2019 SYMPOSIUM:
FOCUS ON THE FUTURE- PM
ROLES EVOLVE
![Page 2: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/2.jpg)
![Page 3: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/3.jpg)
BIG HUMUNGOUS
COMPANY 1
![Page 4: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/4.jpg)
2017Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2017
Launch
Jan 2
GW 1
Feb 17
RequirementsLock Down
Apr 3
Design Freeze
Jun 1
GW 2
Jun 16
GW 3
Oct 6
Testing Complete
Sep 25
Jan 9 - Mar 31 Gather Requirements
Apr 3 - Jun 1 Design
Jun 2 - Jun 30 Build
Jul 1 - Sep 25 Test
Sep 26 - Nov 17 Deploy
![Page 5: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/5.jpg)
![Page 6: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/6.jpg)
Design-Build-Test
Design-Build-Test
Design-Build-Test
Design-Build-Test
2017Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2017
Launch
Jan 2
GW 1
Feb 17
RequirementsLock Down
Apr 3
Design Freeze
Jun 1
GW 2
Jun 16
GW 3
Oct 6
Testing Complete
Sep 25
Jan 9 - Mar 31 Gather Requirements
Apr 3 - Jun 1 Design
Jun 2 - Jun 30 Build
Jul 1 - Sep 25 Test
Sep 26 - Nov 17 Deploy
![Page 7: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/7.jpg)
#1 - Ability To Handle Changing Priorities
![Page 8: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/8.jpg)
8
BIG HUMUNGOUS COMPANY 1
![Page 9: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/9.jpg)
BIG HUMUNGOUS COMPANY 1
9
![Page 10: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/10.jpg)
BIG HUMUNGOUS COMPANY 1
10
![Page 11: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/11.jpg)
BIG HUMUNGOUS COMPANY 1
11
![Page 12: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/12.jpg)
BIG HUMUNGOUS COMPANY 1
12
![Page 13: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/13.jpg)
Chief Big Wig
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Asst
![Page 14: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/14.jpg)
Chief Big Wig
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Asst
![Page 15: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/15.jpg)
In today’s fast-paced, fiercely competitive world of commercial new product development, speed and flexibility are essential. Companies are…realizing that the old, sequential approach to developing new products simply won’t get the job done
![Page 16: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/16.jpg)
In today’s fast-paced, fiercely competitive world of commercial new product development, speed and flexibility are essential. Companies are…realizing that the old, sequential approach to developing new products simply won’t get the job done
![Page 17: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/17.jpg)
In today’s fast-paced, fiercely competitive world of commercial new product development, speed and flexibility are essential. Companies are…realizing that the old, sequential approach to developing new products simply won’t get the job done
#1 Song Jan 1986
#1 Movie 1986
![Page 18: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/18.jpg)
“In fact, the foundations of ‘modern’ management were laid by people like Daniel McCallum, Frederick Taylor, and Henry Ford, all of whom were born before the end of the American Civil War in 1865.”
Harvard Business Review
Feb 2009
![Page 19: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/19.jpg)
![Page 20: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/20.jpg)
ValueValueValueValue
![Page 21: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/21.jpg)
ValueValueValueValue
1. Eliminate/Reduce Dependencies
2. Drastically Reduce Durations from Months to Weeks or Even Days
![Page 22: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/22.jpg)
ValueValueValueValue
![Page 23: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/23.jpg)
ValueValueValueValue
Non-IT Example• Within 1st sprint,
accomplished more than what they normally would in 6-8 weeks
• First Few Retro’s Were Incredible Testimonials
![Page 24: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/24.jpg)
SECTION 2
![Page 25: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/25.jpg)
We’re 160% Over Capacity!
That’s Not Something to Be Proud of…
![Page 26: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/26.jpg)
![Page 27: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/27.jpg)
![Page 28: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/28.jpg)
![Page 29: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/29.jpg)
Work in Process - Utilization
![Page 30: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/30.jpg)
Work in Process - Utilization “We will always conclude that operating…near full utilization is an economic
disaster.”
― Donald G. Reinertsen,
The Principles of Product Development Flow: Second Generation Lean Product Development
![Page 31: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/31.jpg)
“You can’t multi-task. Not really. And neither can anyone else.”
