Island School Redevelopmentat 20 Borrett Road, Mid-Levels, Hong Kong

Students Workshop22 January 2015

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton/ isBIM

01 Introduction

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

SR

Q

P

N

ML

K

H

G

F

E

D

C

B

A

J

Island School

BORRETT ROAD

N

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

VISION/ESF & Island School’s vision for the new Island School provides a qualitative design framework:

• To ensure that the educational, personal and social needs of the students,

staff and community be met in a safe, secure, welcoming and inclusive environment;

• To create an environment which is flexible and can embrace the use of new technologies and different learning styles;

• To create a campus that is an exemplar of sustainable design, which can be used as a tool for teaching the principles of environmental conservation to students;

• To ensure our new campus reflects all that works so well about our current

one, that it supports ESF and Island School ethos and yet it benefits from all that is best about emerging ideas for school design from around the world.

BLOCK 5 PLAYGROUNDCOMMUNAL SPACESHOUSES

02 Overall Design Approach

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroomclassroom

classroom

corridor

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroomclassroom

classroom

corridor

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroomclassroomclassroomclassroom

corridor

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

Social/

• Hybrid of village & campus approach to create an extended social spaces between buildings

• This social approach focus on the spatial organisation to encourage social activities

Landscape/

• The building form adapt to the site topography, another landscape is re-created

• Greening area is maximised and more flexible spaces are created

Village/

• Conventional• Cluster with small footprints• Series of open spaces formed• Resemble existing IS arrangement

Loop/

• Hybrid of linear and folded approach to form a loop to maximise the use of site area

• Large internal social space is formed, Kellett School is an example of this type

Campus/

• Larger footprint with internal social spaces

• Encourage more social activities• More flexible learning spaces could be

enabled with larger footprints

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom classroom classroom classroom classroom

corridor

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroom

classroomclassroom

classroom

classroom

classroom

classroom

classroom

classroom

+ + FILLING

MASSING OPTIONS OVERVIEW/

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015 Thomas Chow Architects + schmidt hammer lassen architects 42/Island School Redevelopment / Hong Kong

Co-Creation (Stage C) Design Review - Massing Design Options14/10/2014

Massing Typology Options Overview/

Social Option/ Option C/ LandscapeOption A/ Village Option D/ LoopOption B/ Campus

Island Spirit (Communal Space)/

Island Spirit (Sightline)/

Flexibility/

Natural Light/

Ventilation/

Greening/

Island Spirit (Communal Space)/

Island Spirit (Sightline)/

Flexibility/

Natural Light/

Ventilation/

Greening/

Island Spirit (Communal Space)/

Island Spirit (Sightline)/

Flexibility/

Natural Light/

Ventilation/

Greening/

Island Spirit (Communal Space)/

Island Spirit (Sightline)/

Flexibility/

Natural Light/

Ventilation/

Greening/

Island Spirit (Communal Space)/

Island Spirit (Sightline)/

Flexibility/

Natural Light/

Ventilation/

Greening/

MASSING OPTIONS OVERVIEW/

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Social Option Landscape Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Science

Technology

Creative Arts

Sharing/ Flexible Teaching

+167.4 4/F

Science

Technology

Creative Arts

Sharing/ Flexible Teaching

Adminstration

+163.8 3/F

English

Humanities

IN/ EAL

Administration

+160.2 2/F

Language

IN/ EAL

Sharing/ Flexible Teaching

Administration

+156.6 1/F

Mathematics

Physical Education

Sharing/ Flexible Teaching

Administration

Amenities

+152.1 G/F

Creative Arts

Physical Education

Administration

Amenities

+148.1 LG1M

Creative Arts

Physical Education

Sharing/ Flexible Teaching

Amenities

+143.4 LG1

Car Park

+136.0 LG2

Social Option/

NOFA 14,751m2

17,251m2 (incl. covered carpark & drop-off)

