2020 Mid-Year Updates Large Commercial & Industrial Energy Efficiency Program Presented: 7/17/2020 Speakers: Amaury De La Cruz, C&I Program Manager & Yoav Malka, Trade Ally Manager 1

Upload: others

Post on 02-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

2020 Mid-Year Updates Large Commercial & Industrial Energy

Efficiency Program

Presented: 7/17/2020Speakers: Amaury De La Cruz, C&I Program Manager & Yoav Malka, Trade Ally Manager

1

➢ Program Updates

• Bonus Installation Incentives

• Program Manual Updates

• Tool Updates

• Virtual Inspections

• COVID-19 Guidance and Resources

➢ Participating Contractor Updates

• Participating Contractor Portal

• Incentive Navigator Updates

➢ Summary

➢ Q&A

Agenda

2

Program Updates

COVID-19

Guidance &

Resources

Installation

Bonus

Incentives

Program

Manual

Updates

Tool Updates

Virtual

Inspections

3

Tool Updates

Virtual

Inspections

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Installation Bonus

Incentives

➢ Bonus Incentives Overview

• Measures Included

• Eligibility and Deadlines

➢ Sample Projects

• Compare base incentives to bonus installation incentives

Bonus Installation Incentives

4

Tool Updates

Virtual

Inspections

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Installation Bonus

Incentives

Bonus Incentive Overview

• Launched 6/8/2020

• LED Lighting

• Incentives increased by up to 50%

• VFD

• Incentives increased by up to 30%

• Steam Trap Repair

• Cost cap increased from 70% to 85%

• Pipe Insulation

• Cost cap increased from 70% to 85%

View All Incentives

5

Tool Updates

Virtual

Inspections

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Installation Bonus

Incentives

Bonus Incentive FAQs

• Do the bonus incentive apply to projects that were submitted before June 8,

2020?

• Yes, if the project was not completed before June 8th, it is still eligible to receive bonus incentives

as long as the project meets the required deadlines and eligibility requirements.

• What qualifies a project as completed?

• A project is considered complete when the eligible equipment is installed and operational, and the

project is ready for post-inspection by our team. When you complete your project, submit the

completion documents, including the completion certificate and invoices.

• Bonus Incentive FAQs

6

Tool Updates

Virtual

Inspections

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Installation Bonus

Incentives

Deadlines and Eligibility

September 30 November 15 November 30

✓ Must finish

installation and

submit required

completion

documents by

November 15th

✓ Must submit project

application package

by September 30th,

2020

✓ Must pass post

inspection by

November 30th

7

Tool Updates

Virtual

Inspections

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Installation Bonus

Incentives

• LED Lighting

• Fixtures, Retrofit kits, Bi-level lighting, and LPD

• VFD

• New VFDs tied to control system operating at variable frequencies

• Steam Trap Repair

• Space Heating: Low pressure systems with less than 15 (psig) gauge pressure

• Non-Space Heating Systems: Up to 3,000 (psig) gauge pressure

• Pipe Insulation

• Space and Hot Water Heating: Bare pipe with diameter up to 2”

• Domestic Hot Water: Bare pipe with diameter 2-8”

Deadlines and Eligibility

8

$

Scope of Work:

Per FixtureTotalPer Fixture Total

Standard Incentive Standard + Bonus

TOTAL INCENTIVE:

Installation Bonus

Incentives

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

100 LED Parking Garage

Fixture replacing HID ≤100W

100 LED 2x4 Luminaires

replacing Fluorescent Fixtures

100 LED 1x4 Luminaires

replacing Fluorescent Fixtures

$150 $15,000 $20,000$200

$60 $6000 $80 $8000

$100 $10,000 $140 $14,000

$31,000 $42,000

LED Sample Project

9

$

Scope of Work:

Per kWh savedkWh savedPer kWh saved kWh saved

Standard Incentive Standard + Bonus

TOTAL INCENTIVE:

Program

Manual

Updates

Tool Updates

Tool Updates

Installation Bonus

Incentives

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

New VFD installed on a

50HP Supply Fan$0.19 250,000 $0.25 250,000

$47,500 $62,500

VFD Sample Project

10

$

Scope of Work:

