2018 entry point schedule effective date: 01/01/2018 … · 2018. 11. 19. · effective date:...

163
MOUNT ST. JOHN OH2900112 ENTRY POINT MONITORING SCHEDULE 2018 ENTRY POINT SCHEDULE Nontransient Noncommunity System Type: Operating Period: to 1/1 12/31 Sampling Location Facility ID: SMP ID: 2954581 EP001 Facility Name: MOUNT ST JOHN STU 1 Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Also, monitoring schedules may be revised during the year based on sampling results. For water emergencies that occur after hours, please call 800-282-9378 Chemicals Monitoring Requirements Facility Class: CLASS A Facility Source: Ground Water EP001 EP001 Not Required INORGANICS Not Required NITRITE - 1041 Sample(s) Required between NITRATE - 1040 1 1/1/2018 and 5/31/2018 Sample(s) Required between SYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below: ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037 Not Required VOLATILE ORGANIC CHEMICALS (VOC)

Upload: others

Post on 23-Aug-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

MOUNT ST. JOHNOH2900112

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954581EP001

Facility Name: MOUNT ST JOHN STU 1

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 2: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

MOUNT ST. JOHNOH2900112

2018 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTIONDS000

Sample(s) Required between 3/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 6/30/20181 4/1/2018 andSample(s) Required between 9/30/20181 7/1/2018 andSample(s) Required between 12/31/20181 10/1/2018 and

Sample(s) Required between 3/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 6/30/20181 4/1/2018 andSample(s) Required between 9/30/20181 7/1/2018 andSample(s) Required between 12/31/20181 10/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 3: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOWERSVILLE VILLAGE PWSOH2900212

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954582EP001

Facility Name: BOWERSVILLE VILLAGE

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/1/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 4: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOWERSVILLE VILLAGE PWSOH2900212

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 3365 MAYSVILLE STREET

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 5: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOWERSVILLE VILLAGE PWSOH2900212

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 6: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FAIRBORN PUBLIC WATER SYSTEMOH2900612

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954585EP001

Facility Name: FAIRBORN - SANDHILL

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 7: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FAIRBORN PUBLIC WATER SYSTEMOH2900612

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960642EP002

Facility Name: FAIRBORN - NORTH PARK

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 8: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FAIRBORN PUBLIC WATER SYSTEMOH2900612

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/201830TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201830 2/1/2018 andSample(s) Required between 3/31/201830 3/1/2018 andSample(s) Required between 4/30/201830 4/1/2018 andSample(s) Required between 5/31/201830 5/1/2018 andSample(s) Required between 6/30/201830 6/1/2018 andSample(s) Required between 7/31/201830 7/1/2018 andSample(s) Required between 8/31/201830 8/1/2018 andSample(s) Required between 9/30/201830 9/1/2018 andSample(s) Required between 10/31/201830 10/1/2018 andSample(s) Required between 11/30/201830 11/1/2018 andSample(s) Required between 12/31/201830 12/1/2018 and

Sample(s) Required between 1/31/201830TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201830 2/1/2018 andSample(s) Required between 3/31/201830 3/1/2018 andSample(s) Required between 4/30/201830 4/1/2018 andSample(s) Required between 5/31/201830 5/1/2018 andSample(s) Required between 6/30/201830 6/1/2018 andSample(s) Required between 7/31/201830 7/1/2018 andSample(s) Required between 8/31/201830 8/1/2018 andSample(s) Required between 9/30/201830 9/1/2018 andSample(s) Required between 10/31/201830 10/1/2018 andSample(s) Required between 11/30/201830 11/1/2018 andSample(s) Required between 12/31/201830 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 3744 GERMANY LANE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 9: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FAIRBORN PUBLIC WATER SYSTEMOH2900612

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 2430 KAUFFMAN AVE

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 10: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - DAYOH2900803

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS201 4380 MOHAVE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 11: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - DAYOH2900803

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 12: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BELLBROOK WATER WORKSOH2901112

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954587EP001

Facility Name: BELLBROOK WTP 1

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 5/31/2018

Page 13: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BELLBROOK WATER WORKSOH2901112

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/201810TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201810 2/1/2018 andSample(s) Required between 3/31/201810 3/1/2018 andSample(s) Required between 4/30/201810 4/1/2018 andSample(s) Required between 5/31/201810 5/1/2018 andSample(s) Required between 6/30/201810 6/1/2018 andSample(s) Required between 7/31/201810 7/1/2018 andSample(s) Required between 8/31/201810 8/1/2018 andSample(s) Required between 9/30/201810 9/1/2018 andSample(s) Required between 10/31/201810 10/1/2018 andSample(s) Required between 11/30/201810 11/1/2018 andSample(s) Required between 12/31/201810 12/1/2018 and

Sample(s) Required between 1/31/201810TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201810 2/1/2018 andSample(s) Required between 3/31/201810 3/1/2018 andSample(s) Required between 4/30/201810 4/1/2018 andSample(s) Required between 5/31/201810 5/1/2018 andSample(s) Required between 6/30/201810 6/1/2018 andSample(s) Required between 7/31/201810 7/1/2018 andSample(s) Required between 8/31/201810 8/1/2018 andSample(s) Required between 9/30/201810 9/1/2018 andSample(s) Required between 10/31/201810 10/1/2018 andSample(s) Required between 11/30/201810 11/1/2018 andSample(s) Required between 12/31/201810 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 14: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BELLBROOK WATER WORKSOH2901112

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201820LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 15: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

JAMESTOWN VILLAGE PWSOH2901712

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954589EP001

Facility Name: JAMESTOWN NEW PWS

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 16: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

