2015 ANNUAL STOCKHOLDERS’ MEETING PRESIDENT’S MESSAGE
First Gen Corporation | www.firstgen.com.ph
AT FIRST GEN, WE CONTINUE TO DREAM AND TO DARE FOR A BETTER, MORE LIVABLE FUTURE
OUR STRATEGIC COMMITMENT IS TO SERVE THE GROWING NEEDS OF THE FILIPINO CONSUMER WITH CLEAN, AFFORDABLE ELECTRICITY
FIRST GEN IS FOCUSING ITS EFFORTS TO GROW ITS CLEAN AND RENEWABLE PORTFOLIO, AS WELL AS DEVELOP A WORLD-CLASS LNG TERMINAL
WE BELIEVE THAT MAKING DIFFICULT BUT CORRECT CHOICES WILL PAY OFF
FINANCIAL HIGHLIGHTS
FIRST GEN’S ATTRIBUTABLE NET INCOME ENDED AT US$167.3MM IN 2015, LOWER BY 13.3% DUE TO EDC’S
HIGHER NON-RECURRING GAINS IN 2014
193.2
167.3
2014
2015
EDC LIKEWISE BOOKED GAINS ON SALE OF RIG 16 AND REVERSAL OF
A PREVIOUS IMPAIRMENT PROVISION ON NORTHERN
NEGROS IN 2014
FINANCIALS FINANCIALS
IN 2014, EDC BOOKED INSURANCE CLAIMS RELATING TO DAMAGES SUSTAINED BY ITS TYPHOON-HIT
PLANTS
ATTRIBUTABLE NET INCOME (IN US$ MM)
MORE IMPORTANTLY, 2015 WAS A SOLID YEAR AS FIRST GEN’S RECURRING NET INCOME ATTRIBUTABLE TO THE
PARENT (RNI) INCREASED BY 6.6% TO US$163.0MM
152.9
163.0
2014
2015
HIGHER DISPATCH OF SANTA RITA AND SAN LORENZO IN 2015, AND LOWER BUSINESS DEVELOPMENT EXPENSES
PARTIALLY OFFSET BY LOWER RNI CONTRIBUTIONS FROM EDC AND FG
HYDRO FINANCIALS
RECURRING NET INCOME (IN US$ MM)
UNIT II (37.5 MW) OF EDC’S 112.5-MW TONGONAN WENT ON A 4-MONTH UPLANNED OUTAGE DUE TO BLADE FAILURE IN 2015
SAN GABRIEL IS EXPECTED TO START COMMERCIAL OPERATIONS IN 2H 2016
AVION IS EXPECTED TO START COMMERCIAL OPERATIONS IN 1H 2016
CONSOLIDATED REVENUES SLIGHTLY DECREASED TO US$1.8 BILLION FROM USD$1.9 BILLION IN 2014
1.9
1.8
2014
2015 THE GAS PLANTS BOOKED LOWER FUEL CHARGES FROM DECLINING
OIL PRICES
PARTIALLY OFFSET BY HIGHER REVENUES FROM EDC’S BURGOS AND GEO PROJECTS, AND HIGHER DISPATCH OF FG HYDRO
FINANCIALS
AVE. SELLING PRICE OF GAS PLANTS:
19.5%
TO PHP4.96/kWh
REVENUES (IN US$ BN)
(IN US$MM) FIRST GAS EDC FG HYDRO
2015 2014 Change 2015 2014 Change 2015 2014 Change
Revenues 1,076 1,205 11% 709 652 9% 42 37 14%
Attributable Net Income
124 121 2% 78 122 36% 8 9 1%
Recurring Net Income
118 107 10% 90 93 4% 8 12 33%
59% 39%
2%
2015 REVENUES
SANTA RITA SAN LORENZO
EDC
FG HYDRO
OPERATIONAL HIGHLIGHTS
NATURAL GAS
GEOTHERMAL
HYDRO
WIND/SOLAR
2015 WAS THEMED AN ‘EXECUTION YEAR’ TO DELIVER GROWTH PROJECTS AND SAFEGUARD EXISTING PLANTS
THE 1000-MW SANTA RITA AND 500-MW SAN LORENZO GAS-FIRED PLANTS
IN 2015, BOTH SANTA RITA AND SAN LORENZO PERFORMED STEADILY AND RELIABLY
NATURAL GAS
SANTA RITA : 7,388 GWh 17.5%
UNIT 40 RETURNED TO OPERATION AFTER MAIN TRANSFORMER BREAKDOWN IN 2014
