NOTE All Materials to be distributed at the Meeting Members of City Council, Administration and the Media may with to bring City of Lethbridge 2011 – 2020 Capital Improvement Program Binder FINANCE COMMITTEE MEETING 2011 – 2020 Capital Budget Discussion DATE: Monday, May 10, 2010 TIME: 1:00 PM PLACE: CITY COUNCIL CHAMBERS Public is Welcome to Attend A G E N D A CALL TO ORDER 1. PRESENTATIONS: 1:00 PM 1.1. Garth Sherwin, City Manager, re Introduction by City Manager 1.2. Corey Wight, City Treasurer, re Overview of Capital Improvement Program (CIP), including funding 1.3. Doug Hawkins, Director of Infrastructure Services, re Review of Transportation Projects 1.4. Doug Hawkins, Director of Infrastructure Services, re Review of Parks Projects LUNCH: 12:00 Noon to 1:00 PM BREAK: 2:00 PM

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

NOTE

All Materials to be distributed at the Meeting Members of City Council, Administration and the Media may with to bring

City of Lethbridge 2011 – 2020 Capital Improvement Program Binder

FINANCE COMMITTEE MEETING 2011 – 2020 Capital Budget Discussion

DATE: Monday, May 10, 2010 TIME: 1:00 PM

PLACE: CITY COUNCIL CHAMBERS

Public is Welcome to Attend

A G E N D A

CALL TO ORDER

1. PRESENTATIONS:

1:00 PM 1.1. Garth Sherwin, City Manager, re Introduction by City Manager

1.2. Corey Wight, City Treasurer, re Overview of Capital Improvement Program (CIP), including funding

1.3. Doug Hawkins, Director of Infrastructure Services, re Review of Transportation Projects

1.4. Doug Hawkins, Director of Infrastructure Services, re Review of Parks Projects

LUNCH: 12:00 Noon to 1:00 PM

BREAK: 2:00 PM

Page 2: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

1

City of Lethbridge2011‐2020 Capital Improvement Program

May 10, 2010

Finance Committee

Agenda

Objective

Timeline Timeline

Review of Draft CIP Book

Project evaluation

Pay‐As‐You‐Go

Debt Debt

Funding by category

Operating costs

Grants

-1- 1.2.

Page 3: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

2

Objective

Approve a three year capital program (2011 to 2013) within a ten year plan(2011 to 2013) within a ten year plan (2011 to 2020)

Target for approval July 5, 2010

Operating costs that flow from this capital plan will feed the 2012 to 2014 Operatingplan will feed the 2012 to 2014 Operating Budget

CIP needs to be balanced within the three year window

What is the Capital Improvement Program (CIP)

A plan which matches the capital wants, needs and priorities of the communityneeds, and priorities of the community with a financial strategy

Wants/Needs Dollars Available

-2-1.2.

Page 4: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

3

Pre CIP Planning Master Plans

Transportation

Parks

Bikeways and Pathways

Cemeteries

Emergency Services

Recreation and Cultural Facilities

Heart of our City

Police Needs Assessment and 25 yr facility

F ili C di i A di Facility Condition Audit

Transit and Para‐transit Service Standards

Lethbridge Performing Arts Centre Study

Growth Management Plan

Various Community Based Plans 

Timeline

Planning

Feb 1 2010 Feb 1, 2010

CIP process and financial overview

Project updates and accomplishments Transportation

Community

28th Street North project

March 1, 2010

Police Facility project

Nature Centre Expansion project

Transit Facility Expansion

-3- 1.2.

Page 5: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

4

Timeline

March 15, 2010

D ft CIP Draft CIP

Water, Wastewater, Stormwater

Waste & Recycling

Electric

March 29 2010 March 29, 2010

Draft CIP

Parks

Community Services Master Planning

Timeline (cont.)

April 12, 2010

Draft CIP – Transportation

Bill Kergan Centre project

Exhibition Park project

Apr 26, 2010

Family Village Co‐location project

Offsite Levy

-4-1.2.

Page 6: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

5

Timeline (cont.)

May 10‐11, 2010

Overview of CIP book, Funding, Process

Review of Projects

Transportation, Utilities

Community (including Parks & Storm)

Specific Project Information

Transit Smart Card Technology

Police Facility

May 12‐13, 2010

Resolutions & Debate

Timeline (cont.)

May 17‐21 and June 7‐11, 2010

Community information – City Hall Foyer

Hosted May 18 & 20 from 5:00‐8:00p.m.

June 14, 2010

Amended Draft CIP document presentedAmended Draft CIP document presented to Finance Committee

July 5, 2010

City Council approval of CIP

-5- 1.2.

Page 7: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

6

REVIEW OF DRAFT CIP BOOK

Directional Resolutions

Resolutions from 2008‐2017 CIP requiring some future actionrequiring some future action

listed at front of book including the action taken on the resolution

-6-1.2.

Page 8: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

7

Section A

Some portions of A will not be included until the final draftuntil the final draft

A‐1 transmittal letter

A‐3, A‐4 Pie charts

will be included in story boards following decisions on projects occurring this weekdecisions on projects occurring this week

Section A

A‐2 Evaluation Process

-7- 1.2.

Page 9: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

8

Section A

A‐2 Evaluation Process

Proposed projects are subjected to anProposed projects are subjected to an evaluation process

Planning documents (including master plans) are a key part of these evaluations

Helps to ensure high priority projects are considered in the Capital Improvement Program 

Section A

A5 Pay‐As‐You‐Go (PAYG) Plan

Th C t f PAYG Pl Three Components of PAYG Plan

Annual PAYG amounts for Community and Transportation Projects

Annual tax supported debt payments (currently all internal)

Balancing amount to (or from) the Major Capital Projects Reserve.

-8-1.2.

Page 10: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

9

Pay‐As‐You‐Go in Operating Budget

Page 119 in 2009‐2011 Approved Operating BudgetOperating Budget

PAYG Capacity

10,000,000

4,000,000

6,000,000

8,000,000

0

2,000,000

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Transportation PAYG Leisure & Comm PAYG Debt Payments PAYG Total

-9- 1.2.