JAMESTOWN VILLAGE PWSOH2901712

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20182TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20182 2/1/2018 andSample(s) Required between 3/31/20182 3/1/2018 andSample(s) Required between 4/30/20182 4/1/2018 andSample(s) Required between 5/31/20182 5/1/2018 andSample(s) Required between 6/30/20182 6/1/2018 andSample(s) Required between 7/31/20182 7/1/2018 andSample(s) Required between 8/31/20182 8/1/2018 andSample(s) Required between 9/30/20182 9/1/2018 andSample(s) Required between 10/31/20182 10/1/2018 andSample(s) Required between 11/30/20182 11/1/2018 andSample(s) Required between 12/31/20182 12/1/2018 and

Sample(s) Required between 1/31/20182TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20182 2/1/2018 andSample(s) Required between 3/31/20182 3/1/2018 andSample(s) Required between 4/30/20182 4/1/2018 andSample(s) Required between 5/31/20182 5/1/2018 andSample(s) Required between 6/30/20182 6/1/2018 andSample(s) Required between 7/31/20182 7/1/2018 andSample(s) Required between 8/31/20182 8/1/2018 andSample(s) Required between 9/30/20182 9/1/2018 andSample(s) Required between 10/31/20182 10/1/2018 andSample(s) Required between 11/30/20182 11/1/2018 andSample(s) Required between 12/31/20182 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 202 HUNTERS POINTE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 17: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

JAMESTOWN VILLAGE PWSOH2901712

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 35 SOUTH LIMESTONE ST.

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 18: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

MAPLE GROVE MOBILE HOMEOH2901812

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954590EP001

Facility Name: MAPLE GROVE MHP

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 19: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

MAPLE GROVE MOBILE HOMEOH2901812

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLE GROVE MOBILE HOME DISTRIBUTIONDS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLE GROVE MOBILE HOME DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 20: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

MAPLE GROVE MOBILE HOMEOH2901812

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLE GROVE MOBILE HOME DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 21: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT STATE UNIVERSITYOH2902012

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954592EP001

Facility Name: WRIGHT STATE UNIVERSITY WTP

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 22: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT STATE UNIVERSITYOH2902012

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/201820TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201820 2/1/2018 andSample(s) Required between 3/31/201820 3/1/2018 andSample(s) Required between 4/30/201820 4/1/2018 andSample(s) Required between 5/31/201820 5/1/2018 andSample(s) Required between 6/30/201820 6/1/2018 andSample(s) Required between 7/31/201820 7/1/2018 andSample(s) Required between 8/31/201820 8/1/2018 andSample(s) Required between 9/30/201820 9/1/2018 andSample(s) Required between 10/31/201820 10/1/2018 andSample(s) Required between 11/30/201820 11/1/2018 andSample(s) Required between 12/31/201820 12/1/2018 and

Sample(s) Required between 1/31/201820TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201820 2/1/2018 andSample(s) Required between 3/31/201820 3/1/2018 andSample(s) Required between 4/30/201820 4/1/2018 andSample(s) Required between 5/31/201820 5/1/2018 andSample(s) Required between 6/30/201820 6/1/2018 andSample(s) Required between 7/31/201820 7/1/2018 andSample(s) Required between 8/31/201820 8/1/2018 andSample(s) Required between 9/30/201820 9/1/2018 andSample(s) Required between 10/31/201820 10/1/2018 andSample(s) Required between 11/30/201820 11/1/2018 andSample(s) Required between 12/31/201820 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS201 ROCKAFIELD HOUSE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 23: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT STATE UNIVERSITYOH2902012

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS202 DIGGS LAB

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201830LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 24: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY VILLAGEOH2902422

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954594EP002

Facility Name: SPRING VALLEY STU 2

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 25: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY VILLAGEOH2902422

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 1480 PAINTERSVILLE ROAD

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 26: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY VILLAGEOH2902422

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 2547 US ROUTE 42 SOUTH

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 27: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY ESTATES MHPOH2902512

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954595EP001

Facility Name: SPRING VALLEY ESTATES MHP

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 28: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY ESTATES MHPOH2902512

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 29: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPRING VALLEY ESTATES MHPOH2902512

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 30: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

XENIA CITY PWSOH2902812

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954597EP001

Facility Name: XENIA CITY

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 31: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

XENIA CITY PWSOH2902812

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/201830TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201830 2/1/2018 andSample(s) Required between 3/31/201830 3/1/2018 andSample(s) Required between 4/30/201830 4/1/2018 andSample(s) Required between 5/31/201830 5/1/2018 andSample(s) Required between 6/30/201830 6/1/2018 andSample(s) Required between 7/31/201830 7/1/2018 andSample(s) Required between 8/31/201830 8/1/2018 andSample(s) Required between 9/30/201830 9/1/2018 andSample(s) Required between 10/31/201830 10/1/2018 andSample(s) Required between 11/30/201830 11/1/2018 andSample(s) Required between 12/31/201830 12/1/2018 and

Sample(s) Required between 1/31/201830TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201830 2/1/2018 andSample(s) Required between 3/31/201830 3/1/2018 andSample(s) Required between 4/30/201830 4/1/2018 andSample(s) Required between 5/31/201830 5/1/2018 andSample(s) Required between 6/30/201830 6/1/2018 andSample(s) Required between 7/31/201830 7/1/2018 andSample(s) Required between 8/31/201830 8/1/2018 andSample(s) Required between 9/30/201830 9/1/2018 andSample(s) Required between 10/31/201830 10/1/2018 andSample(s) Required between 11/30/201830 11/1/2018 andSample(s) Required between 12/31/201830 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 819 COLORADO DR.