Psychology Today
Nov 2018
![Page 32: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/32.jpg)
“Think of task switching as less like multi-tasking and more like juggling. You have a couple different balls in the air, but you're only really touching one at a time.”
Psychology TodayNov 2018
![Page 33: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/33.jpg)
Work in Process - Utilization Throughput
![Page 34: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/34.jpg)
•Prioritize work so we do highest priority things first
• If EVERYTHING is High Priority, then nothing is High Priority
![Page 35: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/35.jpg)
Apple lost over $1 Billion in 1997. Jobs decided to reduce the number of products by 70%. Apple was to produce only four products: one desktop and one portable device aimed at both consumers and professionals. The job of his team members was to focus on building four great products…. All others would be cancelled
STRATEGIC
PRIORITIZATION
![Page 36: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/36.jpg)
![Page 37: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/37.jpg)
“If you only quantify one thing, quantify the Cost of Delay”
Don Reinertsen
![Page 38: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/38.jpg)
Funnel 3
Initiative 1
Initiative 2
Review 3
Initiative 3
Initiative 4
Analyzing 3
Initiative 5
Initiative 6
Portfolio Backlog 3
Initiative 7
Initiative 8
SMAET
SMAET
SMAET
SMAET
![Page 39: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/39.jpg)
SMAET
SMAET
SMAET
Funnel 3
Initiative 1
Initiative 2
Review 3
Initiative 3
Initiative 4
Analyzing 3
Initiative 5
Initiative 6
Portfolio Backlog 3
Initiative 7
Initiative 8
SMAET
![Page 40: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/40.jpg)
SECTION 3
![Page 41: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/41.jpg)
#1 On Top Tips For Success With Scaling Agile
Internal Agile Coaches
![Page 42: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/42.jpg)
![Page 43: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/43.jpg)
•Communicate Business Need, Urgency, And Vision For Change
•Provide Coaching And Training
•Develop Lean Agile Implementation Plan
![Page 44: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/44.jpg)
•Passionate
•Willing to Learn
•Good Communicators
![Page 45: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/45.jpg)
•Few Volunteers
Big Humungous Company 1
![Page 46: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/46.jpg)
•20+ Coaches: FTE + Consultants•Few Volunteers
Big Humungous Company 1
Big Humungous Company 2
![Page 47: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/47.jpg)
SECTION 4
![Page 48: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/48.jpg)
BIG HUMUNGOUS COMPANY 2
![Page 49: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/49.jpg)
BIG HUMUNGOUS COMPANY 2
![Page 50: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/50.jpg)
BIG HUMUNGOUS COMPANY 2
![Page 51: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/51.jpg)
![Page 52: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/52.jpg)
![Page 53: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/53.jpg)
“Active And Visible Executive Sponsorship has been number one on the list of top contributors in all of Prosci’s benchmarking reports since 1998.”
Executive Sponsor's Importance and Role, Prosci
![Page 54: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/54.jpg)
“Though much has changed in the field of change management over the last two decades, the importance of the leader’s role in change has remained constant.”
Executive Sponsor's Importance and Role, Prosci
![Page 55: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/55.jpg)
“People are already doing their best; the problems are with the system. Only management can change the system.”
W. Edwards Deming
![Page 56: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/56.jpg)
Chief Big Wig
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Asst
SMAET
![Page 57: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/57.jpg)
Chief Big Wig
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Big Wig
Middle Mng
Bottom Feeder
Exec Asst
SMAET
![Page 58: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/58.jpg)
![Page 59: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/59.jpg)
1. Organize Around Value
2. Strategic Prioritization
3. Create a Lean Agile Center of Excellence
4. Executive Sponsorship
![Page 60: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/60.jpg)
![Page 61: 2019 Symposium: Focus on the Future- PM Roles Evolvepminashville.org/wp-content/uploads/2019/09/... · Launch Jan 2 GW 1 Feb 17 Requirements Lock Down Apr 3 Design Freeze Jun 1 GW](https://reader034.vdocuments.us/reader034/viewer/2022050421/5f907473c059d1656e614094/html5/thumbnails/61.jpg)
THANK YOU PMI
NASHVILLE!