 Matl/Type:
Far #1 Matl/Type:
Far #2 Matl/Type:
A
PRECAST CONCRETE/NOT PRESTR / 29 CHANNEL BEAM
/
PRECAST CONCRETE/NOT PRESTR / 29 CHANNEL BEAM
/
Median Width/Type: 0 Ft. 0/ None
Guardrail Type L/R: 0 None 0 None/
Toll Facility Indicator: 0 No Toll
Latitude: 41.85453893 Longitude: 88.60188625
Structure Length: 39.9
AASHTO Bridge Length: 34.5
Length of Long Span: 36.0
Bridge Roadway Width: 40.0
Appr Roadway Width: 30.0
Deck Width: 42.2
Deck Structure Type: E PCAST PRES CN DK BM Deck Structure Thickness: 17.0
Sufficiency Rating: 91.9
No
Replaced By:
Replaces:
Last Update Date: 07/05/2012
HBP Eligible:
Parallel Structure: None
Multi-Level Structure Nbr:
Skew Direction: Right
42 DSkew Angle:
Structure Flared: No
NoHistorical Significance:
Border Bridge State:
Bdr State SN:
Bdr State % Responsibility: 0
Structural Steel Wt: 0
Rated By: 3 Rate Method: 6Consultant LOAD FACTOR (LF) REP
Inventory Rating: 0.750
Operating Rating: 1.260
(27)
(45)
Design Load: 02 HS20
Load Rating Date: 05/12/2016
Sidewalk Width Right: 0.0
Sidewalk Width Left: 0.0
Sidewalks Under Structure: 0
Key Route On Data
None
Navigation Vert Clear: 0
Navigation Horiz Clear: 0
Navigation Control: 0 No
Culvert Fill Depth: 0.0
Number Culvert Cells: 0
Culvert Cell Width: 0.00
Culvert Cell Height: 0.00
Culvert Opening Area: 0.0
0 Ft 0 In
Crossing 1 Nbr:
RR Lateral Underclear: 0.0
RR Vertical Underclear:
Crossing 1 Nbr:
***Railroad Crossing Info***
Functional Class: 6
2500Curr AADT Yr/Count: 2018
Est Truck Percentage: 8
Number Of Lanes: 2
One Or Two Way: 2
Horizontal: 40.0 0.0
Min Vertical: 99 00
41
1
1
Designated Truck Rte: NONE
Bypass Length: 3
Urban Area: None
Natl. Hwy System: Not on NHS
*** Marked Route On Data ***Designation
** CLEARANCES ** South/East North/West
Key Route Nbr: COUNTY HIGHWAY
Two-Way
0001
Segment:Main RouteAppurtenances 00000
MINOR COLLECTOR
Station: 1.7200
Inventory County: 045
Township/Road Dist 11
574Future AADT Yr/Cnt: 2032
KANE
Special Systems: No
11Ft
In
00Ft
In
KANEVILLE
Linked: Y
Inventory Direction:Municipality 0000
Max Rdwy Width: 40.0
10 Ft Vertical: 99 0011Ft
In
00Ft
In
/
/
Mainline
Mainline
Mainline
FAS, CH, or TR's Unmarked
Key Route Under Data
Curr AADT Yr/Count:
Est Truck Percentage:
Number Of Lanes:
One Or Two Way:
Designated Truck Rte:
Bypass Length:
Natl. Hwy System:
Segment:
Station:
Future AADT Yr/Cnt:
Special Systems:
Linked:
Inventory Direction:
/
/
South/East North/West
Ft
In
Ft
InFt
In
Ft
In
Lateral: Ft Ft
Kind Number
Route #1:
Route #2:
Route #3:
*** Marked Route Under Data ***Designation Kind Number
% %
Substructure Material: 5N
FO: NSD: N
Attachment B
![Page 13: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/13.jpg)
Illinois Department of Transportation
Structures Information Management System
Master Structure Report (S-107)
Date: 2/14/2020
Structure Number: 045-3001 District: 1
Page 2
Data Related to Inspection Information
***Inspection Intervals ***
Routine NBIS: 24
Fracture Critical: 0
Underwater: 0
Special: N
MOS
MOS
MOS
Bridge Posting Level:
5 No Posting RequiredOne Truck At A Time: 0
Single Unit Vehicles:
Combination Type 3S-1:
Combination Type 3S-2:
*** Maximum Allowable Posting Limits ***
Tons
Tons
Tons
Inspection/Appraisal Information
SATISFACTORY CONDITION - MINOR DETERIORATION
Inspection Date: 01/22/2020
Deck: 6
Structural Evaluation: 6
Deck Geometry: 6
Superstructure: 6
Underclearance-Vert/Lat.: N
Substructure: 6
Channel and Protection: 7
Waterway Adequacy: 8
Culvert: N
Approach Roadway Align: 8
SATISFACTORY CONDITION - MINOR DETERIORATION
SATISFACTORY CONDITION - MINOR DETERIORATION
GOOD CONDITION - SOME MINOR PROBLEMS
NOT APPLICABLE
EQUAL TO PRESENT DESIRABLE CRITERIA
EQUAL TO PRESENT MINIMUM CRITERIA
EQUAL TO PRESENT MINIMUM CRITERIA
NOT APPLICABLE
EQUAL TO PRESENT DESIRABLE CRITERIA
Pier Navig Protection: N N/A
Inspection Temperature: 25 Deg. F
One Truck At A Time: 0
Single Unit Vehicles:
Combination Type 3S-1:
Combination Type 3S-2:
** Actual Posted Limits **
Tons
Tons
Tons
Utilities Attached: N N/A
N/A
N/A
N
N
Deck Wearing Surf: R
Total Deck Thick: 22.0
Last Paint Date:
Insp by (Name): JOSH BURDIN
F NONE
A EPOXY COATED REINF
Inspection Remarks:
Item 58 -Two 1'x1' spall with exposed rebar on deck. 1'x2' spall on south appro ach span deck. Item 36A -Rusting with minor hole on east railing, appears to be old name plate location. Item 36C -Impact damage at SE guardrail.
Deck Membrane:
Deck Protection:
Underwater Inspection/Appraisal Information
Inspection Date:
Appraisal Rating:Inspected By:
Inspection Method:
Temperature:
Inspection Remarks:
Scour Critical Information
09/28/1996
8 B
FOUAD ALSABBAGHAnalysis Date:
Rating: Evaluation Method:
Analysis By:
CALCULATED SCOUR ABOVE FOOTING Rational Analysis Fracture Critical Members:
Microfilm Data Recorded:
No
No
Miscellaneous
Meets Standards
Acceptable Acceptable Acceptable
Bridge Railing Appraisal: 3
Approach Guardrail: 333
Insp by (Name): Shoup, Scott
Inspected By:
Last Paint Type:
1931
FAS 97
80-00080-01-BR
129+89.9
00000000000000
3
1981
FAS 97
80-00080-01-BR
129+89.9
00000000000000
0
Construction Information
Year: Original Reconstructed
Route:
Section Nbr:
Contract Nbr:
Fed Aid Pr #:
Built By:
Sta: Sta:
COUNTY AGENCY UNKNOWN
Proposed Improvement
Bridge Cost:
Total Project Cost:
*** Costs in Dollars ***
Roadway Cost:
Cost Estimate Year:
Type of Work:
Done By:
Length:
Remarks:
Attachment B
![Page 14: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/14.jpg)
N
N
LOCATION SKETCH
045-3001
3rd. P.M.
R. 5 E.,
3rd. P.M.
R. 6 E.,
(Looking North)
2-18''x45'' PCB
(Typ.)
3'-9''
4'' Reinforced Concrete Wearing Surface
10-17''x48'' PPC Deck Beams = 40'-0''
2'-
1''
Wearing Surface
4'' Reinforced Concrete
40'-0'' Face to Face of Rails and Out to Out of Deck
TBT, TY. 5A, Typ.
Top/Water
(Looking West)
PLAN
(Typ.)
Concrete Channel Beams
2 Approach Precast
(Typ.) Wingwall
Original
¡ of Structure
¡ Roadway
42°35'
24'-
0'' Road
way
crack on Wingwall
'' Diagonal211
/ft.''41 /ft.''4
1
39'-11'' bk.-bk. Abutments
Rebuilt Cap (Typ.)
Back of
N. Abut.
Back of
S. Abut.
1' Deep
Scour
GENERAL PLAN AND ELEVATION
SHEET 1 OF 3
Steel Railing
Type S-1, Typ.
Steel Railing
Type S-1, Typ.