Page 11: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

10

Section B ‐ Debt

B‐2 Tax Supported External Debt

-10-1.2.

Page 12: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

11

B‐3 Utility/Self Supported Debt

B‐4 Offsite Supported Debt

-11- 1.2.

Page 13: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

12

Section B – Debt Schedules

B‐5 Proposed Borrowing

l b B‐6 External Debt Payments

B‐7 Internal Loan Payments

B‐8 External Debt Balance

B‐9 Internal Loan Balance

Transportation (C):

Roadways

Bridges

Pathways/Sidewalks

Community (D):Sport/Rec/Cultural Facilities

Other Facilities (Public Ops, West Leth Ctr)

Transit

Community Partnership

EnvironmentalUtilities (E):

Water

Wastewater

Solid Waste

Electric Utility (F):

Transmission

Distribution

Support

Stormwater

Basic Capital Grant

Pay‐As‐You‐Go

MSI / AMIP Grant

Other Grants

MSI / AMIP Grant

Pay‐As‐You‐Go

MSI / AMIP Grant

Other Grants

MSI / AMIP Grant

Other Grants

Offsite Levy

External Loan

Offsite Levy

Other Grants

Internal Loan

External Loan

MRSR

-12-1.2.

Page 14: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

13

Section C – Transportation

Section D ‐ Community

-13- 1.2.

Page 15: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

14

Section E – Environmental Utilities

Environmental Utility Budgets

Operating & Capital Mtce

Funded fromUtility Rates

Debt Payments

-14-1.2.

Page 16: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

15

eed 

-15- 1.2.

Page 17: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

16

Section F – Electric Utility

-16-1.2.

Page 18: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

17

Section G – Grants/Funding

Municipal Sustainability Initiative  (MSI) G 1G‐1

Alberta Municipal Infrastructure Program (AMIP) G‐2

Federal Gas Tax Fund (formerly NDCC) G‐3

Basic Capital Grant (BCG) G‐4

Municipal Sustainability Initiative (MSI) – Page G‐1

Purpose:  Provide long‐term sustainable funding to enhance municipalfunding to enhance municipal sustainability. 

-17- 1.2.

Page 19: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

18

MSI – Page G‐1

Eligible projects:  

“R d d B id P bli T it “Roadways and Bridges, Public Transit Vehicles and Facilities, Water, Wastewater, and Storm Sewer Management, Emergency Service Facilities and Equipment, Solid Waste Management Facilities and Equipment, Maintenance Equipment, Infrastructure Management Systems, Community & Recreation Facilities, and other Municipal Buildings and Facilities”

Alberta Municipal Infrastructure Program (AMIP) – Page G‐2

For “Core Infrastructure”

R d & B id Roadways & Bridges

Public Transit 

Water Supply and Treatment Systems

Wastewater Treatment Systems 

Storm Sewer drainage Systems

Emergency Service Facilities and Vehicles

-18-1.2.

Page 20: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

19

Alberta Municipal Infrastructure Program (AMIP) – Page G‐2

Other infrastructure can only be funded after the City has certified that it’s coreafter the City has certified that it s core infrastructure is in good condition

2009/2010 is the final year of Grant Funding

Projects must be completed by December 31, 2015

Grants – Federal Gas Tax FundPage G‐3

Purpose: Development of environmentally sustainable municipalenvironmentally sustainable municipal infrastructure to maintain or enhance economic, social and cultural opportunity and well being, while protecting and improving the quality ofprotecting and improving the quality of our environment upon which people and economies of Alberta depend

-19- 1.2.

Page 21: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

20

Grants – Federal Gas Tax FundPage G‐3

Eligible projects: 

P bli T it Public Transit 

Water and Wastewater Management

Stormwater

Solid Waste Management

Community Energy Systems 

Roadways and Bridges

Grants – Basic Capital Grant (BCG)Page G‐4

$60 per capita based on the previous year’s official populationofficial population.  

75 percent Province/25 percent City cost sharing

For transportation capital‐related projects.  

The City’s 25% matching share is funded The City s 25% matching share is funded from the Pay‐As‐You‐Go program

-20-1.2.

Page 22: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

21

Grants – Basic Capital Grant (BCG)Page G‐4

Eligible projects:  Roadways and Bridges, Utility Rehabilitation and Public TransitUtility Rehabilitation, and Public Transit System

Note: City of Lethbridge uses this grant for the maintenance and upgrades to our transportation system

Questions? 

-21- 1.2.

Page 23: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

1

2011 – 2020 2011 – 2020 Capital Improvement ProgramCapital Improvement Program

Presentation to Finance CommitteeMay 10 2010

Presentation to Finance CommitteeMay 10 2010

Infrastructure Services

May 10, 2010May 10, 2010

TRANSPORTATION 2011 - 2020 CIP

TRANSPORTATION 2011 - 2020 CIP

Infrastructure Services

-23- 1.3.

Page 24: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

2

Transportation CIP Project Identification

• Growth – with the Growth Management Plan

• Capacity – through the Transportation Master Plan and Intersection counts

• Condition Assessments – through condition assessments of our system we determine the annual rehab necessary

• System Upgrades – through public requests, inspection programs, warrant analysis and planning studies system

Infrastructure Services

y p g yupgrades are identified (ie. Pathway missing links, sidewalk pararamps, traffic calming)

Transportation CIP Project Prioritization

• Maintaining Safety• Maintaining Safety• Maintaining Levels of Services• Preserving Existing Infrastructure• Upgrades to Existing System• Providing Access for Growth

Infrastructure Services

-24-1.3.

Page 25: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

3

Transportation CIP Funding Options

Transportation projects are funded by the following sources

• Tax supported – Pay as you Go• Provincial / Federal Grants• Offsite Levies – restricted to growth projects

Infrastructure Services

Refer to C-1Infrastructure – TransportationInfrastructure – TransportationCapital Improvement Program

2011 – 2020 ProjectsCommencing in the First Three

Years

Infrastructure Services

-25- 1.3.

Page 26: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

4

Infrastructure Services

Infrastructure Services

-26-1.3.

