CHILLER REPLACEMENTS
Chiller Water Pump
PE/Athletics Dressing/Locker Room AC Installation and Chiller Replacement at
Marshall HS
Engineering Firm – Clearly Zimmermann Engineers
NISD Project Manager – Rob Ibarra
Contract Amount - $1,795,700
Contractor – International Mechanical Services, Inc.
Construction Period – June 2016 – March 2017
Construction Status: 97%
Project Scope – Replace chiller plant and A/C installation in boys’ and girls’
locker room.
3
Pad Site for the New Chiller
= Chiller Replacement & Lighting Upgrades at Reddix Center
Engineering Firm – Clearly Zimmermann Engineers
NISD Project Manager – Carlos Rodriguez
Contract Amount - $418,000
Contractor – Gillette Air Conditioning Co, Inc.
Construction Period – January 2017 – March 2017
Construction Status: 50%
Project Scope – Replace two chillers and upgrade lighting fixtures to LED
lighting.
4
FIRE ALARM SYSTEM REPLACEMENTS
Typical Fire Alarm Panel
Fire Alarm Systems & Plumbing Upgrades at NW Crossing ES
Engineering Firm – TLC Engineering for Architecture
NISD Project Manager – Ramiro Guerrero
Contract Amount - $273,340
Contractor – Quinney Electric, Inc.
Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Replace total fire alarm system and walk-in freezer and cooler in
the Cafeteria.
5
HVAC RENOVATION
HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC
Installation at
HS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra
Contract Amount - $16,200,000
Contractor – Bartlett-Cocke General Contractors
Construction Period – June 2016 – August 2018
Construction Status: 40% Construction Overall (Phase IV of IX in Progress)
Project Scope – Replace entire HVAC system including boiler and piping; install
air conditioning and heating in boys’ and girls’ locker rooms. Phase IV began
February 27, 2017.
Existing Job Site
HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC
Installation at Clark HS
New Installed Chillers
6
LIGHTING UPGRADES
Lighting Upgrades at Child Nutrition Warehouse
Engineering Firm – TTG Engineers, Inc.
NISD Project Manager – Carlos Rodriguez
Contract Amount - $125,517
Contractor – HJD Capital Electric, Inc.
Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Replace ballast and 32 watt lamps in office area with 28 watt
lamps. Replace existing lamps with high output lamps in dry storage area.
7
MECHANICAL UPGRADES
Engineering Firm – Clearly Zimmermann Engineers
NISD Project Manager – Rob Ibarra
Contract Amount - $2,977,400
Contractor – International Mechanical Services, Inc.
Construction Period – June 2016 – August 2017
Construction Status: 75% Construction Overall
Project Scope – Evers ES: Replace unit ventilators with fan powered boxes.
Leon Springs ES: Replace air handler for Admin, Library and Cafeteria.
Mechanical Upgrades at Evers ES & Leon Springs ES
Evers ES
8
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero
Contract Amount - $2,345,820
Contractor – Comfort-Air Engineering, Inc.
Construction Period – June 2017 – August 2018
Construction Status: 0%
Project Scope – Replace unit ventilators throughout the campus with VAV
systems, replace two chillers and HVAC controls throughout.
HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC
Installation at
HS
Mechanical Upgrade & Energy Controls Upgrade at Elrod ES
Elrod ES – Phasing Plan
9
Mechanical Upgrades at Glass ES
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra
Contract Amount - $201,000
Contractor – Tezel & Cotter A/C, L.P.
Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Replace existing rooftop units at the Cafeteria; replace existing
ductwork and air devices.
10
Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at John
Jay HS
Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Rob Ibarra
Contract Amount - $788,189
Contractor – Flo-Aire Service, Inc.
Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Mechanical upgrades and AC installation in the PE and Athletic
areas.
11
Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at Neff
MS
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero
Contract Amount - $748,505
Contractor – Flo-Aire Service, Inc.
Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Mechanical upgrades and AC installation in the PE and Athletic
areas. Replace two rooftop units at Coach’s offices.
12
P.A. INTERCOM SYSTEM
P.A. Intercom Systems, Lighting Upgrades & Electrical Upgrades at Michael ES,
Meadow Village ES & Ward ES
Engineering Firm – TLC Engineering for Architecture
NISD Project Manager – Ramiro Guerrero Contract Amount – $235,687 Contractor – Quinney Electric, Inc. Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Meadow Village ES – Main power for portables will be upgraded. Ward ES & Michael ES – Replace PA System to include the callback
feature; lighting upgrades at both campuses.
