2015 IPC Design, Installation and Inspection Principles Copyright 2015 International Code Council 1 2015 IPC ® Design, Installation and Inspection Principles 2015 IPC ® Design, Installation and Inspection Principles Based on the 2015 International Plumbing Code ® (IPC ® ) Description Description The 2015 International Plumbing Code ® (IPC ® ) continues to emphasize both prescriptive and performance-related provisions. The 2015 IPC encompass the initial design of the plumbing system, the installation and construction of plumbing systems and the maintenance of operating systems. All plumbing systems that are provided for utilization by and for the general safety and wellbeing of the occupants of a building are intended to be governed by the code. 2015 IPC Design, Installation and Inspection Principles 2 Goal Goal The goal of this seminar is to provide key information on the design, installation and inspection principles based on the 2015 IPC. 2015 IPC Design, Installation and Inspection Principles 3 Objectives Objectives Upon completion, participants will be better able to: Identify code enforcement issues and key code sections Describe the application of the code to inspection, plan review and code enforcement 2015 IPC Design, Installation and Inspection Principles 4

Upload: nguyenque

Post on 05-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 1

2015 IPC® Design, Installation and Inspection Principles

2015 IPC® Design, Installation and Inspection PrinciplesBased on the 2015 International Plumbing Code® (IPC®)

Description Description The 2015 International Plumbing Code® (IPC®)

continues to emphasize both prescriptive and performance-related provisions.

The 2015 IPC encompass the initial design of the plumbing system, the installation and construction of plumbing systems and the maintenance of operating systems.

All plumbing systems that are provided for utilization by and for the general safety and wellbeing of the occupants of a building are intended to be governed by the code.

2015 IPC Design, Installation and Inspection Principles 2

Goal Goal The goal of this seminar is to provide key

information on the design, installation and inspection principles based on the 2015 IPC.

2015 IPC Design, Installation and Inspection Principles 3

ObjectivesObjectives Upon completion, participants will be better able

to:

Identify code enforcement issues and key code sections

Describe the application of the code to inspection, plan review and code enforcement

2015 IPC Design, Installation and Inspection Principles 4

Page 2: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 2

Marginal Markings within the codebookMarginal Markings within the codebook Solid vertical lines indicate a technical change

from the requirements of the 2009 edition.

Arrows indicate where a section, paragraph, item in a list, exception or table has been deleted.

A single asterisk [*] indicates that text or a table has been relocated elsewhere in the code.

A double asterisk [**] indicates that the section or table immediately following has been relocated here from a different section.

2015 IPC Design, Installation and Inspection Principles 5

***

Table of ContentsTable of Contents Module I – Administration, Definitions and

General Regulations Module 2 – Fixtures, Module 3 – Water Systems, Sanitary Drainage

and Venting Module 4 – Storm Drainage, Special Piping and

Storage Systems and Gray Waste Recycling Systems.

2015 IPC Design, Installation and Inspection Principles 6

Administration, Definitions and General RegulationsAdministration, Definitions and General Regulations

Part 1

7

AdministrationAdministrationChapter One

8

Page 3: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 3

Chapter One — Administration Chapter One — Administration

Applies to the code official Establishes the rights and privileges of the

design professional, contractor and building owner

Establishes the responsibilities of various professionals

2015 IPC Design, Installation and Inspection Principles 9

Scope 101.2Scope 101.2Code applies to: Erection Installation Alterations Repairs Relocation Replacement Addition to Use or maintenance

Code doesn’t apply to: fuel gas systems Residential buildings

2015 IPC Design, Installation and Inspection Principles 10

Existing installations 102.2Existing installations 102.2 Existing

installations that were installed per the code in effect during its construction do not need to be changed, provided it is maintained in good operating condition.

Inspector’s Challenge: Installations that did

not meet code at the time of construction will need to be brought up to the current code.

2015 IPC Design, Installation and Inspection Principles 11

Maintenance 102.3Maintenance 102.3 The owner or

authorized agent shall maintain the system and all of its parts in a safe operating condition

Inspector’s challenge: The code official has

the right to re-inspect the plumbing systems and may be called on to force compliance with the code when the plumbing systems are unsafe.

2015 IPC Design, Installation and Inspection Principles 12

Page 4: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 4

Additions, alterations or repairs 102.4Additions, alterations or repairs 102.4 The new work shall

comply with the current code, the existing parts may continue unchanged if they are safe

Inspector’s challenge:Determining what has been altered or repaired, may require a preliminary inspection before new work commences.

2015 IPC Design, Installation and Inspection Principles 13

Change of occupancy 102.5Change of occupancy 102.5 A change of

occupancy requires that all parts of the plumbing system meet the current code for that occupancy

Inspector’s challenge:Determining what plumbing elements, if any, can have their use continued is sometimes hampered by limited access to the systems involved. (buried in walls, underground)

2015 IPC Design, Installation and Inspection Principles 14

Duties and Powers of the Code Official Section 104Duties and Powers of the Code Official Section 104 The code official shall: Receive applications, review plans and issue permits Conduct inspections and record the results Have the right of entry to inspect (within the law) Carry identification Issue the appropriate notices to ensure compliance Keep and retain records of activities

2015 IPC Design, Installation and Inspection Principles 15

Administration – Chapter 1Administration – Chapter 1 Section 105 – Approval Section 108 – Violations Section 109 – Means of Appeal Section 110 – Temporary Equipment, Systems

and Uses

2015 IPC Design, Installation and Inspection Principles 16

Page 5: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 5

Chapter One —Administration Chapter One —Administration

Discuss the following questions:

What are the Duties and Power of the Code Official?

What are your challenges as a code official?

2015 IPC Design, Installation and Inspection Principles 17

DefinitionsDefinitionsChapter Two

18

Branch intervals Branch intervals

2015 IPC Design, Installation and Inspection Principles 19

Depth of Trap Seal Depth of Trap Seal Change from depth of

water seal Allows other liquids to

maintain the seal, such as in a waterless urinal

2015 IPC Design, Installation and Inspection Principles 20

Page 6: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 6

Grease Interceptor Grease Interceptor

Fats, oils and grease (FOG) disposal systems Gravity Hydromechanical

2015 IPC Design, Installation and Inspection Principles 21

Plumbing Appliance Plumbing Appliance There is difference between a

plumbing fixture and a plumbing appliance. A dishwasher is a plumbing

appliance. Because a jetted whirlpool tub

does not depend upon energized components to be a bathtub, it is a plumbing fixture.

2015 IPC Design, Installation and Inspection Principles 22

Plumbing Fixture Plumbing Fixture Plumbing fixture could have only a water supply

connected to it, only a waste line connected to it, or both.

2015 IPC Design, Installation and Inspection Principles 23

Toilet FacilityToilet Facility A room or space that

contains not less than one water closet and one lavatory.

2015 IPC Design, Installation and Inspection Principles 24

Page 7: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 7

Gravity GREASE INTERCEPTOR Gravity GREASE INTERCEPTOR

2015 IPC Design, Installation and Inspection Principles 25 2015 IPC Design, Installation and Inspection Principles 26

Alternative Onsite Nonpotable Water. A way to collect waste

water for partial treatment and reuse for flushing toilets and urinals.

Alternate Onsite NonpotableWaterAlternate Onsite NonpotableWater

Waste ReceptorWaste Receptor Waste Receptor. A

floor sink, standpipe, hub drain or a floor drain that receives the discharge of one or more indirect waste pipes.

2015 IPC Design, Installation and Inspection Principles 27

Parts of a plumbing systemParts of a plumbing system

2015 IPC Design, Installation and Inspection Principles 28

Page 8: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 8

General Regulations General Regulations

Chapter 3

29

Section 301.3 – Connections to drainage systemSection 301.3 – Connections to drainage system An exception is

included to allow gray-water-producing fixtures to be connected to a gray water collection

2015 IPC Design, Installation and Inspection Principles 30

Section 303.1 – IdentificationSection 303.1 – Identification

2015 IPC Design, Installation and Inspection Principles 31

Section 303.4 – Third-party certificationSection 303.4 – Third-party certification

This requires all plumbing products and materials be listed by a third-party certification agency such are the ICC-ES PMG Listing Program.

2015 IPC Design, Installation and Inspection Principles 32

Page 9: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 9

Section 304.4 –Openings for pipesSection 304.4 –Openings for pipes

All spaces between pipes and the sides of the openings through walls, floors or ceilings shall be caulked or closed with appropriate material.

2015 IPC Design, Installation and Inspection Principles 33

Section 305.3 – Pipes through foundation wallsSection 305.3 – Pipes through foundation walls

All pipes traveling through a foundation wall must be sleeved or have a relieving arch that supports the foundation.

2015 IPC Design, Installation and Inspection Principles 34

Section 305.4 – FreezingSection 305.4 – Freezing

2015 IPC Design, Installation and Inspection Principles 35

Section 305.6 – Protection against physical damageSection 305.6 – Protection against physical damage

2015 IPC Design, Installation and Inspection Principles 36

Page 10: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 10

Section 305.7 – Protection of plumbing system components Section 305.7 – Protection of plumbing system components

2015 IPC Design, Installation and Inspection Principles 37

NOTE: OTHER METHODS OF PROTECTION OF PLUMBING COMPONENTS ARE POSSIBLE, SUBJECT TO APPROVAL BY THE CODE OFFICIAL.

WALL BEYOND

RECESSED IN BUILDING WALL

DRIVEWAY

PROTECTED BY A GUARD

DRIVEWAY

CONCRETE-FILLED STEEL POST

Section 306 — Trenching, excavation and backfillSection 306 — Trenching, excavation and backfill

2015 IPC Design, Installation and Inspection Principles 38

Section 307 — Structural safety Section 307 — Structural safety

2015 IPC Design, Installation and Inspection Principles 39

Section 307.2 – Cutting, notching or bored holesSection 307.2 – Cutting, notching or bored holes

2015 IPC Design, Installation and Inspection Principles 40

Page 11: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 11

Section 307.2 – Cutting, notching or bored holesSection 307.2 – Cutting, notching or bored holes

2015 IPC Design, Installation and Inspection Principles 41

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

2015 IPC Design, Installation and Inspection Principles 42

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

2015 IPC Design, Installation and Inspection Principles 43

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

Section 307.3 – Penetration of floor/ceiling assemblies and fire-resistance-rated assemblies

2015 IPC Design, Installation and Inspection Principles 44

Page 12: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 12

Section 307.5 Protection of footingsSection 307.5 Protection of footings Trenches installed

parallel to footings must remain outside the bearing plane of the bottom of the footing

2015 IPC Design, Installation and Inspection Principles 45

Piping support—Section 308Piping support—Section 308

2015 IPC Design, Installation and Inspection Principles 46

Location of hangersLocation of hangers

2015 IPC Design, Installation and Inspection Principles 47

For SI: I inch =25.4 mm

Table 308.5 –Hanger spacingTable 308.5 –Hanger spacing The spacing of

supports, listed in Table 308.5, is based on reducing the sag of the piping system

2015 IPC Design, Installation and Inspection Principles 48

Page 13: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 13

Midway guidesMidway guides Midway guides shall be installed on

a number of products when the size is 2 inches or less. Midway between the required vertical supports (5’). These guides should not be tight, vertical movement should be unimpeded.