Page 27: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

5

Infrastructure Services

Infrastructure Services

-27- 1.3.

Page 28: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

6

Upgrade Existing System – C-16, Scenic Drive North, 9 Ave / Stafford Dr

Projects, next three years:

• Scenic Dr North 9 Ave N / Stafford DrScenic Dr North, 9 Ave N / Stafford Dr• 2010 -$1,000,000 previously approved

Budget, next three years:• 2011 - $9,500,000• 2012 - $9,500,000

Prepare a detailed design and provide construction services

Infrastructure Services

Construct the initial two lanes of an ultimate four lane roadway with ultimate earthwork

Upgrade Existing System – C-17, 43 Street N

Projects, next three years:

• Prelim design – 43 St - Hwy 3 / 62 Ave NPrelim design 43 St Hwy 3 / 62 Ave N

• Construct a four lane roadway from Hwy 3 to • 9 Ave N divided

Budget, next three years:• 2011 - $300,000• 2013 - $6,600,000

Prepare a detailed design and provide

Infrastructure Services

p g pconstruction services.

-28-1.3.

Page 29: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

7

Upgrade Existing System – C-18, 26 Avenue N, 23 Street to 28 Street

Projects, next three years:

• 26th Ave N 23 Street / 28 Street N26 Ave N, 23 Street / 28 Street N

Budget, next three years:• 2012 - $2,100,000

Prepare a detailed design and construct a four lane roadway to connect with that recently constructed in 2007 at 28 Street.

Infrastructure Services

Upgrade Existing System – C-19Mayor Magrath Drive, 40 Ave S to City Limit,

Projects, next three years:

Mayor Magrath Dr 40 Ave S to City Limit• Mayor Magrath Dr, 40 Ave S to City Limit

Budget, next three years:• 2012 - $4,200,000

Prepare a detailed design and construct embankment fill to accommodate the Ultimate six lane divided roadway.

Infrastructure Services

-29- 1.3.

Page 30: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

8

Provide Access for Growth - C-31, Metis Trail, Simon Fraser to Garry Drive

Projects, next three years:

• Metis Trail Temple Blvd / Whoop-up DriveMetis Trail, Temple Blvd / Whoop up Drive

• Metis Trail, Simon Fraser / Temple Blvd

Budget, next three years:• 2011 - $3,000,000• 2013 - $2,200,000

Prepare a detailed design and construct the

Infrastructure Services

Prepare a detailed design and construct the initial two lanes of Arterial Roadway to accommodate development

Provide Access for Growth - C-32, Garry Drive, Existing to 600m west of Metis Trail

Projects, next three years:

• Garry Drive existing to 600m west ofGarry Drive, existing to 600m west ofMetis Trail (to first development entrance)

Budget, next three years:• 2011 - $3,000,000

Prepare a detailed design and construct the initial two lanes of Arterial Roadway to accommodate development

Infrastructure Services

p

-30-1.3.

Page 31: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

9

C-2 shows the Transportation program out to 2020C 2 shows the Transportation program out to 2020

Questions?

Infrastructure Services

Maintain Safety - C- 5, Gravel Road Upgrading

Projects, next three years: • 43 Street from 26 Ave north • Whoop-up Dr, to City Limits

As required (unidentified)• As required (unidentified)

Budgets, next three years:• 2011 - $700,000• 2012 - $525,000• 2013 - $550,000

Involves reconstruction of existing gravel roads or upgrading to a paved standard rural roadway if traffic volumes warrant

Infrastructure Services

roadway if traffic volumes warrant.

-31- 1.3.

Page 32: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

10

Maintain Safety – C-6, Intersection Improvements –Growth

Projects, next three years:• 13 Street N / 26 Ave N• Garry Drive / Squamish W

43 N / 2 A N• 43 N / 2 Ave N• 43 N / 5 Ave N• University Dr. W / Highlands Blvd. W

Budget, next three years:• 2011 - $1,000,000• 2012 - $1,051,000• 2013 - $1,104,000

Infrastructure Services

As Warranted:- Traffic and Pedestrian Volumes,- Accidents History, - Congestion

Project involves new traffic signals and geometric improvements in new growth areas.

Maintain Safety – C-7, Intersection Improvements –Non-Growth

Projects, next three years:• MMDr / 5 Ave S• 9 Ave / 36 St N• 23 St / 9th Ave N• 13 St / 5 Ave N• 13 St /6 Ave S• 16 Ave / 13 St S

Budget, next three years:• 2011 - $1,000,000• 2012 - $1,051,000• 2013 - $1,104,000

Infrastructure Services

As Warranted:- Traffic and Pedestrian Volumes,- Accidents History,- Congestion

Project involves new traffic signals, signal upgrades and geometric improvements in older non-growth areas.

-32-1.3.

Page 33: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

11

Maintain Safety – C-8, Sidewalk Mobility Ramps

Projects, next three years: • Downtown / Hospital Areas• Older Communities (central

neighborhoods in Lethbridge)

Budgets, next three years:

• 2011 - $250,000• 2012 - $263,000• 2013 - $275,000

Approximately 25 intersections and 25 handicap parking stalls per year will be reconstructed until 2016

Infrastructure Services

reconstructed until 2016

Follows the request of the Canadian Paraplegic Association.

Maintain Safety – C-9, Bikeways/Pathways on Roadways

Projects, next three years:

Bicycle Lanes• 13 St – 16 Ave S / 26 Ave N

10 Ave S MMDr / 13 St S• 10 Ave S –MMDr / 13 St SPathways

• Scenic Drive -1 Ave S/5 Ave N

Budget, next three years:

• 2011 - $500,000• 2012 - $525,000• 2013 - $551,000

Infrastructure Services

Program will complete pathway connections and develop bikeways within roadways as per the Bikeways/Pathways Master Plan adopted by Council in 2007.

-33- 1.3.

