Oklahoma City, [email protected]
Accident Report –Hazardous Liquid Pipeline Systems form updates:• Common Geo Ref.
• Single unit of measure
• 259 to 588 fields
• Biodiesel
• Subtypes
• Coating selections
• Valve type selections
• SCADA / CPM adders
• Drug and Alcohol tested
• Unique Int/Ext Corrosion
• ILI: Combo & Transverse
• Excavator Equip Type
• Previous Damage (Excav)
Form RSPA F 7000-1
49 CFR §195.50
Pg. 1of 17Pg. 1of 4
TANK DATA
-
10,000
20,000
30,000
40,000
50,000
60,000
bbl
TANK SUBTYPE SPILLS
SINGLE BOTTOM ROOF DRAINMIXER OTHERROOF/ROOF SEAL DOUBLE BOTTOM
COMMODITY
CRUDE OIL
NON-HVL, LIQ @ AMB
HVL, GAS @ AMB
BIOFUEL / ALTERNATIVE FUEL
CAUSE
EQUIPMENT FAILURENATURAL FORCE DAMAGEOTHER INCIDENT CAUSEINCORRECT OPERATIONCORROSION FAILUREOTHER OUTSIDE FORCE DAMAGEMATERIAL FAILURE OF PIPE OR WELD
- 10,000 20,000 30,000
OTHER EQUIP
MALFUNCTION OFCONTROL/RELIEF EQUIP
EQUIP BODY (<PUMP,TANK PLATE, MATERIAL)
NON-THREADED CONNECT
EQUIPMENT FAILURE
0
10,000
20,000
30,000
0
1,000
2,000
3,000
19
20
19
40
19
51
19
56
19
64
19
71
19
76
19
81
19
89
19
94
20
01
20
06
20
11
20
16
- 1,000 2,000
TANK, VESSEL, ORSUMP/SEPARATOR ALLOWED OR
CAUSED TO OVERFILL
EQUIPMENT NOT INSTALLEDPROPERLY
OTHER INCORRECT OPERATION
VALVE LEFT OR PLACED INWRONG POSITION, NOT
OVERFLOW OR OVERPRESSURE
INCORRECT OPERATION
Tank Damage ExpendituresTOTAL per TANK category• $73,246,437AVG per incident• $265,385$7-15/1,000 bll storage (0.5B-1B Part M)
• Inclement Weather planning / procedure development review
• Maintenance interval review, seal type and material compatibility reviews,
• Reliability programs, rotating equipment inspections.
• Mechanical Integrity program reviews• Operator Training / Vendor Qualifications• Control and Safety Systems Simulations
VALVE DATA
0
100
200
300
400
19
45
19
54
19
57
19
65
19
68
19
73
19
80
19
83
19
86
19
90
19
95
20
00
20
03
20
07
20
10
20
13
20
16
MANUFACTURE YEAR
0
200
400
600
800
1000
1200
1400
1600
1800Mainline Valve Type Failure
GATE BALL CHECK OTHER PLUG
MAINLINE LEAK TYPE
OTHERSEAL OR PACKINGCONNECTION FAILUREPINHOLECRACK
COMMODITY
CRUDE OIL
HVL, GAS @ AMB
NON-HVL, LIQ @ AMB
CO2
- 2,000 4,000 6,000 8,000
EQUIPMENT FAILURE
INCORRECT OPERATION
OTHER OUTSIDE FORCE
CORROSION FAILURE
NATURAL FORCE
EXCAVATION DAMAGE
OTHER INCIDENT CAUSE
AUXILIARY OR OTHER VALVE
EQUIPMENT FAILURE
EQUIP BODY (<PUMP, TANK PLATE, MATERIAL)
THREADED CONNECTION/COUPLING
MALFUNCTION OF CONTROL/RELIEF EQUIP
NON-THREADED CONNECTION
OTHER EQUIPMENT
PUMP OR PUMP-RELATED EQUIP
DEFECTIVE OR LOOSE TUBING OR FITTING
VALVE DATA
• Evaluating vandalism risk and appropriate security measures.