SAN LORENZO: 3,725 GWh 7.2%
2015 GENERATION
PRUDENT PLANNING AND PROPER SCHEDULING FOR RECEIVING LIQUID FUEL ENABLED THE CONTINUED OPERATIONS OF THE GAS PLANTS
AVION IS CURRENTLY COMMISSIONING AND IS EXPECTED TO ACHIEVE COMMERCIAL OPERATIONS IN 2Q 2016
THE 97-MW AVION GAS-FIRED PLANT IN BATANGAS CITY
IN EARLY 2016, AVION’S EPC CONTRACT WITH IEG AND EPC WAS TERMINATED. A COMPLETIONS WORK CONTRACT WITH MTU BB WAS EXECUTED LAST MARCH 2016
AS OF TODAY, UNIT 2 HAS EXPORTED UP TO 47.5MW OF POWER, WHILE UNIT 1 IS CURRENTLY UNDERGOING PRE-SYNCHRONIZATION SETTINGS AND TESTING
NATURAL GAS
THE 414-MW SAN GABRIEL GAS-FIRED PLANT IN BATANGAS CITY
SAN GABRIEL WAS MECHANICALLY COMPLETED BY END-2015. ONCE IT STARTS OPERATING IN 2H 2016, IT WILL BE THE MOST EFFICIENT NATURAL GAS PLANT IN SOUTHEAST ASIA
NATURAL GAS
LAST APRIL 13, 2016, SAN GABRIEL WENT ONLINE FOR THE FIRST TIME, EXPORTING UP TO 60 MW TO THE GRID
SAN GABRIEL WILL RE-SYNCHRONIZE TO THE GRID TO ACHIEVE A FULL LOAD OF 414 MW
GEOTHERMAL OUR MAIN FOCUS IN OUR GEOTHERMAL PLATFORM WAS TO IMPROVE THE RESILIENCY AND RELIABILITY OF OUR PLANTS
GEOTHERMAL
OUTPUT IMPROVED BY 5.4% TO 7,755 GWh IN 2015
EDC COMPLETED THE 49.4-MW NASULO GEOTHERMAL PLANT IN JULY 2015
BACMAN’S RETROFIT PROGRAM INCREASED ITS CAPACITY BY
10 MW TO 140 MW
IN 2015, THE GEOTHERMAL ASSETS’ OUTPUT IMPROVED PRIMARILY DUE TO NASULO’S FULL YEAR OPERATIONS AND BACMAN’S HIGHER DISPATCH
GEOTHERMAL
EDC’S HIGHER ELECTRICITY OUTPUT IN 2015 WAS SLIGHTLY TEMPERED BY TONGONAN UNIT II’S FOUR-
MONTH UNPLANNED OUTAGE • UNPLANNED OUTAGE FROM MARCH TO JULY 2015 DUE TO BLADE FAILURE IN ITS STEAM TURBINE ROTOR
• ORDERED RETROFIT KITS IN JANUARY 2015 • REHAB PROGRAM IS EXPECTED TO INCREASE OUTPUT BY
10 MW ONCE COMPLETED IN 2H 2017
GEOTHERMAL
TONGONAN’S 37.5-MW UNIT II OUTAGE:
HYDRO DISPATCH OF THE 132-MW PANTABANGAN-MASIWAY INCREASED BY 4.2% TO 259.2 GWh IN 2015, AS A RESULT OF TWO UNEXPECTED TYPHOONS IN 4Q 2015
THE 132-MW PANTABANGAN-MASIWAY HYDRO PLANT IN NUEVA ECIJA
HYDRO
FG HYDRO’S 12-MW MASIWAY COMPLETED ITS REHAB PROGRAM TOWARDS THE END OF 2015
WIND AND SOLAR THE 150-MW BURGOS WIND PROJECT IS THE LARGEST WIND PROJECT IN THE COUNTRY
BURGOS WIND NOW ENJOYS FULL DISPATCH FOLLOWING THE COMPLETION OF THE SAN ESTEBAN TRANSMISSION LINE IN SEPT 2015
THE 150-MW BURGOS WIND PROJECT IN ILOCOS NORTE
WIND/SOLAR
THE 6.8-MW BURGOS SOLAR PROJECT IN ILOCOS NORTE
2015 WAS THE YEAR WHERE SOLAR WAS ADDED TO THE PORTFOLIO
6.8-MW BURGOS SOLAR PROJECT 4.16-MW BURGOS SOLAR: COD: MARCH 2015 FiT* RATE: PHP9.68/kWh 2.66-MW BURGOS SOLAR PHASE 2: COD: JANUARY 2016 FiT* RATE: PHP8.69/kWh