2015 IPC Design, Installation and Inspection Principles 49

2015 IPC Table 308.5Footnote b

midwayguides

Section 308.6 –Sway bracingSection 308.6 –Sway bracing

2015 IPC Design, Installation and Inspection Principles 50

Section 308.7 –Anchorage

Section 308.7 –Anchorage

2015 IPC Design, Installation and Inspection Principles 51

Section 308.7.1 –Location

Section 308.7.1 –Location

2015 IPC Design, Installation and Inspection Principles 52

Page 14: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 14

Section 308.9 – Parallel water distribution systemsSection 308.9 – Parallel water distribution systems Where hot water piping is bundled with other hot

water piping or cold water piping, each individual hot water pipe must be insulated.

2015 IPC Design, Installation and Inspection Principles 53

Section 309.2 – Flood hazard Section 309.2 – Flood hazard The code refers to an elevation as required by

Section 1612 of the International Building Code as such required elevations may be above the actual design flood elevation.

309.3 restricts plumbing from penetrating or being mounted to walls that are designed to break away in flood conditions.

2015 IPC Design, Installation and Inspection Principles 54

Washroom and toilet room requirements—Section 310Washroom and toilet room requirements—Section 310

Toilet room requirements are regulated by building and mechanical code.

2015 IPC Design, Installation and Inspection Principles 55

Section 311 —Toilet facilities for workers

Section 311 —Toilet facilities for workers

2015 IPC Design, Installation and Inspection Principles 56

Page 15: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 15

Section 312 – Tests and InspectionsSection 312 – Tests and Inspections Section 312.1 – Required tests Section 312.2 – Drainage and vent water test Section 312.3 – Drainage and vent air test Section 312.4 – Drainage and vent final test Section 312.5 – Water supply system test Section 312.6 – Gravity sewer test Section 312.7 – Forced sewer test Section 312.8 – Storm drainage system test Section 312.9 – Shower liner test Section 312.10 – Inspection and testing of backflow

prevention assemblies

2015 IPC Design, Installation and Inspection Principles 57

Section 312.9 —Shower liner testSection 312.9 —Shower liner test

2015 IPC Design, Installation and Inspection Principles 58

Section 312.9 — Shower liner testSection 312.9 — Shower liner test

2015 IPC Design, Installation and Inspection Principles 59

Section 314.2.2 – Drain pipe materials and sizesSection 314.2.2 – Drain pipe materials and sizes

2015 IPC Design, Installation and Inspection Principles 60

2015 IPC Table

314.2.2Page 22

Page 16: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 16

Section 315 – Penetrations Section 315 – Penetrations

Brings the plumbing code into alignment with the energy code, by sealing openings in wall plates.

Any penetration of fire-rated assemblies shall sealed per the building code.

2015 IPC Design, Installation and Inspection Principles 61

Section 315.1 — Sealing of annular spaces Section 315.1 — Sealing of annular spaces

2015 IPC Design, Installation and Inspection Principles 62

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

1. After final approval of a plumbing system, the code does not provide for any reinspection of the system.

True

2015 IPC Design, Installation and Inspection Principles 63

False

According to Section 102.3, the code official shall have the authority to require any plumbing system to be

reinspected.

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

2. Requirements needed for plumbing safety that are not in the code shall be determined by the __________________.

2015 IPC Design, Installation and Inspection Principles 64

Code Official

Page 17: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 17

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

3. Define the following words:Conductor _______________________Gray water ________________________Plumbing fixture ___________________

2015 IPC Design, Installation and Inspection Principles 65

Conductor – A pipe inside the building that conveys storm water from the roof to a storm or combined building drain.Gray water – Water waste discharged from lavatories, bathtubs, showers, clothes washers and laundry traps.Plumbing fixtures – A receptacle or device that is connected to a water supply system or discharge to a drainage system or both.

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

4. A pipe sleeve used for protection shall be two pipe sizes greater than the pipe passing through the wall.

False

2015 IPC Design, Installation and Inspection Principles 66

True

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

5. Gravity sewer tests consist of filling the pipe with no less than a ________foot head of water.

2015 IPC Design, Installation and Inspection Principles 67

103048 mm

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

6. An air test may be used to test plastic plumbing systems.

True

2015 IPC Design, Installation and Inspection Principles 68

False

Page 18: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 18

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

7. A potable water system or a _____________ system may be used to flush water closets.

2015 IPC Design, Installation and Inspection Principles 69

gray water

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

8. Penetrations of the building envelope that leave gaps between the sides of the opening and the pipe shall be _______________.

2015 IPC Design, Installation and Inspection Principles 70

sealed

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

9. An alternative engineered design for a plumbing system may be used if it provides the _____________ level of quality, strength, effectiveness, fire resistance, durability and safety.

2015 IPC Design, Installation and Inspection Principles 71

equivalent

Module 1 — Administration, Definitions and General Regulations

Module 1 — Administration, Definitions and General Regulations

10. A shower liner test must be plugged below the flange clamping the liner and filled with water to the overflow point.

True

2015 IPC Design, Installation and Inspection Principles 72

False

Page 19: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 19

Fixtures, Water Heaters, Indirect/Special Wastes and Separators

Fixtures, Water Heaters, Indirect/Special Wastes and Separators

Module 2

73

Fixtures, Faucets and Fixture FittingsFixtures, Faucets and Fixture Fittings

Chapter 4

74

Table 403.1 — Minimum Number of Plumbing FixturesTable 403.1 — Minimum Number of Plumbing Fixtures The number of fixtures provided shall be

determined based on the actual use of the building Ex. A gymnasium with a stage for assemblies at a

school without permanent seating would be an A-3

2015 IPC Design, Installation and Inspection Principles 75

Table 403.1 — Minimum Number of Plumbing Fixtures (portion)

Table 403.1 — Minimum Number of Plumbing Fixtures (portion)

2015 IPC Design, Installation and Inspection Principles 76

2015 IPC Table 403.1

Pages 25-27

d. The occupant load for seasonal outdoor seating and entertainment areas shall be included when determining the minimum number of facilities required.

Page 20: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 20

Table 403.1 — Minimum Number of Plumbing Fixtures (portion)

Table 403.1 — Minimum Number of Plumbing Fixtures (portion)

2015 IPC Design, Installation and Inspection Principles 77

2015 IPC Table 403.1

Pages 25-27

e. For business and mercantile occupancies with an occupant load of 15 or fewer, service sinks shall not be required.

Table 403.1 — Minimum Number of Plumbing Fixtures

Table 403.1 — Minimum Number of Plumbing Fixtures

A mixed-use building with a Group E (education) occupant load of 538, Group A-3 (gymnasiums, halls, museums) occupant load of 115 and Group S-1 (storage) occupant load of 82.

What are the minimum numbers of fixtures required for each sex? See previous slides.

2015 IPC Design, Installation and Inspection Principles 78

Section 403.2 — Separate facilitiesSection 403.2 — Separate facilities

Item 3 changed to allow a mercantile occupant load of up to 100 persons before separate sex facilities are required.

This relaxes the burden on small retail spaces so that they do not require two accessible toilet rooms, which take up a disproportionate amount of space.

2015 IPC Design, Installation and Inspection Principles 79

Section 403.2.1 — Family or assisted-use toilet facilities serving as separate facilities.

Section 403.2.1 — Family or assisted-use toilet facilities serving as separate facilities.

Added to allow two “no sex designated” family or assisted-use toilet rooms to serve a space that requires only one water closet per sex.

Advantage is that because either toilet room can be used by either sex, there is more availability of facilities in smaller spaces without needing to offer multiple-user toilet facilities.

2015 IPC Design, Installation and Inspection Principles 80

Page 21: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 21

Section 403.3 — Required public toilet facilitiesSection 403.3 — Required public toilet facilitiesExceptions: To clarify that parking lots and parking garage

buildings (without attendants) do not require public toilet facilities.

Structures and tenant spaces intended for quick transactions, including take out, pick up and drop off, having a public access area less than or equal to 300 sq. ft. do not need to provide public facilities (employee restrooms still apply)

2015 IPC Design, Installation and Inspection Principles 81

Section 403.3.2 — Toilet room locations new drawing show lavsSection 403.3.2 — Toilet room locations new drawing show lavs

2015 IPC Design, Installation and Inspection Principles 82

Section 403.3.6 — Door locking Section 403.3.6 — Door locking

Doors of multiple-occupant toilet rooms must not be capable of being locked from the inside.

2015 IPC Design, Installation and Inspection Principles 83

Section 403.5 —Drinking fountain locationSection 403.5 —Drinking fountain location The code requires drinking fountains to be

located within 500’ of the most remote tenant space.

2015 IPC Design, Installation and Inspection Principles 84

Within a travel distance of 500 feet of the most remote location in the tenant space.

Page 22: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 22

Section 405.3.1 — Fixture ClearancesSection 405.3.1 — Fixture Clearances

2015 IPC Design, Installation and Inspection Principles 85

Index

A. All fixtures shall not be closer than 15” from center to sidewall.

B. All fixtures shall not be closer than 30’’ center to center between adjacent fixtures.

C. All fixtures shall have at least 21“ of clearance in front.

D. Water closet compartments shall not be less than 30“ wide and 60’’ deep.

E. Urinal partitions shall extend at least 18“ from sidewall or 6’’ out from the lip.

Section 405.3.5 — Urinal PartitionsSection 405.3.5 — Urinal Partitions Each urinal

utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy.

2015 IPC Design, Installation and Inspection Principles 86

Section 405.3.5 — Urinal Partitions (cont.)Section 405.3.5 — Urinal Partitions (cont.)

2015 IPC Design, Installation and Inspection Principles 87

No more than 12” From floor

At least 60” from floor

At least 18” from wall

6”

Section 405.4 — Floor and wall drainage connectionsSection 405.4 — Floor and wall drainage connections

A new type of water closet drain connection is added to this section.

2015 IPC Design, Installation and Inspection Principles 88

Page 23: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 23

Section 406.2 — Waste ConnectionsSection 406.2 — Waste Connections

2015 IPC Design, Installation and Inspection Principles 89

2-inch minimum 3-inch minimum

Note: Where a connection is made to a fixture branch, horizontal branch drain or drainage stack, the minimum required size is 3 inches

Section 407.2 — Bathtub waste outlets and overflows Section 407.2 — Bathtub waste outlets and overflows

Overflows for bathtubs are required as a safeguard against the overfilling of bathtubs.

2015 IPC Design, Installation and Inspection Principles 90

Dishwashing Machines—Section 409 Dishwashing Machines—Section 409

2015 IPC Design, Installation and Inspection Principles 91

Section 410.1 — Approved drinking fountainsSection 410.1 — Approved drinking fountains

Although the IPC indicates the minimum number of drinking fountains for an occupancy, the International Building Code required additional drinking fountains to comply with accessibility regulations.

The International Building Code requirement was brought into the IPC for clarity.

2015 IPC Design, Installation and Inspection Principles 92

Page 24: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 24

Section 410.3 — Minimum number of drinking fountains Section 410.3 — Minimum number of drinking fountains

2015 IPC Design, Installation and Inspection Principles 93

Section 410.3 — Substitution for drinking fountains Section 410.3 — Substitution for drinking fountains

Restaurants where water is served with the meal may omit a drinking fountain.

Water dispensers can be substituted for half the required drinking fountains.