40'-0'' Face to Face of Rails and Out to Out of Deck
7'-6'' 7'-6''
2-18''x45'' PCB25'-0''
PCC Pav't, 8''
SECTION THRU APPROACH SPAN
TYPICAL DECK CROSS SECTION SPAN
Steel Railing
Type S-1, Typ.
''8517'-5''8
517'-5Bk. Appr. Cap Bk. Appr. Cap
'' Total Length4174'-10
40'-
0'' o.-
o.
deck
Back of
Appr. cap
Back of
Appr. cap
(Looking North)
ELEVATION
1'x2' SP
1'x1' SP, RF
Flo
w
Flo
w
T.
39
N.
Structure No.
A B C D
1 2 3 4 5 6 7 1098
Approach cap, (Typ.)
'' fc.-fc. Abutments4334'-5
Original Concrete
Footing (Typ.) Untreated Timber
Piles (Typ.)
TBT, TY 5A, SPBGR
Tangent (Typ.)
TBT, TY 1 (Spl.)
P:\aaa KANE CO INSPECTION\BRIDGE INVENTORY\045-3001 (C) County Line-Young's Crk\CAD\3001-sht-bridge.dgn
LEGEND
Crack
Scour Pocket
Spalls
Delamination
Water Leakage
Efflorescence
Shear Stirrup
WL =
EF =
SS =
Spall
Rust Staining
Repair
Reinforcement
Prestressed Strand
Plugged Drain Hole
Leaching
Delamination
Crack - Closed
Crack - Open
SP =
RS =
RP =
RF =
PS =
PD =
LE =
DL =
CC =
CO =
PROJECT 20.0001.180
Hampton, Lenzini and Renwick, Inc.
Land Surveyors . Environmental Services
Civil Engineers . Structural Engineers
DRAWN BY: RDH
CHECKED BY: JKK 06 / 25 / 2020
DATE:
SHEET 1 OF 3 WOODRIDGE . MT CARMEL
ELGIN . SPRINGFIELD
SN 045-3001
KANE COUNTY
OVER YOUNG'S CREEK
WEST COUNTY LINE ROAD / C.H. 1
Attachment C
![Page 15: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/15.jpg)
N
UNDERSIDE OF DECK PLAN
2
3
4
5
6
7
8
9
10
Approach Precast Concrete
Channel beam (Typ.)
1'x6'' SP, RF
Wet full length
Spots EF
UNDERSIDE OF DECK
SHEET 2 OF 3
EF spots full length (Typ.)
1
P:\aaa KANE CO INSPECTION\BRIDGE INVENTORY\045-3001 (C) County Line-Young's Crk\CAD\3001-sht-bridge.dgn
LEGEND
Crack
Scour Pocket
Spalls
Delamination
Water Leakage
Efflorescence
Shear Stirrup
WL =
EF =
SS =
Spall
Rust Staining
Repair
Reinforcement
Prestressed Strand
Plugged Drain Hole
Leaching
Delamination
Crack - Closed
Crack - Open
SP =
RS =
RP =
RF =
PS =
PD =
LE =
DL =
CC =
CO =
PROJECT 20.0001.180
Hampton, Lenzini and Renwick, Inc.
Land Surveyors . Environmental Services
Civil Engineers . Structural Engineers
DRAWN BY: RDH
CHECKED BY: JKK 06 / 25 / 2020
DATE:
SHEET 1 OF 3 WOODRIDGE . MT CARMEL
ELGIN . SPRINGFIELD
SN 045-3001
KANE COUNTY
OVER YOUNG'S CREEK
WEST COUNTY LINE ROAD / C.H. 1
Attachment C
![Page 16: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/16.jpg)
SOUTH ABUTMENT ELEVATION
NORTH ABUTMENT ELEVATION
RS
EF
Map Cracking,
CO
ABUTMENTS
SHEET 3 OF 3
P:\aaa KANE CO INSPECTION\BRIDGE INVENTORY\045-3001 (C) County Line-Young's Crk\CAD\3001-sht-bridge.dgn
LEGEND
Crack
Scour Pocket
Spalls
Delamination
Water Leakage
Efflorescence
Shear Stirrup
WL =
EF =
SS =
Spall
Rust Staining
Repair
Reinforcement
Prestressed Strand
Plugged Drain Hole
Leaching
Delamination
Crack - Closed
Crack - Open
SP =
RS =
RP =
RF =
PS =
PD =
LE =
DL =
CC =
CO =
PROJECT 20.0001.180
Hampton, Lenzini and Renwick, Inc.