CFA 29,590m2

Efficiency (NOFA/CFA) 0.58

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

English

Language

Humanities

Mathematics

Science

Technology

Creative Arts

Physical Education

IN/ EAL

Sharing/ Flexible Teaching

Administration

Amenities

Plant Rooms & Core

Car Park

English

Language

IN/ EAL

Administration

Humanities

Mathematics

Technology

Administration

Administration

Technology

Creative Arts

Science

Technology

Creative Arts

Science

Creative Arts

Physical Education

Creative Arts

Physical Education

Sharing/ Flexible Teaching

Administration

Amenities

Physical Education

+152.0 G/F

+148.2 LG1M

+143.0 LG1

+136.0 LG2

+158.4 2/F

+162.3 3/F

+166.2 4/F

+154.5 1/F

Landscape Option/

NOFA 14,751m2

17,251m2 (incl. covered carpark & drop-off)

CFA 32,480m2

Efficiency (NOFA/CFA) 0.53

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02a The PATH

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

The Heart of the Island School - The Path/to link the mountain/nature with the harbour/city with a lot of different activities extended from it

• THE PATH

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

PLAZA 2PLAZA 1

SCIENCERESEARCH LAB

INTEGRATED HUMANITIES STUDIO

CREATIVE HUB

LANGUAGESHARED

LRC/ SLC& SHARED TEACHING SPACES

LRC(QUIET)

ADMISSION OFFICE etc+RECEPTION

SLT & ADMIN

HARBOUR

BO

RR

ET

T R

OA

D

CAFE

MINI LECTURE THEATRE

BO

RR

ET

T R

OA

D

MINI LECTURETHEATRE

ART

D&T

ATRIUM

SOCCERPITCH

• Open• Vibrant• Well-articulated & More Vibrant• House Commons along the Path

• Internal• More Enclosed• Spaces Connected by More Enclosed Corridors• Follow the stepping of the Building Mass

PLAYGROUND

• THE PATH

Social Option Landscape Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• THE PATH/ Houses

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

LG/ 2* GF/ 1 L1/ 3 L2/ 2*

ProposedHOUSE COMMONS

Proposed HOUSE COMMONS on the other side of the PATH

L2/ 2*

L1/ 3

GF/ 1

LG/ 2*

• THE PATH/ HousesSocial Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

GF/ 2 L1/ 2 L2/ 2

L2/ 2

The Path

L1/ 2

GF/ 2

• THE PATH/ HousesLandscape Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02b Terraces

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• Visual Connection from Above to the Open Playground• Enable Students’ Participation from Above as Existing School• Visual Connection with the Hill behind

• Terraces with Varieties in Size• No Visual Connection with the Ballcourts• Stepping Effect Easily Visualised from the Outside - Image of the

Island School

• TERRACES

Social Option Landscape Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• TERRACES•Visual Connection from Above to the

Open Playground•Enable Students’ Participation from

Above as Existing School•Visual Connection with the Hill behind

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02c Open Playgrounds

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

1

2

450 m2/ GFAbout 80% of existing block 5 playground

255 m2/ L1

1650 m2/ GFMore than twice of block 5 playground

660 m2/ GFAbout the size of existing block 5 playground

850 m2/ L3

500 m2/ GFOpen Deck

• 2 no. of outdoor spaces with total area of more than 3 times of existing block 5 playground • Open playground at GF to fulfil lease conditions requirement

• OPEN PLAYGROUNDS

Social Option Landscape Option• More Open Playgrounds • Less Open Playgrounds

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02d Flexible Teaching Spaces

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• house area/• learning area/• informal learning/• social interaction/

informal learning/self-study/group work/

Architectural furniture (lockers) can be installed in the house areas in zone C for space definition and to integrate social space with learning space

• FLEXIBLE TEACHING SPACES

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• engagement activities and briefings• involve more teacher led activities and whole class

work• support lecture style learning• considerable degree of flexibility through judicious

choice of furniture

Engagement Space (Zone A)/

• researching, analysing, questioning, creating and collaborating activities

• support both individual and group work• high level of porosity• division by architecural furniture and non-load bearing

“walls”