2015 IPC Design, Installation and Inspection Principles 94

Section 412.2 — Floor DrainsSection 412.2 — Floor Drains

2015 IPC Design, Installation and Inspection Principles 95

Section 412.3 — Size of Floor DrainsSection 412.3 — Size of Floor Drains

2015 IPC Design, Installation and Inspection Principles 96

Page 25: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 25

Section 413.4 – Water supply requiredSection 413.4 – Water supply required

2015 IPC Design, Installation and Inspection Principles 97

Section 416.1 — Group Wash-up FixtureSection 416.1 — Group Wash-up Fixture

2015 IPC Design, Installation and Inspection Principles 98

Group wash up equipment shall conform to the requirements of Section 416.

20 inches of rim equals one lavatory

Section 416.5 — Tempered water for public handwashing facilities Section 416.5 — Tempered water for public handwashing facilities

This section was revised to clarify what is considered to be a public hand-washing facility.

Tempered water is required for lavatories and group wash up fixtures in public toilet facilities provided for customer, patrons and visitors.

Maximum temperature at the outlet: 110 degrees

2015 IPC Design, Installation and Inspection Principles 99

417.2 — Water supply riser 417.2 — Water supply riser Riser must be fastened using screws or a device

specifically designed for such purpose.

2015 IPC Design, Installation and Inspection Principles 100

Page 26: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 26

Section 417.4 — Shower compartmentsSection 417.4 — Shower compartments

2015 IPC Design, Installation and Inspection Principles 101

Exception:Exception:

2015 IPC Design, Installation and Inspection Principles 102

417.4.1 Floor and wall area417.4.1 Floor and wall area Smooth, corrosion

resistant, and non-absorbent materials shall extend to at least 6 feet above floor level and not less that 70 inches above the drain of the tub or shower joints made water tight

2015 IPC Design, Installation and Inspection Principles 103

Section 417.4.2 — AccessSection 417.4.2 — Access The shower compartment

access and egress opening shall have a minimum clear and unobstructed finished width of 22 inches.

Shower compartments required to be designed in conformance to accessibility provisions shall comply with Section 404.1.

2015 IPC Design, Installation and Inspection Principles 104

Page 27: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 27

Section 419.1 — ApprovalSection 419.1 — Approval Urinals shall conform to

ANSI Z124.9, ASME A112.19.2M, CSA B45.1 or CSA B45.5. Urinals shall conform to the water consumption requirements of Section 604.4.

Water-supplied urinals shall conform to the hydraulic performance requirements of ASME A112.19.6, CSA B45.1 or CSA B45.5.

2015 IPC Design, Installation and Inspection Principles 105

Section 420.1 – Approval Section 420.1 – Approval Electro-hydraulic water

closets (a water closet of the siphonic or washdowntype that utilizes motors, pumps, and controllers to assist the flushing action)

And dual flush water closets (two flushing actions, one using less water than 1.6 gal/flush) are addressed and the relevant standards are cited.

2015 IPC Design, Installation and Inspection Principles 106

Dual flush water closets

Section 421.5 — Access to PumpSection 421.5 — Access to Pump

2015 IPC Design, Installation and Inspection Principles 107

Section 421.5 —Access to Pump (cont.)Section 421.5 —Access to Pump (cont.)

2015 IPC Design, Installation and Inspection Principles 108

Page 28: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 28

Section 424.3 – Individual shower valvesSection 424.3 – Individual shower valves

2015 IPC Design, Installation and Inspection Principles 109

Section 424.4 – Multiple (gang) showersSection 424.4 – Multiple (gang) showers

2015 IPC Design, Installation and Inspection Principles 110

Maximum Temperatures Allowed At Use LocationsMaximum Temperatures Allowed At Use Locations

2015 IPC Design, Installation and Inspection Principles 111

Plumbing FixtureMaximum Discharge

TemperatureReference Standard IPC Section

1. Bidet ≤ 110°F (43.33°C) ASSE 1070 408.3

2. Public hand-washing facilities

> 85°F (29.44°C) and

< 110°F (43.33°C)ASSE 1070 or CSA B125.3 416.5

3. Individual shower valves ≤ 120°F (48.89°C) ASSE 1016 or ASME A112.18.1 /

CSA B125 424.3

4. Multiple (gang) showers ≤ 120°F (48.89°C) ASSE 1069 or CSA B125 424.3

5. Bathtub/whirlpool bathtubs

≤ 120°F (48.89°C) ASSE 1070 or CSA B125.3except as allowed by Section 424.3.

424.5

Section 424.9 — Water closet personal hygiene devicesSection 424.9 — Water closet personal hygiene devices

ASME A112.4.2 was added to the code to cover specialized water closets or water closet seats having sprays for personal hygiene.

2015 IPC Design, Installation and Inspection Principles 112

Page 29: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 29

Water HeatersWater Heaters

Chapter 5

113

Section 501.2 – Water heater as space heaterSection 501.2 – Water heater as space heater

2015 IPC Design, Installation and Inspection Principles 114

Water-to-Air HeatExchanger

502.1.1 Elevation and protection502.1.1 Elevation and protection

Elevation of water heater ignition sources and mechanical damage protection requirements for water heaters shall be in accordance with the International Mechanical Code and the International Fuel Gas Code.

2015 IPC Design, Installation and Inspection Principles 115

502.5 Clearance for Maintenance and Replacement 502.5 Clearance for Maintenance and Replacement

2015 IPC Design, Installation and Inspection Principles 116

Page 30: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 30

Section 503.1 – Cold water line valveSection 503.1 – Cold water line valve

2015 IPC Design, Installation and Inspection Principles 117

Water Heater Valve

Section 504.4.1 - Installation of temperature and pressure relief valvesSection 504.4.1 - Installation of temperature and pressure relief valves

2015 IPC Design, Installation and Inspection Principles 118

Section 504.4.1 - Installation of temperature and pressure relief valvesSection 504.4.1 - Installation of temperature and pressure relief valves

2015 IPC Design, Installation and Inspection Principles 119

Section 504.4.1 – InstallationSection 504.4.1 – Installation

2015 IPC Design, Installation and Inspection Principles 120

CORRECT INSTALLATION

Page 31: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 31

Section 504.6 - Requirements for discharge pipingSection 504.6 - Requirements for discharge piping

2015 IPC Design, Installation and Inspection Principles 121

Section 504.7- Required panSection 504.7- Required pan The language states that

where drain pans are required for water heaters they are only required for storage tank-type water heaters or hot water storage tanks. Tank-less water heaters are exempt.

2015 IPC Design, Installation and Inspection Principles 122

Section 505.1 - Unfired vessel insulation Section 505.1 - Unfired vessel insulation

Unfired hot water storage tanks shall be insulated to R-12.5 (h × ft2 × °F)/Btu (R-2.2 m2 × K/W).

2015 IPC Design, Installation and Inspection Principles 123

Indirect/Special WastesIndirect/Special Wastes

Chapter 8

124

Page 32: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 32

Section 801.1 - ScopeSection 801.1 - Scope Food-handling establishments Sterilizers Clear-water waste Swimming pools Methods of providing air breaks or air gaps Neutralizing devices for corrosive waste

2015 IPC Design, Installation and Inspection Principles 125

Section 802.1 - Where requiredSection 802.1 - Where required

2015 IPC Design, Installation and Inspection Principles 126

Section 802.1.2 – Floor drains in food storage areasSection 802.1.2 – Floor drains in food storage areas

2015 IPC Design, Installation and Inspection Principles 127

Section 802.1.3 - Potable clear-water wasteSection 802.1.3 - Potable clear-water waste

2015 IPC Design, Installation and Inspection Principles 128

Page 33: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 33

Section 802.1.8 - Food utensils, dishes, pots and pans sinksSection 802.1.8 - Food utensils, dishes, pots and pans sinks Sinks used for the washing, rinsing or sanitizing

of utensils, dishes, pots, pans or service ware used in the preparation, serving or eating of food must connect indirectly to the drainage system through an air gap or air break.

2015 IPC Design, Installation and Inspection Principles 129

Section 802.2 – InstallationSection 802.2 – Installation

2015 IPC Design, Installation and Inspection Principles 130

Section 802.2.1 – Air gapSection 802.2.1 – Air gap

2015 IPC Design, Installation and Inspection Principles 131

2D

Waste Receptor

Section 802.2.2 - Air BreakSection 802.2.2 - Air Break

2015 IPC Design, Installation and Inspection Principles 132

Page 34: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 34

Section 802.3 - Waste receptorsSection 802.3 - Waste receptors

In addition to waste receptors prohibited from being in bathrooms or toilet rooms, they are now prohibited from being in plenums, crawl spaces, attics, interstitial spaces above ceilings and below floors.

Waste receptors in those locations can dry out or overflow without knowledge of the occupants.

2015 IPC Design, Installation and Inspection Principles 133

Section 802.3 –Waste receptors

Section 802.3 –Waste receptors

2015 IPC Design, Installation and Inspection Principles 134

Section 802.4 - StandpipesSection 802.4 - Standpipes

2015 IPC Design, Installation and Inspection Principles 135

Traps, Interceptors and SeparatorsTraps, Interceptors and Separators

Chapter 10

136

Page 35: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 35

Section 1002.1 - Fixture trapsSection 1002.1 - Fixture traps An exception for parking garage floors drains

allows them to run without traps when they run to a storm sewer.

Traps for individual floor drains are not required provided that the drains are connected to a main trap before discharge to a combined sewer.

2015 IPC Design, Installation and Inspection Principles 137

Section 1002.1, Exception 4 for Floor Drain Traps in Parking GaragesSection 1002.1, Exception 4 for Floor Drain Traps in Parking Garages

2015 IPC Design, Installation and Inspection Principles 138

Section 1002.1 - Fixture trapsSection 1002.1 - Fixture trapsINLET

OUTLET

EXCEPTION #1

EXCEPTION #2

CROWN WEIRSEAL

DIP

WATER CLOSETS HAVEAN INTEGRAL TRAP

SINK

MAX. VERTICALDISTANCE - 24"

TWO-COMPARTMENT SINK

MAX. DISTANCE - 30"MAX. DISTANCE - 6"

2015 IPC Design, Installation and Inspection Principles 139

Section 1002.3 - Prohibited trapsSection 1002.3 - Prohibited traps

2015 IPC Design, Installation and Inspection Principles 140

“DRUM TRAP”

EXCEPTION: WHEN USED AS A SOLIDS

INTERCEPTOR

”S” TRAP TENDS TO SELF-SIPHON

“OLD STYLE” FLOOR DRAIN WITH INTERIOR PARTITION

BELL TRAPCROWN-VENTED TRAP

TRAP WITH FLOAT BALL (MOVING PARTS)

WATER SEAL

VENTINLET

Page 36: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 36

Section 1002.4 - Trap sealsSection 1002.4 - Trap seals Minimum liquid seal is 2 inches (51 mm) Maximum liquid seal is 4 inches (102 mm) When evaporation threatens the trap seal, the

seal shall be protected by one of four methods Trap seal protection shall conform to ASSE

1018, ASSE 1044, or ASSE 1072

2015 IPC Design, Installation and Inspection Principles 141

Trap seal barrierTrap seal barrier

2015 IPC Design, Installation and Inspection Principles 142

Section 1002.4 - Trap sealsSection 1002.4 - Trap seals Trap seal primer valve discharge piping must connect

to the trap above the trap seal water line.

2015 IPC Design, Installation and Inspection Principles 143

Section 1003.1 -Interceptors and separatorsSection 1003.1 -Interceptors and separators Provided to prevent the discharge of: Oil Grease Sand Substances harmful to the system, e.g. acid, heavy

metals

2015 IPC Design, Installation and Inspection Principles 144

Page 37: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 37

Section 1003.2 - Approval Section 1003.2 - Approval

2015 IPC Design, Installation and Inspection Principles 145

Section - 1003.3.1Section - 1003.3.1 Grease interceptors and automatic grease

removal devices required A list of equipment and fixtures that require their

waste water be treated in commercial settings

grease interceptors can be installed in series, instead of requiring the replacement of an existing grease interceptor that is too small.