13
PAVING / DRAINAGE UPGRADES
Paving & Drainage Upgrades at Braun Station ES & Sul Ross MS
Engineering Firm – MTR Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $425,200 Contractor – Pronto Sandblasting & Coating & Oil Field Services Co., Inc. Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Upgrade paving for staff parking and bus loop at both campuses.
14
P.E./ATHLETICS DRESSING/LOCKER ROOM AC INSTALLATION
P.E./Athletics Dressing/Locker Room AC Installation at Rawlinson MS
Engineering Firm – Alderson & Associates, Inc. NISD Project Manager – Troy Spear Contract Amount – $265,000 Contractor – Flo-Aire Service, Inc. Construction Period – June 2017 – August 2017
Construction – 0%
Project Scope – AC installation in the PE and Athletic areas.
15
PLAYGROUND UPGRADES
Playground Upgrades at Beard ES, Blattman ES, Braun Station ES, Elrod ES, Glass
ES, Leon Valley ES, Oak Hills Terrace ES & Raba ES
Engineering Firm – MTR Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $535,790 Contractor – R.L. Rhode General Contracting, Inc. Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Geodesic dome replacement at eight campuses and full upper
replacement at Blattman ES.
Typical Playscape
16
Playground Upgrades at Fernandez ES, Fisher ES, Galm ES, Rhodes ES,
Scarborough ES, Thornton ES & Timberwilde ES
Engineering Firm – CDS Muery Engineering
NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $219,600 Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc. Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Geodesic dome replacement at seven campuses.
17
Playground Upgrades at Henderson ES, Knowlton ES, Kuentz ES, Lewis ES, Linton ES & Myers ES
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $209,000 Contractor – R.L. Rhode General Contracting, Inc. Construction Period – June 2017 – August 2017
Construction Status: 0%
Project Scope – Geodesic dome replacement at six campuses.
18
TENNIS COURT UPGRADES
Tennis Court Resurfacing at Luna MS
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Troy Spear Contract Amount – $35,000 Contractor – Premier Courts Limited Company Construction Period – June 2017 – June 2017
Construction Status: 0%
Project Scope – Tennis court resurfacing.
Typical Resurfaced Court
20
ATHLETICS UPGRADES
Engineering Firm – MTR Engineers, LLC
NISD Project Manager – Troy Spear Budget Amount – $105,000 Contractor - TBD Construction Period – April 2017 – August 2017
(95% Design)
Project Scope – Upgrade tennis courts at both campuses.
Tennis Court Upgrades at Sul Ross MS & Stevens HS
Track & Field Upgrades at Jay HS
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $1,700,000
Contractor - TBD
Construction Period – April 2017 – August 2017
(100% Design)
Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).
21
LIGHTING UPGRADES
Lighting Upgrades at Galm ES, Timberwilde ES & Alternative HS
Engineering Firm – TLC Engineering for Architecture
NISD Project Manager – Ramiro Guerrero Budget Amount – $165,000 Contractor - TBD Construction Period – June 2017 – August 2017
(100% Design)
Project Scope – Lighting upgrades at three campuses.
Lighting Upgrades at Rhodes ES
Engineering Firm – MS2 Inc. Consulting Engineers NISD Project Manager – Carlos Rodriguez Budget Amount – $70,000 Contractor - TBD Construction Period - June 2017 – August 2017
(100% Design)
Project Scope – Lighting upgrades.
22
FIRE ALARM SYSTEM REPLACEMENTS
Engineering Firm – CNG Engineering, PLLC
NISD Project Manager – Carlos Rodriguez
Budget Amount – $270,000
Contractor - TBD
Construction Period – June 2017 – August 2017
(100% Design)
Project Scope –
Raba ES: Fire alarm and lighting upgrades.
Central Office: Electrical upgrades.
at Central Office.
Fire Alarm & Lighting Upgrades at Raba ES & Electrical Upgrades at Central Office
23
MECHANICAL UPGRADES
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra Budget Amount – $6,700,000 Contractor - TBD
Construction Period – June 2018 – August 2020
(95% Design)
Project Scope – Mechanical upgrades and chiller replacement.