• Maintenance procedure development, review, and training.• Commissioning procedures and planning• Design and construct with operability in mind. • Ensure OEM records are inclusive of maintenance
recommendations and easily accessible by Operations.• Vendor Qualifications
Valve Damage ExpendituresTOTAL per VALVE category• $79,267,306AVG per incident• $113,40128,369 bbl on 699 events
PIPE DATA
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
4 6
6.6
25
8.6
25
10
.5 12
14
20
26
32
40
COMODITY
HVL, GAS @ AMB CRUDE OIL
NON-HVL, LIQ @ AMB
0
10000
20000
30000
40000
19
10
19
29
19
37
19
44
19
50
19
56
19
62
19
68
19
74
19
80
19
87
19
93
19
99
20
06
20
11
20
18
MANUFACTURE YEAR
-
50,000
100,000
150,000
200,000
250,000
Pipe Body, Corrosion, Material Failure, Incident Area
UNDERGROUND TRANSITION AREA ABOVEGROUND
- 50,000 100,000
CPM LEAK DETECTIONOR SCADA INFO
NOTIFICATION FROMPUBLIC
CONTROLLER
LOCAL OPERATINGSTAFF AND CONTRACT
AIR PATROL
GROUND PATROL BYOPS OR CONTRACT
OTHER
ACCIDENT IDENTIFIER
0% 5% 10% 15% 20%
GALVANIC
OTHER
MICROBIOLOGICAL
STRAY CURRENT
ATMOSPHERE
SELECTIVE SEAM
TYPE OF CORROSION
46% of External Corrosion
records noted Prior Coating
Damage
PIPE DATA
51%29%
8%
7%5% 18
51
4
4
36
3
PIPE SEAM TYPE FAILURES
LONGITUDINAL ERW - HFLONGITUDINAL ERW - LFLAP WELDEDFLASH WELDEDSEAMLESSLONGITUDINAL ERW - UNK
0% 10% 20% 30% 40%
TOTAL ILI
MFL
GEOMETRY
COMBO
CALIPER
ULTRASONIC
TRANSVERSE
OTHER
CRACK
PRIOR TOOL RUNS
0% 50% 100%
CORROSION INHIBITORS
CORROSION COUPONS
INTERNAL CORROSION EFFORTS
0% 10% 20% 30% 40%
INTEGRITY HYDRO
CLOSE INTERVAL
DIRECT INSPECT
INTEGRITY PROGRAMS
67%
33%
2018 DOT 195 Part E -ERW Pipe Seam
HIGH FREQUENCY LOW FREQUENCY AND DC
0%
20%
40%
60%
80%
100%
-
10,000
20,000
30,000
40,000
50,000
<4 8 12
16
20
24
28
32
36
40
44
48
2018 DOT 195 Part H Mileage
On Shore Off Shore %
• Integrity Management is complex• Development of excavation requirements, adherence, and
representative presence during line crossing urgent• Surface owner and public relations importance to leak
detection• Application and selection of integrity concepts • Aging infrastructure• Vendor Qualifications
Pipe Damage ExpendituresTOTAL per PIPE category• $1,676,554,446AVG per incident• $2,250,409279,679 bbl on 745 eventsCorrosion, Material Failure, & Other Incident
EXCAVATION
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000 Excavator Equipment
TRENCHER BACKHOE/TRACKHOE UNKNOWN/OTHERGRADER/SCRAPER FARM EQUIPMENT DRILLINGDIRECTIONAL DRILL AUGER BORING
13
57
23
14
12
0% 20% 40% 60% 80% 100%
TRENCHERBACKHOE/TRACKHOE
UNKNOWN/OTHERGRADER/SCRAPER
FARM EQUIPMENTDRILLING
DIRECTIONAL DRILLAUGER
BORINGPROBING DEVICE
One Call Notice
One Call Completed
EXCAVATION PRACTICES NOT SUFFICIENT
LOCATING PRACTICES NOT SUFFICIENT
OTHER
ONE-CALL NOTIFICATION PRACTICES NOTSUFFICIENT
Comodity
HVL, GAS @ AMB
CRUDE OIL
NON-HVL, LIQ @ AMB
Median Grade 42,000
Median Diameter 10
Average Install Year 1968
Data includes dozer line strike to a propane pipeline, resulting in one general public fatality and one general public injury.
• Equipment operator training and pipeline operator requirements.
• Farm and Road grading equipment One Call compliance• Line Locator training, equipment operator fundamentals• Construction Inspection• Project planning, utility and sub-surface infrastructure
identification exercises.
Excavator Damage ExpendituresTOTAL per EXCAVATOR category• $ 173,762,000AVG per incident• $ 1,223,676
2010-2019 Accident Summary
Data Summary
• 3,910 Accidents
• 822,129 bbl, 38% recovered
• 10 Fatalities, 5 public
• 26 Injuries, 5 public
• 124 Ignitions & 15 Explosions
• 58 Impacted Wildlife
• 781 Drug/Alcohol tests– 2 Failed (Contractors)
• Risk Evaluations
• Procedure development, auditing, and training
• Mechanical Integrity
• Reliability Evaluations
• Vendor Qualifications
• Record Keeping
Opportunities for Improvement
IC-Solutions-LLC Services
IntegrityOperations Engineering InspectionCoordination
IC-Solutions LLC brings together 40 years of mid-continent pipeline operations, integrity, construction, and optimization experience. Our experience includes facility design and operation. We will utilize our extensive experience and background to ensure your
assets remain compliant and free of any jurisdictional interruptions; thereby leaving your schedule open for revenue generating and expense management activities. Our years of experience inside mid-sized organizations has established a value driven approach with all projects. We can help you unlock underutilized capacity and assist with operational challenges that appear in the form of
regulatory restrictions, inefficiencies or losses.