2015 IPC Design, Installation and Inspection Principles 146

Grease Interceptor In SeriesGrease Interceptor In Series

2015 IPC Design, Installation and Inspection Principles 147

Section 1003.3.1 - Grease interceptors and automatic grease removal deviceSection 1003.3.1 - Grease interceptors and automatic grease removal device

2015 IPC Design, Installation and Inspection Principles 148

Page 38: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 38

Section 1003.3.2 - Food waste grindersSection 1003.3.2 - Food waste grinders

2015 IPC Design, Installation and Inspection Principles 149

Outside Grease InterceptorsOutside Grease Interceptors

2015 IPC Design, Installation and Inspection Principles 150

Section 1003.3.5 - Automatic grease removal devicesSection 1003.3.5 - Automatic grease removal devices

2015 IPC Design, Installation and Inspection Principles 151

Gravity grease interceptorsGravity grease interceptors

2015 IPC Design, Installation and Inspection Principles 152

Page 39: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 39

Section 1003.4.2 - Oil separator design Section 1003.4.2 - Oil separator design Oil separators not

designed in accordance with Sections 1003.4.2.1 and 1003.4.2.2, must be listed and labeled.

2015 IPC Design, Installation and Inspection Principles 153

Section 1003.6 – clothes washer discharge interceptorSection 1003.6 – clothes washer discharge interceptor Applies to

commercial and industrial clothes washers

Applies to residential clothes washers when there is more than one in a laundry room

2015 IPC Design, Installation and Inspection Principles 154

Section 1003.9 - Venting of grease interceptorSection 1003.9 - Venting of grease interceptor

PRE-RINSE ANDFOOD WASTEGRINDER

POT WELLSINK

3 COMPARTMENTSINK

FLOORDRAINS

FLOORDRAINS

GREASE INTERCEPTOR

DISHWASHER

2015 IPC Design, Installation and Inspection Principles 155

Venting of Interceptors and SeparatorsVenting of Interceptors and Separators

2015 IPC Design, Installation and Inspection Principles 156

Page 40: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 40

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

1. There shall be at least 21 inches (533 mm) of clearance in front of a lavatory to any wall or fixture.

True

2015 IPC Design, Installation and Inspection Principles 157

False

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

2. The waste outlet of a pressure, temperature or other relief valve shall be indirectly connected to the __________________ (Section 504.6).

2015 IPC Design, Installation and Inspection Principles 158

drainage system

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

3. Standpipes shall extend a minimum of _________________ and a maximum of _________________ inches above a trap.

2015 IPC Design, Installation and Inspection Principles 159

18 inches (457 mm) 42 inches (1067 mm)

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

4. The vertical distance from the fixture outlet to the trap weir shall not exceed ______________________ .

2015 IPC Design, Installation and Inspection Principles 160

24 inches (610 mm)

Page 41: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 41

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

5. Bathtubs require a waste outlet and an _________ outlet both connected to 1½ inch (38 mm) pipe.

2015 IPC Design, Installation and Inspection Principles 161

overflow

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

6. An indirect waste receptor installed below the floor in a crawl space is a code violation.

True

2015 IPC Design, Installation and Inspection Principles 162

False

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

7. When a water heater is connected to an additional storage tank, both the water heater and the tank must have temperature and pressure relief valves.

True

2015 IPC Design, Installation and Inspection Principles 163

False

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

8. When lack of space or capacity is a factor, an additional grease interceptor may be added upstream of the existing grease interceptor.

Yes

2015 IPC Design, Installation and Inspection Principles 164

No

Page 42: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 42

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

Module 2 - Fixtures, Water Heaters, Indirect/Special Waste and Separators

9. A tankless water heater (does or does not) require a water heater pan.

Does Not

2015 IPC Design, Installation and Inspection Principles 165

Does

Water Systems, Sanitary Drainage and VentingWater Systems, Sanitary Drainage and Venting

Module 3

166

Water Supply and DistributionWater Supply and Distribution

Chapter 6

167

601.5 Rehabilitation601.5 Rehabilitation Existing water piping

systems may be rehabilitated using an epoxy liner system that complies with ASTM F 2831.

2015 IPC Design, Installation and Inspection Principles 168

Page 43: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 43

Section 602.2 – Potable Water RequiredSection 602.2 – Potable Water Required Only potable water shall be supplied to plumbing

fixtures that provide water for drinking, bathing or culinary purposes, or for the processing of food, medical or pharmaceutical products.

Unless otherwise provided in this code, potable water shall be supplied to all plumbing fixtures.

2015 IPC Design, Installation and Inspection Principles 169

602.3.4 Disinfection of system602.3.4 Disinfection of system All newly constructed water supply systems shall

be disinfected as outlined in this code.

2015 IPC Design, Installation and Inspection Principles 170

Section 603.1 - Size of Water Service PipeSection 603.1 - Size of Water Service Pipe

2015 IPC Design, Installation and Inspection Principles 171

Section 603.2 - Separation of Water Supply and Building Sewer Section 603.2 - Separation of Water Supply and Building Sewer

2015 IPC Design, Installation and Inspection Principles 172

12" MIN.WATER SERVICE

ON SHELF

BUILDING SEWERWATER SERVICE INSEPARATE TRENCH

BUILDING SEWER INSEPARATE TRENCH

UNEXCAVATED OR COMPACTEDEARTH SEPARATING TRENCHES COMMON TRENCH

5' MINIMUM

Exception 1

Page 44: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 44

Section 603.2 - Separation of Water Service and Building SewerSection 603.2 - Separation of Water Service and Building Sewer

2015 IPC Design, Installation and Inspection Principles 173

Sewer pipe not listed in Table 702.2

Section 603.2.1 - Water Service Near Sources of PollutionSection 603.2.1 - Water Service Near Sources of Pollution Potable water service pipes shall not be

located in, under or above: Cesspools Septic tanks Septic tank drainage fields or seepage pits

2015 IPC Design, Installation and Inspection Principles 174

Section 604 - Design of Building Water Distribution SystemSection 604 - Design of Building Water Distribution System Shall conform to accepted engineering practice.

Appendix E describes two methods of sizing a water supply system. Section E103.3 (Segmented loss method) Section E 201.1 (Based on water fixture units or old

method)

2015 IPC Design, Installation and Inspection Principles 175

Example of E201.1 (Residential Method)Example of E201.1 (Residential Method)

The following example utilizes Appendix E (Residential Method).

A building with 15’ elevation difference to the highest water supply outlet.

Available Pressure = 65 psi low, 70 psi high. Developed length of 40’. Combined fixture unit value of 27.5.

2015 IPC Design, Installation and Inspection Principles 176

Page 45: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 45

Step Task1 Obtain the minimum service pressure (psig) available from the local water authority.

2 Adjust for elevation conditions (Subtract 0.5 psi for each foot of height. If the highest water supply outlet is below the meter, add .5 psi for each foot of difference. Take in consideration the pressure reducing valve.

3 Deduct for all pressure losses caused by special equipment, such as backflow preventers, water softeners, filters, etc. The loss is determined in accordance with the manufacture’s. specifications. Table 604.3

4 Determine if fixture water controls require more than 8 psig minimum to operate. (Note the resulting figure). Temperature-controlled shower valve deduct in excess of 8 psi (12).

5 Note the resulting figure.

6 Determine the approximate length of piping from the water main to the most remote fixture in house. (The hot water circuit may be the longest length.)

7 Using the “Combined” column of Table E103.3(2) add the water system fixture units (wsfu ) of all fixtures that are a part of the system, and note the resulting figure.

8 In the appropriate pressure range (from step 5) of the Table E201.1, find the maximum developed length through water heater or cold water branches and multiply by 1.2 to account for fittings. Read down this column until you find the (wsfu) that is equal to or greater than the total (wsfu) obtained in Step 7.

9 Read across this row to obtain the minimum meter and service pipe size from column one.

10 Determine required size of each branch, by starting at the most remote outlet and work back to the main distribution pipe. Determine the (wsfu) on a given section of piping and using the same pressure range and maximum developed length column as in Step 8, locate the (wsfu) and read across that row to obtain the pipe size for that section.

1772015 IPC Design, Installation and Inspection Principles 178

Example of E201.1 (Residential Method) cont.Example of E201.1 (Residential Method) cont.Steps

ResultsStep 1. 65 65 Step 2. 15’ x 0.5 - 7.5Step 3. 3 psi - 3 Step 4. Temperature-controlled showers deduct in excess of 8 psi -12Step 5. Resulting pressure 42.5Step 6. 48’ = (40’ x 1.2) 48’Step 7. 1 bathroom group = 2 x 3.6 (private use) 7.2

Kitchen sink = 1 x 1.4 1.4Dishwasher = 1 x 1.4 1.4Hose bibb = 3 x 2.5 7.5Sprinkler head = 5 x 2.0 10Total 27.5

Table E103.3(2)

Example

2015 IPC Design, Installation and Inspection Principles

2015 IPC Design, Installation and Inspection Principles 179

Static Pressure Loss

Loss of Pressure (-)Example:Pressure at meter = 80 psiElevation change = 20 feetP = 0.5 X Head (feet)P = 0.5 X 20 feetP = 10 psiPressure for sizing, then, is80 psi - 10 psi = 70 psiMeter

Elevation

Presure (pounds per square inch = 0.5 x head (feet)

Static Pressure Gain

MeterElevation

Gain in Pressure (+)Pressure for sizing. then, is80 psi +10 psi = 90 psi

Back

TABLE E103.3(2) (Private) WATER SUPPLY FIXTURE UNIT VALUES FOR VARIOUS

PLUMBING FIXTURES AND FITURE GROUPS

TABLE E103.3(2) (Private) WATER SUPPLY FIXTURE UNIT VALUES FOR VARIOUS

PLUMBING FIXTURES AND FITURE GROUPS

2015 IPC Design, Installation and Inspection Principles 180

TYPE OF FIXTURES OR GROUP OF FIXTURESWATER SUPPLY FIXTURE UNIT VALUE

(w.s.f.u.)HOT COLD COMBINED

Bathtub (with/without overhead shower head) Private 1.0 1.0 1.4Clothes washer (Private) 1.0 1.0 1.4Dishwasher (Private) 1.4 — 1.4Bathroom group (Private), (Flush tank) with bathtub or shower stall 1.5 2.7 3.6Half-bath group (water closet and lavatory) 0.5 2.5 2.6Hose bibb (Silcock)ª — 2.5 2.5Kitchen group (dishwasher and sink with/without garbage grinder) 1.9 1.0 2.5Kitchen sink (private) 1.0 1.0 1.4Laundry group (clothes washer standpipe and laundry tub) 1.8 1.8 2.5Laundry tub (private) 1.0 1.0 1.4Lavatory (private) 0.5 0.5 0.7Shower stall (private) 1.0 1.0 1.4Water closet (tank type), (private) — 2.2 2.2

Back

Page 46: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 46

Example of E201.1 (Residential Method) contExample of E201.1 (Residential Method) cont Step 8. From the “Pressure Range 40-49 psi”

(from step 5) column, read down the 60’ column.

Step 9. The meter size from column one is ¾” and the main distribution pipe shall be 1 inch.