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 32: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

XENIA CITY PWSOH2902812

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 517 UNION RD

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201830LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 33: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

YELLOW SPRINGS VILLAGE PWSOH2903012

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954598EP001

Facility Name: YELLOW SPRINGS VLG

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 34: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

YELLOW SPRINGS VILLAGE PWSOH2903012

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

02/16/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20184TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20184 2/1/2018 andSample(s) Required between 3/31/20184 3/1/2018 andSample(s) Required between 4/30/20184 4/1/2018 andSample(s) Required between 5/31/20184 5/1/2018 andSample(s) Required between 6/30/20184 6/1/2018 andSample(s) Required between 7/31/20184 7/1/2018 andSample(s) Required between 8/31/20184 8/1/2018 andSample(s) Required between 9/30/20184 9/1/2018 andSample(s) Required between 10/31/20184 10/1/2018 andSample(s) Required between 11/30/20184 11/1/2018 andSample(s) Required between 12/31/20184 12/1/2018 and

Sample(s) Required between 1/31/20184TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20184 2/1/2018 andSample(s) Required between 3/31/20184 3/1/2018 andSample(s) Required between 4/30/20184 4/1/2018 andSample(s) Required between 5/31/20184 5/1/2018 andSample(s) Required between 6/30/20184 6/1/2018 andSample(s) Required between 7/31/20184 7/1/2018 andSample(s) Required between 8/31/20184 8/1/2018 andSample(s) Required between 9/30/20184 9/1/2018 andSample(s) Required between 10/31/20184 10/1/2018 andSample(s) Required between 11/30/20184 11/1/2018 andSample(s) Required between 12/31/20184 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 DOLLAR GENERAL 1485 XENIA AVE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 35: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

YELLOW SPRINGS VILLAGE PWSOH2903012

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

02/16/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 RAHN PARK DAYTON STREET

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/201840LEAD - 1030 AND COPPER - 1022 1/1/2018 andSample(s) Required between 12/31/201840 7/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 36: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA B PWSOH2903312

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954600EP001

Facility Name: WRIGHT-PATTERSON AFB AREA B STU 1

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 2Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 37: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA B PWSOH2903312

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960515EP002

Facility Name: WRIGHT-PATTERSON AFB AREA B STU 2

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 38: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA B PWSOH2903312

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/201810TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201810 2/1/2018 andSample(s) Required between 3/31/201810 3/1/2018 andSample(s) Required between 4/30/201810 4/1/2018 andSample(s) Required between 5/31/201810 5/1/2018 andSample(s) Required between 6/30/201810 6/1/2018 andSample(s) Required between 7/31/201810 7/1/2018 andSample(s) Required between 8/31/201810 8/1/2018 andSample(s) Required between 9/30/201810 9/1/2018 andSample(s) Required between 10/31/201810 10/1/2018 andSample(s) Required between 11/30/201810 11/1/2018 andSample(s) Required between 12/31/201810 12/1/2018 and

Sample(s) Required between 1/31/201810TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201810 2/1/2018 andSample(s) Required between 3/31/201810 3/1/2018 andSample(s) Required between 4/30/201810 4/1/2018 andSample(s) Required between 5/31/201810 5/1/2018 andSample(s) Required between 6/30/201810 6/1/2018 andSample(s) Required between 7/31/201810 7/1/2018 andSample(s) Required between 8/31/201810 8/1/2018 andSample(s) Required between 9/30/201810 9/1/2018 andSample(s) Required between 10/31/201810 10/1/2018 andSample(s) Required between 11/30/201810 11/1/2018 andSample(s) Required between 12/31/201810 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS201 OFF OF SPAATZ CIRCLE (TAP 1)

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 39: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA B PWSOH2903312

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS202 C AND 10TH STREET

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201830LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 40: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954601EP001

Facility Name: WRIGHT PATTERSON AFB AREA AREA A STU 1

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 2Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2018 and 9/30/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 41: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960516EP002

Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 2

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 2Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2018 and 9/30/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 42: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960517EP003

Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 3

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Source: Ground Water

EP003

EP003

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 43: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960518EP004

Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 4

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Source: Ground Water

EP004

EP004

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Page 44: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/201815TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201815 2/1/2018 andSample(s) Required between 3/31/201815 3/1/2018 andSample(s) Required between 4/30/201815 4/1/2018 andSample(s) Required between 5/31/201815 5/1/2018 andSample(s) Required between 6/30/201815 6/1/2018 andSample(s) Required between 7/31/201815 7/1/2018 andSample(s) Required between 8/31/201815 8/1/2018 andSample(s) Required between 9/30/201815 9/1/2018 andSample(s) Required between 10/31/201815 10/1/2018 andSample(s) Required between 11/30/201815 11/1/2018 andSample(s) Required between 12/31/201815 12/1/2018 and

Sample(s) Required between 1/31/201815TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201815 2/1/2018 andSample(s) Required between 3/31/201815 3/1/2018 andSample(s) Required between 4/30/201815 4/1/2018 andSample(s) Required between 5/31/201815 5/1/2018 andSample(s) Required between 6/30/201815 6/1/2018 andSample(s) Required between 7/31/201815 7/1/2018 andSample(s) Required between 8/31/201815 8/1/2018 andSample(s) Required between 9/30/201815 9/1/2018 andSample(s) Required between 10/31/201815 10/1/2018 andSample(s) Required between 11/30/201815 11/1/2018 andSample(s) Required between 12/31/201815 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS201 MUSTANG DRIVE (TAP 19)

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 45: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT-PATTERSON AFB AREA A PWSOH2903412

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS202 SHERWOOD STREET (TAP 20)

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/201860LEAD - 1030 AND COPPER - 1022 1/1/2018 andSample(s) Required between 12/31/201860 7/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 46: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-NORTHWEST REG WATEROH2903512

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954602EP001

Facility Name: GREENE CO NORTHWEST REGIONAL WTP 1

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 47: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-NORTHWEST REG WATEROH2903512

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2960519EP002

Facility Name: GREENE CO. NORTHWEST REGIONAL WTP 2

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Sample(s) Required betweenARSENIC - 1005 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 48: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-NORTHWEST REG WATEROH2903512

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2DS000

Sample(s) Required between 1/31/201840TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/201840 2/1/2018 andSample(s) Required between 3/31/201840 3/1/2018 andSample(s) Required between 4/30/201840 4/1/2018 andSample(s) Required between 5/31/201840 5/1/2018 andSample(s) Required between 6/30/201840 6/1/2018 andSample(s) Required between 7/31/201840 7/1/2018 andSample(s) Required between 8/31/201840 8/1/2018 andSample(s) Required between 9/30/201840 9/1/2018 andSample(s) Required between 10/31/201840 10/1/2018 andSample(s) Required between 11/30/201840 11/1/2018 andSample(s) Required between 12/31/201840 12/1/2018 and