Processing Space (Zone B)/

• combined learning/ house areas• support more informal learning and social interaction• larger level of movement and link with main circulation

routes directly• combine with terraces look over and across large

communal spaces

Community Space (Zone C)/

B CA

OPAQUEFIXEDIMPERMEABLEFORMAL

TRANSPARENTFLEXIBLE

PERMEABLESOCIAL

Transition of Learning Spaces/• Opacity• Flexibility• Permeability• Formality

• FLEXIBLE TEACHING SPACES

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

A

A AA AA A

A

A

C

C C

C

C

B

B B

B

B

A

A

A

A A

A

A

A

A AA AA A

A

A

C

C C

C

C

B

B B

B

B

A

A

A

A A

A

A

A

A AA AA A

A

A

C

C C

C

C

B

B B

B

B

A

A

A

A A

A

A

Typology for Flexible Arrangement/

• SOA(teaching)=A+B• whichcouldbeconvertedto10no.ofenclosedteachingspacesifrequired• morespaceprovided• moreflexiblelayouttoadapttodifferentuses

AREA A < AREA A+B EFFICIENCY

OR

Typology for Traditional Arrangement/

• SOA(teaching)=A• 10enclosedteachingspaces• lessspaceprovided• moredifficulttousebreak-outspaces

• FLEXIBLE TEACHING SPACES

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Transition of Learning Spaces/Transition radially from the Heart of the School towards the skin, from sharing spaces to more specific spaces

SPECIFIC

SHARED

OPAQUEFIXEDIMPERMEABLEFORMAL

TRANSPARENTFLEXIBLEPERMEABLESOCIAL

SHARED TRANSPARENTFLEXIBLEPERMEABLESOCIAL

SPECIFIC OPAQUEFIXEDIMPERMEABLEFORMAL

SPECIFIC

SHARED

OPAQUEFIXEDIMPERMEABLEFORMAL

TRANSPARENTFLEXIBLEPERMEABLESOCIAL

SHAREDTRANSPARENTFLEXIBLEPERMEABLESOCIAL

SPECIFICOPAQUEFIXEDIMPERMEABLEFORMAL

SPECIFICOPAQUEFIXEDIMPERMEABLEFORMAL

• CAMPUS ORGANISATION

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• FLEXIBLE TEACHING SPACES (SPACE PLANNING, NATURAL LIGHTING & VENTILATION and ENERGY CONSUMPTION)

Social Option• Balanced Flexible Teaching Spaces• Adequate Natural Light and Ventilation Provision• Less Energy Consumption

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Landscape Option• More Flexible Teaching Spaces• Deeper Floor Plate leading to Inadequate Natural Light and

Ventilation• Light wells Introduced which limits the Flexibility of the spaces• More Energy Consumption

• FLEXIBLE TEACHING SPACES (SPACE PLANNING, NATURAL LIGHTING & VENTILATION and ENERGY CONSUMPTION)

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

• FLEXIBLE TEACHING SPACES (SPACE PLANNING, NATURAL LIGHTING & VENTILATION and ENERGY CONSUMPTION)

Social Option

Landscape Option

English

Language

Humanities

Mathematics

Science

Technology

Creative Arts

Physical Education

IN/ EAL

Sharing/ Flexible Teaching

Administration

Amenities

Plant Rooms & Core

Car Park

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Landscape Option• FLEXIBLE TEACHING SPACES/ LRC

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Social Option• FLEXIBLE TEACHING SPACES/ LRC

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02f Sports Complex

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

GFTransfer & Open Playground

LGLarge Volumes

SPORTS HALLBLACK

BOX

SWIMMING POOL

PLAY-GROUND

GFTransfer & Open Playground

LGLarge Volumes

BLACK BOX

SPORTS HALL

SWIMMING POOL

PLAY-GROUND

Swimming Pool/Swimming Pool/

• SPORTS COMPLEX

Social Option Landscape Option

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

02h Summary

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Social Option Landscape Option

DESIGN & PLANNING SUMMARY/

03 Technical Issues

a) Site Formation, Foundationb) Superstructurec) Building Servicesd) Greening Designe) Sustainabilityf) Cost Issues

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Site Formation & Foundation Design Strategy/• Re-use Existing Retaining Structures• Avoid Extensive Excavation by Localising the Extent of Areas Lower than Existing Levels• Back-fill

BLOCK 7

BLOCK 2HALL

Swimm

ing Pool

Block 5

Playgro

und

BLOCK 1

BLOCK 5

BLOCK 4

BLOCK 3

B O R R E T T R O A D

KeepKeep & Abandoned

Demolished

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Hybrid of Foundation Systems/• Footing, where Rock Head Level is High• Piling, where Rock Head Level is Low