Land Surveyors . Environmental Services
Civil Engineers . Structural Engineers
DRAWN BY: RDH
CHECKED BY: JKK 06 / 25 / 2020
DATE:
SHEET 1 OF 3 WOODRIDGE . MT CARMEL
ELGIN . SPRINGFIELD
SN 045-3001
KANE COUNTY
OVER YOUNG'S CREEK
WEST COUNTY LINE ROAD / C.H. 1
Attachment C
![Page 17: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/17.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 1 – West Elevation
Photo 2 – East Elevation
![Page 18: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/18.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 3 – South Approach, Looking South
Photo 4 – North Approach, Looking North
![Page 19: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/19.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 5 – Top of South Approach Span, Looking West
Photo 6 – Top of North Approach Span, Looking East
![Page 20: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/20.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 7 – East Bridge Rail, Looking Southeast
Photo 8 – Top of Wearing Surface, Looking Northwest
![Page 21: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/21.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 9 – Longitudinal Cracks in Wearing Surface, Looking North
Photo 10 – Spalls with Exposed Reinforcement & Cracks in Wearing Surface, Looking West
![Page 22: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/22.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 11 – Underside of PPC Deck Beams, Looking Southeast
Photo 12 – Underside of PPC Deck Beams, Looking Northeast
![Page 23: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/23.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 13 – Water Leakage with Efflorescence from Keyway Joints, Looking South
Photo 14 – Spall with Exposed Reinforcement on Beam 9, Looking North
![Page 24: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/24.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 15 – South Abutment, Looking Southeast
Photo 16 – North Abutment, Looking Northeast
![Page 25: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/25.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 17 – Map Cracking with Efflorescence, West End of South Abutment, Looking South
Photo 18 – Spall on Back of South Abutment Cap, East End, Looking Northwest
![Page 26: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/26.jpg)
Kane County SN 045-3001
January 2020
Attachment D
Photo 19 – Upstream Channel, Looking East
Photo 20 – Downstream Channel, Looking West
![Page 27: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/27.jpg)
KANE COUNTY DIVISION
OF TRANSPORTATION
STRUCTURE 045-3001
WEST COUNTY LINE ROAD OVER
YOUNG'S CREEK
ESTIMATE OF COST - SHORT TERM (1-3 YEARS)
ITEM UNIT
NO. ITEMS UNIT QUANTITY PRICE TOTAL
1 Structural Repair of Concrete (<5") Sq Ft 10 600.00$ 6,000.00$
2 Concrete Sealer Sq Ft 2994 3.00$ 8,982.00$
3 Traffic Control and Protection L Sum 1 10,000.00$ 10,000.00$
SUBTOTAL $24,982.00
6% MOBILIZATION 1,500.00
15% CONTINGENCY 3,750.00
TOTAL ESTIMATE OF COST $30,232.00
Made by: JRB 2/14/2020
Checked by: JKK 3/27/2020
Attachment E
![Page 28: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/28.jpg)
KANE COUNTY DIVISION
OF TRANSPORTATION
STRUCTURE 045-3001
WEST COUNTY LINE ROAD OVER
YOUNGS CREEK
ESTIMATE OF COST - LONG TERM (4-8 YEARS)
3 SPAN RC CONCRETE SLAB, CONCRETE PARAPET
800' OF ROADWAY IMPROVEMENT
ITEM UNIT
NO. ITEMS UNIT QUANTITY PRICE TOTAL
1 ROADWORK L. SUM 1 388,385.00$ 388,385.00$
2 REMOVAL OF EXISTING STRUCTURE L. SUM 1 35,000.00$ 35,000.00$
3 PROPOSED STRUCTURE L. SUM 1 1,126,590.00$ 1,126,590.00$
4 TRAFFIC CONTROL AND PROTECTION L. SUM 1 50,000.00$ 50,000.00$
SUBTOTAL $1,599,980.00
3% MOBILIZATION $48,000.00
10% CONTINGENCY $160,000.00
CURRENT TOTAL ESTIMATE OF COST $1,807,980.00
16% ESCALATION $289,280.00
FUTURE TOTAL ESTIMATE OF COST $2,097,260.00
Made by: JKK 4/23/2020
Checked by: JRB 6/4/2020
Attachment E
![Page 29: 2022 Structure Inspections RSOI](https://reader034.vdocuments.us/reader034/viewer/2022050306/626f45f4ccfc5647895aa725/html5/thumbnails/29.jpg)
~ IDinois De rtment ~of Tran~rtation
STRUCTURE LOAD RATING SUMMARY (SLRS) Structure Number (SN): 04S-3001
Rating Type: Rerating Date of Previous Load Rating: S/12/2016
Rating Method: (6) Analytical- LFR r As Built Plans
r Shop Drawings
r Material Testing
P Design/Rehab. Plans
r Field Measurements
r LRI Dated :
Rating Model: (M) Rating Model Exists r Overlay
r One Traffi c Lane used for Opr. RF's r Load Testing ~
I Rating Controlling Comments Factor Force Effect (controlling span, element, location, etc.)
