2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 Recommended by the Transportation Advisory Committee February 28, 2017 Approved by the Board of Supervisors June 7, 2017

Upload: others

Post on 16-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

pg. 1

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021

Recommended by the Transportation Advisory Committee February 28, 2017

Approved by the Board of Supervisors June 7, 2017

Page 2: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2016-2017 THROUGH 2020-2021

The Pinal County Board of Supervisors (Board) proudly presents the 2017 Five-Year Transportation Improvement and

Maintenance Program (TIMP) for Budget Years 2016-2017 through 2020-2021. The TIMP is Pinal County’s near-term transportation

plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is

fiscally constrained and updated annually with new projects added to the fifth year.

The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s

five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP

to the Board. On February 28, 2017, the TAC met in an open public meeting and recommended approval of the 2017 TIMP for Budget

Years 2016-2017 through 2020-2021.

In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.

First Row (L-R): Paul Prechel, District 1; David Garcia, District 1; Vice-Chair Maxine Brown, District 5; Jim Fabris, District 2;

Second Row (L-R): Tom Snider, District 4; Gordon Brown, District 2; Giao Pham, District 5; Chair Kevin Louis, District 3

Not pictured: Ted Hawkins, District 4 and Harold Vangilder, District 3

Page 3: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2016-2017 THROUGH 2020-2021

The TAC conducts three public meetings during the months of September, November, and February in Florence and considers

public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on

the TIMP and future transportation projects.

Meetings are held on Tuesdays in the Ironwood Room (Northeast Multipurpose Room 101) of the Pinal County Administrative

Complex (1891 Historic Courthouse) and begin at 2:30 p.m. as follows:

Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website:

http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.

Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half-cent sales tax, approved

by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout

the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented

countywide. With your support, we can continue building and improving the county’s transportation system.

Pinal County Board of Supervisors

September 26, 2017 November 28, 2017 February 27, 2018

Vice-Chairman Pete Rios, District 1; Mike Goodman, District 2; Chairman Stephen Miller, District 3; Anthony Smith, District 4; Todd House, District 5

Page 4: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The
Page 5: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2016-2017 THROUGH 2020-2021

GLOSSARY

Activity – Project work such as: pre-construction/construction/new construction/reconstruction, drainage, dust palliative,

pavement preservation or safety.

Construction – The building of roadway and/or related infrastructure improvements.

Drainage – The management of storm water to protect private and/or public infrastructure.

Dust Palliative – A surface treatment applied to unimproved roadways to control dust.

New Construction – The establishment of a roadway and/or related infrastructure improvements.

Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.

Pre-Construction – The project work conducted prior to construction of roadway and/or related infrastructure

improvements such as: planning, environmental, design, and right-of-way acquisition.

Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may

be incorporated into the project.

Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection

realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.

Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway

Cancelled – The project was terminated due to financial or other constraints such as unresolved right-of-way issues or

changing priority.

Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated

funding for project was not used.

Page 6: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2016-2017 THROUGH 2020-2021

GLOSSARY (continued)

Completed – The project was successfully finished/constructed and closed out.

Pending – The project is about to start or awaiting the completion of another activity.

Programmed – The project was approved/authorized and scheduled for a future budget year.

Underway – The project is in progress.

Unfunded – Funding has not been identified/allocated.

Page 7: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Budget Year 2016-2017Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Battaglia Drive Overfield Rd Intersection Construction/Reconstructi $350,000 14UnderwayAngeline To a

Florence-Kelvin Highway Cochran Rd-Donnelly Wash Construction $275,900 11CompletedAngeline To b

Gantzel Road (Pathway) Bella Vista Rd-Poston Butte High School New Construction $500,000 22CompletedCeleste Garza a

Germann Road Meridian Rd-Ironwood Dr Pre-Construction $244,124 22UnderwayCeleste Garza b

Henness Road Val Vista Rd-Waverly Dr New Construction $350,000 33UnderwayLindsey Randall a

Hunt Highway - Phase IV Gary Rd-Magma Rd Pre-Construction $250,000 32CompletedCeleste Garza b

Maricopa-Casa Grande Highway Santa Cruz Wash Crossing New Construction $2,600,000 44CompletedJohn Kraft a

Mitchell Trail Heritage Rd-Arizona Farms Rd Pre-Construction $100,000 42UnderwayCeleste Garza b

Safety Program Countywide Safety $915,600 57ProgrammedJohn Kraft a

$5,585,624SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Bronco Lane Valley View Dr south .1 mile Dust Palliative $30,000 55PendingCeleste Garza b

Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative $750,000 61, 4PendingAngeline To a

Cattle Tank Road Davis Ranch Rd-Park Link Dr Pre-Construction $90,000 61, 4UnderwayAngeline To b

Christensen Road-Bartlett Road Martin Rd-5th St Dust Palliative $180,000 71CompletedCeleste Garza a

Estancia Drive Davis Ranch Rd-Hedgehog Tr Dust Palliative $100,000 74PendingAngeline To b

Harmon Road Toltec Hwy-Tweedy Rd Dust Palliative $360,000 81PendingAngeline To a

Huisatch Road Garnet Rd-Amarillo Valley Rd Dust Palliative $175,000 84PendingLindsey Randall b

La Barranca Road Sage St-Hidden Valley Rd Dust Palliative $100,000 94CompletedLindsey Randall a

La Palma Road State Route 287-.25 north of Kleck Rd Dust Palliative $150,000 91PendingLindsey Randall b

Maverick Circle Mohican Rd west .1 mile Dust Palliative $30,000 105PendingCeleste Garza a

Pavement Preservation Program Countywide Pavement Preservation $84,400 107ProgrammedJoe Ortiz b