2015 IPC Design, Installation and Inspection Principles 181

Table E201.1

TABLE E201.1MINIMUM SIZE OF WATER METERS, MAINS AND

DISTRIBUTION PIPING BASED ON WATER SUPPLY FIXTURE UNIT VALUES (w.s.f.u.)

TABLE E201.1MINIMUM SIZE OF WATER METERS, MAINS AND

DISTRIBUTION PIPING BASED ON WATER SUPPLY FIXTURE UNIT VALUES (w.s.f.u.)

2015 IPC Design, Installation and Inspection Principles 182

Pressure Range-40 to 49

METER AND SERVICE PIPE

(INCHES)

DISTRIBUTIONPIPE

(INCHES)

MAXIMUM DEVELOPMENT LENGTH (feet)

40 60 80 100 150 200 250 300 400 500

¾ ½ ª 3 2.5 2 1.5 1.5 1 1 .5 .5 .5

¾ ¾ 9.5 9.5 8.5 7 5.5 4.5 3.5 3 2.5 2

¾ 1 32 32 32 26 18 13.5 10.5 9 7.5 6

1 1 32 32 32 32 21 15 11.5 9.5 7.5 6.5

¾ 1¼ 32 32 32 32 32 32 32 27 21 16.5

1 1¼ 80 80 80 80 65 52 42 35 26 20

1½ 1¼ 80 80 80 80 75 59 48 39 28 21

1 1½ 87 87 87 87 87 87 87 78 65 55

1½ 1½ 151 151 151 151 151 130 109 93 75 63

Step 8

Section 604.5 - Size of Fixture SupplySection 604.5 - Size of Fixture Supply

2015 IPC Design, Installation and Inspection Principles 183

Table 604.5

Table 604.5Minimum Sizes of Fixture Water Supply Pipes

Table 604.5Minimum Sizes of Fixture Water Supply Pipes

2015 IPC Design, Installation and Inspection Principles 184

Back

Page 47: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 47

Section 604.9 – Water HammerSection 604.9 – Water Hammer

2015 IPC Design, Installation and Inspection Principles 185

Chapter 6 – Water Supply and DistributionChapter 6 – Water Supply and Distribution

2015 Section Title Description of Change

Table 605.3 Water Service Pipe

Chlorinated polyvinyl chloride/aluminum/chlorinated polyvinyl chloride

Table 605.4 Water Distribution Pipe

Table 605.7 Valves

2015 IPC Design, Installation and Inspection Principles 186

ValvesValves Valves must be

compatible with the type of piping being used

Valves shall meet the standards in Table 605.7

Valve shall comply with NSF 61

2015 IPC Design, Installation and Inspection Principles 187

605.2.1 Lead content of drinking water pipe and fittings605.2.1 Lead content of drinking water pipe and fittings Everything used in a

water supply shall comply with NSF 372 which stipulates no more than .25 of a percent of lead content

2015 IPC Design, Installation and Inspection Principles 188

Page 48: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 48

Section 605.24.1 – Copper or copper-alloy tubing to galvanized steel pipeSection 605.24.1 – Copper or copper-alloy tubing to galvanized steel pipe

2015 IPC Design, Installation and Inspection Principles 189

Section 606 - Installation of the Building Water Distribution SystemSection 606 - Installation of the Building Water Distribution SystemSection 606.1 Location of Full Open Valves Full-open valves shall

be installed in the following locations: Curb Valve

2015 IPC Design, Installation and Inspection Principles 190

Section 606.2 -Location of Shutoff ValvesSection 606.2 -Location of Shutoff Valves Shutoff valves shall be installed in the following

locations: On the fixture supply to each plumbing fixture other

than bathtubs and showers in one- and two-family residential occupancies, and other than in individual sleeping units that are provided with unit shutoff valves in hotels, motels, boarding houses and similar occupancies.

On the water supply pipe to each sillcock. On the water supply pipe to each appliance or

mechanical equipment.

2015 IPC Design, Installation and Inspection Principles 191

Section 606.2 - Location of Shutoff Valves Shutoff Valves For Each FixtureSection 606.2 - Location of Shutoff Valves Shutoff Valves For Each Fixture

2015 IPC Design, Installation and Inspection Principles 192

Page 49: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 49

Valve at Entrance to Building and on Discharge Side of MeterValve at Entrance to Building and on Discharge Side of Meter

2015 IPC Design, Installation and Inspection Principles 193

Dwelling Unit ValveDwelling Unit Valve

2015 IPC Design, Installation and Inspection Principles 194

Valves for Each Riser & Down FeedValves for Each Riser & Down Feed

2015 IPC Design, Installation and Inspection Principles 195

Section 606.4 -Valve IdentificationSection 606.4 -Valve Identification

2015 IPC Design, Installation and Inspection Principles 196

Section 606.4 requires valveto be identified

Page 50: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 50

Section 606.7 – Labeling of water distribution pipes in bundles Section 606.7 – Labeling of water distribution pipes in bundles

This new section requires that water distribution piping that is in bundles have labels to identify the direction of flow and contents.

2015 IPC Design, Installation and Inspection Principles 197

Section 607.1 – Where requiredSection 607.1 – Where required

2015 IPC Design, Installation and Inspection Principles 198

Section 607.1.1 - Temperature limiting meansSection 607.1.1 - Temperature limiting means This section was

added to prohibit a water heater thermostat from being used as the temperature limiting device where the code requires a limit for hot or tempered water.

2015 IPC Design, Installation and Inspection Principles 199

Section 607.2 – Hot water supply temperature maintenance Section 607.2 – Hot water supply temperature maintenance The threshold for where a hot water temperature

maintenance system is required was lowered from 100 feet to 50 feet (30 480 mm to 15 240 mm).

2015 IPC Design, Installation and Inspection Principles 200

Page 51: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 51

Section 607.2 – Hot or Tempered Water Supply to FixtureSection 607.2 – Hot or Tempered Water Supply to Fixture

2015 IPC Design, Installation and Inspection Principles 201

607.2.1 maintaining heated water temperature607.2.1 maintaining heated water temperature Residential

occupancies shall comply with the energy code section R403.5 .1

Commercial occupancies shall comply with the energy code section C404.6

2015 IPC Design, Installation and Inspection Principles 202

Section 607.3 - Example of Thermal Expansion ControlSection 607.3 - Example of Thermal Expansion Control

2015 IPC Design, Installation and Inspection Principles 203

Example of closed system

Pressure Reducing Valve with Thermal Expansion BypassPressure Reducing Valve with Thermal Expansion Bypass

2015 IPC Design, Installation and Inspection Principles 204

Page 52: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 52

607.5 [E] - Pipe insulation 607.5 [E] - Pipe insulation The International Energy Conservation

Code regulates pipe insulation, which is sometimes installed by the plumbing contractor.

2015 IPC Design, Installation and Inspection Principles 205

Section 607.5 - Pipe insulation Section 607.5 - Pipe insulation

2015 IPC Design, Installation and Inspection Principles 206

Section 608.7 – Stop-and-waste valves prohibitedSection 608.7 – Stop-and-waste valves prohibited

2015 IPC Design, Installation and Inspection Principles 207

Section 608.8 - Identification of nonpotable water Section 608.8 - Identification of nonpotable water

Wherever nonpotable water systems are installed the piping must be identified.

Signage is required at outlets Color of piping, letters and letter size is

addressed in this section Identification tape is allowed Potable water used for cooling equipment can

not be returned to the potable water system

2015 IPC Design, Installation and Inspection Principles 208

Page 53: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 53

Air Gap for a FaucetAir Gap for a Faucet

2015 IPC Design, Installation and Inspection Principles 209

Air Gap in Piping System Air Gap in Piping System

2015 IPC Design, Installation and Inspection Principles 210

Section 608.13.2 – Reduced pressure principle backflow prevention assemblies Section 608.13.2 – Reduced pressure principle backflow prevention assemblies

2015 IPC Design, Installation and Inspection Principles 211

Section 608.13.3 – Backflow preventer with intermediate atmospheric ventSection 608.13.3 – Backflow preventer with intermediate atmospheric vent

2015 IPC Design, Installation and Inspection Principles 212

Page 54: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 54

Section 608.13.6 – Atmospheric-type vacuum breakersSection 608.13.6 – Atmospheric-type vacuum breakers

2015 IPC Design, Installation and Inspection Principles 213

Section 608.14.2 – Protection of backflow preventersSection 608.14.2 – Protection of backflow preventers

2015 IPC Design, Installation and Inspection Principles 214

Section 608.14.2 – Protection of backflow preventersSection 608.14.2 – Protection of backflow preventers

2015 IPC Design, Installation and Inspection Principles 215

Table 608.15.1 -Minimum Required Air GapsTable 608.15.1 -Minimum Required Air Gaps

2015 IPC Design, Installation and Inspection Principles 216

FixtureMinimum Air Gap

Away from a walla (inches) Close to a wall (inches)

Lavatories and other fixtures with effective openings not greater than 1/2 inch in diameter 1 1½Sinks, laundry trays, gooseneck back faucets and other fixtures with effective openings not greater than ¾ inch in diameter 1.5 2.5Over-rim bath fillers and other fixtures with effective openings not greater than 1 inch in diameter 2 3Drinking water fountains, single orifice not greater than 7/16 inch in diameter or multiple orifices with a total area of 0.150 square inch (area of circle 7/16 inch in diameter)

1 1½

Effective openings greater than 1 inch Two times the diameter of the effective opening

Three times the diameter of the effective opening

For SI: 1 inch = 25.4 mma. Applicable where walls or obstructions are spaced from the nearest inside-edge of the spout opening a

distance greater than three times the diameter of the effective opening for a single wall, or a distance greater than four times the diameter of the effective opening for two intersecting walls.

Page 55: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 55

2015 IPC Design, Installation and Inspection Principles 217

7”

2”

Air gap = 4 inches

For SI: 1 inch = 25.4 mm

6018.15.1(3)Air Gap: Located Near Single Wall

6”

2”

Example 1Cross Section of Supply Outlet

Example 2Cross Section of Supply Outlet

Air gap = 6 inches

2015 IPC Design, Installation and Inspection Principles 218

9”

2”

Air gap = 4 inches

For SI: 1 inch = 25.4 mm

6018.15.1(4)Air Gaps: Located Near Intersecting Wall

8”

2”

Example 1Intersecting Wall

Example 2Intersecting Wall

Air gap = 6 inches

9”

8”

Section 608.15.4.1 – Deck-mounted and integral vacuum breakersSection 608.15.4.1 – Deck-mounted and integral vacuum breakers

Lavatory and kitchen sink faucets with the primary outlet attached to a flexible hose must be protected by an integral vacuum breaker or be provided with a dedicated vacuum breaker.

2015 IPC Design, Installation and Inspection Principles 219

Section 608.15.4.2 – Hose connectionsSection 608.15.4.2 – Hose connections

These devices consist of two check valves with an atmospheric vent located between the check valves.