Page 34: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

12

Preserve Existing Infrastructure – C-10, Arterial Rehab

Projects, next three years:

• Various locations

Budget, next three years:

• 2011 - $1,000,000• 2012 - $1,051,000• 2013 - $1,104,000

Ongoing program varies as indentified from annual condition inspection program.M i i l P t M t

Infrastructure Services

Municipal Pavement Management Application (MPMA)

Intent of the Overlay program is to maintain our Arterial roads to an acceptable standard and protect this valuable asset.

Preserve Existing Infrastructure – C-11,Bridge Rehab

Projects, next three years:

• Whoop-up BarrierR l t (2011)Replacement (2011)

Budget, next three years:• 2011 - $1,315,000• 2012 - $319,000• 2013 - $293,000

Ongoing program varies as indentified from annual condition inspection program.Bridge Management System

Infrastructure Services

Bridge Management System

Intent of the Bridge Rehab program is to maintain our Parks and Transportation bridges to an acceptable standard and protect this valuable asset.

-34-1.3.

Page 35: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

13

Preserve Existing Infrastructure – C-12, Community Lighting - Rehab

Projects, next three years:

• Arterials / Downtown / Older neighborhoodsg

Budget, next three years:• 2011 - $300,000• 2012 - $316,000• 2013 - $332,000

Condition Assessment completed in 2010

Program replaces 1% of street lights annually

Infrastructure Services

Program replaces 1% of street lights annually that are beyond their useful life.

Secondary benefit is to replace street lights with LED bulbs (less electricity).

Preserve Existing Infrastructure – C-13, Traffic Signal Replacement

Projects, next three years:

• Older traffic signals that require upgrades

Budget, next three years:• 2011 - $300,000• 2012 - $315,000• 2013 - $330,000

Condition Assessment completed in 2010.

I t t f thi l T ffi Si l

Infrastructure Services

Intent of this program replaces Traffic Signals that are beyond their useful life .

-35- 1.3.

Page 36: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

14

Preserve Existing Infrastructure – C-14, Major Sidewalk Rehab

Projects, next three years:

• Downtown/London Road

Budget, next three years:

• 2011 - $190,000• 2012 - $200,000• 2013 - $210,000

Ongoing program varies as indentified from annual condition inspection program.

Infrastructure Services

Infrastructure Management System

Intent of this program replaces approx. 750 m (1 or 2 blocks) annually that are beyond their useful life.

Preserve Existing Infrastructure – C-15,Railway Rehab Program

Projects, next three years:

• Signalization of approx 5 Rail-Road crossings

• Rehabilitation of Rail Spur lines as required• Rehabilitation of Rail Spur lines as required

Budget, next three years:• 2011 - $500,000• 2012 - $526,000• 2013 - $552,000

Initial crossing assessment indicates 11 signalized crossings required of 24

Infrastructure Services

Intent of this program is to repair spur lines as required through ongoing inspections

-36-1.3.

Page 37: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

15

Upgrade Existing System – C-20, C-21,Planning Projects

Projects, next three years:

• Mayor Magrath Drive 3 Ave S to 3 Ave NMayor Magrath Drive, 3 Ave S to 3 Ave N

• 6 Ave South, Mayor Magrath Dr to Scenic Dr

Budget, next three years:

• 2012 - $315,000, each project

Conduct a Functional Design of Roadways to determine upgrades to accommodate increased traffic and growth

Infrastructure Services

g

Upgrade Existing System - Planning Projects

2014 -2020, Planning Studies

• C-22, 5 Avenue North, Stafford Dr to MMD,

• C -23, Interchange preliminary design –Whoop-up/University Dr and Whoop-up/ Scenic Dr

• C-24, 13 Street N, Crowsnest Trail to 26 Ave N

• C-25, University Drive, North of Rail tracks to Hwy3,

• C-26 Transportation Master Plan

Infrastructure Services

C-26, Transportation Master Plan,

Planning Studies are needed to determine land requirements, initial costs estimates, determine constraints, obtain public and Council approval.

-37- 1.3.

Page 38: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

16

Upgrade Existing System – Construction Projects

2014 -2020, Construction Projects

• C-27, Whoop-up Drive (McMaster to Aquatania Blvd.), 2016

• C-28, University Drive (Sunridge Blvd to Community Stadium), 2018

• C-29, 26th Ave N (31st N to 43rd Street N), 2020

• C-30, 28th Street N (5th Ave to 18th Ave N), 2020

• C-17, 43rd Street North (9th Ave to 26th Ave N) 2019

Infrastructure Services

Ave N), 2019

• C-18 26th Ave N (Scenic Drive N to 23rd Street N), 2021

• C-19 Mayor Magrath Drive (40th Ave S to South City Limits), 2015

As Warranted: Traffic and Pedestrian Volumes, Accidents History, Congestion

Provide Access for Growth – C-33, C-34Planning Projects

Projects, next three years:

• C-33, North Scenic Drive, Upland Blvd / 62 Ave, in 2013

• C34, 44 Avenue North, Scenic Dr N to 43 Street N, in 2013

Planning Studies are needed to determine land requirements, initial costs estimates, determine constraints, obtain public and Council approval.

Infrastructure Services

-38-1.3.

Page 39: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

17

2014 -2020, construction projects

Provide Access for Growth – Construction Projects

•C-31, Metis Trail (Whoop-up Drive to Caledonia), 2016

•C-31, Metis Trail (Jerry Potts W to Garry Drive W), 2018

•C-35, Jerry Potts, 2018

•C-36, Whoop-up Drive (Coalbanks Gate to 30th Street W), 2014

Infrastructure Services

•C-37 43rd Street S (24thAve/Hwy4 to 40th Ave), 2018

As Required by development

2011 – 2020 2011 – 2020 Capital Improvement ProgramCapital Improvement Program

Presentation to Finance CommitteeMay 11 2010

Presentation to Finance CommitteeMay 11 2010

Infrastructure Services

May 11, 2010May 11, 2010

-39- 1.3.

Page 40: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

18

Waste & Recycling Services 2011 - 2020

Capital Improvement Program

Infrastructure Services

Waste & Recycling Services CIP Project Identification

• Regulations• Planning DocumentsCity Council Strategic initiativesMaster Plans (eg. Waste Prevention &

Diversion)Business plans

Infrastructure Services

• Lifecycle management of assets

-40-1.3.