*Feed-in-Tariff
WIND/SOLAR
AS OF TODAY, EDC HAS A TOTAL SOLAR CAPACITY OF 6.8 MW
BUSINESS
DEVELOPMENT
THE TERMINAL IS IN ITS THIRD FRONT-END ENGINEERING DESIGN REVISION AND POTENTIAL PARTNERS HAVE STARTED TO BE ENGAGED
LNG TERMINAL PROJECT COST: UP TO US$1 BILLION
IN PREPARATION FOR THE MALAMPAYA FIELD’S EVENTUAL EXHAUSTION, WE PURSUED AND HEIGHTENED OUR PLANNED DEVELOPMENT OF AN LNG TERMINAL
FIRST GEN REMAINS BULLISH IN DEVELOPING ITS HYDRO PORTFOLIO. THE COMPANY IS SCALING UP ITS EXPERTISE TO START BUBUNAWAN’S CONSTRUCTION IN 2016
RUN-OF-RIVER HYDRO PROJECTS: 32-MW BUBUNAWAN 30-MW PUYO 40.5-MW TAGOLOAN
CORPORATE SOCIAL RESPONSIBILITY AND SUSTAINABILITY
WE REMAIN COMMITTED TO A BETTER AND INCLUSIVE FUTURE
MARINE BIODIVERSITY CONSERVATION AND PROTECTION PROGRAMS OF FIRST GEN
BINHI: EDC’S REFORESTATION OF PRIME ENDANGERED PHILIPPINE TREE SPECIES IN NEGROS ISLAND
CONSERVATION EFFORTS ON BOTH TERRESTRIAL AND MARINE SPECIES AT THE BIODIVERSITY CENTER IN PANTABANGAN-MASIWAY
SCHOOL REBUILDING PROGRAM FOR SCHOOLS DAMAGED BY TYPHOON YOLANDA
THE AGREEMENTS MADE DURING THE COP 21 HAS CHANGED THE VIEW OF GOVERNMENTS AND INDUSTRIES ON CLIMATE CHANGE
THE AFTERMATH OF SUPER TYPHOON YOLANDA IN LEYTE
FIRST GEN CONTINUES TO DEVELOP CLEANER SOURCES OF ENERGY. THE COP 21, AS WELL AS THE PARTICIPATION OF 198 COUNTRIES, ONLY REAFFIRMS OUR COMMITMENT
-World Bank Group President Jim Yong Kim at COP 21 in Paris
“We welcome the historic agreement that has just been reached in Paris. The world has come together to forge
a deal that finally reflects the aspiration, and the seriousness, to preserve our planet for future generations.
We called for strong ambition, for remarkable partnerships, for mobilization of finance, and for implementation of
national climate plans. Paris delivered. Now the job becomes our shared responsibility.”
-World Bank Group President Jim Yong Kim at Climate Action 2016
Summit in Washington, DC
“We have no time to waste. Delay is not an option. We have to wake up once again from the fog of
success – political successes must lead quickly to action and implementation.”
SUSTAINABILITY IN BUSINESS IS NOT JUST ABOUT THE FINANCIAL IMPACT, BUT ABOUT THE ENVIRONMENTAL AND SOCIAL IMPACT AS WELL
WITH SUSTAINABILITY IN MIND, FIRST GEN CONTINUES TO PRIORITIZE INVESTMENTS IN CLEAN AND AFFORDABLE ELECTRICITY
FIRST GEN WILL CONTINUE TO REMAIN RELEVANT, EFFECTIVE, PIONEERING AND SMART … IN MOVING TOWARDS A DECARBONIZING WORLD
FIRST GEN CONTINUES TO CARE…WE
WILL CONTINUE TO DARE TO MAKE POSITIVE CONTRIBUTIONS