Sample(s) Required between 1/31/201840TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/201840 2/1/2018 andSample(s) Required between 3/31/201840 3/1/2018 andSample(s) Required between 4/30/201840 4/1/2018 andSample(s) Required between 5/31/201840 5/1/2018 andSample(s) Required between 6/30/201840 6/1/2018 andSample(s) Required between 7/31/201840 7/1/2018 andSample(s) Required between 8/31/201840 8/1/2018 andSample(s) Required between 9/30/201840 9/1/2018 andSample(s) Required between 10/31/201840 10/1/2018 andSample(s) Required between 11/30/201840 11/1/2018 andSample(s) Required between 12/31/201840 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2DS201 3989 W. ENON RD. BEAVERCREEK

Dual Sample Required between 1/14/2018at: DS201DISINFECTION BYPRODUCTS 1/8/2018 andDual Sample Required between 4/14/2018at: DS2014/8/2018 andDual Sample Required between 7/14/2018at: DS2017/8/2018 andDual Sample Required between 10/14/2018at: DS20110/8/2018 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 49: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-NORTHWEST REG WATEROH2903512

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2DS202 2960 W. ENON RD. BEAVERCREEK

Dual Sample Required between 1/14/2018at: DS202DISINFECTION BYPRODUCTS 1/8/2018 andDual Sample Required between 4/14/2018at: DS2024/8/2018 andDual Sample Required between 7/14/2018at: DS2027/8/2018 andDual Sample Required between 10/14/2018at: DS20210/8/2018 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2DS203 200 DARST RD. BEAVERCREEK

Dual Sample Required between 1/14/2018at: DS203DISINFECTION BYPRODUCTS 1/8/2018 andDual Sample Required between 4/14/2018at: DS2034/8/2018 andDual Sample Required between 7/14/2018at: DS2037/8/2018 andDual Sample Required between 10/14/2018at: DS20310/8/2018 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2DS204 3600 FEEDWIRE RD. BEAVERCREEK

Dual Sample Required between 1/14/2018at: DS204DISINFECTION BYPRODUCTS 1/8/2018 andDual Sample Required between 4/14/2018at: DS2044/8/2018 andDual Sample Required between 7/14/2018at: DS2047/8/2018 andDual Sample Required between 10/14/2018at: DS20410/8/2018 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 50: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-NORTHWEST REG WATEROH2903512

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-NORTHWEST REG WTP 01 DISTRFacility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201830LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 51: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CEDARVILLE UNIVERSITYOH2903612

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954603EP001

Facility Name: CEDARVILLE UNIVERSITY

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2018 and 3/31/2018Sample(s) Required between1 4/1/2018 and 6/30/2018Sample(s) Required between1 7/1/2018 and 9/30/2018Sample(s) Required between1 10/1/2018 and 12/31/2018

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 52: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CEDARVILLE UNIVERSITYOH2903612

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CEDARVILLE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20184TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20184 2/1/2018 andSample(s) Required between 3/31/20184 3/1/2018 andSample(s) Required between 4/30/20184 4/1/2018 andSample(s) Required between 5/31/20184 5/1/2018 andSample(s) Required between 6/30/20184 6/1/2018 andSample(s) Required between 7/31/20184 7/1/2018 andSample(s) Required between 8/31/20184 8/1/2018 andSample(s) Required between 9/30/20184 9/1/2018 andSample(s) Required between 10/31/20184 10/1/2018 andSample(s) Required between 11/30/20184 11/1/2018 andSample(s) Required between 12/31/20184 12/1/2018 and

Sample(s) Required between 1/31/20184TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20184 2/1/2018 andSample(s) Required between 3/31/20184 3/1/2018 andSample(s) Required between 4/30/20184 4/1/2018 andSample(s) Required between 5/31/20184 5/1/2018 andSample(s) Required between 6/30/20184 6/1/2018 andSample(s) Required between 7/31/20184 7/1/2018 andSample(s) Required between 8/31/20184 8/1/2018 andSample(s) Required between 9/30/20184 9/1/2018 andSample(s) Required between 10/31/20184 10/1/2018 andSample(s) Required between 11/30/20184 11/1/2018 andSample(s) Required between 12/31/20184 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CEDARVILLE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS201 PUMP HOUSE

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 53: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CEDARVILLE UNIVERSITYOH2903612

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CEDARVILLE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS202 PATTERSON HALL CUSTODIAL SINK

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CEDARVILLE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 54: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-SOUTHWEST REG WATEROH2903912

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954605EP001

Facility Name: GREENE CO SOUTHWEST REGIONAL

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2018 and 9/30/2018

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3 1 4/1/2018 and 6/30/2018 Sample for all the analytes listed below:

BHC-GAMMA (LINDANE) - 2010 DIQUAT - 2032 GLYPHOSATE - 2034

METHOXYCHLOR - 2015 POLYCHLORINATED BIPHENYLS (PCB) - 2383

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 55: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-SOUTHWEST REG WATEROH2903912

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-SOUTHWEST REG DISTRIBUTIONFacility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-SOUTHWEST REG DISTRIBUTIONFacility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 56: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO.-SOUTHWEST REG WATEROH2903912

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-SOUTHWEST REG DISTRIBUTIONFacility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE CO.-SOUTHWEST REG DISTRIBUTIONFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 57: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - SWIGART PWSOH2904103

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - SWIGART DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - SWIGART DISTRIBUTION Facility Class: CLASS 1DS201 601 WALDEN WAY

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 58: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - SWIGART PWSOH2904103

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - SWIGART DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 59: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - CLYO PWSOH2904203

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - CLYO DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - CLYO DISTRIBUTION Facility Class: CLASS 1DS201 4398 CLYO ROAD

