20120531 impact silver presentation final

22
CORPORATE PRESENTATION MAY 2012 TSX V : IPT FRANKFURT : IKL ISIN : CA45257A1021

Upload: adnet-communications

Post on 04-Jul-2015

609 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: 20120531 impact silver presentation final

CORPORATE PRESENTATION │ MAY 2012

TSX–V:IPT │ FRANKFURT:IKL │ ISIN:CA45257A1021

Page 2: 20120531 impact silver presentation final

DISCLAIMER

Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to

IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available

to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including

but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating

hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and

strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events.

Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual

results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to

update any forward-looking statement.

The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic

conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which

the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes

to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and

efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding

for the continued exploration and development of the Company’s exploration properties.

This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance

on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such

future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy

and completeness of these forward-looking statements.

George Gorzynski, P.Eng., a Qualified Person under the meaning of Canadian National Instrument 43-101,

is responsible for the technical information in this presentation.

1

Page 3: 20120531 impact silver presentation final

• Corporate focus is mining at a profit

• Consistently maintains a strong cash position & zero debt

• 90% of revenues from unhedged silver

• Friendly-to-investor, tightly managed share structure (73M Shares FD)

CORPORATE HIGHLIGHTS

2

Page 4: 20120531 impact silver presentation final

TECHNICAL HIGHLIGHTS

• Three operating silver mines

in Mexico feeding a central

processing plant

• Two new mines scheduled for

initial production in late 2012

• Plan to double silver

production in three years

• Ownership of two silver

districts covering 248 square

miles (643 square kilometers)

• Substantial exploration

potential based on extensive

silver mining history

ROYAL MINES OF ZACUALPAN

.

3

Page 5: 20120531 impact silver presentation final

LOCATION

• Located a three-hour

drive from Mexico City

with a paved road right

to the front gate of the

plant

• Excellent infrastructure

with modern electric

power grid, ample water

supplies & skilled work

force (99% Mexican)

• Many other significant

mining operations in the

surrounding area

4

Page 6: 20120531 impact silver presentation final

HISTORY

• The Royal Mines of Zacualpan

is one of the oldest mining

districts in the Americas with

485 years of recorded mining

history

• Over 2,700 old mine workings

have been catalogued and

form the basis for modern and

effective exploration

• IMPACT Silver bought the

Zacualpan assets in 2006

and then consolidated

ownership of the entire district

for the first time in its history

One of 30 historic processing plants found in the

district attesting to a long history of silver mining

5

Page 7: 20120531 impact silver presentation final

MINE PRODUCTION

ROYAL MINES OF ZACUALPAN

• Three producing mines –

San Ramon, Chivo,

Noche Buena

• In 2011 the three mines

averaged 421 tonnes

per day (tpd) at 5.7

oz/tonne (195 g/t) silver

• In 2011 the cash cost per

ounce of silver was $9 net

of lead and zinc credits

• All three mines feed

the central Guadalupe

Processing Plant

This map is reproduced in miniature on following slides

6

Page 8: 20120531 impact silver presentation final

MINERAL PROCESSING

GUADALUPE AND CAPIRE PLANTS

OPERATING

• Guadalupe Processing Plant, Zacualpan

• 500-tpd crushing and flotation circuit

UNDER CONSTRUCTION

• Capire Pilot Plant, Mamatla

• 200-tpd Pilot Plant being installed

with expansion plans for 2015

7

Page 9: 20120531 impact silver presentation final

NEW MINE DEVELOPMENT #1

OSCAR MINE

OLD CUCHARA MINE

NEW OSCAR MINE

SANTA LUCIA ZONE

8

• The high grade Oscar-

Santa Lucia Zones are

scheduled for production

in late 2012 to replace the

Chivo Mine where grades

are dropping with depth

• Oscar is a silver vein

corridor on the

southern extension

of the past-producing

Cuchara Mine

• Pre-existing Cuchara Mine

mining infrastructure will

contribute to a low capital

costs and rapid mine

development at Oscar

Page 10: 20120531 impact silver presentation final

NEW MINE DEVELOPMENT #1

OSCAR MINE

• Oscar and Santa Lucia host high grade veins as found in the following drill holes:

OSCAR CORRIDOR DRILLING HIGHLIGHTS

Drill

Hole

True

Width

(m/ft)

Silver

(g/t)

Gold

(g/t)

Lead

(%)

Zinc

(%)

Z11-44 31m /

101.7ft 291 0.01 0.1 0.4

Including 7.5m /

24.6ft 780 0.02 0.4 1.1

Including 5.8m /

19.0ft 398 0.03 0.2 0.9

Z11-46 5.7m /

18.7ft 1,007 0.07 0.5 1.1

Including 2.8m /

9.2ft 1,128 0.51 0.9 1.4

Including 1.1 /

3.6ft 4,580 0.26 1.7 4.0

Z11-64 6.6m /

21.7ft 223 0.08 0.2 0.5

Z11-74 1.0m /

3.3ft 1,875 0.74 2.7 6.9

Z12-08 23.4 /

76.8ft 115 0.02 0.1 0.4

SANTA LUCIA ZONE DRILLING HIGHLIGHTS

Drill

Hole

True

Width

(m/ft)

Silver

(g/t)

Gold

(g/t)

Lead

(%)

Zinc

(%)

Z09-35 1.4m /

4.6ft 600 0.10 - -

Z09-47 6.3m /

20.7ft 278 0.01 0.2 0.7

Including 3.2m /

10.5ft 467 0.01 0.2 1.1

Z09-50 1.0m /

3.3ft 602 0.02 0.1 0.1

Z09-53 2.4m /

7.9ft 419 0.03 0.3 0.3

Z09-55 1.1m /

3.6ft 372 0.01 0.1 0.2

Z09-58 2.1m /

6.9ft 274 0.10 0.4 1.2

Z10-03 1.1m /

3.6ft 588 0.05 0.4 2.0

Including 1.7m /

5.6ft 394 0.07 1.1 1.6

9

Page 11: 20120531 impact silver presentation final

NEW MINE DEVELOPMENT #2

CAPIRE MINE

• The Capire Mine represents a new production center in a new

mining district

• Three-phase strategy to bring Capire to full-scale production in 2015:

o 2012: Construction of 200-tpd Pilot Plant and 5,000 m drill program

o 2013: Pilot Plant production (~200,000 oz silver) to optimize

operating parameters for expansion plans

o 2014: Construction of full scale plant (800-1,500 tpd) with goal to

produce 1M oz silver per year starting in 2015

Capire Mine Site Capire Mine Open Pit Model

Open-Pit

Plant

Site

Tailings Facility

Defined NI 43-101

Mineral Resources Open for

expansion

Open for expansion Capire

Open Pit

3D Model Processing Plant Site

Tailings

Facility

Open for expansion

10

Page 12: 20120531 impact silver presentation final

CAPIRE PROJECT

NI 43-101 MINERAL RESOURCE ESTIMATE

Metal Content for Capire Project

Ag (oz) Au (oz) Cu (lbs) Pb (lbs) Zn (lbs)

Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820

Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173

Measured & Indicated 7,224,035 30,446 7,083,007 37,264,478 95,662,993

Inferred 435,959 1,919 475,594 2,260,089 5,823,490

Summary Table Classified Mineral Resources – Measured + Indicated and Separate Inferred

Domain Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%)

Capire Measured + Indicated 3,104,944 46.46 0.19 0.06 0.33 0.93

Aurora 1 Measured + Indicated 1,807,302 44.50 0.199 0.07 0.36 0.80

Grand Total Measured + Indicated 4,912,246 45.74 0.193 0.06 0.34 0.88

Grand Total Total Inferred 371,066 36.54 0.161 0.06 0.28 0.71

• Initial production planned on higher grade sections

• Drilling is continuing at Capire and other nearby zones to expand mineral resources

11

Page 13: 20120531 impact silver presentation final

GEOLOGY

11

METAL DISTRIBUTION IN ORE ZONES

Depth

0 ft (0m)

500 ft (150m)

1,000 ft (300m)

Oscar Mine

San Ramon Mine

Chivo Mine

Noche Buena Mine

Length

500-1400ft (150-420m)