Page 41: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

19

Waste & Recycling Services CIP Project Prioritization

• Health & Safety• Health & Safety• Regulatory compliance• Condition assessment• Maintaining a Level of Service

Fi i l i bilit

Infrastructure Services

• Financial viability

Refer to E-1Environmental UtilitiesEnvironmental Utilities

Capital Improvement Program 2011 – 2020 Projects

Commencing in the First Three Years

Infrastructure Services

-41- 1.3.

Page 42: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

20

Infrastructure Services

Disposal Cell Construction (E-7)Description• Design & construction of waste disposal cells

•2011 - $4 5M

Description• Design & construction of waste disposal cells

•2011 - $4 5M•2011 - $4.5M•2014 - $5.7M

Purpose & Justification• Consume 200,000 cu m of air space per year• Current staging plan

• Cell #4 – 2011

•2011 - $4.5M•2014 - $5.7M

Purpose & Justification• Consume 200,000 cu m of air space per year• Current staging plan

• Cell #4 – 2011

Infrastructure Services

Cell #4 2011• Cell #5 – 2014• Final 2 cells = 8 to 10 yr capacity

Cell #4 2011• Cell #5 – 2014• Final 2 cells = 8 to 10 yr capacity

-42-1.3.

Page 43: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

21

Environmental Management at the Closed Sites (E-8)

Description• Design & construction of a gas/leachate collection &

Description• Design & construction of a gas/leachate collection &gas/leachate collection & treatment facility:

•Northside site –2011 - $660K2012 - $660K

•Centre Site –2015 - $550K2016 - $275K

gas/leachate collection & treatment facility:

•Northside site –2011 - $660K2012 - $660K

•Centre Site –2015 - $550K2016 - $275K

Infrastructure Services

Purpose & Justification• Protect public health & safety• Environmental compliance

Purpose & Justification• Protect public health & safety• Environmental compliance

Environmental Management at the Closed Sites

Background• 2 closed sites in Lethbridge• Have been monitoring since 2000

Background• 2 closed sites in Lethbridge• Have been monitoring since 2000• Have been monitoring since 2000• Centre site:

• has an active vapor extraction system venting to atmosphere

• Northside site: • No collection or treatment system• Elevated methane gas level beyond the perimeter• Elevated leachate heads

• Have been monitoring since 2000• Centre site:

• has an active vapor extraction system venting to atmosphere

• Northside site: • No collection or treatment system• Elevated methane gas level beyond the perimeter• Elevated leachate heads

Infrastructure Services

• 2010 - Engineering study and preliminary design ($65K)• May require a CIP amendment in 2011 based on design• 2010 - Engineering study and preliminary design ($65K)• May require a CIP amendment in 2011 based on design

-43- 1.3.

Page 44: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

22

Environmental Management at the Closed Sites

Funding• Unfunded liabilityFunding• Unfunded liability• Unfunded liability• 2010 engineering study will provide better understanding• No dedicated funding source• Create an additional cost pressure for the operating site

• Unfunded liability• 2010 engineering study will provide better understanding• No dedicated funding source• Create an additional cost pressure for the operating site

Infrastructure Services

E-2 shows the Waste Services program out to 2020E 2 shows the Waste Services program out to 2020

Questions?

Infrastructure Services

-44-1.3.

Page 45: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

23

Landfill Gas Management (E-9)

Description• Design & construction of a gas collection &

Description• Design & construction of a gas collection &a gas collection & treatment facility (flaring)

•2014 - $2.2M •2015 - $2.0M

Purpose & Justification• Generation of 60,000

a gas collection & treatment facility (flaring)

•2014 - $2.2M •2015 - $2.0M

Purpose & Justification• Generation of 60,000

Infrastructure Services

tonnes of CO2 equiv.• To meet Specified Gas Emitters Regulation

tonnes of CO2 equiv.• To meet Specified Gas Emitters Regulation

Landfill Gas Management

Background• Specified Gas Emitters Regulation

• 2003 reporting requirement > 100K tonnes of C02 equiv/yrd

Background• Specified Gas Emitters Regulation

• 2003 reporting requirement > 100K tonnes of C02 equiv/yrd• 2007 – 12% reduction

• 2009 reporting requirement > 50K -100K tonnes of C02 equiv/yr• 20?? – ??% reduction

• Legislation – Federal, provincial, US EPA• Delayed construction to 2014/2015 • Options (from Master Plan)

• reduce gas generation

• 2007 – 12% reduction• 2009 reporting requirement > 50K -100K tonnes of C02 equiv/yr• 20?? – ??% reduction

• Legislation – Federal, provincial, US EPA• Delayed construction to 2014/2015 • Options (from Master Plan)

• reduce gas generation

Infrastructure Services

g g• purchase offset credits• Collect & treat gas• Current cost estimate based on a flaring system

g g• purchase offset credits• Collect & treat gas• Current cost estimate based on a flaring system

-45- 1.3.

Page 46: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

24

Landfill Rate Impacts

Rate Changes to support capital programRate Changes to support capital program• 2011 - $2.00/tonne ($54.50/tonne -> $56.50/tonne)

• 2012 – 2014 - no rate increase to support capital costs

• 2010 preliminary design study may result in additional pressure on the capital budget

• 2011 - $2.00/tonne ($54.50/tonne -> $56.50/tonne)

• 2012 – 2014 - no rate increase to support capital costs

• 2010 preliminary design study may result in additional pressure on the capital budget

Infrastructure Services

Infrastructure Services

-46-1.3.

Page 47: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

25

Landfill Master Plan Projects

Description• Master plan is underway• Master plan may create

Description• Master plan is underway• Master plan may create• Master plan may create additional projects• Do not anticipate any projects within 2011-2013 CIP time frame

• Master plan may create additional projects• Do not anticipate any projects within 2011-2013 CIP time frame

Infrastructure Services

Recycling Depot Enhancement

Description• Needs survey has been completed

Description• Needs survey has been completedcompleted• Design options review• Council presentation on options – May, 2010• May result in capital expenditures in 2011• Amend CIP at that time if required

completed• Design options review• Council presentation on options – May, 2010• May result in capital expenditures in 2011• Amend CIP at that time if required

Infrastructure Services

requiredrequired

-47- 1.3.