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 60: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - CLYO PWSOH2904203

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - CLYO DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 61: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - KITRIDGEOH2905003

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - KITRIDGE DISTRIBUTIONDS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - KITRIDGE DISTRIBUTIONDS201 4311 KITRIDGE ROAD

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 62: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - KITRIDGEOH2905003

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - KITRIDGE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 63: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY EASTERN REGIONAL PWSOH2906103

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - EASTERN REG. DISTRIBUTFacility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20185TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20185 2/1/2018 andSample(s) Required between 3/31/20185 3/1/2018 andSample(s) Required between 4/30/20185 4/1/2018 andSample(s) Required between 5/31/20185 5/1/2018 andSample(s) Required between 6/30/20185 6/1/2018 andSample(s) Required between 7/31/20185 7/1/2018 andSample(s) Required between 8/31/20185 8/1/2018 andSample(s) Required between 9/30/20185 9/1/2018 andSample(s) Required between 10/31/20185 10/1/2018 andSample(s) Required between 11/30/20185 11/1/2018 andSample(s) Required between 12/31/20185 12/1/2018 and

Sample(s) Required between 1/31/20185TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20185 2/1/2018 andSample(s) Required between 3/31/20185 3/1/2018 andSample(s) Required between 4/30/20185 4/1/2018 andSample(s) Required between 5/31/20185 5/1/2018 andSample(s) Required between 6/30/20185 6/1/2018 andSample(s) Required between 7/31/20185 7/1/2018 andSample(s) Required between 8/31/20185 8/1/2018 andSample(s) Required between 9/30/20185 9/1/2018 andSample(s) Required between 10/31/20185 10/1/2018 andSample(s) Required between 11/30/20185 11/1/2018 andSample(s) Required between 12/31/20185 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - EASTERN REG. DISTRIBUTFacility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 64: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY EASTERN REGIONAL PWSOH2906103

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - EASTERN REG. DISTRIBUTFacility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - EASTERN REG. DISTRIBUTFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201820LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 65: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BEAVER SQUARE

2018 MONITORING SCHEDULE

OH2930612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

02/16/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEAVER SQUARE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 66: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BEAVER SQUARE

2018 MONITORING SCHEDULE

OH2930612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEAVER SQUAREGround Water

2954609

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 67: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BEAVERCREEK FAMILY DENTAL

2018 MONITORING SCHEDULE

OH2930912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEAVERCREEK FAMILY DENT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 68: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BEAVERCREEK FAMILY DENTAL

2018 MONITORING SCHEDULE

OH2930912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEAVERCREEK FAMILY DENTALGround Water

2954610

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 69: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

OHIO SOUTH YOUTH SPORTS SPACE INC.

2018 MONITORING SCHEDULE

OH2932612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OHIO SOUTH YOUTH SPORTS INC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 70: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

OHIO SOUTH YOUTH SPORTS SPACE INC.

2018 MONITORING SCHEDULE

OH2932612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OHIO SOUTH YOUTH SPORTS SPACE INCGround Water

2954614

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 71: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GLEN HELEN OUTDOOR EDUCATION CENTER

2018 MONITORING SCHEDULE

OH2934012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GLEN HELEN OUTDOOR ED CT DISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 72: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GLEN HELEN OUTDOOR EDUCATION CENTER

2018 MONITORING SCHEDULE

OH2934012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GLEN HELEN OUTDOOR ED CTRGround Water

2954617

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 73: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO FISH & GAME CLUBHOUSE PWS

2018 MONITORING SCHEDULE

OH2934112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GREENE COUNTY FISH & GAME CLUBHOUSE DISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 74: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE CO FISH & GAME CLUBHOUSE PWS

2018 MONITORING SCHEDULE

OH2934112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREENE COUNTY FISH & GAME CLUBHOUSEGround Water

2962123

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 75: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK CAMPGROUND

2018 MONITORING SCHEDULE

OH2935012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ODNR-JOHN BRYA ST PK CAM DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 76: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK CAMPGROUND

2018 MONITORING SCHEDULE

OH2935012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR-JOHN BRYA ST PK CAM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 77: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK CAMPGROUND

2018 MONITORING SCHEDULE

OH2935012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODNR JOHN BRYAN STATE PARK CAMPGround Water Facility Class: CLASS A

2954621

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 78: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KNOLLWOOD TAVERN

2018 MONITORING SCHEDULE

OH2935812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KNOLLWOOD TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 79: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KNOLLWOOD TAVERN

2018 MONITORING SCHEDULE

OH2935812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KNOLLWOOD TAVERNGround Water

2954623

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 80: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SANTA FE LOUNGE

2018 MONITORING SCHEDULE

OH2936312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SANTA FE LOUNGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 1/31/2018

Sample(s) Required between1 2/1/2018 and 2/28/2018

Sample(s) Required between1 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Sample(s) Required between1 11/1/2018 and 11/30/2018

Sample(s) Required between1 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 81: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SANTA FE LOUNGE

2018 MONITORING SCHEDULE

OH2936312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SANTA FE LOUNGEGround Water

2954625

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 82: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

XENIA CHRIST TEMPLE CHURCH

2018 MONITORING SCHEDULE

OH2939312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: XENIA CHRIST TEMPLE CHURCHGround Water

2954633

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 83: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

4-H CAMP CLIFTON, INC.

2018 MONITORING SCHEDULE

OH2939612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: 4-H CAMP CLIFTON, INC. DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 84: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

4-H CAMP CLIFTON, INC.

2018 MONITORING SCHEDULE

OH2939612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

11/16/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: 4-H CAMP CLIFTON, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 1/31/2018

Sample(s) Required between1 2/1/2018 and 2/28/2018

Sample(s) Required between1 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Sample(s) Required between1 11/1/2018 and 11/30/2018

Sample(s) Required between1 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 85: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

4-H CAMP CLIFTON, INC.

