2020 interim results ppt (with script)v8

20
Stock Code 股份編號:1680 2020 Interim Results and Business Updates 27 August 2020

Upload: others

Post on 27-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2020 interim results ppt (with script)v8

Stock Code 股份編號:1680

2020 Interim Results and Business Updates27 August 2020

Page 2: 2020 interim results ppt (with script)v8

Business and Performance Updates

(1) Adjusted EBITDA excluded corporate expenses(2) Loss for the periods excluded Landmark operations and other one off items(3) Net gearing ratio is expressed as a percentage of total borrowings minus cash over total equity

Summary of financial performance

1H 2020 1H 2019

The Group(excluding

Savan Legend)Savan Legend Group

The Group(excluding

Savan Legend)Savan Legend Group Change

HK$m HK$m HK$m HK$m HK$m HK$m %

Revenue 323 41 364 957 125 1,082 (66)

- Gaming 250 37 287 755 113 868 (67)

- Non-gaming 73 4 77 202 12 214 (64)

Adjusted EBITDA(1) (181) (2) (183) 130 53 183 (200)

Profit/(loss) for the period(2)

(468) (82) (550) (128) 21 (107) (412)

As of 30.06.2020 As of 31.12.2019

Liquidity

• Debt 1,960 - 1,960 1,959 - 1,959 -

• Net Gearing%(3) 21% 5% 16

2

Page 3: 2020 interim results ppt (with script)v8

COVID-19 ActionsMacau Operations Laos Operations

Timing Timing

Operations suspended

- Legend Palace Casinos and Babylon Casino

- 5 F&B outlets in hotels and boulevard

- Rocks Hotel and F&B outlet

5 Feb 2020

5 Feb 2020

5 Feb 2020

- Savan Legend Hotel and Casino 28 Mar 2020

Operations reopened

- Legend Palace Casinos and Babylon Casino

- 4 F&B outlets in hotels and boulevard

- Rocks Hotel and F&B outlet

20 Feb 2020

Mar & Apr 2020

1 Aug 2020

- Thakhek Club (soft Opening) 15 Jul 2020

Cost reductions in 1H

- Special leave arrangement of staff

- Reduced slot machines in operation

- Strict control on utilities and F&B costs

1H 2020 - Graduated payroll reductions &consumed all annual leave

- Renegotiated key contracts

- Strict control over essential costs

1H 2020

Cost reduction plans in 2H

- Continue to strictly control costconsumption and reduce wastage

2H 2020 - Furloughed over 1,200 local staff &continue to strictly control costs

2H 2020

Border policies - Entry from China is restricted

- Two Macau-Mainland border resumednormal service

- PRC resume granting of leisure travellingvisa from Guangdong Province to Macau

- PRC resume granting of leisure travellingvisa from all travelers from Mainland China toMacau

20 Feb 2020

3 May 2020

26 Aug 2020

23 Sep 2020

- International borders begin to close

- All travelers restricted from crossingborders

- Provinces shut down all business &allowed special request to repatriateLaotians

19 Mar 2020

23 Mar 2020

01 May 2020

3

Page 4: 2020 interim results ppt (with script)v8

Business UpdatesItem Status Timing

Legend Palace Hotel and Casino

- Completing new F&B facilities for VIP customers- Attracted local gaming patrons to our casinos during COVID-19- Introducing more hotel and F&B/entertainment packages to attract more local and Guangdong customers

2H 2020

Macau Fisherman’s Wharf

- Renovation on Convention and Exhibition Centre was completed and grand opening was made in mid-July 2020

- Additional non-gaming attractions- More than 70 events are scheduled in the 2H 2020 including major expos andexhibition (including Mega Sales, Industry Expo, International Food Fair & etc.)