Pavement Preservation Program Countywide Pavement Preservation $915,600 117ProgrammedJoe Ortiz a

Ralston Road Wildcat Ln-Dune Shadow Rd Dust Palliative $200,000 114CompletedLindsey Randall b

Redington Road Veterans Memorial Blvd-Pima County Line Dust Palliative $665,000 121UnderwayAngeline To a

Sixshooter Road Jacob Waltz St north .1 mile Dust Palliative $30,000 125PendingCeleste Garza b

Wildwood Road Warren Rd-Amarillo Valley Rd Dust Palliative $400,000 134CompletedLindsey Randall a

$4,260,000SUBTOTAL MAINTENANCE

$9,845,624GRAND TOTAL 2016-2017

District 7 = Multiple districts or countywide

Page 8: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Budget Year 2017-2018Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Curry Road State Route 287-Storey Rd Construction $110,000 133ProgrammedLindsey Randall b

McCartney Road Interstate 10-Evans Rd Reconstruction $3,500,000 141, 3UnderwayLindsey Randall a

Safety Program Countywide Safety $500,000 147ProgrammedJohn Kraft b

Sunland Gin Road Battaglia Dr Intersection Safety $350,000 154ProgrammedAngeline To a

Tweedy Road State Route 287-Storey Rd Construction $110,000 153ProgrammedLindsey Randall b

$4,570,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Cactus Road Kaniksu St (north)-Frontier St Dust Palliative $20,000 165PendingCeleste Garza a

Dust Abatement Program Apache Junction area Dust Palliative $500,000 165PendingCeleste Garza b

McDavid Road Warren Rd-Hidden Valley Rd Dust Palliative $110,000 174UnderwayLindsey Randall a

Muleshoe Road Roundup St-Shiprock St Dust Palliative $20,000 175PendingCeleste Garza b

Pavement Preservation Program Countywide Pavement Preservation $500,000 187ProgrammedJoe Ortiz a

Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative $252,083 183ProgrammedLindsey Randall b

Warren Road Farrell Rd-McDavid Rd Dust Palliative $220,000 194PendingLindsey Randall a

$1,622,083SUBTOTAL MAINTENANCE

$6,192,083GRAND TOTAL 2017-2018

District 7 = Multiple districts or countywide

Page 9: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Budget Year 2018-2019Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Arizona City Safety Study Multiple Intersections Pre-Construction $100,000 194ProgrammedAngeline To b

Baseline Avenue Mohican Rd-East 980 feet Construction $55,417 205ProgrammedCeleste Garza a

Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction $61,700 205ProgrammedCeleste Garza b

Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction $800,000 211ProgrammedAngeline To a

Gantzel Road Chandler Heights Rd Construction $325,000 212, 5ProgrammedCeleste Garza b

Germann Road Meridian Rd-Ironwood Dr New Construction $1,728,590 222ProgrammedCeleste Garza a

Hohokam Road Paisano Dr-Quartzite Dr Construction $286,300 221ProgrammedCeleste Garza b

Lost Dutchman Road Sun Rd-Prospectors Rd Construction $156,000 235ProgrammedCeleste Garza a

Safety Program Countywide Safety $1,000,000 237ProgrammedJohn Kraft b

$4,513,007SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Arica Road Isom Rd-Trekell Rd Dust Palliative $120,000 244CompletedJohn Kraft a

Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation $200,000 243, 4ProgrammedAngeline To b

Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation $2,000,000 253ProgrammedJohn Kraft a

Dust Abatement Program Countywide Dust Palliative $1,000,000 257ProgrammedJoe Ortiz b

Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative $240,000 264ProgrammedJohn Kraft a

Sage Street Barnes Rd-Miller Rd Dust Palliative $120,000 264CompletedJohn Kraft b

Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative $150,000 274ProgrammedJohn Kraft a

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction $50,000 275UnderwayCeleste Garza b

$3,880,000SUBTOTAL MAINTENANCE

$8,393,007GRAND TOTAL 2018-2019

District 7 = Multiple districts or countywide

Page 10: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Budget Year 2019-2020Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd Construction $700,000 281ProgrammedAngeline To a

Gantzel Road Queen Creek (Wash) Pre-Construction $50,000 282, 5ProgrammedCeleste Garza b

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction $110,000 295ProgrammedCeleste Garza a

Jackpot Street Skyline Dr-Rolling Ridge Rd Construction $82,500 295ProgrammedCeleste Garza b

Roberts Road Felix Rd-Joel Rd Construction $38,542 305ProgrammedCeleste Garza a

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction $110,000 305ProgrammedCeleste Garza b

Safety Program Countywide Safety $1,000,000 317ProgrammedJohn Kraft a

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction $110,000 315ProgrammedCeleste Garza b

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction $28,333 325ProgrammedCeleste Garza a

Tombstone Street Skyline Dr-Rolling Ridge Rd Construction $82,500 325ProgrammedCeleste Garza b

Val Vista Road Warren Rd-Hidden Valley Rd Construction $520,000 334ProgrammedJohn Kraft a

$2,831,875SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Ashmore Street Passmore Rd-Baldwin Av Dust Palliative $59,000 333, 4ProgrammedJohn Kraft b

Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative $11,000 345ProgrammedCeleste Garza a

Carefree Place State Route 347-Pepper Pl Dust Palliative $500,000 344ProgrammedJohn Kraft b

Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative $78,100 352ProgrammedCeleste Garza a

Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative $84,700 352ProgrammedCeleste Garza b

Dust Abatement Program Countywide Dust Palliative $2,000,000 367ProgrammedJoe Ortiz a