2015 IPC Design, Installation and Inspection Principles 220

Page 56: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 56

Section 608.16.1 – Beverage dispensersSection 608.16.1 – Beverage dispensers

2015 IPC Design, Installation and Inspection Principles 221

Section 608.16.3 – Heat exchangersSection 608.16.3 – Heat exchangers

2015 IPC Design, Installation and Inspection Principles 222

Section 608.16.4 –Connections to automatic fire sprinkler systems and standpipe systems

Section 608.16.4 –Connections to automatic fire sprinkler systems and standpipe systems

2015 IPC Design, Installation and Inspection Principles 223

Section 608.16.4 – Connections to automatic fire sprinkler systems and standpipe systems

Section 608.16.4 – Connections to automatic fire sprinkler systems and standpipe systems

2015 IPC Design, Installation and Inspection Principles 224

Page 57: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 57

Section 608.16.5 – Connections to lawn irrigation systemsSection 608.16.5 – Connections to lawn irrigation systems

2015 IPC Design, Installation and Inspection Principles 225

Section 609.2 – Water serviceSection 609.2 – Water service

2015 IPC Design, Installation and Inspection Principles 226

Sanitary DrainageSanitary Drainage

Chapter 7

227

Section 701 - Sanitary Drainage Section 701 - Sanitary Drainage

2015 IPC Design, Installation and Inspection Principles 228

Branch Interval

Building Sewer

Gate Valve

Check valve

Building Drain

Drain Stack

Soil Stack

Horizontal BranchWaste stack

Building Subdrain

Page 58: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 58

Branch Interval ReviewBranch Interval Review

THIS IS A BRANCHINTERVAL

THIS ISNOT ABRANCHINTERVAL

FLOOR

FLOORSOIL OR WASTE STACK

10’-0

” STO

RY H

EIG

HT

(TY

P.)

7’-0

8’-0

” OR

MO

RE

2015 IPC Design, Installation and Inspection Principles 229 230

2015 IPC Design, Installation and Inspection Principles 231

Common Building Sewer Location within an Approved Public Sewer Easement

Common Building Sewer Location within an Approved Public Sewer Easement

LOT LINES

BUILDINGA

BUILDINGB

BUILDINGC

BUILDINGD

BUILDINGSEWER

BUILDINGSEWER

BUILDINGSEWER

BUILDINGSEWER

PUBLIC SEWER

DEDICATEDPUBLIC SEWEREASEMENT

2015 IPC Design, Installation and Inspection Principles 232

Page 59: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 59

Building on Same Lot Example 2Building on Same Lot Example 2

PUBLICSEWER BUILDING

ABUILDING

B

BUILDING ASEWER

BUILDING BSEWER

PRIVATELY CONTROLLEDCOMMON SEWER PERMITTED

LOTLINE

2015 IPC Design, Installation and Inspection Principles 233

Section 701.4 - Sewage TreatmentSection 701.4 - Sewage Treatment Sewage or other waste from a plumbing system

that is deleterious to surface or subsurface waters shall not be discharged into the ground or into any waterway unless it has first been rendered innocuous through subjection to an approved form of treatment.

2015 IPC Design, Installation and Inspection Principles 234

Section 701.7 - ConnectionsSection 701.7 - Connections No direct connection of a steam exhaust, blow-

off or drip pipe to the building drain. Waste water discharge shall not be higher than

140°F (60°C). When higher temperatures exist, approved

cooling methods shall be provided.

2015 IPC Design, Installation and Inspection Principles 235

Section 701.9 – Drainage Piping In Food Service AreasSection 701.9 – Drainage Piping In Food Service Areas Exposed soil or waste piping shall not be

installed above any working, storage or eating surfaces in food service establishments.

2015 IPC Design, Installation and Inspection Principles 236

Page 60: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 60

Above-ground Drainage & Vent Pipe

Above-ground Drainage & Vent Pipe

Table 702.1 identifies the materials that are approved and the standards with which these materials must comply.

2015 IPC Design, Installation and Inspection Principles 237

2015 IPC Table 702.1

Page 57

Underground Drainage & Vent Pipe

Underground Drainage & Vent Pipe

The materials listed in this table are for underground use within a building. The materials not allowed underground that were allowed above ground in Table 702.1 are the following:

2015 IPC Design, Installation and Inspection Principles 238

2015 IPC Table 702.2

Page 58

Building Sewer PipeBuilding Sewer Pipe Table 702.3

identifies the materials that are permitted and the standards with which these materials must comply.

2015 IPC Design, Installation and Inspection Principles 239

2015 IPC Table 702.3

Page 58

702.5 Temperature rating702.5 Temperature rating Where wastewater is more than 140°, the

drainage piping material shall be rated for the higher temperature.

If the drainage system piping is properly chosen for the high temperatures that will be encountered, the need for cooling is eliminated.

2015 IPC Design, Installation and Inspection Principles 240

Page 61: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 61

703.6 combined sanitary and storm public sewer703.6 combined sanitary and storm public sewer The storm water and the sanitary sewer from the

building must enter the public sewer independently when the public sewer conveys both storm water and sewage.

2015 IPC Design, Installation and Inspection Principles 241

Section 704.1 - Slope of Horizontal Drainage PipingSection 704.1 - Slope of Horizontal Drainage Piping Horizontal drainage piping shall be installed in

uniform alignment at uniform slopes. The minimum slope of a horizontal drainage pipe shall be in accordance with Table 704.1.

2015 IPC Design, Installation and Inspection Principles 242

2015 IPC Table 704.1

Page 59

Section 704.3 - Connections to offsets and bases of stacksSection 704.3 - Connections to offsets and bases of stacks

2015 IPC Design, Installation and Inspection Principles 243

Horizontal Branch ConnectionsHorizontal Branch Connections

2015 IPC Design, Installation and Inspection Principles 244

Page 62: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 62

Section 706.3 - Installation of fittings Section 706.3 - Installation of fittings

2015 IPC Design, Installation and Inspection Principles 245

2015 IPC Table 706.3

Page 62

Back-to-Back FixturesBack-to-Back Fixtures

2015 IPC Design, Installation and Inspection Principles 246

Figure 706.3(5)DOUBLE SANITARYTEE PERMITTED WHERE DEVELOPED LENGTH BETWEEN OUTLET OF WATER CLOSET AND CONNECTION IS 18 INCHES OR GREATER

706.4 Heel-or Side-Inlet Quarter Bends

706.4 Heel-or Side-Inlet Quarter Bends

2015 IPC Design, Installation and Inspection Principles 247

706.4 Heel- or Side-Inlet Quarter Bends706.4 Heel- or Side-Inlet Quarter Bends

2015 IPC Design, Installation and Inspection Principles 248

Page 63: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 63

706.4 Heel- or Side-Inlet Quarter Bends706.4 Heel- or Side-Inlet Quarter Bends

2015 IPC Design, Installation and Inspection Principles 249

Section 708.1.1 -Cleanouts for Horizontal DrainsSection 708.1.1 -Cleanouts for Horizontal Drains

2015 IPC Design, Installation and Inspection Principles 250

Section 708.1.3 - Cleanouts at Sewer JunctionSection 708.1.3 - Cleanouts at Sewer Junction

2015 IPC Design, Installation and Inspection Principles 251

Section 708.1.4 - Change of DirectionSection 708.1.4 - Change of Direction

2015 IPC Design, Installation and Inspection Principles 252

Page 64: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 64

Section 708.1.9 - ClearancesSection 708.1.9 - Clearances

2015 IPC Design, Installation and Inspection Principles 253

Table 709.1 - Drainage Fixture Units For Fixtures and GroupsTable 709.1 - Drainage Fixture Units For Fixtures and Groups

2015 IPC Design, Installation and Inspection Principles 254

2015 IPC Table 709.1

Page 65

Table 709.1 - Drainage Fixture Units For Fixtures and Groups (cont.)Table 709.1 - Drainage Fixture Units For Fixtures and Groups (cont.)

2015 IPC Design, Installation and Inspection Principles 255

Table 709.2Table 709.2

2015 IPC Design, Installation and Inspection Principles 256

2015 IPC Table 709.2

Page 64

Page 65: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 65

Table 710.1(2) – Horizontal Fixture Branch and StacksªTable 710.1(2) – Horizontal Fixture Branch and Stacksª

Diameter of Pipe

(Inches)

Maximum Number of Drainage Fixture Units (dfu)

Total For Horizontal Branch

Stacks (b)

Total Discharge into One Branch

Interval

Total for Stack Three

Branch Intervals or Less

Total for Stack Greater Than Three Branch

Intervals

1-1/2 3 2 4 8

2 6 6 10 24

2-1/2 12 9 20 42

3 20 20 48 72

4 160 90 240 500

5 360 200 540 1,100

6 620 350 960 1,900

8 1,400 600 2,200 3,600

10 2,500 1,000 3,800 5,600

12 3,900 1,500 6,000 8,400

15 7,000 Note C Note C Note C

2015 IPC Design, Installation and Inspection Principles 257

2015 IPCTable

710.1(2)Page 66

Table 710.1(1) Building Drains and SewersTable 710.1(1) Building Drains and Sewers

2015 IPC Design, Installation and Inspection Principles 258

Diameter of Pipe(Inches)

Maximum Number of Drainage Fixture Units Connected To Any Portion of The Building Drain or the Building Sewer, Including Branches of The Building Drain

Slope per foot

1/16 inch 1/8 inch ¼ inch ½ inch

1 1/4 ___ ___ 1 1

1 1/2 ___ ___ 3 3

2 ___ ___ 21 26

2 1/2 ___ ___ 24 31

3 ___ 36 42 50

4 ___ 180 216 250

5 ___ 390 480 575

6 ___ 700 840 1,000

8 1,400 1,600 1,920 2,300

10 2,500 2,900 3,500 4,200

12 3, 900 4,600 5.600 6,700

15 7,000 8,300 10,000 12,000

380 DFU

Sizing Example: Branch Interval 710.1(2)Sizing Example: Branch Interval 710.1(2)

2015 IPC Design, Installation and Inspection Principles 259

BRANCH INTERVAL =

STACK

FLOOR

THE TOTAL D.F.U. OF HORIZONTAL BRANCHES A, B & C CANNOT

EXCEED THE TOTAL LISTED IN THE THIRD COLUMN OF TABLE 710.1(2)

FLOOR

8’

6’

Stack Sizing 710.1(2)Stack Sizing 710.1(2)

2015 IPC Design, Installation and Inspection Principles 260

Page 66: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 66

Sizing of Stack Greater Than Three Branch Intervals 710.1(2)Sizing of Stack Greater Than Three Branch Intervals 710.1(2)

2015 IPC Design, Installation and Inspection Principles 261

Sizing of Stack Three Branch Intervals or Less 710.1(2) Sizing of Stack Three Branch Intervals or Less 710.1(2)

2015 IPC Design, Installation and Inspection Principles 262

Offsets in Drainage Piping (Buildings of 5 Stories or More)Offsets in Drainage Piping (Buildings of 5 Stories or More)

2015 IPC Design, Installation and Inspection Principles 263

VERTICAL STACK OFFSET

VERTICAL OFFSET SIZED AS A VERTICAL STACK PER TABLE 710.1(2)HORIZONTAL

BRANCH CONNECTIONS PROHIBITED UNLESS RELIEF VENT IS INSTALLED OR OFFSET SIZED AS BUILDING DRAIN

UPPER STACK HAS 5 OR MORE BRANCH INTERVALS

Offsets in Drainage Piping (Buildings of 5 Stories or More)Offsets in Drainage Piping (Buildings of 5 Stories or More)

2015 IPC Design, Installation and Inspection Principles 264

HORIZONTAL OFFSET SIZED AS A BUILDING DRAIN PER 710.1(1)

HORIZONTAL STACK OFFSET

HORIZONTAL BRANCH CONNECTIONS NOT PERMITTED

UPPER STACK HAS 5 OR MORE BRANCH INTERVALS

SIZED AS A VERTICAL STACK PER 713.1(2)

SIZED AS A VERTICAL STACK FOR ALL DFU IN THE STACK, BUT NOT LESS THAN THE SIZE OF OFFSET

Page 67: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 67

Section 711.1.1 - Omission of vents for horizontal stack offsets Section 711.1.1 - Omission of vents for horizontal stack offsets Horizontal branches can now connect at any point in

a stack above or below a horizontal offset. Horizontal branches can connect to a horizontal offset provided that the connection point is 10 stack diameters downstream of the upper stack.