Project CostProject

Cost CapProject Cost

Project

Cost Cap

Standard Incentive Standard + Bonus

TOTAL INCENTIVE:

Installation Bonus

Incentives

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Replacing 50 failed steam

traps. 40,000 40,000

$28,000 $34,000

70% 85%

Steam Trap Sample Project

11

$

Scope of Work:

Project CostProject

Cost CapProject Cost

Project

Cost Cap

Standard Incentive Standard + Bonus

TOTAL INCENTIVE:

Installation Bonus

Incentives

Tool Updates

Virtual

Inspections

Program Manual

Updates

COVID-19

Guidance &

Resources

Linear Pipe Insulation

Pipe Insulation Sample Project

50,000 50,000

$35,000 $42,500

70% 85%

12

Tool Updates

Tool Updates

Virtual

Inspections

Installation

Bonus

Incentives

Program Manual

Updates

COVID-19

Guidance &

Resources

Version 1.2

• Updates include:

• NWS Adders Information – Brooklyn and

Queens customers

• Lighting Measures – new categories for 1x4,

2x2 and 2x4 replacements

• New Measure: Boiler Clean & Tune

*Available on our site next week

13

Tool Updates

Tool Updates

Virtual

Inspections

Installation

Bonus

Incentives

Program Manual

Updates

COVID-19

Guidance &

Resources

NWS Adders Incentives

• Applies to certain parts of

Brooklyn and Queens

• New section in our manual

• Includes map of eligible neighborhoods

• Eligible measures receive $2,000 per kW

saved

• Look for “NWS Eligible” in the manual

14

Tool Updates

Tool Updates

Virtual

Inspections

Installation

Bonus

Incentives

Program Manual

Updates

COVID-19

Guidance &

Resources

• New categories for 1x4, 2x2 and 2x4 replacements

Fixture Replacements Retrofit Kits

Program Manual Updates

15

Tool Updates

Tool Updates

Virtual

Inspections

Installation

Bonus

Incentives

Program Manual

Updates

COVID-19

Guidance &

Resources

• New Measure

• Improves boiler efficiency

• Clean burners, combustion chamber and burner nozzles

• Adjust air flow and reduce excessive stack temperatures

• Adjust burner and gas input, check venting, safety controls, and adequacy of combustion air

intake

• Eligible Projects

• For existing gas-fired hot water and steam boilers

• Process loads or Space heating not covered under 40 CFR Part 63 Subpart 6J708.

• Combustion efficiency must be measured before and after tune-up using a flue gas analyzer

Boiler Tune Up Measure

16

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

➢ New Tool: Boiler Clean and Tune-Up Calculator

➢ Electric Measure Tool

➢ Steam Trap Survey Update

➢ Pipe Insulation Survey Update

Tool Updates

17

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

New Tool: Boiler Clean and Tune-Up Calculator

• Launched June 2020

• Easy to use

• Applies to boiler clean and tune measure outlined in the program manual

• Captures your facility information and project costs

• Estimates savings and incentives

18

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

New Tool: Boiler Clean and Tune-Up Calculator

• Guidelines Tab

• Outlines energy savings calculation

(NYS TRM)

• Lists required documents, including:

❑ Photos of boiler nameplate

❑ BMS screenshots

❑ Flue gas test requirements

19

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

New Tool: Boiler Clean and Tune-Up Calculator

• Summary Tab

• Instructions to help you complete the tool

• Captures your project information

• Summarizes estimated incentive and savings

• Required fields highlighted in orange:

• Facility Name

• Facility Address

• Facility Rep Name

• Building Type

• HVAC System Type

• Tune Up Cost

20

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

New Tool: Boiler Clean and Tune-Up Calculator

• Boiler Input Tab

• Use one row per boiler

• Captures system information:

• Boiler Make & Model, location

• End Use (space heating/process load)

• Boiler Type (Steam/Hot Water)