Marlow Road Jacob Waltz St-End of road Dust Palliative $15,958 365ProgrammedCeleste Garza b

Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative $102,083 372ProgrammedCeleste Garza a

Pavement Preservation Program Countywide Pavement Preservation $700,000 377ProgrammedJoe Ortiz b

Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative $6,667 385ProgrammedCeleste Garza a

Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative $91,667 381ProgrammedCeleste Garza b

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Dust Palliative $250,000 395ProgrammedCeleste Garza a

Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative $300,000 394ProgrammedJohn Kraft b

$4,199,175SUBTOTAL MAINTENANCE

$7,031,050GRAND TOTAL 2019-2020

District 7 = Multiple districts or countywide

Page 11: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Budget Year 2020-2021Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction $50,000 401ProgrammedAngeline To a

Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction $250,000 404ProgrammedAngeline To b

Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction $125,000 412ProgrammedCeleste Garza a

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 412ProgrammedCeleste Garza b

Kenworthy Road Germann Rd-Pima Rd Reconstruction $550,000 422ProgrammedCeleste Garza a

Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $1,250,000 422ProgrammedCeleste Garza b

Mountain View Road Broadway Av Intersection Construction $250,000 435ProgrammedCeleste Garza a

Ocotillo Road Meridian Rd-Ironwood Dr Construction $2,500,000 432ProgrammedCeleste Garza b

$6,225,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostArea Engineer

Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative $100,000 444ProgrammedLindsey Randall a

Logan Boulevard Diffin Rd-Reed Rd Dust Palliative $125,000 441ProgrammedCeleste Garza b

Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative $250,000 454ProgrammedLindsey Randall a

Midway Road Beggs Rd-Marsh Rd Dust Palliative $230,000 453, 4ProgrammedLindsey Randall b

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative $250,000 461ProgrammedAngeline To a

Rhea Road Brennar Pass Rd-Donnaloy Road Dust Palliative $30,000 462ProgrammedCeleste Garza b

River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 471ProgrammedAngeline To a

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative $30,000 471ProgrammedAngeline To b

Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative $100,000 484ProgrammedLindsey Randall a

Tweedy Road Storey Rd-Randolph Rd Dust Palliative $250,000 483ProgrammedLindsey Randall b

$1,565,000SUBTOTAL MAINTENANCE

$7,790,000GRAND TOTAL 2020-2021

District 7 = Multiple districts or countywide

Page 12: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Battaglia Drive Overfield Rd Intersection

Construction/Reconstruction

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Culvert for intersection and pavement replacementStatus: From Programmed to Underway. Design is underway (60% complete) with construction scheduled for Summer/Fall 2017.

Status Underway

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

1 a

Length in Miles

Florence-Kelvin Highway Cochran Rd-Donnelly Wash

Construction

$275,900

$0

$275,900

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeBudget Year: Carryover of $275,900 from 2015-2016 to 2016-2017Status: From Pending to Completed. Construction on original project limits, from Adams Wy-Cochran Rd, completed May 2015. Construction on one mile from Cochran Rd to Donnelly Wash completed Spring 2016.

Status Completed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6511204

3

1 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 13: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Gantzel Road (Pathway) Bella Vista Rd-Poston Butte High School

New Construction

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Pathway constructionBudget Year: Carryover of $500,000 from 2015-2016 to 2016-2017Status: From Underway to Completed. Construction is subtantially completed as of September 2016. Project constructed in conjunction with the Hunt Highway - Phase III (Gary Rd - Bella Vista Rd) and Gantzel Road - Phase D1 projects.

Status Completed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.8

2 a

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

Pre-Construction

$13,866

$230,258

$244,124

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Right-of-way acquisition, environmental, design for construction of two-lane road, and plan review by the Arizona Department of TransportationCounty Cost: $13,866 reflects Pinal County's cost share matchStatus: Design underway and approximately 95% complete and pending review/management by Arizona Department of Transportation. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.

Status Underway

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

2 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 14: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Henness Road Val Vista Rd-Waverly Dr

New Construction

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Status: Right-of-way has been obtained, in-house design is underway, and construction is scheduled for Summer 2017. Design (at 60%) is anticipated to be completed February 2017.

Status Underway

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

3 a

Length in Miles

Hunt Highway - Phase IV Gary Rd-Magma Rd

Pre-Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: DesignStatus: From Underway to Completed. Design is 95% completed and is now bond funded. Final design submittal mid-February 2017. Construction is anticipated June 2017.

Status Completed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3

3 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 15: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Maricopa-Casa Grande Highway Santa Cruz Wash Crossing

New Construction

$2,600,000

$0

$2,600,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Box culvert constructionCounty Cost: Increased from $2,300,000 to $2,600,000Budget Year: Carryover of $2,600,000 from 2015-2016 to 2016-2017Status: From Underway to Completed. Project completed Spring 2016.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6731157

0.5

4 a

Length in Miles

Mitchell Trail Heritage Rd-Arizona Farms Rd

Pre-Construction

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Right-of-way/design for new roadwayBudget Year: Carryover of $100,000 from 2015-2016 to 2016-2017Status: Right-of-way acquisition is underway but responses are not favorable at this time.

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

4 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 16: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Safety Program Countywide

Safety

$915,600

$0

$915,600

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Safety Program (Target Funding: 15%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

5 a

Length in Miles

Bronco Lane Valley View Dr south .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Asphalt Rock Dust PalliativeStatus: Asphalt rock dust palliative scheduled Summer 2017.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

5 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 17: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Cattle Tank Road Davis Ranch Rd-Park Link Dr

Dust Palliative

$750,000

$0

$750,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1, 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeStatus: Submitted final Environmental Assessment to the Bureau of Land Management. Right-of-way acquisition from the Arizona State Land Department is completed. Asphalt rock dust palliative is scheduled Spring 2017. Construction will be in phases starting with Davis Ranch Road to Amber Sunrise Drive.