2015 IPC Design, Installation and Inspection Principles 265

Sewer Ejector InstallationSewer Ejector Installation

2015 IPC Design, Installation and Inspection Principles 266

Section 712.3.5 - Pump connection to the drainage systemSection 712.3.5 - Pump connection to the drainage system Pumps connected to the drainage system can now

connect to a building sewer, building drain, soil stack, waste stack or horizontal branch drain.

For a connection near the base of a stack, the distance has been reduced from 10 feet (3048 mm) to 10 stack diameters.

2015 IPC Design, Installation and Inspection Principles 267

Section 715.1 - Sewage backflowSection 715.1 - Sewage backflow This section changed to require a backwater

valve where the floor elevation of the plumbing fixtures is at or below the level for the next upstream manhole cover.

2015 IPC Design, Installation and Inspection Principles 268

Page 68: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 68

Section 715 – Backwater ValvesSection 715 – Backwater Valves

2015 IPC Design, Installation and Inspection Principles 269

Section 715.1 - Sewage backflowSection 715.1 - Sewage backflow

2015 IPC Design, Installation and Inspection Principles 270

716 Vacuum Drainage Systems716 Vacuum Drainage Systems Drain fixtures by vacuum Installed per the manufacturer’s installation

instructions Fixtures are accorded the same DFU, as the

chapter specifies, counted where they discharge from the vacuum system

A vacuum test is required to demonstrate a tight system

2015 IPC Design, Installation and Inspection Principles 271

717 Pipe bursting existing sewers717 Pipe bursting existing sewers

2015 IPC Design, Installation and Inspection Principles 272

Page 69: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 69

VentsVents

Chapter 9

273

Vents – Chapter NineVents – Chapter Nine Venting protects the trap seal by reducing

differential pressures within the drainage system.

Only plumbing systems with traps require vents, example: rainwater systems

2015 IPC Design, Installation and Inspection Principles 274

Distance from Trap to VentDistance from Trap to Vent

2015 IPC Design, Installation and Inspection Principles 275

Separation of Vent TerminalSeparation of Vent Terminal10' MINIMUM

10' MINIMUM

VENT

10' MINIMUM

2' MINIMUM AIR INTAKE

2' MINIMUM

ROOFTOP UNIT WITHOUTDOOR AIR INTAKE

2015 IPC Design, Installation and Inspection Principles 276

Page 70: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 70

Frost closureFrost closure Increase to 3” min. Must be increased

one foot below the thermal envelope

2015 IPC Design, Installation and Inspection Principles 277

Section 903.4 - Prohibited use of vent terminalsSection 903.4 - Prohibited use of vent terminals

Vent terminals are prohibited from being used for any purpose other than venting.

Condensate drains included.

2015 IPC Design, Installation and Inspection Principles 278

Section 903.5 - Location of vent terminal Section 903.5 - Location of vent terminal

The vertical distance increased from 2 feet to 3 feet (610 mm to 914 mm) to coordinate with similar requirements for IMC vent terminal requirements.

2015 IPC Design, Installation and Inspection Principles 279

Section 903.6 – Extension through the wallSection 903.6 – Extension through the wall

2015 IPC Design, Installation and Inspection Principles 280

Page 71: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 71

Vent TerminalVent Terminal

2015 IPC Design, Installation and Inspection Principles 281

Stack VentStack Vent

2015 IPC Design, Installation and Inspection Principles 282

Vent Stack 903.2Vent Stack 903.2

2015 IPC Design, Installation and Inspection Principles 283

VEN T STACK SIZEDPER TABLE 916.1- TO TAL DFU- SI ZE OF DRAIN STAC K- LE NGTH OF VENT ST ACK FIORMOBR AIN AVENT STACK MUSTCONNECT WITHINTHIS PORTION OFDRAINAGE SYSTEMBUI LDINGDR AIN10 Xs PI PEDIAMET ER

VENT STACK SIZED PER TABLE 916.1• TOTAL DFU• SIZE OF DRAIN STACK• LENGTH OF VENT STACK

FIVE OR MORE BRANCH INTERVALS

VENT STACK MUST CONNECT WITHIN THIS PORTION OF DRAINAGE SYSTEM

BUILDINGDRAIN 10 Xs PIPE

DIAMETER

Grade of VentsGrade of Vents

2015 IPC Design, Installation and Inspection Principles 284

Page 72: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 72

Vent Connections Vent Connections

2015 IPC Design, Installation and Inspection Principles 285

Vertical Rise of Vent

Vertical Rise of Vent

2015 IPC Design, Installation and Inspection Principles 286

Improperly Connected Vent Serving a Drain

Improperly Connected Vent Serving a Drain

2015 IPC Design, Installation and Inspection Principles 287

Properly Connected Vent Serving a Drain

Properly Connected Vent Serving a Drain

2015 IPC Design, Installation and Inspection Principles 288

Page 73: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 73

Horizontal Offset of Branch Vent

Horizontal Offset of Branch Vent

2015 IPC Design, Installation and Inspection Principles 289

Vent SizingVent Sizing

2015 IPC Design, Installation and Inspection Principles 290

Vent SizingVent Sizing

NOTE: ALL VENTS SHOWNLESS THAN 40'-0" INDEVELOPED LENGTH.

1 1/2" MAIN VENT

BUILDING DRAIN

2015 IPC Design, Installation and Inspection Principles 291

Section 907 —Vents for Stack OffsetsSection 907 —Vents for Stack Offsets

2015 IPC Design, Installation and Inspection Principles 292

Page 74: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 74

Section 908 - Relief Vent ConnectionSection 908 - Relief Vent Connection

2015 IPC Design, Installation and Inspection Principles 293

Section 909.1 – Distance of Trap from VentSection 909.1 – Distance of Trap from Vent

2015 IPC Design, Installation and Inspection Principles 294

Distance from Vent to Trap Distance from Vent to Trap

2015 IPC Design, Installation and Inspection Principles 295

Violation: Shower Drain Does Not Connect Independently to Wet Valve Violation: Shower Drain Does Not Connect Independently to Wet Valve

2015 IPC Design, Installation and Inspection Principles 296

Page 75: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 75

Section 909.2 – Maximum Fall of Fixture Drain Between Trap and VentSection 909.2 – Maximum Fall of Fixture Drain Between Trap and Vent

2015 IPC Design, Installation and Inspection Principles 297

Vent Connection Vent Connection

2015 IPC Design, Installation and Inspection Principles 298

Individual Fixture as Dry Vent for Horizontal Wet VentIndividual Fixture as Dry Vent for Horizontal Wet Vent

2015 IPC Design, Installation and Inspection Principles 299

Dry Vent for Vertical Wet Vent of Two Bathroom GroupsDry Vent for Vertical Wet Vent of Two Bathroom Groups

2015 IPC Design, Installation and Inspection Principles 300

Page 76: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 76

Crown VentCrown Vent

2015 IPC Design, Installation and Inspection Principles 301

Individual VentsIndividual Vents

2015 IPC Design, Installation and Inspection Principles 302

Improperly Installed Individual VentsImproperly Installed Individual Vents

2015 IPC Design, Installation and Inspection Principles 303

Common Vents with Fixture Drains Connecting at Same LevelCommon Vents with Fixture Drains Connecting at Same Level

LAV

LAVDOUBLESANITARYTEE

1 1/4"

1 1/2"

BT

BTCOKS

KS

CO

DOUBLE WYE

BT SH

1 1/2"

2"

2"

1 1/4"

LAV

LAV

CO

DOUBLESANITARYTEE

1 1/4"

1 1/2"

WC

BT

3"

1 1/2"

SANITARY TEEWITH SIDE INLET

WC

WC

DOUBLE WYE3"

1 1/2"

SH

SH2"

2"

2"

1 1/4"

CO

1 1/4"

2"1 1/2"

1 1/4"

2"2" CO

CO

2015 IPC Design, Installation and Inspection Principles 304

Page 77: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 77

Common Vents with Fixture Drains Connecting at Different LevelCommon Vents with Fixture Drains Connecting at Different Level

2015 IPC Design, Installation and Inspection Principles 305

Single Bathroom Group Wet VentSingle Bathroom Group Wet Vent

2015 IPC Design, Installation and Inspection Principles 306

ITEMMINIMUM

SIZEDFUs

TABLE 709.1

LAV FIXTURE DRAINSH FIXTURE DRAINWC FIXTURE DRAIN

A-Ba

B-Ca

C-Da

1¼”2”3”

1½”a

2”a

3”a

123126

A-X 1½” N/A

a = from Table 909.3N/A = Not Applicable

Double Bathroom Group (Private) Wet VentDouble Bathroom Group (Private) Wet Vent

2015 IPC Design, Installation and Inspection Principles 307

DRAIN COMPONENT

MINIMUM SIZE

DFUs TABLE 709.1

LAV DRAINBT DRAINWC DRAIN

A-Ba

B-Ca

C-Da

D-Ea

1¼”1½” 3”2”a

2”a

2½”a

3”a

1232269

A-X 1½” N/A

a = from Table 909.3N/A = Not Applicable

Section 913 - Waste Stack VentSection 913 - Waste Stack Vent

2015 IPC Design, Installation and Inspection Principles 308

Page 78: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 78

Section 911 Circuit Venting (Back-To-Back Water Closets Circuit Vented)Section 911 Circuit Venting (Back-To-Back Water Closets Circuit Vented)

2015 IPC Design, Installation and Inspection Principles 309

Sizing A Circuit Vent SystemSizing A Circuit Vent System

2015 IPC Design, Installation and Inspection Principles 310

The vent shall connect between the two most upper stream fixture drains

A maximum of eight fixtures are permitted to be circuit vented

Each fixture drain shall connect horizontally to the horizontal branch being circuit vented

1

2

3

4

5

67

8

Sizing a Circuit Vent SystemSizing a Circuit Vent System

2015 IPC Design, Installation and Inspection Principles 311

Each separate circuit-vented horizontal branch that is interconnected shall be sized independently in accordance with Section 911.3.

The downstream circuit-vented horizontal branch shall be sized for the total discharge into the branch, including the upstream branches and the fixtures within the branch.

Multiple Circuit VentingMultiple Circuit Venting

2015 IPC Design, Installation and Inspection Principles 312

Page 79: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 79

2015 IPC Design, Installation and Inspection Principles 313

Multiple Circuit Venting In Parallel

Entire length of vent section is uniformly sized based on total d.f.u. load on branch.

Each separate circuit-vented horizontal branch that is interconnected shall be sized independently in accordance with Section 911.3.

Circuit Vent with Relief Vent ConnectionCircuit Vent with Relief Vent Connection

2015 IPC Design, Installation and Inspection Principles 314

A relief vent shall be provided for circuit vented horizontal branches receiving the discharge of four or more water closets and connecting to a drainage stack that receives the discharge of soil or waste from upper horizontal branches.

The relief vent shall connect to the horizontal branch drain between the stack and the most downstream fixture drain of the circuit vent.