Mechanical Upgrades at Jordan MS
HVAC Mechanical Upgrades & Chiller Replacement at Cable ES
Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $900,000 Contractor - TBD Construction Period – May 2017 – August 2017
(100% Design)
Project Scope – Mechanical upgrades and chiller replacement.
24
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Carlos Rodriguez Budget Amount – $75,000 Contractor - TBD Construction Period – June 2017 – August 2017
(100% Design)
Project Scope – Mechanical upgrades.
Mechanical Upgrades at Oak Hills Terrace ES
25
PAVING / DRAINAGE UPGRADES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $455,000
Contractor - TBD Construction Period – June 2017 – August 2017
(100% Design)
Project Scope – Upgrade paving at bus loop and staff parking lot.
Paving & Drainage Upgrades at Howsman ES & Zachry MS
Paving & Drainage Upgrades at Marshall HS & O’Connor HS
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $419,000
Contractor - TBD Construction Period – June 2017 – August 2017
(100% Design)
Project Scope – Marshall HS: Upgrade paving and drainage.
O’Connor HS: Upgrade drainage.
26
P.E. / ATHLETICS DRESSING / LOCKER ROOM AC INSTALLATION
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra Budget Amount – $1,080,000 Contractor - TBD
Construction Period – June 2017 – August 2017
(100% Design)
Project Scope – AC installation in the PE and Athletic areas and fire alarm
upgrade.
PE/Athletics Dressing/Locker Room AC Installation & Fire Alarm Upgrades at O’Connor HS
SCHOOL FLASHERS
School Flashers at Harlan HS & Kallison ES
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $300,000
Contractor - TBD Construction Period – May 2017 – July 2017
(100% Design)
Project Scope – Installation of school flashers at both campuses.
Harlan High School
Facilities Construction
NNOORRTTHHSSIIDDEE IINNDDEEPPEENNDDEENNTT SSCCHHOOOOLL DDIISSTTRRIICCTT
Leroy San Miguel
ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS
Henry Acosta
EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING
Jim Berg
DIRECTOR OF FACILITIES CONSTRUCTION
2014 CITIZENS’ BOND ADVISORY COMMITTEE
2014 Bond
March 2017 Update
HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL)
Architect – Garza Bomberger & Associates
Project Architect – Roy Lewis
NISD Project Manager – Jim Berg
Contractor – Joeris General Contractor
GMP - $110,800,000
Construction Period – October 2014 – Summer 2017
Construction Status: 93% Complete
Project Scope – New 2800 Student High School
Site grading, utilities, landscaping.
Interior CMU walls, drywall framing.
Interior painting.
MPE / Tech systems.
Concrete drives and parking areas in progress.
Final Punch in progress.
HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) Aerial (Feb. 20, 2017)
Aerial looking from West
KALLISON ELEMENTARY SCHOOL (KALLISON RANCH #2 ELEMENTARY)
Architect – Garza Bomberger
Project Architect – Roy Lewis
NISD Project Manager – Marilyn Sevedge
Contractor – Guido Construction
GMP - $24,640,000
Construction Period – March 2016 – July 2017
Construction Status: 60% Complete
Project Scope – New 800 Student Elementary School
Masonry, brick, MPE / Tech Systems and roofing in progress.
GLENOAKS ELEMENTARY - Administration Upgrades/Security Lobby
Architect – NextGen Architects
Project Architect – Joel Hernandez
NISD Project Manager – Marilyn Sevedge
Contractor – McGoldrick Construction Co.
Construction Amount - $3,750,000
Construction Period – June 2016 – June 2017
Construction Status: 50% Complete
Project Scope – New Administration Building
Roofing, interior walls, MPE / Tech Systems in progress.
HOLMES HS FINE ARTS BUILDING
Architect – Alamo Architects
Project Architect – Jerry Lammers
NISD Project Manager – Jim Berg
Contractor – Bartlett Cocke
Construction Budget - $27,000,000
Construction Period – June 2017 – December 2018
Construction Status – 1% Complete
Project Scope – Fine Arts Building Replacement
Status
Phase 1 – Portables Complete 2 – MDF Relocate in Progress 3 – Demolition / Abatement in Progress (Spring to Summer 2017)
4 – Building Design / Construction (Summer 2017 to Fall 2018)
CHILD NUTRITION CENTER Renovation
Architect – Shawn Kaarlsen & Associates
Project Architect – Shawn Kaarlsen
NISD Project Manager – Henry Acosta
Contractor – Workman Commercial
Contract Amount - $5,726,500
Construction Period – July 2016 – January 2017
Construction Status: 70% Complete
Project Scope – Warehouse Renovation
Contract in progress. Renovation funded from Child Nutrition 2016 Growth
& Improvement funds and 2010 Bond Savings.