- Expecting more than 1 million visitors can be introduced in 2H 2020

July 2020

On-going

Savan Legend Resorts - Phase 2 expansion will include new entertainment and gaming facilities plus a new boutique hotel

- Thakhek Slot Club has commenced operations, with a soft opening in mid-July 2020

Q4 2020

July 2020

Cape Verde - Office building has core construction completed; commencing interior work- Construction of the hotel and casino complex has commenced; however, certain delay is expected due to COVID 19

Q4 20212022

Cambodia - SPA signed on land acquisition in Siem Reap Province in Cambodia- Land preparation and master planning for an integrated resort- In progress of transferring land titles and fencing the land

28 Dec 2018On-going

Hengqin, PRC - Acquired 21.5% of Hengqin project which holds 勵駿龐都廣場 PONTO- Offer over 300 shops with a diversified dining and entertaining experience (including cinema, gymn room, mega grocery store and other famous F&B outlets)

April 20192H 2020

4

Page 5: 2020 interim results ppt (with script)v8

Legend Palace Hotel

Status A luxury 5 star offering with gaming facilities primarily for our in-house customers

Six months performance in 2020:

Games drop (Mass) HK$ 847 million

Turnover (VIP) HK$ 1 billion

Net win HK$ 217 million

Hold rate Mass 19.6% , VIP 4.8%

Rooms 223Tables (in operation) 60

Slots (in operation) 51Visitation 0.4 millionOccupancy 44%Staff (Gaming) 501Staff (non-gaming) 424

5

Night view of Legend Palace

Legend Palace Hotel was opened since 2017, within 5 minutes walking from the Macau Ferry Terminal

New footbridge to Macau Ferry Terminal

The bridge linking from Legend Palace to Macau Ferry Terminal is newly built and available for use since April 2020

Page 6: 2020 interim results ppt (with script)v8

MacauFisherman’s Wharf

Status Legend BoulevardRocks HotelHarbourview Hotel and Babylon Casino

Six months performance in 2020:

Games drop (Mass) HK$ 346 million

Turnover (VIP) HK$ 910 million

Net win HK$ 82 million

Hold rate Mass 15.7% , VIP 3.1%

Tables in Operation 21Rooms Harbourview Hotel: 444

Rocks Hotel: 72

Occupancy Harbourview Hotel: 32% Rocks Hotel: 74% (up to Feb 2020)

Visitation 0.5 millionStaff (Gaming) 219Staff (non-gaming) 980

Events in MFW

First outdoor night market event in Macau since start of COVID-19 restrictions

6

VR Zone

VR Zone joined “Macau Ready Go!” Campaign, and is one of the most popular attractions

Page 7: 2020 interim results ppt (with script)v8

Macau Fisherman’sWharf

Soda Port – New restaurant

Demon Chef Alvin Leung is bringing his Michelin Star Brand to the Soda Port at Legend Palace Hotel. We expect the restaurant should be opening in Q4 2020

Alvin Leung is famous in making X-treme Chinese Cuisine. His two restaurants were awarded with Michelin Stars (three Michelin Stars in HK and one Michelin Star in London)

The facilities will include fine dining, private dining and a cocktail bar and will cater to our VIP and Premium Mass guests

Demon Chef Alvin Leung is bringing his Michelin Star Brand to the Soda Port at Legend Palace Hotel. We expect the restaurant should be opening in Q4 2020

Alvin Leung is famous in making X-treme Chinese Cuisine. His two restaurants were awarded with Michelin Stars (three Michelin Stars in HK and one Michelin Star in London)

The facilities will include fine dining, private dining and a cocktail bar and will cater to our VIP and Premium Mass guests

7

New Renovated CEC Ballroom

Grand opening ceremony for the renovated ballroom was held on 17 July 2020.

The renovated ballroom is the largest facility in the Macau Peninsula and is a major draw for MFW and the Legend Palace Hotel.

Pipeline of events for 2H2020 included more than 70 events and exhibition, including Mega Sale Carnival, Baby Products Fair, International Home Expo, Macau Industrial Products Show, International Food Fair and etc.

Page 8: 2020 interim results ppt (with script)v8

Savan Resorts –Savannakhet

Status 99 year exclusive monopoly on gaming for 3 provinces, 50 year land lease and annual flat tax with no limit on number of gaming tables and electronic gaming machines

Six months performance in 2020:

Games drop HK$799 million

Net win HK$41 million

Hold rate Mass 25.4% , VIP 3.4%

Visitation 136,000 (Savan-Mukdahan Border, during 2019)

Rooms 472

Tables (in March) 48

Slots (in March) 133Staff (Gaming) 633

Staff (non-gaming) 721

8

Site Overview

Savan Resorts

Extensive revitalization of the exterior façade of the main casino with plans to upgrade the entrance and driveway