Circuit-vented Branch with Additional Fixture ConnectionsCircuit-vented Branch with Additional Fixture Connections

2015 IPC Design, Installation and Inspection Principles 315

Section 915 – Combination Waste and Vent SystemSection 915 – Combination Waste and Vent System

ISLAND SINKFIXTURE DRAIN

COMBINATION DRAINAND VENT (OVERSIZEDDRAIN)

FIXTURE DRAIN FOR SINK - 1 1/2"COMBINATION DRAIN AND VENT - 2"

SINK

FD

FD

LAV

SINK

1 1/2"

2"

2"

1 1/4"

COMBINATION DRAINAND VENT

2"2"

3"(2 1/2" PERMITTED)

1 1/2"

FIXTURE DRAINWITHIN DISTANCEFROM TRAP TOVENT

EXTENSION OFBUILDING DRAIN

2015 IPC Design, Installation and Inspection Principles 316

Page 80: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 80

Section 915 – Vertical Fixture Drain Component in Combination Waste and Vent System

Section 915 – Vertical Fixture Drain Component in Combination Waste and Vent System

2015 IPC Design, Installation and Inspection Principles 317

Section 915 – Combination Waste and Vent System Section 915 – Combination Waste and Vent System

In a combination waste and vent system, the drain also serves as the vent for the fixture.

The system is commonly used when floor drains are installed.

It is also practical to use in laboratories equipped with island sinks.

2015 IPC Design, Installation and Inspection Principles 318

Section 915 – Combination Waste and VentSection 915 – Combination Waste and Vent

2015 IPC Design, Installation and Inspection Principles 319

Section 915 – Combination Waste and VentSection 915 – Combination Waste and Vent

2015 IPC Design, Installation and Inspection Principles 320

Page 81: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 81

Section 915.2.4 – Combination Waste and VentSection 915.2.4 – Combination Waste and Vent

2015 IPC Design, Installation and Inspection Principles 321

Section 916 – Island Fixture VentSection 916 – Island Fixture Vent

2015 IPC Design, Installation and Inspection Principles 322

Section 917Section 917 Single Stack Vent System Single-stack venting was added to

the code. This type of venting is similar to the

Philadelphia-stack drainage system that has been used in the Philadelphia, PA area for more than a century.

2015 IPC Design, Installation and Inspection Principles 323

Module 3Module 3

1. All water supply pipe installed underground and outside of the structure shall have a working pressure rating of not less than 160 psi.

True

2015 IPC Design, Installation and Inspection Principles 324

False

Page 82: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 82

Module 3Module 3

2. A sanitary tee may be used for a horizontal-to-horizontal change in direction.

False

2015 IPC Design, Installation and Inspection Principles 325

True

Module 3Module 3

3. What is the minimum size of a building drain with a total of 36 dfu connected thereto with a 1/8-inch slope? _________________________

2015 IPC Design, Installation and Inspection Principles 326

3 inches

Module 3Module 3

4. A waste stack must not receive the discharge of ______________________.

2015 IPC Design, Installation and Inspection Principles 327

water closets and urinals

Module 3Module 3

5. Polyethylene of raised temperature plastic may be joined by ____________ or mechanical joints.

2015 IPC Design, Installation and Inspection Principles 328

flared

Page 83: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 83

Module 3Module 3

6. Bundles of PEX must be _____________ to indicate direction of flow.

2015 IPC Design, Installation and Inspection Principles 329

labeled

Module 3Module 3

7. The water heater thermostat may be used to temper the water at the shower.

False

2015 IPC Design, Installation and Inspection Principles 330

True

Module 3Module 3

8. What code regulates the installation of solar heating systems?

________________

2015 IPC Design, Installation and Inspection Principles 331

IMC

Module 3Module 3

9. On a single stack vent system, if there were three water closets on the stack, the minimum size of the stack would be _________________ diameter.

2015 IPC Design, Installation and Inspection Principles 332

4 inches

Page 84: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 84

Module 3Module 3

10. A plumbing system utilizing air admittance valves does not need to have a vent to the outdoors.

False

2015 IPC Design, Installation and Inspection Principles 333

TrueStorm Drains, Special Piping and Storage Systems and Gray Water Recycling Systems

Storm Drains, Special Piping and Storage Systems and Gray Water Recycling Systems

Module 4

334

Storm DrainageStorm Drainage

Chapter 11

335

Section 1105.1Section 1105.1 Roof drains are to be installed in accordance

with the manufacturer’s installation instructions and that roofing membrane materials must not block the opening of the drain.

2015 IPC Design, Installation and Inspection Principles 336

Page 85: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 85

Section 1105.2Section 1105.2 The flow rate of the specific roof drain must be

provided by the manufacturer This rate determines the storm drain piping that

can be connected to it Flow rate is determined at specific head

elevations above the inlet More head - greater flow rate

2015 IPC Design, Installation and Inspection Principles 337

Size of storm drain pipingSize of storm drain pipingBased on: The size of the roof and contributing areas The rainfall rate per hour for the specific area Slope of horizontal piping connected to the drain The flow rate or the specific roof drain at the

established head over the inlet The GPM of the roof is plugged into Table

1106.2 to determined vertical and horizontal piping diameters

2015 IPC Design, Installation and Inspection Principles 338

How to calculate GPM for the roofHow to calculate GPM for the roof A = roof and contributory area ( vertical walls

and parapets) leading to the drain .623 gal.= 1 inch of water over 1 square foot HR= rain delivered by 100 year event in inches

per hour as determined by this chapter or appendix B

A X { (HR X .623) divided by 60 minutes} = GPM load on roof drain and piping

2015 IPC Design, Installation and Inspection Principles 339

Sizing the drain and pipingSizing the drain and piping Determine the GPM of the roof Pick a roof drain with a flow rate equal to or

greater than the GPM of the roof Determine if horizontal piping is present and the

slope of that piping Use the table to determine the diameter of the

storm piping, the pipe rated GPM must be at least as great as the roof drain

2015 IPC Design, Installation and Inspection Principles 340

Page 86: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 86

Special Piping and Storage SystemsSpecial Piping and Storage Systems

Chapter 12

341

What’s in the sectionWhat’s in the sectionMedical Gases—Section 1202 This section refers to NFPA 99 for medical gas

systems, inhalation anesthetic systems and vacuum piping systems.

Oxygen Systems—Section 1203 This section refers to NFPA 55 and NFPA 51 for

nonmedical oxygen system requirements.

342

Nonpotable Water SystemsNonpotable Water Systems

Chapter 13

343

Section 1301.1 through 1303.11Section 1301.1 through 1303.11 Gray water, nonpotable rainwater and reclaimed

water systems requirements such as: Water quality Materials Storage Permit Connection Disinfection and treatment Water testing Manuals for operation and maintenance

2015 IPC Design, Installation and Inspection Principles 344

Page 87: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 87

Gray Water Recycling System for Flushing Water Closets and UrinalsGray Water Recycling System for Flushing Water Closets and Urinals

2015 IPC Design, Installation and Inspection Principles 345

Section 1302 – Systems for Flushing Water Closets and UrinalsSection 1302 – Systems for Flushing Water Closets and Urinals

This section is about the specific details for on-site nonpotable water reuse systems. Refer to the definition of “On-site nonpotable water reuse system” in Chapter 2.

2015 IPC Design, Installation and Inspection Principles 346

Section 1303 – Subsurface Landscape IrrigationSection 1303 – Subsurface Landscape IrrigationDesign based on: Amount of nonpotable water available daily The percolation rate of the specific soilInstallation covers: Trench width, depth and spacing Aggregate and backfill Distribution piping

2015 IPC Design, Installation and Inspection Principles 347

Module 4Module 4

1. A vertical leader with a diameter of 3 inches in an area with a rainfall rate of 2 inches (51 mm) per hour is capable of draining a projected roof area of 2,930 square feet (272 m2).

True

2015 IPC Design, Installation and Inspection Principles 348

False

Page 88: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 88

Module 4Module 4

2. A 40 by 80 foot (102 by 203 mm) roof is attached to a building on the 80 foot side of the wall which rises another 30 feet (762 mm) above the lower roof. The adjusted area (leaving out other parapets) for the roof would now be_______________ square feet (m2).

2015 IPC Design, Installation and Inspection Principles 349

4,400 (409)

Module 4Module 4

3. The water from a nonpotable water system used to flush a urinal will be blue or green

False

2015 IPC Design, Installation and Inspection Principles 350

True

Module 4Module 4

4. A nonpotable water system could be used for an irrigation system that includes sprinklers.

True

2015 IPC Design, Installation and Inspection Principles 351

False

352

International Code Council is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members are available on request.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 89: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 89

353

Copyright Materials

This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is

prohibited.

© International Code Council 2016

2015 IPC Design, Installation and Inspection Principles 354

Thank you for participatingThank you for participating

To schedule a seminar, contact:

The ICC Training & Education Department

1-888-ICC-SAFE (422-7233) Ext. 33818

orE-mail: [email protected]

Hyperlinked Slides

Beyond This Point

Hyperlinked Slides

Beyond This Point

2015 IPC Design, Installation and Inspection Principles 355

Table 608.1 Application of Backflow PreventersTable 608.1 Application of Backflow Preventers

2015 IPC Design, Installation and Inspection Principles 356

Page 90: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 90

Table 608.1 Application of Backflow Preventers (cont)Table 608.1 Application of Backflow Preventers (cont)

2015 IPC Design, Installation and Inspection Principles 357

Table 608.8.3 Size of Pipe IdentificationTable 608.8.3 Size of Pipe Identification

2015 IPC Design, Installation and Inspection Principles 358

Pipe Diameter(inches)

Length BackgroundColor Field (inches)

Size of Letters(inches)

¾ to 1 1/4 8 0.5

1 ½ to 2 8 0.75

2 ½ to 6 12 1.25

8 to 10 24 2.5

Over 10 32 3.5

Back

Table 906.1(1-1/4” thru 5”only)Table 906.1(1-1/4” thru 5”only)

2015 IPC Design, Installation and Inspection Principles 359

Return

Table 916.(1 1-1/4” thru 5”only)Table 916.(1 1-1/4” thru 5”only)

2015 IPC Design, Installation and Inspection Principles 360

Return

Page 91: 2015 IPC Design, Installation and Inspection Principles ...€¦ · Copyright 2015 International Code Council 45 Step Task 1 (— — —

2015 IPC Design, Installation and Inspection Principles

Copyright 2015 International Code Council 91

Table 909.3Table 909.3Table 909.3 Wet Vent Size

Wet Vent Pipe Size(inches)

Drainage Fixture Unit Load (dfu)

1-1/2 1

2 4

2-1/2 6

3 12

3612015 IPC Design, Installation and Inspection Principles

Table 909.3Table 909.3Table 909.3 Wet Vent Size

Wet Vent Pipe Size(inches)

Drainage Fixture Unit Load (dfu)

1-1/2 1

2 4

2-1/2 6

3 12

3622015 IPC Design, Installation and Inspection Principles

Table 910.4 Waste Stack Vent SizeTable 910.4 Waste Stack Vent Size

Stack Size(inches)

Maximum Number of Drainage Fixture Units (dfu)

Total Discharge into One Branch Interval

Total Discharge for stack

1-1/2 1 2

2 2 4

2-1/2 No limit 8

3 No limit 24

4 No limit 50

5 No limit 75

6 No limit 100

3632015 IPC Design, Installation and Inspection Principles