Status Pending

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

5.5

6 a

Length in Miles

Cattle Tank Road Davis Ranch Rd-Park Link Dr

Pre-Construction

$90,000

$0

$90,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1, 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Environmental and right-of-way for Asphalt Rock Dust PalliativeStatus: Submitted final Environmental Assessment to the Bureau of Land Management. Right-of-way acquisition from the Arizona State Land Department is completed. Asphalt rock dust palliative is scheduled Spring 2017. Construction will be in phases starting with Davis Ranch Road to Amber Sunrise Drive.Project Numbers: 6511213 (environmental clearance), 6511214 (right-of-way acquisition)

Status Underway

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6511213

5.5

6 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 18: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Christensen Road-Bartlett Road Martin Rd-5th St

Dust Palliative

$180,000

$0

$180,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Celeste Garza E-mail [email protected]

Comments Status: From Pending to Completed. Asphalt rock dust palliative completed August 2016. Comment: Project is a joint effort with the City of Coolidge.

Status Completed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

7 a

Length in Miles

Estancia Drive Davis Ranch Rd-Hedgehog Tr

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Angeline To E-mail [email protected]

Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled for Summer 2017.

Status Pending

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.1

7 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 19: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Harmon Road Toltec Hwy-Tweedy Rd

Dust Palliative

$235,000

$125,000

$360,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments County Cost: From $360,000 to $235,000Non County Cost: From $0 to $125,000Status: Cost share agreement with dairy owner pending approval by the Board of Supervisors 2/15/17. Construction scheduled for Summer 2017.

Status Pending

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

8 a

Length in Miles

Huisatch Road Garnet Rd-Amarillo Valley Rd

Dust Palliative

$175,000

$0

$175,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: Asphalt rock dust palliative is scheduled Fall 2017

Status Pending

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

8 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 20: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

La Barranca Road Sage St-Hidden Valley Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Pending to Completed. Asphalt rock dust palliative was completed August 2016.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

9 a

Length in Miles

La Palma Road State Route 287-.25 north of Kleck Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Asphalt rock dust palliative is scheduled Fall 2017.Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]

Status Pending

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2.25

9 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 21: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Maverick Circle Mohican Rd west .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeStatus: Asphalt rock dust palliative scheduled Summer 2017.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

10 a

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$84,400

$0

$84,400

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation ProgramCounty Cost: Additional allocation as recommended by the Transportation Advisory Committee (total direct funding $1,000,000.00)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

10 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 22: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$915,600

$0

$915,600

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 15%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

11 a

Length in Miles

Ralston Road Wildcat Ln-Dune Shadow Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Underway to Completed. Asphalt rock dust palliative completed Spring 2016.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.75

11 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 23: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Redington Road Veterans Memorial Blvd-Pima County Line

Dust Palliative

$665,000

$0

$665,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeStatus: Dust palliative on Redington Road from Veterans Memorial Blvd to River Rd completed September 2015. Environmental study completed on Redington Road from River Rd to Pinal-Pima County boundary September 2016 with completion of asphalt rock dust palliative anticipated April 2017.

Status Underway

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

8

12 a

Length in Miles

Sixshooter Road Jacob Waltz St north .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Status: Asphalt rock dust palliative scheduled Summer 2017.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

12 b

Budget Year 2016-2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 24: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Wildwood Road Warren Rd-Amarillo Valley Rd

Dust Palliative

$400,000

$0

$400,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Budget Year: Carryover of $400,000 from 2015-2016 to 2016-2017Status: From Underway to Completed. Asphalt rock dust palliative completed Spring 2016.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3

13 a

Length in Miles

Curry Road State Route 287-Storey Rd

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

13 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2016-2017

Page 25: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

McCartney Road Interstate 10-Evans Rd

Reconstruction

$3,500,000

$0

$3,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1, 3Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Installation of culverts at dip crossings. Budget Year: Carryover of $1,500,000 from 2016-2017 to 2017-2018County Cost: Increased from $2,000,000 to $3,500,000 to consolidate 2 programmed projects.Status: From Pending to Underway. Design is underway (90% completed) with construction anticipated Fall 2017.

Status Underway

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3.1

14 a

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Safety Program (Target Funding: 10%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

14 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 26: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Sunland Gin Road Battaglia Dr Intersection

Safety

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Westbound Turn laneBudget Year: Advanced from 2019-2020 to 2017-2018

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 19118

0

15 a

Length in Miles

Tweedy Road State Route 287-Storey Rd

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

15 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 27: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Cactus Road Kaniksu St (north)-Frontier St

Dust Palliative

$20,000

$0

$20,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled Summer 2018

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

16 a

Length in Miles

Dust Abatement Program Apache Junction area

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Area Engineer's discretionary project(s) to address fugitive dust (Particulate Matter 10) in Pinal County's Non-Attainment area (T1N, R8E)Status: From Programmed to Pending. Asphalt rock dust palliatives scheduled Summer 2018

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

16 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 28: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

McDavid Road Warren Rd-Hidden Valley Rd

Dust Palliative

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]: From Programmed to Underway. Project is underway and may be completed Budget Year 2016-2017.