Silver-rich at top

200 – 1,000 g/t+ Ag

Lead & Zinc rich

at bottom

60 – 150 g/t Ag

Gold (Copper)

at depth

Host to high grade

Gold

Mining Level

Carlos Pacheco

Gold-Copper Zone Typical

Mining Width

10 ft (3m)

• Mineral zones in the

Royal Mines of Zacualpan

District tend to be silver-

rich near the top

(commonly 1,000+ g/t)

with increasing lead and

zinc, and decreasing

silver toward the bottom

• New discoveries indicate

that significant gold and

copper may lie at depth

Page 14: 20120531 impact silver presentation final

VALLE DE ORO

GOLD POTENTIAL AT DEPTH

• First gold-copper zone found by company prospectors in a

canyon below known silver veins

• Initial drill results on two zones returned high gold values

(see tables below)

• These initial results indicate a potential gold district lying at

depths of 1,000 ft (300 m) below the silver district

• Drilling will test gold targets at depth on other silver veins

HUATECOSCO DRILLING HIGHLIGHTS

Drill

Hole

True Width

(m/ft)

Gold

(g/t /opt)

Silver

(g/t)

Lead

(%)

Zinc

(%)

Z11-48 4.1 m /

13.5 ft

5.22 g/t /

0.15 opt 30 0.7 1.8

Including 0.8 m /

2.6 ft

25.00 g/t/

0.73 opt 50 0.5 1.6

Z11-17

3.2 m /

10.5 ft

3.44 g/t /

0.10 opt 118 0.6 0.8

Z11-19 1.8m /

5.9 ft

3.53 g/t /

0.10 opt 321 0.4 0.6

Z11-20 9.5 m /

31.2 ft

3.97 g/t /

0.12 opt 49 1.7 2.6

Including 4.2 m /

13.9 ft

6.96 g/t /

0.20 opt 84 2.9 5.1

CARLOS PACHECO DRILLING HIGHLIGHTS

Drill

Hole

True Width

(m/ft)

Gold

(g/t /opt)

Silver

(g/t)

Copper

(%)

Z08-65 2.1 m /

6.9 ft

11.3 g/t /

0.33 opt 18 -

Including 1.2m /

3.9 ft

18.8 g/t /

0.55 opt 24 -

Z08-68 2.9 m /

9.5 ft

19.6 g/t /

0.57 opt 68 0.29

Including 1.0 m /

3.3 ft

49.7 g/t /

1.45 opt 59 0.31

Including 1.7 m /

5.6 ft

31.1 g/t /

0.91 69 0.31

13

Page 15: 20120531 impact silver presentation final

RAPID EXPLORATION

TO MINE DEVELOPMENT

RESEARCH

Compile old

mines/

prospects from

historic maps

DRILLING

Drilling in

phases

based on

success

MINE

DEVELOPMENT

Mine Planning,

Permitting and

Construction

FIELD WORK

Surface &

underground

sampling,

mapping

MINE

PRODUCTION

AND CASH

FLOW

More than

2,700 old

mine and

prospects

catalogued

to date

Select

areas and

prospects

for drilling

• Capire (North)

• Pilarica

• Condesa &

Cuchara North

• Carlos Pacheco

• Huatecosco

• San Ramon

• Noche

Buena

• Chivo

• Capire

• Oscar

• Santa Lucia

First Drill Hole to Production: 12 – 24 Months

• A cornerstone of IMPACT Silver’s success is rapid mine development to generate

near-term cash flow

• Since 2006, IMPACT’s successful team has discovered and built three new mines

with two additional mines now under construction

(Chivo, San Ramon Extensions, Noche Buena)

EXPLORATION AND MINE DEVELOPMENT PROCESS FLOWCHART:

14

Page 16: 20120531 impact silver presentation final

ZACATECAS OPTION AGREEMENT

DEFIANCE SILVER CORP. (TSX.V:DEF)

• IMPACT Silver optioned its

200-tpd Santa Gabriela

Processing Plant and ten

mineral concessions in

Zacatecas, Mexico to Defiance

Silver for cash and a 16.5%

share position (September 2011)

