2015 Interregional Transportation Strategic Plan. Active Transportation and Livable Communities August 21, 2014 Scott Sauer. Overview. Interregional Transportation Strategic Plan (ITSP) Overview ITSP-Interregional Transportation Improvement Program (ITIP) Funding Vision and Goals - PowerPoint PPT PresentationTRANSCRIPT
2015 Interregional Transportation Strategic PlanActive Transportation and Livable CommunitiesAugust 21, 2014Scott Sauer
Overview
•Interregional Transportation Strategic Plan (ITSP) Overview
•ITSP-Interregional Transportation Improvement Program (ITIP) Funding
•Vision and Goals•Analysis Methodology – Central Coast
Example
What is the Interregional Transportation Strategic Plan?• The ITSP is a California Department of
Transportation (Caltrans) document that provides guidance for the identification and prioritization of interregional transportation projects.
• The ITSP has guided ITIP funding towards intercity rail corridors and a subset of routes identified in California’s Legislatively-designated Interregional Road System (IRRS).
• The initial ITSP was developed in 1998 and a status update to the 1998 ITSP was published in October of 2013.
Current ITSP Priority Corridors
•10 Focus Routes that represent the IRRS corridors that are of highest priority for completion to at least the “minimum facility concept standard.”
•Pacific Surfliner between San Diego and San Luis Obispo, the San Joaquin between Bay Area/Sacramento and Bakersfield, and the Capitol Corridor between San Jose and Auburn.
California Transportation Funding• Funding for IRRS improvements was identified in
Senate Bill 45, which mandated that 25% of the State Transportation Improvement Program (STIP) be used to fund interregional improvement projects in the ITIP, including intercity passenger rail.
• The ITSP is Caltrans long-range planning documents only for funds programmed in the ITIP.
• The ITIP is a small portion of the annual transportation funding spent in California – 1.2%.
STIP Fund Allocation
State/Region, North/South Splits & County Shares
S&H Section 164 Caltrans RTPAs SB 45 (1997) N/S Split S&H Section 164 S&H Section 188 Subject to S&H Section 188.8 N/S Split* *Urban non-IRRS 40% maximum to North, 60% max to South (no minimum)
STIP Funds (State & Federal)
25% 75%
ITIP (Interregional Transp.
Improvement Program)
RTIP (Regional Transp.
Improvement Program
~60% ~40% 40% 60%
15% Minimum Intercity Rail
85% Maximum IRRS: Outside Urban Areas
Subject to County Share County Population (75%) St. Hwy Mileage (25%)
North Counties
South Counties
The Purpose of the 2015 ITSP
•It will assess if the current 10 Focus Routes are still the priority for Interregional Improvement Program funds.
•Develop multimodal corridor concepts that include a sustainability concept
•It will continue to implement an intercity rail program.
•It will be consistent with the CTP
ITSP Assumptions
•Caltrans is responsible for interregional travel in California.
•All areas of the State of California have value and require a minimum level of access to the Interstate system.
•California needs a backbone of State highways to serve interregional needs including goods movement and resiliency.
Caltrans’ Mission - Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability.
CTP 2040 2015 ITSPVision Vision
California’s transportation system is safe, sustainable, and globally competitive. It
provides reliable and efficient mobility and accessibility for people, goods, and services while meeting our greenhouse gas emission reduction goals and preserving community character. This integrated, connected, and
resilient multimodal system supports a prosperous economy, human and
environmental health, and social equity.
A well developed, high quality interregional State Highway and Intercity Passenger Rail network serving as the backbone for the movement of people and goods
throughout California.
Mission and Vision
Improve Multimodal Mobility and Accessibility for All People
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Improve Multimodal Mobility and Accessibility for All People
Accessibility - Provide access for people and
goods to and through all regions of California.
Reliability - Ensure that the interregional
transportation network is reliable and efficient for the movement of people, goods, services, and for
emergency response.
Improve Public Safety and Security
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Improve Public Safety and Security
Safety - Develop and operate a safe interregional transportation
network for all travelers.
Foster Livable and Healthy Communities and Promote Social Equity
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Foster Livable and Healthy Communities and Promote
Social Equity
Integration - Optimize multi-modal connectivity
throughout interregional transportation network.
Support a Vibrant Economy
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Support a Vibrant EconomyEconomy -
Improve interregional connectivity to enhance California’s diverse economy.
Practice Environmental Stewardship
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Practice Environmental Stewardship
Sustainability - Improve and manage California’s
interregional transportation network in an environmental,
economical, and equitable manner.
Preserve the Multimodal System
California Transportation Plan 2040
2015 Interregional Transportation Strategic Plan
Preserve the Multimodal Transportation System
Sustainability - Improve and manage California’s
interregional transportation network in an environmental, economical,
and equitable manner.
Performance Measures
•Identify all routes that meet the Accessibility goal
•Assess potential focus routes based on the six goals
•Select preferred focus routes for each region
•Assess the preferred focus routes as an integrated backbone of State highways
Identify Potential Priority Corridors
•Identify key areas of the State•Identify all IRRS routes and intercity rail
that provide access to and through all regions
•Determine best interregional State highway north-south and east-west routes through each region
Performance Measures• Identifying performance measures (PM)
supporting the six ITSP Strategies• Utilize the California Statewide Travel Demand
Model and other data to provide qualitative analysis (Vehicle Miles Traveled, Average Speed, Annual Average Daily Trips)
• Identify other PMs – accessibility to modes (rail, bicycle, pedestrian), environmental (electric charging and hydrogen fueling stations), safety (truck parking, rest areas), and economic factors (goods movement, recreational travel)
Public Outreach•Present to Committees and Organizations –
Rural Counties Task Force, CTC, CalCOG, ATLC, etc.
•Four public workshops in October (one webinar) to present the vision, goals, performance measures, and identified focus routes
•Draft ITSP in November – December•Present Draft ITSP to CTC in January•CTP Public Workshops in February – March•Final ITSP in March