Demo complete, rough-ins in progress.
Walk in cooler/freezer floor complete.
Office area drywall complete, tape & float (finishes in progress), new
switch gear being installed, new CPS transformer on its way.
Walk-in cooler/freezers, walls, racks and ceilings being installed.
Condensers set.
PAUL TAYLOR FIELD HOUSE RENOVATIONS
Architect – Garza Bomberger Architects
Project Architect – Roy Lewis
NISD Project Manager – Thomas Curiel
Contractor – Stoddard Construction Management, Inc.
Construction Amount - $3,400,000
Construction Period – February 2017 – August 2017
Construction Status – 2% Complete
Project Scope – ADA Interior/Exterior Renovations
Site Mobilization and Demolition in Progress.
NORTHSIDE ACTIVITY CENTER RENOVATIONS
Architect – Richard Sanchez Architects, Inc.
Project Architect – Richard Sanchez
NISD Project Manager – Thomas Curiel
Contractor – O’Haver Contractors Co.
Construction Budget - $4,000,000
Construction Period – February 2017 – January 2018
Construction Status – 1% Complete
Project Scope – Addition and Renovation of Meeting Rooms
Mobilization and Demolition in progress.
GROSENBACHER AREA ELEMENTARY (Prototype of Boldt ES and Cole ES)
Architect – Noonan Rittiman
Project Architect – John Rittiman
NISD Project Manager – Tom Curiel
Contractor – DL Bandy
Construction Amount - $22,465,000
Construction Period – March 2017 – May 2018
Construction Status – 0% Complete
Project Scope – New 800 Student Elementary School
Notice to Proceed Issued.
2017 SECURITY LOBBIES at (9) ELEMENTARY SCHOOLS
Architect – NextGen Architects
Project Architect – Joel Hernandez
NISD Project Manager – Marilyn Sevedge
Contractor – CGC General Contractors
Construction Amount - $1,293,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – New Security Lobby for (9) Elementary Schools:
Adams Hill ES, Allen ES, Beard ES, Braun Station ES, Forester ES, Hoffmann
ES, Knowlton ES, Timberwilde ES, and Villarreal ES
Notice to Proceed Issued.
GLENOAKS ELEMENTARY - Window Upgrades / ADA Work
Architect – NextGen Architects
Project Architect – Joel Hernandez
NISD Project Manager – Marilyn Sevedge
Contractor – TBD
Construction Budget - $1,100,000
Construction Period – June 2017 – December 2017
Construction Status – 0% Complete
Project Scope – Window Upgrades and ADA Work
Bids to be received March 29, 2017.
BOONE ELEMENTARY - Administration Upgrades, Bus/Student Canopy & Security Lobby
Architect – Garza Architects
Project Architect – Jesse Garza
NISD Project Manager – Jim Berg
Contractor – TBD
Construction Budget - $4,040,000
Construction Period – June 2017 – May 2018
Construction Status – 0% Complete
Project Scope – Administration Upgrades, Bus/Student Walkway Canopy
Modifications
Construction Documents in progress.
COLONIES NORTH ELEMENTARY Window Upgrades / ADA Work
Architect – Huckabee Architects
Project Architect – Jeff Rodriquez
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget - $2,000,000
Construction Period – June 2017 – October 2017
Construction Status – 0% Complete
Project Scope – Window Upgrades and ADA Work
Contractor submitted for March Board Approval.
GLASS ELEMENTARY Window Upgrades / ADA Work
Architect – Marmon Mok
Project Architect – Monty Howard
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget - $1,500,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Window Upgrades and ADA Work
Master Plan in progress.
HELOTES ELEMENTARY Window Upgrades / ADA Work
Architect – Shawn Kaarlsen & Associates
Project Architect – Shawn Kaarlsen
NISD Project Manager – Marilyn Sevedge
Contractor – TBD
Construction Budget - $700,000
Construction Period – June 2017 – November 2017
Construction Status – 0% Complete
Project Scope – Window Upgrades and ADA Work
Master Plan in progress.