Status Underway

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

17 a

Length in Miles

Muleshoe Road Roundup St-Shiprock St

Dust Palliative

$20,000

$0

$20,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled Summer 2018

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

17 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 29: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 10%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

18 a

Length in Miles

Peters Road Santa Cruz Wash-Corrales Rd

Dust Palliative

$252,083

$0

$252,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.6

18 b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 30: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Warren Road Farrell Rd-McDavid Rd

Dust Palliative

$220,000

$0

$220,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Dust palliative programmed for Summer 2018.Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]

Status Pending

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

19 a

Length in Miles

Arizona City Safety Study Multiple Intersections

Pre-Construction

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Location: Battaglia Drive from Sunland Gin Road to Overfield Road, Battaglia Drive from Chuichu Road to Del Rio Road, Lamb Road from Battaglia Drive to Milligan Road, Milligan Road from Sunland Gin Road Overfield Road, Overfield Road from Battaglia Drive to Milligan Road, and Sunland Gin Road from Battaglia Drive to Milligan Road

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

19 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2017-2018

Page 31: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Baseline Avenue Mohican Rd-East 980 feet

Construction

$55,417

$0

$55,417

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.19

20 a

Length in Miles

Cactus Wren Street Mountain View Rd-Val Vista Rd

New Construction

$61,700

$0

$61,700

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.22

20 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 32: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Florence-Kelvin Highway Donnelly Wash-East 2 miles

Construction

$800,000

$0

$800,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

21 a

Length in Miles

Gantzel Road Chandler Heights Rd

Construction

$325,000

$0

$325,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

21 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 33: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

New Construction

$98,530

$1,630,060

$1,728,590

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of two-lane roadBudget Year: Carryover from 2014-2015 to 2018-2019County Cost: $98,530 reflects Pinal County's cost share matchStatus: Design underway and approximately 95% complete. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

22 a

Length in Miles

Hohokam Road Paisano Dr-Quartzite Dr

Construction

$286,300

$0

$286,300

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.33

22 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 34: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Lost Dutchman Road Sun Rd-Prospectors Rd

Construction

$156,000

$0

$156,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

23 a

Length in Miles

Safety Program Countywide

Safety

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety Program

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

23 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 35: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Arica Road Isom Rd-Trekell Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

24 a

Length in Miles

Battaglia Drive Chuichu Rd-Del Rio Rd

Pavement Preservation

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager Angeline To E-mail [email protected]

Comments

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.5

24 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 36: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Chuichu Road Battaglia Dr-Interstate 8

Pavement Preservation

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.3

25 a

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

25 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 37: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Fulcar Road Hidden Valley Rd-Table Top Rd

Dust Palliative

$240,000

$0

$240,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

26 a

Length in Miles

Sage Street Barnes Rd-Miller Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

26 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 38: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Sotol Road Warren Rd-Hidden Valley Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

27 a

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St

Pre-Construction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Project: Stagecoach Pass Av-Ghost Rider Street to Stagecoach Pass AvenueActivity: In-house design and right-of-way design. Budget Year: Carryover from 2014-2015 to 2018-2019Status: Design underway with construction anticipated in Budget Year 2019-2020. Right-of-way acquisition underway but responses are not favorable.

Status Underway

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.8

27 b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 39: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd

Construction

$700,000

$0

$700,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 3030

3

28 a

Length in Miles

Gantzel Road Queen Creek (Wash)

Pre-Construction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 4010

0.07

28 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 40: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 8125

1

29 a

Length in Miles

Jackpot Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 10116

0.75

29 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 41: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Roberts Road Felix Rd-Joel Rd

Construction

$38,542

$0

$38,542

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 15035

0.35

30 a

Length in Miles

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 16114

1

30 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 42: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Safety Program Countywide

Safety

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety Program

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

31 a

Length in Miles

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 17126

1

31 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 43: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr

Construction

$28,333

$0

$28,333

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 18127

1

32 a

Length in Miles

Tombstone Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 20115

0.75

32 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 44: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Val Vista Road Warren Rd-Hidden Valley Rd

Construction

$520,000

$0

$520,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 22036

1

33 a

Length in Miles

Ashmore Street Passmore Rd-Baldwin Av

Dust Palliative

$59,000

$0

$59,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 23022

0.5

33 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 45: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Boyd Road Roosevelt St-End of road (Scenic St)

Dust Palliative

$11,000

$0

$11,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 25015

0.1

34 a

Length in Miles

Carefree Place State Route 347-Pepper Pl

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes 4.1 miles of the following roadways: Carefree Place, Reitz Ranch Road, Padilla Road, Clayton Road, and Lopez Road.

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 27124

4.1

34 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 46: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Dolores Place-Shirley Road Olberg Rd-Avram Rd

Dust Palliative

$78,100

$0

$78,100

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 28121

0.71

35 a

Length in Miles

Donnaloy Road Wilma Rd-Brenner Pass Rd

Dust Palliative

$84,700

$0

$84,700

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 29120

0.77

35 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 47: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

36 a

Length in Miles

Marlow Road Jacob Waltz St-End of road

Dust Palliative

$15,958

$0

$15,958

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected] v

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 30012

0.15

36 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 48: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Olberg Road Arizona Farms Rd-Brenner Pass Rd

Dust Palliative

$102,083

$0

$102,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 31119

0.93

37 a

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$700,000

$0

$700,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

37 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 49: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Plaza Drive Moon Vista St-Goldpoppy St

Dust Palliative

$6,667

$0

$6,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 32016

0.06

38 a

Length in Miles

Reed Road Bartlett Rd-At wash before Cactus Forest Rd

Dust Palliative

$91,667

$0

$91,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Celeste Garza E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 35029

0.74

38 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 50: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeBudget Year: Carryover from 2015-2016 to 2019-2020Status: Right-of-way acquisitions are underway but responses are not favorable. Joint use agreement from crossing over the New Magma Irrigation is currently being processed

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.75

39 a

Length in Miles

Whirly Bird Road Amarillo Valley Rd-Ralston Rd

Dust Palliative

$300,000

$0

$300,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes Whirly Bird Road from Amarillo Valley Rd to Ralston Rd and Garnet Road from Whirly Bird Rd to Century Rd

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 36008

3

39 b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 51: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge

Reconstruction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 134

0.2

40 a

Length in Miles

Cordones Road Catalina Hills Rd-Biosphere Rd

Pre-Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Design Concept Report for new roadway

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 156

3.5

40 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 52: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Hunt Highway (Old) Pioneer Path-Wildhorse Dr

Construction

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Concrete ford crossing

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 181

0

41 a

Length in Miles

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of new road on Judd Road alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years.