2018 MONITORING SCHEDULE

OH2939612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: 4-H CAMP CLIFTON INCGround Water

2954634

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2018 and 6/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 86: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOY SCOUTS-CAMP BIRCH 1 PWS

2018 MONITORING SCHEDULE

OH2940312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BOY SCOUTS-CAMP BIRCH 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 87: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOY SCOUTS-CAMP BIRCH 1 PWS

2018 MONITORING SCHEDULE

OH2940312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BOY SCOUTS CAMP BIRCH NO 1Ground Water

2954635

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 88: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOY SCOUTS-CAMP BIRCH 2 PWS

2018 MONITORING SCHEDULE

OH2940322 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BOY SCOUTS-CAMP BIRCH 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 89: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BOY SCOUTS-CAMP BIRCH 2 PWS

2018 MONITORING SCHEDULE

OH2940322 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BOY SCOUTS CAMP BIRCH NO 2Ground Water

2954636

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 90: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CLIFTON MILLS, INC.

2018 MONITORING SCHEDULE

OH2940712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CLIFTON MILLS, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 91: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CLIFTON MILLS, INC.

2018 MONITORING SCHEDULE

OH2940712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLIFTON MILLS INCGround Water

2954638

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 92: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

COUNTY LINE BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2940912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COUNTY LINE BAPTIST CHUR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 93: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

COUNTY LINE BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2940912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COUNTY LINE BAPTIST CHURCHGround Water

2954639

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 94: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FELLOWSHIP TABERNACLE CHURCH

2018 MONITORING SCHEDULE

OH2941212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FELLOWSHIP TABERNACLE CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 95: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FELLOWSHIP TABERNACLE CHURCH

2018 MONITORING SCHEDULE

OH2941212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FELLOWSHIP TABERNACLE CHURCHGround Water

2954640

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 96: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRAPE GROVE CHURCH OF CHRIST

2018 MONITORING SCHEDULE

OH2941412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRAPE GROVE CHURCH OF CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 97: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRAPE GROVE CHURCH OF CHRIST

2018 MONITORING SCHEDULE

OH2941412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRAPE GROVE CHURCH OF CHRISTGround Water

2954641

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 98: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIDDIE KINGDOMOH2941912

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954644EP001

Facility Name: KIDDIE KINGDOM

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 99: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIDDIE KINGDOMOH2941912

2018 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KIDDIE KINGDOM DISTRIBUTIONDS000

Sample(s) Required between 3/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 6/30/20181 4/1/2018 andSample(s) Required between 9/30/20181 7/1/2018 andSample(s) Required between 12/31/20181 10/1/2018 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KIDDIE KINGDOM DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 100: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SHAWNEE HILLS BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2942312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHAWNEE HILLS BAPTIST CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 101: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SHAWNEE HILLS BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2942312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHAWNEE HILLS BAPTIST CHURCHGround Water Facility Class: CLASS A

2954646

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 102: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2943112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/19/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE BAPTIST CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 1/31/2018

Sample(s) Required between1 2/1/2018 and 2/28/2018

Sample(s) Required between1 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Sample(s) Required between1 11/1/2018 and 11/30/2018

Sample(s) Required between1 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 103: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE BAPTIST CHURCH

2018 MONITORING SCHEDULE

OH2943112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE BAPTIST CHURCHGround Water

2954649

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 104: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WOODHAVEN SWIM AND TENNIS CLUB, INC

2018 MONITORING SCHEDULE

OH2943712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 8/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WOODHAVEN SWIM CLUB, INC DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 105: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WOODHAVEN SWIM AND TENNIS CLUB, INC

2018 MONITORING SCHEDULE

OH2943712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 8/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WOODHAVEN SWIM CLUB, INC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 106: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WOODHAVEN SWIM AND TENNIS CLUB, INC

2018 MONITORING SCHEDULE

OH2943712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 8/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WOODHAVEN SWIM CLUB INCGround Water

2954653

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2018 and 10/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 107: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

W.O. WRIGHTS PWS

2018 MONITORING SCHEDULE

OH2944912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: W.O. WRIGHTS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 108: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

W.O. WRIGHTS PWS

2018 MONITORING SCHEDULE

OH2944912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: W.O. WRIGHTSGround Water

2954656

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 109: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CAMP CLIFTON DAY CAMP

2018 MONITORING SCHEDULE

OH2945712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP CLIFTON DAY CAMP DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 110: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CAMP CLIFTON DAY CAMP

2018 MONITORING SCHEDULE

OH2945712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

11/16/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP CLIFTON DAY CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 1/31/2018

Sample(s) Required between1 2/1/2018 and 2/28/2018

Sample(s) Required between1 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Sample(s) Required between1 11/1/2018 and 11/30/2018

Sample(s) Required between1 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 111: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CAMP CLIFTON DAY CAMP

2018 MONITORING SCHEDULE

OH2945712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP CLIFTON DAY CAMPGround Water

2954657

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2018 and 6/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 112: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

LIBERTY WORSHIP CENTER CHURCH OF GOD

2018 MONITORING SCHEDULE

OH2946912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LIBERTY WORSHIP CENTER CHURCH OF GODGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 113: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

LIBERTY WORSHIP CENTER CHURCH OF GOD

2018 MONITORING SCHEDULE

OH2946912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LIBERTY WORSHIP CENTER CHURCH OF GODGround Water

2954660

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 3/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 114: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE COVENANT CHURCH

2018 MONITORING SCHEDULE

OH2947212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE COVENANT CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 115: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE COVENANT CHURCH

2018 MONITORING SCHEDULE

OH2947212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE COVENANT CHURCHGround Water

2954661

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 116: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE CHRISTIAN CENTER

2018 MONITORING SCHEDULE

OH2947612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

10/19/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE CHRISTIAN CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 1/31/2018

Sample(s) Required between1 2/1/2018 and 2/28/2018

Sample(s) Required between1 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Sample(s) Required between1 11/1/2018 and 11/30/2018

Sample(s) Required between1 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 117: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GRACE CHRISTIAN CENTER