Page 48: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

26

Water and WastewaterWater and Wastewater

2011 – 2020

Capital Improvement Program

Infrastructure Services

Water / Wastewater / StormwaterCIP Project Identification

• Regulations Upgrades to meet regulatory requirements Upgrades to meet regulatory requirements

• System Growth New facilities and network extensions (offsite funded)

• Performance Failure to meet levels of service Analysis predicting performance issues

A t Lif l R l t

Infrastructure Services

• Asset Lifecycle Replacement Elevated maintenance costs End of useful life

-48-1.3.

Page 49: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

27

Water / Wastewater / StormwaterCIP Project Prioritization

• RegulationsMust doMust do

• Risk AssessmentConsequence and likelihood of failure

• Cost-Benefit AnalysisValue comparison of alternatives

Infrastructure Services

• Budget & funding alternatives Can we afford to do this?

Refer to E-1Environmental UtilitiesEnvironmental Utilities

Capital Improvement Program 2011 – 2020 Projects

Commencing in the First Three Years

Infrastructure Services

-49- 1.3.

Page 50: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

28

Infrastructure Services

Infrastructure Services

-50-1.3.

Page 51: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

29

Infrastructure Services

Protective PlumbingProgram (E-10)

The purpose of the PPP is to install sump pumps and backwater valves into homes that were damagedhomes that were damaged as a result of the July 1, 2008 rain storm.154 of 379 basements completed as of April 2010

Estimated cost: $3.6M

Infrastructure Services

$Schedule : 2009-2012Funding: -Stormwater Capital

-Wastewater Capital(from Operations)

-51- 1.3.

Page 52: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

30

Wastewater Treatment Plant Headworks and Clarifier Upgrade (E-14)

This project will implement improvementsimplement improvements recommended in a 2003 WWTP Asset Condition Assessment.

Estimated cost: $8.1MSchedule : 2011-2012

Infrastructure Services

Schedule : 2011-2012Funding: -NDCC Grant

-AMIP Grant -Debenture (Utility Rates)

Water Treatment Plant Residuals Management (E-22)

This project will provide for treatment of water treatment waste streamstreatment waste streams before they are discharged to the river. Regulatory requirements pending.

Estimated cost: $10.7M

Infrastructure Services

Estimated cost: $10.7MSchedule : 2012-2013Funding: Debenture

(Utility Rates)

-52-1.3.

Page 53: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

31

Northwest Lethbridge Utility Servicing (E-25)

New water, wastewater and storm lines are req ired to maintainrequired to maintain existing levels of service and to allow continued growth in west Lethbridge.

Estimated cost: $31.5M

Infrastructure Services

Schedule : 2010-2013Funding: Debenture

(Offsite Levies)

Garry Drive Reservoir (E-29)

This project will provide 15 ML of additional storageML of additional storage capacity and have a pumping capacity of approximately 40 MLD.

Estimated cost: $9.5MSchedule : 2010-2011

Infrastructure Services

Schedule : 2010-2011Funding: Debenture

(Offsite Levies)

-53- 1.3.

Page 54: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

32

Southeast Regional Sanitary Lift Station (E-28)

This project will provide the wastewater collection capacity required for continued growth of southeast Lethbridge.

Estimated cost: $18.0MSchedule : 2015-2016

the subject of a

Infrastructure Services

the subject of a negotiation to advance timing

Funding: Debenture (Offsite Levies)

E-2 shows the Water and Wastewater programsE 2 shows the Water and Wastewater programs out to 2020

Questions?

Infrastructure Services

-54-1.3.

Page 55: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

33

Wastewater Treatment Plant Additional Bioreactors(E-11)

Thi j t ill idThis project will provide additional bioreactors to double the plant's treatment capacity.

Infrastructure Services

Estimated cost: $8.2MSchedule : 2016-2019Funding: Debenture

(Utility Rates)

Wastewater Treatment Plant Additional Digester (E-12)

This project will construct a third digester and pro ide the red ndancprovide the redundancy needed for maintenance and increased digestion capacity to accommodate future growth.

d $

Infrastructure Services

Estimated cost: $6.2MSchedule : 2015-2017Funding: Debenture

(Utility Rates)

-55- 1.3.

Page 56: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

34

Wastewater Treatment Plant Cogeneration Upgrade (E-13)

This project will consist of removal of equipment from the digester gas floorfrom the digester gas floor and installation of replacement or upgraded equipment; upgrade boilers and standby power transformer.

Infrastructure Services

Estimated cost: $3.2MSchedule : 2011-2012Funding: Debenture

(Utility Rates)

Treatment Plants SCADA Upgrade (E-15 & E-20)

This upgrade project will replace aging hardware, impro e historical dataimprove historical data handling, and provide enhancements in the system configuration and security.

Estimated cost: $1.7M

Infrastructure Services

Schedule : 2013-2015Funding: Debenture

(Utility Rates)50% / 50%

-56-1.3.

Page 57: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

35

Wastewater Treatment Plant Security (E-16)

This project will consist of installing additional fencing controlled gatesfencing, controlled gates and interior and exterior video surveillance; upgrade of plant fire alarm system.

Estimated cost: $1 3M

Infrastructure Services

Estimated cost: $1.3MSchedule : 2016-2017Funding: Debenture

(Utility Rates)

Water Reservoir Upgrades (E-17)

This project will consist of the replacement of existing mechanical and electrical equipment, controls and instruments to extend the service life and reliability of the stations.

d $

Infrastructure Services

Estimated cost: $6.1MSchedule : 2013-2019Funding: Debenture

(Utility Rates)

-57- 1.3.

Page 58: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

36

Water Treatment Plant and Reservoir Security (E-18)

This project will consist of installing additionalinstalling additional fencing, controlled gates and interior and exterior video surveillance.