POWELL ELEMENTARY Window Upgrades / ADA Work
Architect – Shawn Kaarlsen & Associates
Project Architect – Shawn Kaarlsen
NISD Project Manager – Marilyn Sevedge
Contractor – TBD
Construction Budget - $700,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Window Upgrades and ADA Work
Master Plan in progress.
GLENN ELEMENTARY School Building Replacements / Security Lobby
Architect – LPA
Project Architect – Mark Oppelt / Lowell Tacker
NISD Project Manager – Jim Berg
Contractor – TBD
Construction Budget - $4,800,000
Construction Period – June 2017 – August 2018
Construction Status – 0% Complete
Project Scope – Replacement of Buildings
Bids to be received March 23, 2017.
KNOWLTON ELEMENTARY Cafeteria / Kitchen Renovations / Library Addition
Architect – Pfluger
Project Architect – Carr Hornbuckle
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget – $2,200,000
Construction Period – June 2017 – November 2017
Construction Status – 0% Complete
Project Scope – Renovations and Additions to Cafeteria, Kitchen & Library
Contractor submitted for March Board Approval.
TIMBERWILDE ELEMENTARY Cafeteria/Kitchen Renovations/Library Addition
Architect – Shawn Kaarlsen & Associates
Project Architect – Shawn Kaarlsen
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget – $2,200,000
Construction Period – June 2017 – November 2017
Construction Status – 0% Complete
Project Scope – Renovations and Additions to Cafeteria, Kitchen & Library
Bids to be received March 22, 2017.
2017 DOOR HARDWARE Glass ES, Westwood Terrace ES and Holmes HS
Architect – Chesney Morales
Project Architect – Richard Morales
NISD Project Manager – James Evans
Contractor – TBD
Construction Budget – $117,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Replacement of Door Hardware for Accessibility
Construction Documents in progress.
2017 FLOORING REPLACEMENTS Elrod, Glenn, Glenoaks, & Michael Elementary
Architect – CWS Architect
Project Architect – Robert Watts
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget – $230,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Replacement of Flooring
Proposal opening March 22, 2017.
2017 SUMMER FLOORING REPLACEMENTS Carson ES, Neff MS, & Warren HS
Architect – Huckabee Architects
Project Architect – Jeff Rodriguez
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget – $325,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Replacement of Flooring
Contractor submitted for March Board Approval.
NEFF MS COMPETITION GYM FLOORING AND BLEACHERS
Architect – Garza Architects
Project Architect – Jesse Garza
NISD Project Manager – Chris Parker
Contractor – TBD
Construction Budget – $200,000
Construction Period – June 2017 – August 2017
Construction Status – 0% Complete
Project Scope – Replacement of Flooring and Bleachers
Contractor submitted for March Board Approval.
MARSHALL HIGH SCHOOL Cafeteria / Kitchen Renovations
Architect – Garza Bomberger Architects
Project Architect – Roy Lewis
NISD Project Manager – Tom Curiel
Contractor – TBD
Construction Budget – $4,400,000
Construction Period – June 2017 – March 2018
Construction Status – 0% Complete
Project Scope – Renovations and Additions
Master Plan in progress.
SCIENCE LAB ADDITIONS/RENOVATIONS Alternative North MS
Architect – C.J. Lammers & Associates
Project Architect – Chris Lammers
NISD Project Manager – Marilyn Sevedge
Contractor – TBD
Construction Budget – $600,000
Construction Period – June 2017 – December 2017
Construction Status – 0% Complete
Project Scope – Renovation of Science Labs
LIST OF SCHOOLS
Hail Damage Roofing Projects
Phase I
Carnahan Elementary School
Beard Elementary School
Clark High School
South Transportation
Stevenson Middle School
Carlos Coon Elementary School
Elrod Elementary School
Fernandez Elementary School
Phase II
Esparza Elementary School
Nichols Elementary School
Connally Middle School
Howsman Elementary School
Leon Valley Elementary School
Scarborough Elementary School
Alternative ES & MS - North
Burke Elementary School
Brauchle Elementary School
Leon Springs Elementary School
Raba Elementary School