· 2020. 6. 12. · (fsi), (setback) 2. the provisions in the g.o.(ms). no. 17, h & ud (ui)...

7

Upload: others

Post on 20-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 2:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 3:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 4:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 5:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 6:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 7:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,