2018 MONITORING SCHEDULE

OH2947612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE CHRISTIAN CENTERGround Water

2954662

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 118: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE VALLEY RECREATION

2018 MONITORING SCHEDULE

OH2948312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: GREENE VALLEY RECREATION DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 119: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE VALLEY RECREATION

2018 MONITORING SCHEDULE

OH2948312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GREENE VALLEY RECREATION DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 120: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE VALLEY RECREATION

2018 MONITORING SCHEDULE

OH2948312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREENE VALLEY RECREATION CLUBGround Water

2954664

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 121: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC OFFICE

2018 MONITORING SCHEDULE

OH2949112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: KIL-KARE INC OFFICE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 122: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC OFFICE

2018 MONITORING SCHEDULE

OH2949112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KIL-KARE INC OFFICE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 123: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC OFFICE

2018 MONITORING SCHEDULE

OH2949112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KIL-KARE INC OFFICEGround Water Facility Class: CLASS A

2954667

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 124: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KNOLLWOOD GARDEN CENTER

2018 MONITORING SCHEDULE

OH2949712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KNOLLWOOD FLOWERS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 125: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KNOLLWOOD GARDEN CENTER

2018 MONITORING SCHEDULE

OH2949712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KNOLLWOOD FLORISTS INCGround Water

2954669

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 126: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

THE SAVORY SKILLET

2018 MONITORING SCHEDULE

OH2950212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MOMS KOUNTRY KITCHEN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 127: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

THE SAVORY SKILLET

2018 MONITORING SCHEDULE

OH2950212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MOMS KOUNTRY KITCHENGround Water

2954670

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2018 and 6/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 128: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK 2 PWS

2018 MONITORING SCHEDULE

OH2950712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ODNR-JOHN BRYAN ST PK 2 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 129: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK 2 PWS

2018 MONITORING SCHEDULE

OH2950712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR-JOHN BRYAN ST PK 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 10/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 130: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

ODNR-JOHN BRYAN STATE PARK 2 PWS

2018 MONITORING SCHEDULE

OH2950712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODNR JOHN BRYAN STATE PARK NO 2Ground Water Facility Class: CLASS A

2954672

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 131: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BELLBROOK-SUGARCREEK COMMUNITY CENTER

2018 MONITORING SCHEDULE

OH2951312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BELLBROOK-SUGARCREEK COM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 132: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BELLBROOK-SUGARCREEK COMMUNITY CENTER

2018 MONITORING SCHEDULE

OH2951312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BELLBROOK-SUGARCREEK COMM CTRGround Water

2954675

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 133: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SUGAR VALLEY GOLF CLUB

2018 MONITORING SCHEDULE

OH2952512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SUGAR VALLEY GOLF CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 134: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SUGAR VALLEY GOLF CLUB

2018 MONITORING SCHEDULE

OH2952512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SUGAR VALLEY G.C. - CLUBHOUSEGround Water

2954677

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 135: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

HOMECROFT, INC. PWSOH2954912

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2954691EP001

Facility Name: HOMECROFT INC

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2018 and 6/30/2018

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 1/1/2018 and 5/31/2018 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3 1 4/1/2018 and 6/30/2018 Sample for all the analytes listed below:

BHC-GAMMA (LINDANE) - 2010 DIQUAT - 2032 GLYPHOSATE - 2034

METHOXYCHLOR - 2015 POLYCHLORINATED BIPHENYLS (PCB) - 2383

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 136: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

HOMECROFT, INC. PWSOH2954912

2018 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HOMECROFT, INC. DISTRIBUTIONDS000

Sample(s) Required between 3/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 6/30/20181 4/1/2018 andSample(s) Required between 9/30/20181 7/1/2018 andSample(s) Required between 12/31/20181 10/1/2018 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HOMECROFT, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20185LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 137: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

JASPER ROAD FOOD MART

2018 MONITORING SCHEDULE

OH2955812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: D & K MARKET DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 138: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

JASPER ROAD FOOD MART

2018 MONITORING SCHEDULE

OH2955812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JASPER ROAD FOOD MARTGround Water

2954695

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 139: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

FREEDOM BAPTIST TEMPLE

2018 MONITORING SCHEDULE

OH2956012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FREEDOM BAPTIST TEMPLEGround Water

2954697

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 140: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KINGDOM HALL JEHOVAHS PWS

2018 MONITORING SCHEDULE

OH2956112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KINGDOM HALL JEHOVAHS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 141: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KINGDOM HALL JEHOVAHS PWS

2018 MONITORING SCHEDULE

OH2956112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KINGDOM HALL JEHOVAH WITNESSESGround Water

2954698

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 142: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - FAIRBORNOH2956203

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - FAIRBORN DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20181TOTAL COLIFORM (TCR) - 3100 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Sample(s) Required between 1/31/20181TOTAL CHLORINE - 1000 1/1/2018 andSample(s) Required between 2/28/20181 2/1/2018 andSample(s) Required between 3/31/20181 3/1/2018 andSample(s) Required between 4/30/20181 4/1/2018 andSample(s) Required between 5/31/20181 5/1/2018 andSample(s) Required between 6/30/20181 6/1/2018 andSample(s) Required between 7/31/20181 7/1/2018 andSample(s) Required between 8/31/20181 8/1/2018 andSample(s) Required between 9/30/20181 9/1/2018 andSample(s) Required between 10/31/20181 10/1/2018 andSample(s) Required between 11/30/20181 11/1/2018 andSample(s) Required between 12/31/20181 12/1/2018 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - FAIRBORN DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 143: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

GREENE COUNTY - FAIRBORNOH2956203

2018 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/25/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2018

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - FAIRBORN DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GREENE COUNTY - FAIRBORN DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/201810LEAD - 1030 AND COPPER - 1022 6/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 144: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC TRACK

2018 MONITORING SCHEDULE

OH2956312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: KIL-KARE INC TRACK DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 145: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC TRACK