• Fuel Input Rating MBH & Boiler Nameplate Efficiency

21

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

• Completed Tool = Estimated Incentive

• Fill out all required fields to see the estimated incentive

• Estimated incentive includes program costs caps

• Submit required documents with your complete

program application

New Tool: Boiler Clean and Tune-Up Calculator

22

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

• Includes 2020 bonus incentives for lighting

• Added Categories for One for One Replacements

• Applies to 1x4, 2x2, and 2x4 Luminaires

• Fixed existing conditions for High Bay Luminaires

• Added T5 and T8 highbay fixtures to match the program manual

*Available on our site next week

Electric Measure Tool: Updated Lighting

Measures

23

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

Steam Trap Survey Update

• New version 20.2, now available on the Con Edison Website

• Use this version for any new projects, valid thru 12/31/2020

• Includes Bonus Cap (up to 85% of project costs)

24

Program Manual

Updates

Virtual

Inspections

Installation

Bonus

Incentives

Tool Updates

COVID-19

Guidance &

Resources

Pipe Insulation Survey Update

• New version 20.2, now available on the Con Edison Website

• Use this version for any new projects, valid thru 12/31/2020

• Updated to include the Bonus Cap (up to 85% of project costs)

25

Program Manual

Updates

Tool Updates

Installation

Bonus

Incentives

Virtual Inspections

COVID-19

Guidance &

Resources

Virtual Inspections

• We’ve adjusted our processes to better fit customer’s needs:

• Virtual pre and post inspections are now available

• Enables customers to proceed with their projects while keeping customers, contractors and our

staff safe

• Methods of verification other than site visits include:

• Live Video Walk-Through (when applicable)

• Document Review – for eligible measures

• List of questions

• Phone interviews

• Pictures of the site

26

Program Manual

Updates

Tool Updates

Installation

Bonus

Incentives

COVID-19

Guidance &

Resources

Virtual

Inspections

• Safety Guidance Compliance

• DOB Fines

• As the City reopens, NYC DOB has released updated COVID-19 safety guidance for

property owners and contractors of all permitted construction sites across New York City.

• Noncompliance with these guidelines may result in possible fines and Stop Work Orders

from the Department of Buildings

• https://www1.nyc.gov/site/buildings/about/restart-phase-1.page

• Other Resources

• https://www.governor.ny.gov/sites/governor.ny.gov/files/atoms/files/NYS_BusinessReopeningSafetyPla

nTemplate.pdf

• https://esd.ny.gov/nyforward-faq

• https://www1.nyc.gov/assets/buildings/pdf/ConstructionMasterGuidance.pdf

• https://www.governor.ny.gov/sites/governor.ny.gov/files/atoms/files/ConstructionShortGuidelines.pdf

COVID-19 Guidance & Resources

27

Participating Contractor Updates

Participating

Contractor

Portal

Summary

Q&A

Incentive

Navigator

Updates

28

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

➢ Overview

➢ Current Features

➢ Features to come

Participating Contractor Portal

29

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

You asked, we listened - designed with you in mind.

• Designated site for

Participating

Contractors in the C&I

program

• Main hub for all PC

updates and resources

URL: https://conedee.force.com/CIPCPortal/s/

Participating Contractor Portal Overview

30

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

• Home Page

• Participating

Contractor Directory

• Co-branding

• New Contractors

• Incentive Navigator

Link

• Contact Us Page

• Quick Links

Current Features

• Pop-up Alerts

31

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

• Program Documents and Tools (live soon)

• Library for all program documentation (i.e. tools, guides, application, custom requirements etc.)

• Training & Videos

• Library for training material (webinar archives and training materials)

• Marketing Material

• Library for promotional materials to market the C&I program to our customers

• News and Events

• Announcement page for news, events and trainings scheduled for Participating Contractors in

C&I program

Features to come..

32

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

Company Name

Company Name

Company Name

[email protected]

[email protected]

[email protected]

• Gain exposure with Con

Edison’s customer network• PC profile displayed with Badge ID

number

• Logo can be added to brand your

listing

• Message Feature• Customers can reach out

to PCs directly through the

portalCompany Name

[email protected]

Participating Contractor Directory

33

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

• Includes:

• Usage Guidelines for Badge

• Downloadable Con Edison

Participating Contractor Badge

(4 versions)

Note: 1) All badges must include PC ID number (can be found in PC profile)

and be approved in writing by TA Manager.

2) This site is password protected. You can access with Incentive Navigator credentials

Co-Branding

• Why Co-Brand?