Estimated cost: $1.3M

Infrastructure Services

Schedule : 2016 - 2017Funding: Debenture

(Utility Rates)

Water Treatment Plant No. 2 HLP Switchgear Upgrade (E-19)

This project will consist of the replacement ofthe replacement of existing electrical switchgear and pump motors to extend the service life of the plant.

Estimated cost: $1.1M

Infrastructure Services

Schedule : 2012Funding: Water Capital

(from Operations)

-58-1.3.

Page 59: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

37

Water Treatment Plant Transmission Pipeline Rehabilitation (E-21)

This project will consist of th li i f th i tithe relining of the existing steel water pipelines to extend their service life.

Estimated cost: $2.0MSchedule : 2010-2013

Infrastructure Services

Schedule : 2010-2013Funding: Water Capital

(from Operations)

Water Treatment Plant Process Redundancy (E-23)

This project will retrofit Plant No. 2 (constructed in 1956) with new technology1956) with new technology and provide the required level of treatment process redundancy.

Estimated cost: $5.5MSchedule : 2013-2015

Infrastructure Services

Schedule : 2013-2015Funding: Debenture

(Utility Rates)

-59- 1.3.

Page 60: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

38

Water Treatment Plant Additional Filters

This project will provide the additional filters tothe additional filters to increase the plant's treatment capacity.

Estimated cost: $6.0MSchedule : 2025-2026

Infrastructure Services

Schedule : 2025-2026Funding: Debenture

(Utility Rates)

Métis Trail Drive Deep Utilities Phase II (E-24)

This project will provide the additional water distribution anddistribution and wastewater collection capacity required for growth in the southwestern areas of west Lethbridge.

Infrastructure Services

Estimated cost: $7.0MSchedule : 2020-2021Funding: Debenture

(Offsite Levies)

-60-1.3.

Page 61: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

39

North Sanitary Siphon Twinning (E-26)

This project will provide the additional wastewater collection capacitcollection capacity required for growth in the northern areas of north Lethbridge.

Estimated cost: $6.0M

Infrastructure Services

Schedule : 2018-2019Funding: Debenture

(Offsite Levies)

West Siphon Screen Relocation (E-27)

This project will increase the capacity of the existingthe capacity of the existing siphon and allow continued growth in the southeastern areas of west Lethbridge.

Infrastructure Services

Estimated cost: $2.0MSchedule : 2015Funding: Offsite Levies

-61- 1.3.

Page 62: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

40

Distribution System Looping (E-30)

This project consists of water distribution system improvements such as additional interconnections, parallel mains and upsized mains.

Estimated cost: $3.0M

Infrastructure Services

Estimated cost: $3.0MSchedule : 2011-2016Funding: Offsite Levies

Infrastructure ServicesWastewater

Infrastructure Services

Debt Servicing ChartTo be inserted here

-62-1.3.

Page 63: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

41

Steel Pipeline

Infrastructure ServicesWater

Infrastructure ServicesWastewater

D bt S i i Ch t

Steel Pipeline Relining Project

Infrastructure Services

Debt Servicing ChartTo be inserted here

Debt Servicing ChartTo be inserted here

Electric2011 – 20202011 2020 Capital Improvement Program

Infrastructure Services

Presentation – Finance Committee

-63- 1.3.

Page 64: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

42

Electric Utility CIP Project Identification

Transmission• Large projects – external (AESO/AUC).Large projects external (AESO/AUC).• Smaller projects – same as Distribution

Distribution• Regulatory Compliance• Condition assessment• Planning and Design (includes Load Growth and

Safety)

Infrastructure Services

Safety).• Financial (cost/benefit, risk/liability analyses)• Support – process improvement/change.

Electric Utility CIP Project Prioritization

In order of importance• Safety• Regulatory Compliance• Maintenance of Service Level• Financial

Infrastructure Services

• Improvement of Service Level

-64-1.3.

Page 65: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

43

Electric Utility

Classification of Electric PlantClassification of Electric Plant

• Transmission, Distribution, Support

Capital Plan primarily Program Based.

Infrastructure Services

Refer to F-1Infrastructure – Electric UtilityInfrastructure – Electric UtilityCapital Improvement Program

2011 – 2020 ProjectsCommencing in the First Three

Years

Infrastructure Services

-65- 1.3.

Page 66: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

44

Infrastructure Services

Infrastructure Services

-66-1.3.

Page 67: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

45

Infrastructure Services

Capital Plan Organization

TransmissionDistribution

P i S i E t i d• Primary Service Extensions and Programs

• Secondary Service Programs• Transformation Programs• Special – Cable Replacement Program

Infrastructure Services

• Special – Advanced Metering Infrastructure.

Support

-67- 1.3.

Page 68: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

46

Distribution Projects - DetailsGroupings (F-16, F-18, F-21)

• Primary, Secondary, Transformation

Typically based on % of plant value• New construction or life extensions/inflation (9.5%), ( ),

and depreciation (3.0%) of base primary values.

Example Projects for 2011/2012• Remove existing river crossing (111S-2)• Replace concrete poles 43rd St./Hwy. #3 to 146S (9th

Ave. N)• Underground lines 241S - #3 and #4 (Industrial area).

Infrastructure Services

• Build new tie line between substations 241S (Sherring Park) to 146S (9th Ave. N. industrial park).

• Build new circuit between switching cubicles (SC91-SC204)

Distribution - Special

F-17 : Infrastructure Replacement• Underground cable installed in 1960’s and 70’s.• Older cable quality unacceptable.• Global replacement required.• Late 2010/2011 – establish program and evaluate

results.• $ 5 million to $7 million annually.• Community Impact.

Infrastructure Services

Minimize service interruptions. Extensive customer communication.

-68-1.3.

Page 69: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

47

Red(1970)

F-17

Orange(1975)

Yellow

Infrastructure Services93

(1980)

Impact on Rates

Transmission Projects have no impactDistribution ProjectsDistribution Projects

• Increases based on primarily on new investments• 2012 and on – cable replacement/AMI has

significant impact.

Approximately 2.2% impact in 2011• Average residential ($ 0 95/month)

Infrastructure Services

• Average residential ($ 0.95/month)

AMI initiative not included in above amount.