2018 MONITORING SCHEDULE

OH2956312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KIL-KARE INC TRACK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 146: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KIL-KARE INC TRACK

2018 MONITORING SCHEDULE

OH2956312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 11/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KIL-KARE INC TRACKGround Water Facility Class: CLASS A

2954700

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 147: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CHURCH OF JESUS CHRIST-FAIRBORN PWS

2018 MONITORING SCHEDULE

OH2956512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHURCH OF JESUS CHRIST-F DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 148: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

CHURCH OF JESUS CHRIST-FAIRBORN PWS

2018 MONITORING SCHEDULE

OH2956512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHURCH OF JESUS CHRIST FAIRBORNGround Water

2954702

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 149: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPORTS PLEX

2018 MONITORING SCHEDULE

OH2956712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPORTS PLEX DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 2 1/1/2018 and 1/31/2018

Sample(s) Required between2 2/1/2018 and 2/28/2018

Sample(s) Required between2 3/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between2 10/1/2018 and 10/31/2018

Sample(s) Required between2 11/1/2018 and 11/30/2018

Sample(s) Required between2 12/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 150: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

SPORTS PLEX

2018 MONITORING SCHEDULE

OH2956712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPORTS PLEXGround Water Facility Class: CLASS A

2954703

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 151: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BATH ROAD CHURCH OF CHRIST PWS

2018 MONITORING SCHEDULE

OH2956912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BATH ROAD CHURCH OF CHRIST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 152: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

BATH ROAD CHURCH OF CHRIST PWS

2018 MONITORING SCHEDULE

OH2956912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BATH ROAD CHURCH OF CHRISTGround Water

2960779

Sample(s) Required betweenNITRITE - 1041 1 1/1/2018 and 5/31/2018

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 153: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

OLD US 35 CAMPGROUND

2018 MONITORING SCHEDULE

OH2957112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OLD US 35 CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 154: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

OLD US 35 CAMPGROUND

2018 MONITORING SCHEDULE

OH2957112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OLD US 35 CAMPGROUNDGround Water

2960674

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2018 and 5/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 155: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

HUFFMAN METROPARK MOMBA WELL PWS

2018 MONITORING SCHEDULE

OH2958512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: HUFFMAN METROPARK MOMBA WELL DISTRIBUTN

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 156: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

HUFFMAN METROPARK MOMBA WELL PWS

2018 MONITORING SCHEDULE

OH2958512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HUFFMAN METROPARK MOMBA WELL DISTRIBUTN

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2018 and 4/30/2018

Sample(s) Required between1 5/1/2018 and 5/31/2018

Sample(s) Required between1 6/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 7/31/2018

Sample(s) Required between1 8/1/2018 and 8/31/2018

Sample(s) Required between1 9/1/2018 and 9/30/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 157: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

HUFFMAN METROPARK MOMBA WELL PWS

2018 MONITORING SCHEDULE

OH2958512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 9/30

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HUFFMAN METROPARK MOMBA WELLGround Water

2962424

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2018 and 10/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 158: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KAVANAGH WILDLIFE FARM INC PWS

2018 MONITORING SCHEDULE

OH2958612 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KAVANAGH WILDLIFE FARM INC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 159: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

KAVANAGH WILDLIFE FARM INC PWS

2018 MONITORING SCHEDULE

OH2958612 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KAVANAGH WILDLIFE FARM INCGround Water

2962508

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2018 and 10/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 160: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WPAFB WARRIOR TRAINING CTR PWS

2018 MONITORING SCHEDULE

OH2958712 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WPAFB WARRIOR TRAINING CTR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2018 and 3/31/2018

Sample(s) Required between1 4/1/2018 and 6/30/2018

Sample(s) Required between1 7/1/2018 and 9/30/2018

Sample(s) Required between1 10/1/2018 and 12/31/2018

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 161: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT PATTERSON MEDICAL CENTER PWSOH2958713

ENTRY POINT MONITORING SCHEDULE

2018 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

2962510EP001

Facility Name: WRIGHT PATTERSON MEDICAL CENTER

Effective Date: 01/01/2018

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample daily when Chlorine Dioxideis applied.

CHLORITE - 1009 1

Sample daily when Chlorine Dioxideis applied.

CHLORINE DIOXIDE - 1008 1

Page 162: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT PATTERSON MEDICAL CENTER PWSOH2958713

2018 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

04/20/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20183CHLORITE - 1009 1/1/2018 andSample(s) Required between 2/28/20183 2/1/2018 andSample(s) Required between 3/31/20183 3/1/2018 andSample(s) Required between 4/30/20183 4/1/2018 andSample(s) Required between 5/31/20183 5/1/2018 andSample(s) Required between 6/30/20183 6/1/2018 andSample(s) Required between 7/31/20183 7/1/2018 andSample(s) Required between 8/31/20183 8/1/2018 andSample(s) Required between 9/30/20183 9/1/2018 andSample(s) Required between 10/31/20183 10/1/2018 andSample(s) Required between 11/30/20183 11/1/2018 andSample(s) Required between 12/31/20183 12/1/2018 and

One sample at each of the following locations: near the first customer, at a location representative of the average residence time, and at alocation reflecting maximum residence time of the water in the distribution system. Consult Chlorine Dioxide plan approval for additionaldistribution requirements unique to your system.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTION Facility Class: CLASS 1DS201 ADDRES NOT KNOWN

Dual Sample Required between 9/30/2018at: DS201DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2018at: DS202DISINFECTION BYPRODUCTS 7/1/2018 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/201820LEAD - 1030 AND COPPER - 1022 1/1/2018 and

Page 163: 2018 ENTRY POINT SCHEDULE Effective Date: 01/01/2018 … · 2018. 11. 19. · Effective Date: 01/01/2018 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM

WRIGHT PATTERSON MEDICAL CENTER PWSOH2958713

2018 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

04/20/2018Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 12/31/201820LEAD - 1030 AND COPPER - 1022 7/1/2018 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.