• Boosts credibility

• Distinguish yourself from

competitors

34

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

Program Documents and Tools

• Library for all program

documentation

• Tools, guides, application,

custom requirements etc.

35

Incentive

Navigator

Updates

Participating

Contractor Portal

Q&A

Summary

• Access Incentive

Navigator through the PC

Portal

• Incentive Navigator

consists of:

• Estimates Calculator

• Project Portal

Note: If you are not going through the PC Portal, use https://incentivenavigator.coned.com/

Participating Contractor Portal 2 Incentive

Navigator

36

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal ➢ Estimates Calculator Updates

• New Project Submission Process

• Project Type

• Name Your Project

• Bonus Incentive Indicator

• Custom Measures

➢ Project Portal Updates & Refresher

• Deactivated Program Page

• Project Dashboard

• Refresher: Measure Page

• Refresher: Custom Measures

Incentive Navigator Update

37

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal• New Project Submission Process

• All projects will begin as an Estimate before proceeding to a Project Application

SUBMIT PROJECT

FOR REVIEW

CREATE AN

ESTIMATE

CONVERT TO A

PROJECT

Estimates Calculator Updates

38

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal• Project Type

• Choose your project type before creating an

estimate

• Electric or Gas

Estimates Calculator Updates

• Name Your Project

• Better organize and track your projects

by giving them a custom name

39

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal• Bonus Incentive Indicator

• Easily identify measures with

promotional incentives

• Custom Measure Option

• Can’t find the measure you’re looking

for? No problem. We’ve added a

Custom Measure option

Note: Additional documentation and information will be required when the estimate is converted to a project in Project Portal.

If you ONLY have Custom Measure in your project, you can skip the Measures page and go directly to the Requirements Page in Project Portal.

Estimates Calculator Updates

40

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal• Program Page has been deactivated

• To submit a project you must first create a new estimate in Estimates Calculator

Project Portal Updates

41

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal • Manage your projects in Dashboard

• Account Tab -> Dashboard Tab

• Dashboard Tab Features:

• Edit account information

• Manage all your projects in one place

Project Portal Updates

42

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal

Refresher: Measures Page

• Required Fields:✓ Quantity of Baseline

✓ Watts Efficient

✓ Building Type

✓ Location Type

✓ HVAC System Type

✓ Reported or Sector

✓ Existing FLH (mandatory if Reported)

✓ Watts Baseline

✓ Measure Cost

✓ Labor Cost and Material Cost

• Auto 50/50 split

• PC can make edits to the cost

distribution

*Note: We are working to have all fields listed above systematically

required, in the meantime please fill out ALL fields listed above.

• Additional Required Fields*✓ Other Model Details

• Input DLC make and model

✓ Heating Fuel Type

✓ Make

✓ Model

✓ Measure Location

✓ Full costs per unit

43

Summary

Incentive

Navigator Updates

Q&A

Participating

Contractor

Portal • Required Documents:

• Completed Application (only if

e-signature was not submitted)

• Written Detailed Narrative

• Cut Sheets

• W9 of the party receiving

incentive

• Unlocked Custom Analysis

used to calculate savings

❖ Your custom analysis must show all

assumptions used to estimate your

project savings, including live

formulas.

Notes:

• Multiple documents can be uploaded per line with a total upload

limit of 10 MB total

• If max upload is reached, email the remaining documents to

your assigned Business Development Manager

Refresher: Custom Measure Attachments

44

Incentive

Navigator

Updates

Summary

Q&A

Participating

Contractor

Portal

Summary

• Bonus Installation Incentives

• Effective 6/8/2020

• Project Eligibility:

• Submit project application package by September 30, 2020

• Finish installation and submitted required completion documents by November 15th

• Must pass post inspection by November 30th

• Program Manual Updates

• New Version 1.2 available on our site next week

• NWS Adders Information – Brooklyn and Queens customers

• Lighting Measures – new categories for 1x4, 2x2 and 2x4 replacements

• New Measure: Boiler Clean & Tune Up

45

Incentive

Navigator

Updates

Summary

Q&A

Participating

Contractor

Portal

Summary

• Tool Updates

• New Tool: Boiler Clean and Tune-Up Calculator

• Electric Measure Tool Update

• Steam Trap Survey Update

• Pipe Insulation Survey Update

* All available on our website

• Virtual Pre and Post Inspections are now available

• Participating Contractor Portal has launched

• https://conedee.force.com/CIPCPortal/s/

• Incentive Navigator Updates and Refresher

46

Incentive

Navigator

Updates

Summary

Q&A

Participating

Contractor

Portal • Clean Heat Program officially launched at state level

• More to come!