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 176

1.5

41 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 53: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Kenworthy Road Germann Rd-Pima Rd

Reconstruction

$550,000

$0

$550,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Rehabilitation

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 178

1

42 a

Length in Miles

Magma Road Hunt Hwy-Gary Rd (Edwards Rd)

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Continuation of improvements on alignment

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1420144

1

42 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 54: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Mountain View Road Broadway Av Intersection

Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Intersection reconstruction and culvert installation

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 179

0

43 a

Length in Miles

Ocotillo Road Meridian Rd-Ironwood Dr

Construction

$2,500,000

$0

$2,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Roadway widening

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 177

1

43 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 55: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Bowlin Road Hidden Valley Rd-Stonebluff Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

44 a

Length in Miles

Logan Boulevard Diffin Rd-Reed Rd

Dust Palliative

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Dust palliative is contingent on receiving right-of-way donations

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 147

1

44 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 56: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Louis Johnson Drive Amarillo Valley Rd-State Route 347

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 137

2

45 a

Length in Miles

Midway Road Beggs Rd-Marsh Rd

Dust Palliative

$230,000

$0

$230,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 130

2

45 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 57: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Continuation of asphalt rock dust palliative and cutoff walls at wash crossings

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 141

2

46 a

Length in Miles

Rhea Road Brennar Pass Rd-Donnaloy Road

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019-2020.

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.3

46 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 58: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

River Road Redington Rd-Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years.

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 191

8

47 a

Length in Miles

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Comments: Dust palliative is contigent on receiving right-of-way donations

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 132

0.25

47 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 59: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

Length in Miles

Stonebluff Road Farrell Rd-Bowlin Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 149

1

48 a

Length in Miles

Tweedy Road Storey Rd-Randolph Rd

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Comments: Carmichael Road to Randolph Road is located within the City of Coolidge

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1400188

2

48 b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 60: 2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & …...2017 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016-2017 THROUGH 2020-2021 GLOSSARY (continued) Completed – The

41b

2b & 22a

3b

5b

7a

10a

12b16a

17b

12a6a & 6b

1a

7b

8a

18b

21b

20b

20a

22b

23a

27b &39a

9b

3a

14a

8b

9a17a

19a

13b48b

21a

19b & 24b

28a

15a

Mesa

Tempe

Chandler

Gilbert

Queen Creek

Five-Year Transportation Improvement & Maintenance Project Map

19b

32a

Tonto National Forest

San Carlos Apache Tribe

38a36b

34a

42a43b

28b 31b29a30b

29b 32b41a

42b

30a

35b

37a

35a46b

38b44b

19b & 24b19b

47a

47b

46a

40b

40a

26a 33a

26b

27a

45b 25a

33b

24a

45a

39b 34b

48a 44a

15b

4b

43a

District 3;

District 4;

;District 2

;District 5

District 1;

WINKELMANHAYDEN

SUPERIOR

KEARNY

APACHE JUNCTION

MAMMOTH

COOLIDGEMARICOPA

FLORENCE

CASA GRANDE

ELOY

HUNT HWY

§̈¦10rx187

£¤60

rx287

rx88

rx587

rx387

rx238

rx287rx84

rx347

rx87

rx177

rx79

rx77§̈¦8

§̈¦10

MARICOPA-CASA GRANDE HWY

PARK LINK DR

Ak-Chin Indian Res.

Gila River Indian Res.

Tohono Indian Res.