-Max . Allowable
GVW j Vehicle Name
·--VI HS 20 Vl HS20 - -
Q)
0.0 Co c: c: Vi ·;:; Vl 0 ~
0 ~
E 0 u
Q) ..... c: .E ·;:; ::::! .... 0 Q)
a:: ~
i s: E Ql ..... >
IL-PS2-21 IL-PS3-31 IL-PS4-28 IL-PS4-34.7S IL-PSS-36 IL-PS6-3S.7S IL-PS7-39. 7S IL-PC3-31 IL-PC4-41 IL-PCS-41 IL-PDG-40 IL-RS3-34 IL-RS4-38 IL-RCS-SO IL-RC6-60
EV2 (axle) EV3 (tandem)
Remarks:
-
~
----
0.79 lnv. Flexure B9 2sr, Span 1 at SO% 1.32 Opr. Flexure B9 2sr, Span 1 at SO%
1.42 Opr. Flexure B9 2sr, Span 1 at SO% 1.01 Opr. Flexure B9 2sr, Span 1 at SO% 1.33 Opr. Flexure B9 2sr, Span 1 at SO% 0.99 Opr. Flexure B9 2sr, Span 1 at SO% 1.46 Opr. Flexure B9_2sr, Span 1 at 50% 1.15 Opr. Flexure B9 2sr, Span 1 at 50% 1.09 Opr. Flexure B9 2sr, Span 1 at 50% 1.75 Opr. Flexure B9 2sr, Span 1 at 50% 1.13 Opr. Flexure B9 2sr, Span 1 at 50% 1.06 Opr. Flexure B9 2sr, Span 1 at 50% 2.29 Opr. Flexure B9 2sr, Span 1 at 50% 1.00 Opr. Flexure B9 2sr, Span 1 at 50% 1.16 Opr. Flexure B9 2sr, Span 1 at 50% 1.22 Opr. Flexure B9 2sr, Span 1 at 50% 1.06 Opr. Flexure B9 2sr, Span 1 at 50%
1.42 Opr. r------F.,...Ie_x_ur_e_-+_B9~2,-s__,r,'-S_,_p_a_n_1_a_t--,4,..,0_%-,-o ------------1
0.92 Opr. J___:_F.;.:Ie:;;x:.=u.:...:re=--__J..-=B-=-9=2::.:s:;;r!,...;, S::.!p:.:a:;;n:...:1=-=-at:...:5:...:0:..:%-=-o ----- --------l
!Ratings based on Beam 9 with 2 strands removed (previous Collins rating).
Single span 10 -17"x48" PPCDB superstructure with 4" reinforced concrete wearing surface.
Model: AASHTOWare BrR Version= 6.8.2; NBIS Inspection= 2018-01-24; WS = S.O inches.
lSay okay for IL-PS4-34. 7S and no restrictions required.
Special Inspection Interval: Months Inspection Type: Not Required
Remarks: N/A
Commercial/Private Vehicle Posting
Single Unit Vehicle: Combo (3 or 4 Axles) :
Combo (5+ Axles): One Truck at a Time: No Sign R12-1106 or 1107 Bridge Posting Level : (5) No Posting or LL Restriction
Rated By: S. Shoup- HLR Inc.
Si ngle Unit:
34 tons
3 or 4 Axles:
n/a +Axles:
n/a 5
Restrict
Below
LL
I certify that the load rating for the designated structure was done by me or under my direct
supervision, and that the load ratings and posting recommendations were derived in accordance
with the AASHTO Manual for Bridge Evaluation.
Lie. Nbr.:
Lie. Exp .:
Printed 5/11/2018
081-006S29
11/30/2018
) /
rive, Suite 201, Springfield, ll62704