2. administrators report - april 4, 2018.pdf 3

12
Agenda COUNCIL AGENDA - APRIL 4, 2018.PDF Administrator's Report ADMINISTRATORS REPORT - APRIL 4, 2018.PDF Engineer's Report ENGINEERS REPORT - APRIL 4, 2018.PDF 1. Documents: 2. Documents: 3. Documents:

Upload: others

Post on 01-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Agenda

COUNCIL AGENDA - APRIL 4, 2018.PDF

Administrator's Report

ADMINISTRATORS REPORT - APRIL 4, 2018.PDF

Engineer's Report

ENGINEERS REPORT - APRIL 4, 2018.PDF

1.

Documents:

2.

Documents:

3.

Documents:

Printed on5/30/2018

3:41:32 PM

1

AGENDA OF BUSINESSREGULAR MEETING OF COUNCIL

SUNBURY, OHIOApril 4, 2018

7:30 P.M.

SILENT PRAYER & PLEDGE OF ALLEGIANCE

ROLL CALL: Mr. Leonard Weatherby, Mr. Scott Weatherby, Mr. Timothy Gose, Mr. Joe St. John, Mr.Martin Fisher, Mr. David Martin.

MINUTES: March 7 2018

VISITORS

Cindy Erndt – Big Walnut Civic Association

Kelsey Kuhlman,Community Health Program Manager

COMMITTEE REPORTS:

POLICE REPORT:

ADMINISTRATOR’S REPORT:

ENGINEER’S REPORT:

Printed on5/30/2018

3:41:32 PM

2

RESOLUTIONS:

Third Readings

Second Readings

First Readings

ORDINANCES:

Third Readings

(Tabled)

ORDINANCE NO. 2017.37

AN ORDINANCE APPROVING THE RECOMMENDATION OF THE PLANNING & ZONING COMMISSION TO APPROVE THE APPLICATION OF METRO DEVELOPMENT, LLC TO REZONE ±183.912 ACRES TO PLANNED RESIDENTIAL DISTRICT (PRD)

Second Readings

First Readings

Printed on5/30/2018

3:41:32 PM

3

UNFINISHED BUSINESS:

NEW BUSINESS:

Purchase Order # 32041 – Delaware County Engineers – Road salt. $18,917.70.Purchase Order # 32051 - Squire Patton Boggs – Legal Services - $ 8,496.25.

Purchase Order # 32011 - Sunbury Ace Hardware – Extension of blanket - $400.00Purchase Order # 32009 – Lexipol – 1 yr. law enforcement policy - $5,181.00

Purchase Order #32093 – Dublin Technical System - upgrade PLC Control at influent /RAS pumps - $12,000.00

2017 OPWC Project – Discussion – add $23,028.00.

ADJOURNMENT

ADMINISTRATOR’S REPORT(April 4, 2018)

1). Street Department FT Maintenance Position- An offer has been made to Dustin Irvin, Sunbury

resident by way of Centerburg, and accepted. Dustin’s background and reference checks have been stellar

and he has passed a pre-employment physical. We are prepared to have him start Monday April 9, 2018.

Waste Water Treatment Plant FT Maintenance Position- This replacement position was posted last

Tuesday and will close Monday April 9, 2018. To date, we have received over 40 applications.

2). Big Walnut Middle School Service Day- Friday April 27, 2018 marks the date for the third annual

BWMS Service Day where the 7th and 8th graders participate in service projects throughout the district.

The Village of Sunbury has received a great deal of supplemental labor for many projects such as tree

planting, as well as parks and grounds improvement.

3). Tree City USA Program in Grove City- Sunbury has qualified for a 2017 Tree City USA Award

which will be presented on Thursday April 19, 2018 in Grove City.

4). MS-4 2017 Compliance Report- This OEPA mandated report was turned in last Friday and Village

Staff will continue to proceed with the 2018 program. We continue to work on an agreement with

Delaware County Soil and Water Conservation District to assist us in our compliance efforts in each of

the six (6) Minimum Control Measures.