FLOREN CE-KELV

INHW

Y

rx347

rx87

£¤60

rx79

Ironwood Forest National Monument

PINAL COUNTYPIMA COUNTY

PINAL

COUN

TYGR

AHAM

COUN

TY

GILA COUNTY

PINAL COUNTY

MARICOPA COUNTYPINAL COUNTY

PINAL COUNTYMARICOPA COUNTY

PINAL

COUN

TY

I-10

I-8

HIGHWAY 79

UNION PACIFIC RAILROAD

HIGHWAY 77

COPPER BASIN RR

CAMINO RIO

FREEMAN RD

SMARRCO RR

HIGHWAY 87

HIGHWAY 84

CHUICHU RD

US HIGHWAY 60

RIVER RD

PARK LINK DRPIPELINE RD

PECA

N R

DCAMINO ADELANTE

FLORENCE-KELVIN HWY

PEAK LN

SASCO RD

ELLIS RDSUNL

AND

GIN

RD

96 RANCH RD

SMITH

RD

PRICE RD

PETERS RDRUSS

ELL

RD

HUNT HWY

TOLT

EC H

WY

BARKERVILLE RD

PINAL

AVE

BURR

IS R

D

WHITE

AND

PARK

ER R

D

JOHN

WAY

NE P

KWY

BIANC

O R

D

MURP

HY R

D

ARAVAIPA RD

SACATON RD

LAMB

RD

CLAYTON RD

MIDW

AY R

D

HIGHWAY 238 MOBILE RD

CURTIS RD

COCHRAN RDPIC

ACHO

HWY

HIGHW

AY 34

7

FELIX RD

COX

RD

ROMERO RD

CASA BLANCA RD

KLECK RD

GREE

N R

D

BUNKER HILL RD

CURR

Y RD

WEBB RD

OCOTILLO RD

BARNES RD

PRETZER RD

EDWIN RD

KORTSEN RD

CAMPO BONITO RD

TWEE

DY R

D

GREENE RESERVOIR RD

SAND

MAN R

D

CALLE ZAPATA

CORNMAN RD

BARTLETT RD

BIA00

7

HIGHWAY 287

SELMA HWY

REDINGTON RD

HARMON RD

MILLIGAN RD

HONEYCUTT RD

VAL VISTA BLVD

GUILD RD

HANNA RD

MT LEMMON RD

BEGGS RD

DEEP WELL RANCH RD

MARI

COPA

RD

ST PETERS MISSION RD

SHAY RDNUTT RD

COWBOY MILLER RD

HACKBERRY WASH RD

CATT

LE TA

NK R

D

UNKNOWN

TREK

ELL

RD

HEWITT STATION RD

SARGENT RD

VAIL

RD

CLEM

ANS

RD

BAUMGARTNER RD

PARK

ER W

ASH

RD

FUQU

A RD

SMITH-ENKE RD

OVER

FIELD

RD

COTTONWOOD CANYON RD

FARRELL RD

AJAX MINE TRL

STEELE RDEARLEY RD

HOUSER RD

BRAD

Y PUM

P RD

WILLOW SPRINGS DR

LA OSA RANCH RD APENA RD

PALMER RD

WHITL

OW R

ANCH

RD

TEEL RD

POWERLINE RD

ANGEL DR

DELLA RD

WILL

Y RD

SUFFERING GULCH RD

BAR RD

TEPEE ST

BATTAGLIA DR

CONNELLEY RD

TOLT

EC BU

TTES

RD

NONA RD

SUNS

HINE

BLV

D

SILVER KING RD

PHILLIPS RD

AGUIRRE LN

NORM

A RD

MILLER RD

MARSH RDARICA RD

HOPI DR

MT LEMMON HWY

ORVILLE ST

CARPENTER RANCH RD

BATT

LE AX

E RD

CERR

O R

D

WINDSOR RD

LINDA VISTA RD

DOZER DR

LA PA

Z RD

CARRANZA RD

ACOMA ST

P Z R

ANCH

RD

MONT

GOME

RY R

D

PROJECT DR

BIA08

5

AVAL

ON S

T

DUDLEYVILLE RD

MILLRISE RDJEAN DR

ALLE

N'S PE

AK R

D

MERI

DIAN

DR

ROBSON CIRMARE

Z DR

LACERTA

LN

KIVA RD

I-10 ON 200

REYMERT RD

GUARDIA DR

LOXIA DR

JOES WAY

TRONA DR

PAWI DR

RUBEN DR

NUBE ST

HILLER RD

EAST

VIEW

RD

PEPP

ER P

L

CART

ER L

N

BOWLIN RD

SLOA

NE R

D

ATTA

WAY

RD

UNKNOWN

I-10

MILLER RD

PIPELINE RD

EDWIN RD

BIA00

7

PHILLIPS RD

PIPELINE RD

I-8

UNION PACIFIC RAILROAD

HIGH

WAY 7

9

UNKNOWN

CURTIS RD

SHAY RD

AGUIR

RE L

NPIP

ELINE

RD

Coconino

Pima

Mohave

Gila

Pinal

Yavapai

Maricopa

Yuma

Cochise

La Paz

Graham

ApacheNavajo

Greenlee

Santa Cruz

Page & Map ID Project Location Activity Status District1a Battaglia Drive Overfield Rd Intersection Construction/Reconstruction Underway 41b Florence-Kelvin Highway *Cochran Rd-Donnelly Wash Construction Completed 12a Gantzel Road (Pathway) *Bella Vista Rd-Poston Butte High School New Construction Completed 22b Germann Road Meridian Rd-Ironwood Dr Pre-Construction Underway 23b Hunt Highway - Phase IV *Gary Rd-Magma Rd Pre-Construction Completed 24b Mitchell Trail Heritage Rd-Arizona Farms Rd Pre-Construction Underway 24a Maricopa-Casa Grande Highway *Santa Cruz Wash Crossing New Construction Completed 43a Henness Road Val Vista Rd-Waverly Dr New Construction Underway 35a Safety Program *Countywide Safety Programmed 7

Page & Map ID Project Location Activity Status District6a Cattle Tank Road Davis Ranch Rd-Park Link Dr Pre-Construction Underway 1, 46b Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative Pending 1, 47b Estancia Drive Davis Ranch Rd-Hedgehog Tr Dust Palliative Pending 48a Harmon Road Toltec Hwy-Tweedy Rd Dust Palliative Pending 112a Redington Road Veterans Memorial Blvd-Pima County Line Dust Palliative Underway 15b Bronco Lane Valley View Dr south .1 mile Dust Palliative Pending 57a Christensen Road-Bartlett Road *Martin Rd-5th St Dust Palliative Completed 110a Maverick Circle Mohican Rd west .1 mile Dust Palliative Pending 512b Sixshooter Road Jacob Waltz St north .1 mile Dust Palliative Pending 58b Huisatch Road Garnet Rd-Amarillo Valley Rd Dust Palliative Pending 49a La Barranca Road Sage St-Hidden Valley Rd Dust Palliative Completed 49b La Palma Road State Route 287-.25 north of Kleck Rd Dust Palliative Pending 1