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

SPORTS HALL

BO

RR

ET

T R

OA

D

Deep Transfer Structure (3m)

CantileverStructure towards the Hill

Swimming Pool

• Sports Hall - no Transfer Above• Black Box - no Transfer Above• Swimming Pool - Partial Transfer Above

• Reinforced Concrete Ratio: 0.49m3/m2 floor area• Steel Reinforcement: 148kg/m2 floor area

• Sports Hall - Transfer of 5 floors Above• Black Box - Transfer of 5 floors Above• Swimming Pool - Transfer of 5 floors Above

• Reinforced Concrete Ratio: 0.61m3/m2 floor area• Steel Reinforcement: 183kg/m2 floor area

Transfer Structure-> Larger Structural Member Size and More Reinforcement-> Less Headroom and More Costly

Superstructure/

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Building Services/

Electrical ServicesElectrical Supply SystemMeteringEarthing and Lightning SystemLighting SystemElevator SystemEmergency Lighting SystemSecurity SystemBroadcast Reception InstallationTelephone InstallationBMS Mechanical ServicesMVAC SystemFire Services SystemWater Supply SystemDrainage SystemGas Supply SystemSwimming Pool Water Filtration System

Other Specialist Systems Wireless Broadband System Public Address System IT Network and Backbone Infrastructure Library Security System Library Lending and Borrowing System Smart Card System Audio/ Visual System (AV) AV and Stage Lighting System Master School Bell System

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Greening Design/

Vertical greening next to Half CourtFigure 8

Terraced landscape at hillsideFigure 4

Entrance of the PATHFigure 6

•The PATH

•PATH Entrance

•Hillside Terraces •Green Wall screen off Ball Courts

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION& PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

Sustainable Design/

• Food Waste Decomposition• Dead Plants Decomposition• Grey Water Recycling System

• Rainwater Recycling for Irrigation

• Energy Generating Floor

• Weather-based Irrigation Control System

• Wind Turbine

at Science Garden

• Photovoltaic (PV) Panel

• Rainwater Heat Island Control System

(self-sustained w/ BIPV panels and Rain Water

Recycling)

• Solar LED Bollards

• Solar Hot Water Systemfor pre-heating of hot water

for changing rooms

• Exposed System as Demonstration & Education Purpose• Cost Effectiveness• Maintainability• Constructability

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

04 RECOMMENDATION & PROGRAMME

INTRODUCTION OVERALL DESIGN APPROACH

TECHNICAL ISSUES RECOMMENDATION & PROGRAMME

01 02 03 04

ESF / Island School / TCA / shl / RLB / AECOM / AURECON / URBIS / MVA / Fotton / isBIM

Island School Redevelopment / Hong KongStudents’ Workshop22 January 2015

SOCIAL OPTION

LANDSCAPE OPTION

CFA/Efficiency (NOA/CFA)

THE PATH (SPATIAL QUALITY)

TERRACES FLEXIBLE USE OF SPACE

SUSTAINABILITY/NATURAL LIGHT &

VENTILATION

SUSTAINABILITY/ENERGY

CONSUMPTION

STRUCTURAL EFFICIENCY

29,590 m2

/ 0.58

• Open• Vibrant• Well-articulated• House Commons along

the Path

• Internal• More enclosed

32,480 m2

/ 0.53

HigherLess

LowerMore

goodnot as good as the other schemenot good enough

COMPARISON SUMMARY & RECOMMENDATION/

PLAZA 2PLAZA 1

SCIENCERESEARCH LAB

INTEGRATED HUMANITIES STUDIO

CREATIVE HUB

LANGUAGESHARED

LRC/ SLC& SHARED TEACHING SPACES

LRC(QUIET)

ADMISSION OFFICE etc+RECEPTION

SLT & ADMIN

HARBOUR

BO

RR

ET

T R

OA

D

CAFE

MINI LECTURE THEATRE

BO

RR

ET

T R

OA

D

MINI LECTURETHEATRE

ART

D&T

ATRIUM

SOCCERPITCH

PLAYGROUND

THANK YOU