-69- 1.3.

Page 70: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

48

Distribution - Special

F-19 : Advanced Metering Initiative (AMI)• AB government regulation (2010) – currently

in draft form.• Current draft would require replacement of all

meters in the City of Lethbridge.• Implementation 2012 – 2017.• Automatic meter reading – all customers.• In Home Display (IHD) for all customers.

Infrastructure Services

p y ( )• Influence customer behaviour.• $ 25 - $30 million cost over CIP timeframe.

Impact on Rates

Transmission Projects have no impactDistribution ProjectsDistribution Projects

• Increases based on primarily on new investments

• 2012 and on – cable replacement/AMI has significant impact.

AMI initiative may add approximately $7.00

Infrastructure Services

AMI initiative may add approximately $7.00 to $10.00/month to each electric customer.

-70-1.3.

Page 71: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

49

F-2 shows the Electric programs out to 2020F 2 shows the Electric programs out to 2020

Questions?

Infrastructure Services

Electric Capital Plan Organization

Transmission• As defined by Electric Utility Act (EUA)• 138 000 volts – from generator to City substation• 138,000 volts from generator to City substation.

Distribution• As defined by EUA• 25,000 volts and below – from City substation to

home.

Infrastructure Services

Support Programs• Contribute to both Transmission and Distribution.• Allocated to Transmission or Distribution

-71- 1.3.

Page 72: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

50

Electric Utility SystemTransmission

• 5 major subs (138/13.8 kV)

• 35 km 138,000 volt Distribution

• 780 km underground

• 200 km overhead• 4,000 transformers

Support

Infrastructure Services99

pp• SCADA, Fiber,

Work and Facilities Management.

Typical Substation

Infrastructure Services

-72-1.3.

Page 73: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

51

Distribution Underground

Infrastructure Services101

Distribution Overhead

Infrastructure Services102

-73- 1.3.

Page 74: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

52

Support - SCADA

Infrastructure Services103

Transmission vs DistributionTransmission Distribution

D fi iti El t i Utilit A t El t i Utilit A tDefinition Electric Utility Act Electric Utility Act

Cost Recovery

Transmission Rate to Province

Distribution Rate to Customers.

Standards Set by Province Set by industry/City

Infrastructure Services104

Projects Assigned by AESO.

Approved AUC

Approved by Council

-74-1.3.

Page 75: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

53

Transmission Projects - Details

Projects based on condition assessment.

• Major projects either completed or underway.

West side substation – additional transformer (2009).

Transmission line (26th Ave. N.) rebuild (2010).

• New projects

‘Like-for-like’ replacement

Infrastructure Services

Like for like replacement.

Require AESO (Alberta Electric System Operator) and AUC (Alberta Utilities Commission) approval.

Transmission Projects – (2011 – 2020)

Like-for-like (no specific approvals required).• North and South East substations – protection and control.

$ 600,000 (2012) (Ref : F-4)$ , ( ) ( )• West side substation – T1 (first transformer).

$1.5 million (2015) (Ref : F-6).• Industrial Park substation – Switchgear replacement.

$ 1.5 million (2014) (Ref : F-9).

Enhancements or New (AESO and AUC approvals) • Line rebuild (26th Ave. N. to substation)

$ 1 1 million (2011) (Ref : F 14)

Infrastructure Services

$ 1.1 million (2011) (Ref : F-14).

• River valley substation –transformer replacement. $ 1.4 million (2013) (Ref : F-6). Requires distribution system analysis and approvals.

-75- 1.3.

Page 76: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

54

2011 - 2020Transmission

- 146S and 593S –protection and control.

241SSwitchgear

138 kV Line

- 111S (River Sub) – T3

- 674S (West Sub) – T1

- 241S (Industrial Sub) –Switchgear replace. 674S – T1

111S – T3

146S – P&C

593S – P&C

Infrastructure Services107

- 734L/813L Line rebuild.

Other Transmission Projects.

Potential Generator – Industrial Park• $ 1.7 million (2011) (Ref : F-12).• External influence – ‘direct assigned’ project.

Potential new west side substation and 138 kV line.

• $ 6.8 million (2017) (Ref : F-11) – substation.• $ 3.4 million (2017) (Ref : F-13) – 138 kV line.

Infrastructure Services

• Requires extensive distribution analysis and approvals.

Misc. Upgrading (Ref : F-7, F-10).

-76-1.3.

Page 77: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

55

Capital Plan Organization

TransmissionTransmissionDistribution

Support• Allocated to

T i i /Di t ib ti

Infrastructure Services

Transmission/Distribution

Support

Information Technologies• AM/FM and Work Management (F-27,

F-28) Roll out to field crews – new regulatory

requirements (AUC). Add transmission and fiber. $ 900,000 (2011 to 2013).

Infrastructure Services

• Fiber Network (F-29) Several major extensions and replacements. $ 1.1 million (2011 to 2013)

-77- 1.3.

Page 78: 2011 – 2020 Capital Budget Discussion · • Prelim designPrelim design – 43 St43 St - Hwy 3 / 62 Ave NHwy 3 / 62 Ave N • Construct a four lane roadway from Hwy 3 to • 9 Ave

56

Support – cont.SCADA (F26)

• Supervisory Control and Data Acquisition• Maintenance and cycle replacement of existing.• $ 800 000 (2011 to 2020)• $ 800,000 (2011 to 2020)

Critical Infrastructure (F-31)• Regulatory compliance (AESO/NERC)• Protection of critical transmission components.• $ 1.3 million (2011 to 2020).

Fleet (F-24)R l t d h t f El t i

Infrastructure Services

• Replacement and enhancement of Electric vehicles.

• $ 1.9 million (2011 to 2020).Other – Environmental,

Advanced Metering Infrastructure

From “Executive Summary” of Draft.• “The role of Advanced Metering

Infrastructure (AMI) in Alberta is envisioned to be enabling –empowering Albertans in wise energy use, setting the stage for further development of retail markets and as

Infrastructure Services

development of retail markets and as one of the key features necessary to move to smart grid technologies.”

-78-1.3.