• Resources to learn more:

• Clean Heat NYSERDA

• Clean Heat Con Edison: Electric Heating and Cooling Technology for

Multifamily and Commercial Buildings

• New C&I Participating Contractor Agreement

• More to come!

What’s next?

47

Participating

Contractor

Portal

Q&A

Incentive

Navigator

Updates

Summary

48

49

Q&A

Q1: Does the C&I program have any plans to offer incentives for LED lamps?

➢ No, the C&I program offers incentives for fixtures and retrofit kits. Incentives for LED lamps are available through the Instant Lighting

Program. See their website here.

Q2: How rigid is the November bonus rebate cutoff date?

➢ To qualify for any bonus incentive your project must be completed by November 15th. Con Edison has no plan to extend the deadline.

Q3: Do the new categories for the LED 1x4, 2x2, and 2x4 replacements include the bonus incentives throughout the rest of the year?

➢ Yes, the new categories that we added to the Program Manual (v1.2) are part of the Bonus Incentives for this year. To qualify, you must

provide Con Edison with a completed application by Sept 30, 2020. The approved scope of work must be installed and operational by

November 15, 2020.Our post inspection must be performed and passed by November 30, 2020.

Q4: Do steam trap and pipe insulation incentives apply to Con Edison steam customers or only gas customers?

➢ Con Edison steam customers are not eligible for the energy efficiency program. You must be a Con Edison gas customer to access gas incentives. To participate, you must have a firm or interruptible gas account.

Q5: How does the 85% project cost cap work for steam trap measures?

➢ Projects replacing failed steam traps will receive incentives at a rate of $750 per failed steam trap replaced, capped at 85% of the

material and labor costs associated with the installation.

50

Q6: What will Con Edison accept as proof of a failed steam trap?

➢ Steam traps should be tested by ultrasonic device or forward-looking infrared (FLIR) camera while in operation to verify that they have

failed open.

➢ Our steam trap verification process relies on being able to see that a steam trap is failed open. We typically use a FLIR camera. The

steam system must be running during our pre-inspection so we can verify that the steam traps submitted to the program are failed open.

Q7: Are you doing any on-site pre/post inspections?

➢ Yes, when applicable but we are also offering an option of a virtual inspection to maintain safety. We will work with you when scheduling

the site visit.

Q8: Why are customers or contractors asked to provide 100% sample verification during a virtual inspection?

➢ Some projects may require verification of 100% of the scope depending on the type of measure installed and the size of the project Our

inspectors employ a sampling approach whenever possible, but this may not be possible in all projects.

Q9: Can we use ultrasonic trap testing for steam trap verification?

➢ This is the best approach. We do encourage contractors to use this method. When the survey is done, it will tell us which were surveyed,

and which were failed. Some contractors tag the failed traps. This will help with the inspection process.

Q&A

51

Q10: When will 2021 program year incentives be published?

➢ The 2021 program year goals and budgets have not been established. Currently there is no timetable to publish those incentives.

Q11: Are all accounts in NWS areas eligible within a specific neighborhood?

➢ To be eligible, customer’s account must receive electric service from one of the targeted networks in the Non-Wires Solutions territory. The

new program manual contains a map of the NWS territory, but you can send an email to [email protected] to check your specific account

eligibility.

Q12: Will be there any incentive for thermal or battery storage?

➢ Thermal or Battery Energy Storage projects are not eligible for the C&I energy efficiency program. Such technologies may be eligible for

incentives from time to time through the Non-Wires Solutions program. You can find out more about the Non-Wires Solution offerings on

their site here.

Q13: Are the bonus incentives available for multifamily buildings?