Extensive revitalization of the exterior façade of the main casino with plans to upgrade the entrance and driveway

Site is 50 ha with 80 year lease and 99 year monopoly on gaming for the three provinces from 2016. This site area has ample land for the development of the Suites (Phrase 2) and additional facilities including gun club, ATV track and villas (Phrase 3)

Page 9: 2020 interim results ppt (with script)v8

The Suites –Savannakhet

Status Phase 2 construction has commenced and will be completed by 1H 2020

40 suite boutique hotel, VIP gaming, spa, pool, three F&B facilities,

Convention facilities for weddings / functions

High tech golf driving range with lounge

Targeting Premium Mass and VIP customers

Private gated entrance, limo service from neighboring airports

Once completed, The Suites will be the highest end premium F&B and hotel facilities in this region of SEA and will be a “Game Charger” for the property

Phase 2 budget

Approx. US$15 million

9

Hi-Tech Golf Range

A golf driving will be included in The Suites and it will also be ready to open by the end of 2020

VIP lounge will cater to 25 premium mass and VIP gaming tables with lounge facilities and outdoor gardenVIP lounge will cater to 25 premium mass and VIP gaming tables with lounge facilities and outdoor garden

The Suites Lounge

Page 10: 2020 interim results ppt (with script)v8

Thakhek Club –Thakhek

Status Entered into a long-term lease agreement for existing slot club, shopping and hotel facilities in Q4 2019 (built but never operated). Renovations of the existing Slot Club completed by mid-June 2020 and rebranded to Savan Resorts, Thakhek Club, existing facilities operations started 15 Jul, 2020.

Current offerings: - 109 Slot Machines in Mass Floor & 22 Slot

Machines in VIP Room- 40 Standard Rooms & 4 Suite Rooms- Savanna Restaurant - Ruby Bar / Lounge

Phase 2 Overview

USD12 million budget for 2nd Phase:

Property additions include: - Mass gaming floor for gaming tables, 2

restaurants (All day dining & Vietnamese), retail outlets, atrium gardens, 48 room 4 star hotel, VIP gaming rooms, KTV, sports bar and kids zone and revitalized casino façade and entrance.

10

Boutique Hotel

4 star hotel with 44 spacious guest rooms4 star hotel with 44 spacious guest rooms

Main Casino Floor

World class slot club that blends latest technology with classic gamesWorld class slot club that blends latest technology with classic games

Page 11: 2020 interim results ppt (with script)v8

Praia, Cape Verde

Status On 22 July 2015, the Company entered into agreements with the Government of Cape Verde

First phase is expected to be completed by late 2021

Structural bridge has been constructed

Exterior work on office building has completed, with interior work commenced

Hotel foundation work has commenced

Expect certain delay on construction work due to COVID-19

Market place

Over 819,000 in 2019 (increase 7% compared to 2018)

Phase1 Budget EUR94 million

11

All day dining

Restaurant with views over the pool and seaRestaurant with views over the pool and sea

Hotel lounge

The Lounge includes element of Cape Verde culture into the interior DesignThe Lounge includes element of Cape Verde culture into the interior Design

Page 12: 2020 interim results ppt (with script)v8

Siem Reap, Cambodia

Status Signed Sales and Purchase Deed for 1,200 hectares of Land in Siem Reap

Total consideration of USD90M

Continuous growing tourism market

Tourism Statistics

6,600,000 tourists in 2019

100 flights per day to Cambodia from SEA and EA

1,400 hotels in Siem Reap

GDP growth rate of 7.1% in 2019

Plan Planned integrated resort including, hotel, golf course, conventions, water park, cultural facilities and agri-tourism facilities

12

Page 13: 2020 interim results ppt (with script)v8

Hengqin, PRCStatus On 27 April 2019, completed acquisition of

21.5% of Hengqin project company for HK$85 million

Holds 勵駿龐都廣場 PONTO with construction area of 140,000m2, offering over 300 shops which provide visitors with diversified shopping, dining and entertaining experience

Ponto opened its door on 15 Dec 2019 under MLD management

Occupancy is reaching over 40% since acquisition and is targeted for 70% by 2020

Management MLD is now actively managing the project in terms of leasing, events and property management

