  • 7/31/2019 20080624 Demand Forecast

    1/23

    Access network architecture

    to be deployed at target area

    24th June 2008

    NTT Access Network Service System Laboratories

  • 7/31/2019 20080624 Demand Forecast

    2/23

    Concept of Demand Forecast

    Case StudySun City BuildingCiputra area

  • 7/31/2019 20080624 Demand Forecast

    3/23

    Concept of Demand Forecast

  • 7/31/2019 20080624 Demand Forecast

    4/23

    Why is design techniques necessary

    Design method enable subscribers to be accommodate efficiently and economically in central office.

    Low penetration of optical service High penetration of optical service

    Efficient constructionof facilities

    Underground cable

    Facility managementunits

    Fibers are distributed from underground cable to every area.

    Central

    office

    facilities are complexmanagement is difficult

  • 7/31/2019 20080624 Demand Forecast

    5/23

    Underground cable

    Optical Demand Forecast

    optical user

    not need

    current 10%

    30%

    current 30%

    50%

    Optical demand depends on each area. If you estimate the demand same in all area , it causeswaste or lack of facilities.Efficient construction of facilities are needed the optical demand management in every area.

    current 10%

    20%

    a few years later

    a few years latera few years later

    potentialoptical-user

  • 7/31/2019 20080624 Demand Forecast

    6/23

    River

    Station

    How to divide the unit

    Railway

    field

    Rice field

    Park

    bridge

  • 7/31/2019 20080624 Demand Forecast

    7/23

    River

    StationRailway

    How to divide the unit

    field

    Rice field

    Park

    bridge

  • 7/31/2019 20080624 Demand Forecast

    8/23

    River

    StationRailway

    How to forecast the demand

    field

    Rice field

    Park

    Now

    bridge

  • 7/31/2019 20080624 Demand Forecast

    9/23

    River

    StationRailway

    Park

    field

    Rice field

    How to forecast the demand

    bridge

  • 7/31/2019 20080624 Demand Forecast

    10/23

    River

    StationRailway

    field

    Rice field

    10 years later

    Park

    How to forecast the demand

    bridge

  • 7/31/2019 20080624 Demand Forecast

    11/23

    Use both single star and PON as the situation

    demands

    Topology

    Access sectionCustomerpremises

    Optical access networks

    Centraloffice

    Splitter ONU

    OLT

    Optical cable

    ONUOptical cable

    Splitter Optical cable

    MC MCMC MC

    OLT

    ONU

    ONU

    ONU

    ONU

  • 7/31/2019 20080624 Demand Forecast

    12/23

    Users requiring Single Star circuit

    Internet cafe Big company

    Bank

  • 7/31/2019 20080624 Demand Forecast

    13/23

    Example : Estimate the number of fibers

    User target rate PON(4user/1SP) SS(depends on areaenvironment)

    Unit 1 600business area

    360 user 90 fiber 100 fiberuser 30% fiber

    Unit 2 500business

    /residential

    300 user 75 fiber 60 fiberuser 20% fiber

    Unit 3 400residential

    240 user 60 fiber 30 fiberuser 10% fiber

    about

    about

    about

  • 7/31/2019 20080624 Demand Forecast

    14/23

    River

    StationRailway

    field

    Rice field

    Park

    How to distribute the optical fiber

    Required fibers

    bridge

  • 7/31/2019 20080624 Demand Forecast

    15/23

    IDMOLT

    AURORA

    OLT ONU

    4 branch Splitter

    Premise

    8 branch Splitter

    Configuration of optical access network topologyConfiguration of optical access network topology

    DistributionPoint

    Aerial optical accessline section

    - About 0.7km -

    Customerinstallations

    section

    Underground optical accessline section

    - About 1.5 km -

    FeederPoint

    Configuration of optical access network topology

    1 2cores

    Mono coatedoptical fibers

    24- 200 cores

    optical

    fiber cable1000 cores

    8 cores

    Drop Point

  • 7/31/2019 20080624 Demand Forecast

    16/23

    River

    StationRailway

    How to distribute the optical fiber

    field

    Rice field

    Park

    Unit1 Unit2 Unit3 reserved

    Feeder point

    bridge

  • 7/31/2019 20080624 Demand Forecast

    17/23

    River

    StationRailway

    field

    Rice field

    Park

    How to distribute the optical fiber

    bridge

  • 7/31/2019 20080624 Demand Forecast

    18/23

    Example 1

    we had designed with Low demand.10 years ago

    Lay the minimum fibers.

  • 7/31/2019 20080624 Demand Forecast

    19/23

    Example 1

    residential houses increase!

    What can I do?We need to lay additional cable!

    Now

    Shortage

    we had designed with Low demand.10 years ago

  • 7/31/2019 20080624 Demand Forecast

    20/23

    Example 2

    we had designed with High demand.10 years ago

    Lay a lot of fibers.

  • 7/31/2019 20080624 Demand Forecast

    21/23

    Example 2

    Customers dont want new services

    What can I do?Sale the new service! (to market division)

    Now

    Many unused optical fibers remain!

    we had designed with High demand.10 years ago

  • 7/31/2019 20080624 Demand Forecast

    22/23

    Demand forecast

    Demandforecast

    Shortage

    Too much

    adequate

    More Sales

    Additional facilities

    OK!

  • 7/31/2019 20080624 Demand Forecast

    23/23

    Summary