5). Up-Ground Reservoir Operating, Maintenance and Inspection (OMI) Manual- We received word

last week from ODNR that the Village of Sunbury’s OMI, submitted for review late last year, has been

approved. This is good news as it puts us in compliance with ODNR requirements. We are still awaiting

confirmation of the approval of our Emergency Action Plan (EAP). With these documents in place we

can begin the Up-Ground Reservoir Up-date/Up-grade Project.

6). Sunbury Meadows SR-3 Traffic Light Up-date- There is no news with respect to the status of the

delivery of the poles for the project, however, MP Dory was at the site Monday doing prep work at each

of the corners.

7). Village of Sunbury Fiber Connection- We appear to be getting very close to finalizing the project to

provide high speed fiber optic cable to the Village of Sunbury Municipal Building (Admin. and Police

Departments). This has been in the works for years. Village staff met with representatives from

Consolidated Electric, EDGE and Delaware County IT to work out the last details. I hope to have PO’s

for installation ($4800.00), additional fire wall ($7000.00) and on-going service agreement (minimal

charge) with Delaware County. With this high speed fiber in place the Police and Administration

departments will be able to perform more efficiently and better utilize technology throughout the Village.

An IT meeting to review this project as well as the web site upgrade and CMI virtual wall is being

considered before the 4/18/18.

8). Drainage Concerns- Staff has received over 3” of rain at the WWTP since Monday, which has

caused numerous calls and complaints throughout the Village. Brad Gerwig is putting together a priority

list of repairs for storm drains and road repairs to be approved at the 4/18/18 meeting.

Respectfully Submitted--- Allen Rothermel

Engineering Status Report

Prepared By: Derek Kiss, E.I. and Dustin P. Doherty, P.E.

Date: April 2, 2018

Project Description Updates

VILLAGE PROJECTS

ODNR Dam Failure Emergency Action Plan (EAP)The Village is under official notice by the ODNR to develop an emergency action plan (EAP) for their up-ground reservoirs by January 2018. This is required for all owners of class 1 dams in the state. Deadline for submitting and EAP is 12/31/17.

The Village has received approval from ODNR for the OMI. Comments have been received from ODNR for the EAP and revised plans will be submitted this week.

5 South Columbus Street PropertyThis project involved the construction of a new parking lot at the southwest corner of Cherry Street and Columbus Street, along with drainage improvements that will connect to the storm sewer currently being installed on W. Cherry St. Preliminary plans provide 14 parking spaces and a landscaped open space on the corner.

CT is preparing a concept plan for park-like improvements at the corner that will complement the proposed the proposedfuture improvements for the Village Square.

Revised concept plan has been submitted to the Village.

A cost estimate has been submitted to the Village for review.

Engineering Status ReportApril 2 , 2018Page 2 of 6

Project Description Updates

2017 Street ImprovementsThis project involves microsurfacing and pavement repair of the Sunbury Estates subdivision, as well as all of N. Miller Drive. Restriping of all existing pavement marking will also be performed.

CT and Administrator walked the N. Miller Drive corridor to evaluate the current pavement condition and adding a few more areas of full-depth replacement to the project. CT is coordinating with the Village administration, OPWC, and the Contractor to evaluate additional scope.

Additional full-depth replacement areas have been identified. These are proposed tobe added to the project through a change order, which ison the agenda for the 4/4/18 Council meeting. CT is coordinating with the Contractor to schedulea preconstruction meeting.

PRIVATE DEVELOPMENT PROJECTS

State Route 3 & Sunbury Meadows Drive Traffic SignalThis projects involves the installation of a new traffic signal at the intersection of State Route 3 and Sunbury Meadows Drive, along with new sidewalks, curb ramps, pedestrian countdown timers, intersection lighting, and illuminated street name signs.

Pole manufacturer went out of business and the Village’s order was cancelled. A new order has been placed with another manufacturer and delivery is expected to be in early fall.

Shop drawings for the new poles have been approved.

Revised shop drawingshave been submitted and are currently underreview.

Shop drawings have

Traffic Signal Location

Engineering Status ReportApril 2 , 2018Page 3 of 6

Project Description Updates

been approved.

Price Ponds RezoningThis rezoning request consists of rezoning 184 acres to the Planned Residential District (PRD) zoning district. The proposed development plan has a total of 337 single-family homes and 60 single-family detached condominiums.

Public hearing was held on 8/28/17 at the Planning and Zoning Commission meeting.