➢ The incentives covered in this webinar only apply to commercial and industrial customers

➢ For information on incentives for multifamily buildings, please contact the Multifamily Program team at [email protected].

Q14: Do parking garages serving multi-family buildings qualify for the LED incentives?

➢ A garage attached to a multifamily building would qualify for the Multifamily Program.

Q&A

52

Q&AQ15: Does Con Edison’s Incentive Navigator work with MacBook’s?

➢ Yes. The Incentive Navigator is a web application and works with your internet browser. Incentive Navigator works best with Google

chrome browser.

Q16: Is it a requirement that all projects MUST start as an estimate?

➢ Yes, Participating Contractors are required to submit their projects in Incentive Navigator. All projects must start as an estimate in

Incentive Navigator.

Q17: Does the program require all customers to submit a signed application as a pdf?

➢ Customers submitting their own projects to the program must fill out and sign the C&I program application and submit the application by

email, along with all other required documents.

➢ Participating Contractors submitting a project to the program must do so via Incentive Navigator. Projects submitted through Incentive

Navigator must be e-signed by the customer.

Q18: How can Con Edison make its C&I program simpler?

➢ Con Edison always looks for opportunities to improve and simplify its energy efficiency program. Our Incentive Navigator was designed to

streamline the process for our Participating Contractors. The Incentive Navigator has the following features:

• Easily check account eligibility instead of relying on utility staff to verify

• Create branded estimates that can be shared with Con Edison customers, including estimated savings and incentives calculated by

Con Edison

• Convert an estimate into a project application and include supporting documentations

• Send a digital application to the customer for e-signature and schedule pre-inspection once signed

• Monitor and track your project’s progress via your personal dashboard

53

Q19: When an electric project is submitted through Incentive Navigator, does Con Edison also generate an electric or gas measure

tool?

➢ No. The Incentive Navigator does not generate excel base Electric or Gas Measure Tools. However, Incentive Navigator provides

Participating Contractors direct access to Estimates Calculator, which eliminates the need to fill out the Electric Measure Tool or the Gas

Measure Tool for most of the program's prescriptive measures. The Estimates Calculator also allows the Participating Contractor to

download a summary of project's measures, savings, estimated incentives, costs, and payback for the project.

Q20: What online resources are available to participating contractors?

➢ Access helpful tools on our Participating Contractor Portal: https://conedee.force.com/CIPCPortal/s/.

➢ Submit projects via the Incentive Navigator: IncentiveNavigator.coned.com

Q21: Is there a specific amount of time required between submitting an estimate and submitting the project application?

➢ There is no required timeframe between estimate creation and project creation. However, once a Participating Contractor submits a

project via Project Portal, the application is sent to the customer for e-Signature. The customer must provide their e-signature within 14

calendar days or the application will be cancelled.

Q22: Can Participating Contractors submit project applications via email to the C&I program team?

➢ No. Participating Contractors are required to submit projects via Incentive Navigator.

Q23: What is required to become a Participating Contractor?

➢ All requirements to become a Participating Contractor can be found on our Participating Contractor portal HERE

Q&A

54

LinksBonus Incentives• Bonus Incentive Summary Sheet

• Bonus Incentive FAQs

COVID-19 Resources• https://www.nyserda.ny.gov/ny/COVID-19-Response/Contractor-and-Construction-Guidance

• https://www1.nyc.gov/site/buildings/about/restart-phase-1.page

• https://www1.nyc.gov/assets/buildings/pdf/ConstructionMasterGuidance.pdf

• https://www.governor.ny.gov/sites/governor.ny.gov/files/atoms/files/ConstructionShortGuidelines.pdf

• https://www.governor.ny.gov/sites/governor.ny.gov/files/atoms/files/NYS_BusinessReopeningSafetyPlanTemplate.pdf

• https://esd.ny.gov/nyforward-faq

Clean Heat Program Resources• Clean Heat NYSERDA

• Heat Con Edison: Electric Heating and Cooling Technology for Multifamily and Commercial Buildings

55

[email protected]

Thank you!

https://conedee.force.com/CIPCPortal/s/

ConEd.com/largecommercial

https://incentivenavigator.coned.com/

Participating Contractor Portal

Program Website

Incentive Navigator

Program Contact