• Defiance Silver plans to marry

IMPACT’s processing plant with

their San Acacio Silver Mine

(18M oz Silver defined) and

begin production in 2013

Santa Gabriela Processing Plant

San Acacio Silver Mine

15

Page 17: 20120531 impact silver presentation final

ROYAL MINES OF ZACUALPAN

SILVER PRODUCTION

2011 2010 2009 2008 2007 2006 % Change

2006-2011

Total tonnes processed (t) 154,289 131,348 114,340 102,426 99,918 68,173 +126%

Tonnes processed per day (t) 424 360 313 280 274 196 +116%

Silver (oz) Production 833,607 750,259* 823,571 645,668 349,949 465,673 +79%

Lead (t) Production 731 734 969 813 601 375 +95%

Zinc (t) Production 1,248 1,212 1,098 1,053 976 725 +72%

Revenue per production tonne

sold $171 $123 $110 $90 - - +90%

Direct cost per tonne sold $70 $63 $60 $55 $44 $60 +17%

• Consistent organic growth with low-cost production

• 2011 direct cost per tonne sold averaged $70 per tonne or $9 per ounce

of silver net of lead and zinc credits

*Silver production was marginally down 9% in 2010 because the Company reduced the cut-off grade of the ore mined due to higher silver prices

16

Page 18: 20120531 impact silver presentation final

CONSISTENTLY PROFITABLE

2011 2010 2009 2008 2007 2006*

% Change

2006-2011

Revenue $24.3 $16.7 $12.2 $8.9 $7.3 $7.0 +247%

Net Earnings $7.6 $3.4 $1.6 $.66 $.29 $.51 +1,390%

Operating Cash Flow $10.2 $5.4 $3.7 $2.2 $1.9 $2.6 +292%

Cash & Cash

Equivalents $30.8 $18.7 $5.3 $5.4 $10.1 $4.0 +670%

EPS $0.12 $0.07 $0.02 $0.01 $0.01 $0.01 +1,100%

$-

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

2006 2007 2008 2009 2010 2011

Revenue

Net Earnings

Operating Cash Flow before changes in non-cash operating capital*

* Royal Mines of Zacualpan project purchased by IMPACT Silver in January 2006

17

Page 19: 20120531 impact silver presentation final

LONG-TERM VALUE PLAY

FUNDAMENTAL DATA

Recent

Share Price $1.40

52 Wk

Range

$1.26-

$2.42

Shares

Outstanding

Basic – 68M

Fully Diluted –

73M

Avg Vol

(3m) 120,000

Market Cap 95M Warrants Nil

Largest Shareholders

Sprott Asset Management,12% & Energold Drilling Corp,11%

CAPITAL EXPENDITURE USE EFFICIENCY ($CDN)*

Total funds raised since start

of operations in January, 2006

Property payments, plant & equipment,

and exploration expenditures

Cash Position

(Dec 31, 2011)

$25 Million $38 Million $30.8 Million

18

Share Price Performance, 3 Years Source: Stockwatch, May 2012

Page 20: 20120531 impact silver presentation final

FUTURE PLANS AND GOALS

2012

• Maintain production while completing construction of two new mines

at Oscar and Capire

• Continue aggressive exploration to accelerate organic growth at the

Royal Mines of Zacualpan

• With $20M+ of unallocated cash and profitable production, pursue

accretive merger and acquisition opportunities

2013-2015

• Double silver production with expansion of Capire Mine

• Continue exploration and potential development of a deep gold

district beneath the Zacualpan silver district

19

Page 21: 20120531 impact silver presentation final

ROYAL MINES OF ZACULAPAN

LONG TERM STRATEGY

To become a Multimillion Ounce Silver Producer with Multiple Processing Centers

1

4

3

2

1. Guadalupe Production Centre

• Oscar Silver Mine scheduled for

production in late 2012

• Current ore feed from San Ramon,

Noche Buena and Chivo Mines

2. Capire Production Centre

• Initial production through 200-tpd pilot

plant, scheduled for late 2012

• Expansion to full scale plant planned for

2015

3. Valle de Oro Gold and Silver Area

• Area of many silver veins with gold

mineralization at depth

• Large drill program underway

• Potential site of a third processing plant

4. Southeast Exploration Area

• Currently mapping numerous old

mine workings, early stage exploration

20

Page 22: 20120531 impact silver presentation final

THANK YOU Contact Us

Telephone: 1 604 681 0172

Email: [email protected]

www.impactsilver.com