13

Ponto Night view

Portuguese architecture in the heart of Hengqin, expressing Sino-Luso connection to MacauPortuguese architecture in the heart of Hengqin, expressing Sino-Luso connection to Macau

Car showIntroducing the property to the residence of Hengqin with games, music and danceIntroducing the property to the residence of Hengqin with games, music and dance

Page 14: 2020 interim results ppt (with script)v8

Connectivity

Status - New Lotus Border construction completed and capacity increased 10 times in preparation of heavy traffic between Macau and Hengqin

- Boarder opened on 18 Aug, 2020

- Railway connecting Zhuhai station to Hengqin was completed 4Q 2019 and will open after rest of the line has been completed and commissioned

Ponto - An underground tunnel is connecting Ponto with Zhuhai station, within 5 minutes walking

14

Page 15: 2020 interim results ppt (with script)v8

Financial Performance

Page 16: 2020 interim results ppt (with script)v8

MFW Gross Gaming Revenue (1) (“GGR”)

68% drop in GGR at MFW, outperformed Macau market by 10%

GGR in HK$m

16

MLD Management continues to be encouraged by the growth in the Mass and Premium Mass business at the Legend Palace Casino

$564

$101

$271

$936

$166 $54 $79

$299

0

100

200

300

400

500

600

700

800

900

1,000

Legend PalaceMass

BabylonMass

VIP Total

1H 2019 1H 2020-71%

-46%

-71%

-68%

(1) GGR analysis includes results for Mass and VIP gaming tables in Legend Palace Casino and Babylon Casino only

Page 17: 2020 interim results ppt (with script)v8

Consolidated Reported Revenue (1)

$868

$287

$214

$77

0

200

400

600

800

1000

1200

2019 1 H 2020 1H

Gaming Non-Gaming

-66%

Reported Revenue Breakdown (HK$m)

Total reported revenue in 1H 2020 decreased by 66% YoY

Historical Reported Revenue (HK$m)

$856

$980 $952 $913

$1,082

$1,278

$364

200

400

600

800

1,000

1,200

1,400

1H 2017 2H 2017 1H 2018 2H 2018 1H 2019 2H 2019 1H 2020

17

MLD Management continues to see promising growth in both Macau and Laos Gaming and our strategy is to focus on increasing non-gaming contributions and expanding our customer base

(1) Reported revenue included Macau gaming commission net of Macau Gaming tax, gaming revenue from casino operations in Laos and revenue from non-gaming operations

$1,082

$364

Page 18: 2020 interim results ppt (with script)v8

Adjusted Consolidated EBITDA (1)

Adjusted consolidated EBITDA decreased 206%

$1

($98)

$122

($87)

$53

($2)

$176

($187)

($200)

($150)

($100)

($50)

$0

$50

$100

$150

$200

1H 2019 1H 2020

MFW (excluded Legend Palace) Legend Palace Savan Legend Total

18

MLD Management expect Adjusted EBITDA to continue to improve once market normalizes with Mass and VIP customers returning

(1) Adjusted consolidated EBITDA excluded Landmark operations, one off items and corporate expenses

Page 19: 2020 interim results ppt (with script)v8

� Attract new and branded tenants for Ponto

� Develop master plan for Siem Reap Integrated resort

� Continue construction of Cape Verde project

� Continue in building and renewing non-gaming offerings in MFW

� Focus on bringing more events and promotion to increase traffic to the property

Other projects

Macau Growth

Laos Growth � Phase 2 of Savan Resorts will increase attractiveness for VIP customers

� Opening of Thakhek property will bring new revenue stream from the region

Key initiatives

19

Page 20: 2020 interim results ppt (with script)v8

Thank YouContact Information

Principal Office

Macau Legend Development Limited

Address: Palace Building, Macau Fisherman’s Wharf, Avenida da Amizade, Macau

Tel: (853) 2822 2211

Fax: (853) 2822 2266

Executive Director & VP Corporate Business Development

Mr. Donald Chow

Tel: (853) 2822 2211

Fax: (853) 2822 2266

Email: [email protected]

EVP, Chief Financial Officer & Company Secretary

Mr. Kelvin Wong

Tel: (853) 2822 2211

Fax: (853) 2822 2266

Email: [email protected]