11b Ralston Road *Wildcat Ln-Dune Shadow Rd Dust Palliative Completed 413a Wildwood Road *Warren Rd-Amarillo Valley Rd Dust Palliative Completed 410b Pavement Preservation Program *Countywide Pavement Preservation Programmed 711a Pavement Preservation Program *Countywide Pavement Preservation Programmed 7

Transportation Maintenance Projects

Transportation Improvement Projects Budget Year 2016 - 2017

Page & Map ID Project Location Activity Status District15a Sunland Gin Road Battaglia Dr Intersection Safety Programmed 413b Curry Road State Route 287-Storey Rd Construction Programmed 314a McCartney Road Interstate 10-Evans Rd Reconstruction Underway 1, 315b Tweedy Road State Route 287-Storey Rd Construction Programmed 314b Safety Program *Countywide Safety Programmed 7

Page & Map ID Project Location Activity Status District16a Cactus Road Kaniksu St (north)-Frontier St Dust Palliative Pending 516b Dust Abatement Program *Apache Junction area Dust Palliative Pending 517b Muleshoe Road Roundup St-Shiprock St Dust Palliative Pending 517a McDavid Road Warren Rd-Hidden Valley Rd Dust Palliative Underway 418b Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative Programmed 319a Warren Road Farrell Rd-McDavid Rd Dust Palliative Pending 418a Pavement Preservation Program *Countywide Pavement Preservation Programmed 7

Transportation Maintenance Projects

Transportation Improvement Projects Budget Year 2017 - 2018

Page & Map ID Project Location Activity Status District19b Arizona City Safety Study Multiple Intersections Pre-Construction Programmed 421a Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction Programmed 120a Baseline Avenue Mohican Rd-East 980 feet Construction Programmed 520b Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction Programmed 521b Gantzel Road Chandler Heights Rd Construction Programmed 2, 522a Germann Road Meridian Rd-Ironwood Dr New Construction Programmed 222b Hohokam Road Paisano Dr-Quartzite Dr Construction Programmed 123a Lost Dutchman Road Sun Rd-Prospectors Rd Construction Programmed 523b Safety Program *Countywide Safety Programmed 7

Page & Map ID Project Location Activity Status District24b Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation Programmed 3, 427b Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction Underway 524a Arica Road Isom Rd-Trekell Rd Dust Palliative Programmed 425a Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation Programmed 326a Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative Programmed 426b Sage Street Barnes Rd-Miller Rd Dust Palliative Programmed 427a Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative Programmed 425b Dust Abatement Program *Countywide Dust Palliative Programmed 7

Transportation Maintenance Projects

Transportation Improvement Projects Budget Year 2018 - 2019

Page & Map ID Project Location Activity Status District28a Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd Construction Programmed 128b Gantzel Road Queen Creek (Wash) Pre-Construction Programmed 2, 529a Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction Programmed 529b Jackpot Street Skyline Dr-Rolling Ridge Rd Construction Programmed 530a Roberts Road Felix Rd-Joel Rd Construction Programmed 530b Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction Programmed 531b Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction Programmed 532a Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction Programmed 532b Tombstone Street Skyline Dr-Rolling Ridge Rd Construction Programmed 533a Val Vista Road Warren Rd-Hidden Valley Rd Construction Programmed 431a Safety Program *Countywide Safety Programmed 7

Page & Map ID Project Location Activity Status District34a Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative Programmed 535b Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative Programmed 235a Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative Programmed 236b Marlow Road Jacob Waltz St-End of road Dust Palliative Programmed 537a Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative Programmed 238a Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative Programmed 538b Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative Programmed 139a Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Dust Palliative Programmed 533b Ashmore Street Passmore Rd-Baldwin Av Dust Palliative Programmed 3, 434b Carefree Place State Route 347-Pepper Pl Dust Palliative Programmed 439b Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative Programmed 436a Dust Abatement Program *Countywide Dust Palliative Programmed 737b Pavement Preservation Program *Countywide Pavement Preservation Programmed 7

Transportation Maintenance Projects

Transportation Improvement Projects Budget Year 2019 - 2020

Page & Map ID Project Location Activity Status District40a Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction New Project 140b Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction New Project 441a Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction New Project 241b Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction New Project 242a Kenworthy Road Germann Rd-Pima Rd Reconstruction New Project 242b Magma Road Hunt Hwy-Gary Rd Construction New Project 243a Mountain View Road Broadway Av Intersection Construction New Project 543b Ocotillo Road Meridian Rd-Ironwood Dr Construction New Project 2

Page & Map ID Project Location Activity Status District46a Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative New Project 147a River Road Redington Rd-Copper Creek Rd Dust Palliative New Project 147b Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative New Project 144b Logan Boulevard Diffin Rd-Reed Rd Dust Palliative New Project 146b Rhea Road Brennar Pass Rd-Donnaloy Road Dust Palliative New Project 244a Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative New Project 445a Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative New Project 445b Midway Road Beggs Rd-Marsh Rd Dust Palliative New Project 3, 448a Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative New Project 448b Tweedy Road Storey Rd-Randolph Rd Dust Palliative New Project 3

Transportation Maintenance Projects

Transportation Improvement Projects Budget Year 2020 - 2021

LegendEngineer Areas

Angeline To

Celeste Garza

Lindsey Randall

Area 1 Projects

Area 2 Projects

Area 3 Projects

Improvement and Maintenance ProjectsProject Time Frame : 2016-2021

PINAL COUNTY Public WorksArizona

Incorporated Cities

Tribal Communities

Tonto National Forest

Supervisor Districts

µ

* Not Represented On Map