Applicant has submitted a revised development plan addressing comments provided at 11/27/17 Planning and Zoning Commission meeting.

Rezoning application was approved at the 12/18/17 Planning and Zoning Commission meeting contingent on final legal and engineering approval.

Rezoning application has had two readings. Applicant has requested the application be tabled.

No update.

Sunbury Estates Assisted Living FacilityThis project involves the construction of a 71,200 square foot facility containing 95 units on 8.37 acres. The property is located at the corner of US36/SR37 & SR3 behind the BST&G fire station and includes the building, parking areas, and the extension of the private access drives behind and next to the Advanced Auto Parts.

Plans were submitted to the Planning and Zoning Commission and were approved contingent on final legal and engineering approval at the 2/26/18 meeting. The final engineering plans are currently under review.

Plans were approved by Council on 3/7/17. Revised plans addressing minor engineering comments

Engineering Status ReportApril 2 , 2018Page 4 of 6

Project Description Updates

expected to be submitted within the next couple of days.

Revised plans were submitted 3/26/18 andare currently under review.

MTB Fourwinds RezoningThis rezoning request consists of rezoning 18.75 acres to the Planned Commercial District (PCD) zoning district. The property is located to the south of Fourwinds Courtnear the interchange of Interstate 71 and US36/SR37. A Development Plan has been submitted outlining design standards and proposed improvements to the property.

A rezoning application was submitted on 2/6/18 and a public hearing was held at the2/26/18 Planning and Zoning Commission meeting. No decision was made at the meeting and the application was tabled.

Applicant has requested a meeting with the Engineer. It isanticipated that the application will be on the April agenda of thePlanning and Zoning Commisssion .

Preservation Parks Sandel Legacy TrailThe project involves the construction of approximately 4700 L.F.of the SandelLegacy Trail within the Village of Sunbury. The trail will be a 10-ft wide asphalt multi-

CT is meeting with Preservation Parks this week to discuss

Engineering Status ReportApril 2 , 2018Page 5 of 6

Project Description Updates

use path. The Village has agreed to provide the survey, design, and bidding assistance to Preservation Parks as part of the project.

final construction documents.

OTHER PROJECTS

Projects Currently On Hold / Inactive

Wastewater Rate Study Sunbury Golf Course Development Northgate Commerce District Granville Street Multi-Family Development Orchid Park Subdivision Little Walnut Creek Trunk Sewer Sure Signs

PROJECTS UNDER CONSTRUCTION

Sunbury Pointe – Site work is progressing. Erosion control and BMPs have been installed. All utility work has been completed. Rough grading is complete on the entire site. Northbound left turn lane on S. Miller Drive at US36/SR37 has been installed. Construction has begun on all buildings. Certificates of Occupancy issued for building 14 and the club house.

Arrow Industrial Supply – Building is complete. Grading, utility services, and paving has been completed. Site work is approximately 85% complete. Occupancy permit has been issued with conditions. Landscaping and site lighting still to be completed.

Dairy Queen – Site work and building are largely complete. Temporary parking lot poles and fixtures have been removed and replaced with the final poles and fixtures.Landscaping still to be completed.

Sunbury Meadows Section 12 – Sanitary sewers have been installed. Storm sewer installation and mass grading is currently progressing. Site work is approximately 15% complete.

RESIDENTIAL PLOT PLAN REVIEWS

Engineering Status ReportApril 2 , 2018Page 6 of 6

Project Description Updates

The following Residential Plot Plan submittals were received since the previous Council Report:

897 Admiral Drive – Sunbury Meadows Section 8 902 Admiral Drive – Sunbury Meadows Section 8 942 Admiral Drive – Sunbury Meadows Section 9 158 Fescue Road – Sunbury Meadows Section 9 1223 Sunbury Meadows Drive – Sunbury Meadows Section 9 718 Viola Drive – Sunbury Meadows Section 9 2102 Common Bent Drive – Sunbury Meadows Section 10 2147 Common Bent Drive – Sunbury Meadows Section 10

RIGHT-OF-WAY PERMIT APPLICATIONS

The following right-of-way permit applications were received since the previous Council Report:

#2018-02 – AEP S. Columbus Street