Civil Engineering ConstructionChapter 3
Formwork System
Dr Mohamad Syazli Fathi
Department of Civil EngineeringUTM Razak School of Engineering &Advanced Technology
UTM International Campus
July 15, 2012
Choosing the RIGHTgFormwork System!
7/15/2012 28
7/15/2012
2
Why worry about the Choice of
Forming System?
7/15/2012 29Chek Lap Kok Airport (Hong Kong)
Concrete Frame Costs
Formwork: 50 - 70%
Concrete: 15Concrete: 15 25%25%
7/15/2012 30Petronas Tower
Rebar: 15 Rebar: 15 -- 25%25%
Concrete: 15 Concrete: 15 -- 25%25%
7/15/2012
3
Formwork Cost
Other: 10Other: 10 -- 15%15%
Labor: 50 - 70%
Material: 15 Material: 15 -- 20%20%Other: 10 Other: 10 15%15%
7/15/2012 31
What Choices Do I Have?
Let’s focus on:
7/15/2012 32
• Walls• Slabs• Columns
7/15/2012
4
Wall Forming
WallsWalls
7/15/2012 33
WallsWalls–– Loose FramingLoose Framing–– Prefabricated PanelsPrefabricated Panels–– Crane Set GangsCrane Set Gangs
Wall Systems (Loose Framing)
7/15/2012 34
7/15/2012
5
Wall Systems (Prefabricated Panels)
7/15/2012 35
Prefab Steel Panel Prefab Alum. PanelPrefab Alum. Panel
Prefabricated Panels
• are durable for many reusesare durable for many reuses• simplify and reduce the labor required• studs and sheathing are preassembled in units
small enough to be handled• panels are set into position and tied together• wales, ties, and braces are then attached
7/15/2012 36
wales, ties, and braces are then attached• made of wood, metal, plywood with metal
bracing, or glass fiber and plastic over wood
7/15/2012
6
Prefabricated Panels
7/15/2012 37
Aluminum Panel
Wall Systems (Ganged Panel Forms)
7/15/2012 38
7/15/2012
7
Ganged Panel Forms
• ranging up to 30x50 ft• ranging up to 30x50 ft• large panels can be assembled flat on the
ground where it is easier to work• stripping is easier (stripped as a unit)• extra bracing is required to withstand the
h dli t
7/15/2012 39
handling stresses• are frequently used as “climbing” forms in
high wall construction• small panels can be ganged together to form
larger units
7/15/2012 40Aluminum Beam Gang Systems
7/15/2012
8
Wall Systems
7/15/2012 41Steel Panel Gang Systems
7/15/2012 42Steel Crane Set Gangs
7/15/2012
9
7/15/2012 43Shearwall Roll Back System
Shear Wall Roll Back System
7/15/2012 44
7/15/2012
10
Slipform Construction• vertical slipforms are moved upward by jacks• can be used for structures such as silos and forcan be used for structures such as silos, and for
high rise elevator and stairway cores• working decks and finisher’s scaffolds are
attached to and carried up with the forms• has shorter construction time
i t f t t t ll th 40 ft
7/15/2012 45
• appropriate for structures taller than 40 ft• not efficient where there are many projections to
the direction of slide
7/15/2012 46
7/15/2012
11
7/15/2012 47
Vertical SlipformsVertical Slipforms
7/15/2012 48
7/15/2012
12
One-sided Wall Form
7/15/2012 49
7/15/2012 50Slab Shoring• Loose Wood Framing• Steel or Aluminum Shoring• Flying Forms
7/15/2012
13
Hand-set Wood Shoring
7/15/2012 51
Steel shoring with aluminum beams
7/15/2012 52
7/15/2012
14
Aluminum shoring with aluminum beams
7/15/2012 53
Flying Forms (truss-supported)
7/15/2012 54
7/15/2012
15
Flying Form (column-mounted)
7/15/2012 55
Flying Form (column-mounted)
7/15/2012 56
7/15/2012
16
Tunnel Forms
7/15/2012 57
Forms wall and slab together
Garage Beam Forms
7/15/2012 58
Panelized system for garage beams and slabs
7/15/2012
17
Column Forming
7/15/2012 59
• Columns– Loose Framing– Hand-set Panels– Crane Set Gangs
Column Forms
7/15/2012 60
Hand-set Steel Panel HandHand--set Aluminum set Aluminum PanelPanel
7/15/2012
18
Column Forms
7/15/2012 61
Round FiberglassRound FiberglassColumn Forms Column Forms
Column Forms
7/15/2012 62Steel Column Forms Steel Column Forms
7/15/2012
19
Column Forms
7/15/2012 63
Aluma Beam Column Forms Aluma Beam Column Forms
Custom Forms
7/15/2012 64
7/15/2012
20
Custom Forms
7/15/2012 65
Choices
7/15/2012 66
Nothing else withstanding, the choice is always….
GANG PANELS!
7/15/2012
21
Factors in the Choice
• What you own• Availability• Initial price• Total cost
7/15/2012 67
• Total cost
Factors in the Choice
• Experience of workers• Experience of workers• What will produce the desired results
with the least amount of cost?
7/15/2012 68
7/15/2012
22
Factors in the Choice• Number of uses• Desired finish• Site conditions
7/15/2012 69
Factors in the Choice• Crane• Schedule• Building design
7/15/2012 70
7/15/2012
23
Factors in the ChoiceFactors in the Choice
The Supplier:The Supplier:History with similar projectsHistory with similar projectsEngineering expertiseEngineering expertiseSupport servicesSupport servicesKnowledge of support personnelKnowledge of support personnel
pppp
7/15/2012 71
g pp pg pp pLocationLocation
Buy vs. Rent
• Duration of project• Future usage• Cash flow• Return on investment
7/15/2012 72
Steel radius wall forms
7/15/2012
24
TheThe
7/15/2012 73
TheThe