2011 airport update - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates...

22
1 2011 AIRPORT UPDATE March 25, 2011

Upload: others

Post on 17-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

1

2011 AIRPORT UPDATE March 25, 2011

Page 2: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

2

Airports are important economic engines for the regions they serve; creating jobs,

facilitating commerce and providing access to the global marketplace

Page 3: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

3

308,000 sq. ft. passenger terminal with fourteen gates

11,500 short-term, long-term and garage parking spaces

Runway 17/35 – 9,250 feet; Runway 06/24 – 7,650 feet

An average of 130 daily passenger and cargo flight operations

Approximately 2.9 million passengers and 175 million pounds of air cargo annually

1,900 people are employed by airport companies

The airport has invested more than $500 million improving airport facilities, runways, taxiways, navigational aids, roadways and parking

The airport now contributes approximately $1.24 billion each year to the local economy

AIRPORT HIGHLIGHTS

Page 4: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

4

CURRENT MHT CAPACITY

Las Vegas

Phoenix

Tampa

Orlando

Atlanta

Charlotte

Chicago Midway

O’Hare

Detroit

Cleveland

Toronto

Washington National

Dulles

Baltimore

Philadelphia

New York LaGuardia Newark

DL ATL 1

WN BWI 8

CO CLE 3

US CLT 1

US DCA 3

DL DTW 5

CO EWR 4

WN FLL 0

UA IAD 2

WN LAS 1

US LGA 4

WN MCO 3

WN MDW 3

UA ORD 2

US PHL 7

WN PHL 4

WN PHX 1

WN TPA 3

AC YYZ 2

TOTAL 57

Page 5: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

5

ECONOMIC IMPACT STUDY

$152.9 million in

annual payroll

(Hillsborough, Merrimack and

Rockingham Counties only)

$1.24 billion in total

economic impact

(Hillsborough, Merrimack and

Rockingham Counties only)

$752.8 million in out-

of-state passenger

expenditures*

(lodging, food/beverage, retail

purchases and entertainment)

3,820 airport-

related jobs

(Hillsborough, Merrimack and

Rockingham Counties only)

* Employment and payroll related to

out-of-state passenger expenditures

were not calculated as part of the

study

Page 6: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

6

LOCATION - Centrally located in the heart of New England. Serves air travelers from ME, VT, NH and MA

CONVENIENCE - Great highway access, no congestion and plenty of inexpensive on-airport parking

POPULATION - Over five million people live within a one hour’s drive of the airport

SUPPORT - Strong support from local, state and federal officials, neighbors, the business community and the FAA

RELIABILITY - Exceptional winter operations track record

Boston

MANCHESTER’S STRENGTHS

Page 7: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

7

Best in the Business!

Page 8: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

8

AIRLINE MARKET SHARE

United

8%

US Airways

17%

Delta

9%

Southwest

59%

Continental

7%

Page 9: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

9

A CHANGING INDUSTRY

Airlines have cut approximately 20% of system-wide capacity and “retired” more than 800 active commercial passenger aircraft since 2008

Low cost carriers (LCC) are chasing away legacy airlines from many markets

Competition in New England has increased dramatically with JetBlue, Southwest, AirTran, Sun Country and Virgin America all adding service at Logan

Perception that Big Dig has made getting to Logan “much easier”

Frequent bus service from southern New Hampshire to Logan

Airline long-range planning has been hampered by jet fuel price instability and a prolonged global recession

Page 10: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

10

MHT SEAT CAPACITY

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11

Page 11: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

11

MHT AVERAGE AIRFARE

0

20

40

60

80

100

120

140

160

180

2000 Q1 2001 Q1 2002 Q1 2003 Q1 2004 Q1 2005 Q1 2006 Q1 2007 Q1 2008 Q1 2009 Q1 2010 Q1

Page 12: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

12

MHT LOAD FACTOR

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Jan-9

0

Jan-9

1

Jan-9

2

Jan-9

3

Jan-9

4

Jan-9

5

Jan-9

6

Jan-9

7

Jan-9

8

Jan-9

9

Jan-0

0

Jan-0

1

Jan-0

2

Jan-0

3

Jan-0

4

Jan-0

5

Jan-0

6

Jan-0

7

Jan-0

8

Jan-0

9

Jan-1

0

Page 13: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

13

IMPACT OF DECREASED AIR SERVICE

Seat Capacity

=

Passenger Activity

=

Airline Revenue

Parking and Concession Revenue

PFC & CFC Revenue

=

Operating Budget

2008 - $58M 2010 - $48M

2009 - $52M 2011 - $45-$46M

Page 14: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

14

Transitioned airport-funded bus service to private ground transportation company

Staffing vacancies and consolidations

Deferred some non-essential capital projects

Restricted non-essential employee and contractor overtime

Deferred non-essential vehicle, equipment and IT purchases

Reduced consultant usage

Renegotiated existing contracts, insurance policies and service agreements - law enforcement and ARFF - parking and parking shuttle - airport security - terminal cleaning - snow removal - interior landscaping - auto/equipment insurance - airport operators insurance - cell phones and pagers

Reduced sponsorships and advertising

Reduced energy consumption - converted to energy efficient lighting in terminal and parking garage - installed motion sensors - turned off lighting on garage roof and in vacant surface parking lots - installed window film on exterior windows to reduce solar gain

Modified operation of The Granite Club, an airport-operated business center

Eliminated free parking validation for state and federal employees traveling on business

Reduced staff development and employee travel

Relocated Employee Parking Lot and eliminated employee parking shuttle bus

2009 – 2011

EXPENSE BUDGET REDUCTIONS

Page 15: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

15

2010 MASTER PLAN UPDATE

Passenger terminal efficiencies and expansion

Improved international capabilities

Airport roadway system improvements

Environmental initiatives

Additional parking garage and/or surface parking

Relocation and expansion of rental car operations

Air cargo facility expansion

Local zoning regulations

Intermodal facilities

New revenue opportunities

Long-range land use planning

Page 16: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

16

Airport Land Use Plan

Page 17: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

17

Highlander Property

Page 18: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

18

Noise Land Available for

Sale or Long-term Lease

Page 19: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

19

RECENT PROJECTS &

ONGOING INITIATIVES

Residential Sound Insulation Program (1,300 homes; $54 M)

Airport Environmental Action Committee

Airport District Energy Audit

Increase public ground transportation between the airport,

northern MA and popular regional destinations

Commuter passenger rail between New Hampshire and

Massachusetts

NHDOT Airport Access Road (State of New Hampshire)

Pettingill Road industrial Park (Town of Londonderry)

Page 20: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

20

Residential Sound Insulation Program

Airport Environmental Action Committee

Increase public ground transportation between the airport,

Boston and other popular regional destinations

NHDOT Airport Access Road

Londonderry Industrial Park access

Improved Federal Inspection Services (FIS) facilities and

international air service capabilities

Commuter passenger rail between New Hampshire and

Massachusetts

NHDOT AIRPORT ACCESS ROAD/

PETTINGILL ROAD PROJECTS

Page 21: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

21

GOOD NEWS!

Adding one daily MD-88 (142-seat aircraft) between MHT –

ATL in April, 2011

Adding four daily regional jets (50/70-seat aircraft) between

MHT – DTW by April, 2011

Additional 1,600 seats per week; doubling capacity of MHT

operation

Page 22: 2011 AIRPORT UPDATE - colliersnh.com · 3 308,000 sq. ft. passenger terminal with fourteen gates 11,500 short-term, long-term and garage parking spaces Runway 17/35 – 9,250 feet;

22

THANK YOU