  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    1/25

    Best solutions ensure enthusiasm

    www.bernard-ing.com

    BERNARD Ingenieure

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    2/25

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    3/25

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    4/25

    Fields of Activity

    Electro TechnologyMaterialsProduction

    Industry

    Energy

    Infrastructure

    Transportation

    HydropowerPipelinesDistribution Networks

    Building ConstructionEnvironmentHydraulic Engineering

    Roads and RailroadsBridgesTunnels

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    5/25

    Comparative Studies, Environmental Impact Planning,Tender Design, Detailed Design, Design Coordination,Safety Design

    Designing

    Feasibility Studies, Environmental Impact Studies,Remedial Concepts, Cost-Benefit Analyses,Tender Invitations, Complete Design

    Consulting

    Controlling

    Expert Opinions, Design Verification, Site Supervision, Monitoring,Occupational Safety and Health Management, Measurement Technology

    Supervising

    Project Development, Project Management,Information Management, Time Scheduling,Financing Concepts, Construction Work Coordination

    Our Engineering Services

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    6/25

    Scope of services

    Feasibility studies; Preparation of tender documents; Detailed planning

    Cost estimates and risk analyses

    Project management

    Site supervision and contract administration

    Consulting during construction

    Claim and anti-claim management

    Department of Geotechnical and Tunnel Engineering

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    7/25

    Department of Geotechnical and Tunnel Engineering

    RAILWAYS AND TUNNELS

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    8/25

    CLIENTASFiNAG (Austrian Motorway Authority)

    BRIEF DESCRIPTIONExisting Pfnder Tunnel constructed 1974 and 1980 to bypass Bregenz.Key component of A14 Rhine Valley Highway and European road network2ndTube required due to increasing traffic and stricter safety standards.6.6 km new 2ndtube excavated by TBM 12.5 m.Geology: Molasse: conglomerates, sandstone, shale, claystone Double-shell lining with a backfilled, non-watertight segmental lining

    waterproofing membrane between segments and cast-in-place lining15 cross-passages between the tunnel tubes, 7 lay-bysRehabilitation of existing tube

    BERNARD SERVICESSite supervision and construction management

    TOTAL PROJECT COSTS218 Mio. (of which192 Mio. are for the construction of the new second tube)

    PERIODMay 2006July 2013- TBM heading completed November 2009- Completion of new second tube expected June 2012

    PFNDER TUNNEL 2.TUBEVorarlberg, Austria

    Recent Tunneling Supervision Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    9/25

    Construction of a 7 km long Access-. Dewatering-, andExploratory Tunnel, 30 m Cross section , excavation and

    support according to the principles of NATM

    Construction of a 3.5 km long, declined Access Tunnel, 85 mCross section , excavation and support according to theprinciples of NATM

    BRENNER BASE TUNNELSITE SUPERVISION AT ACCESS AND EXPLORATORY TUNNELS

    Recent Tunneling Supervision Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    10/25

    CLIENTBB(Austrian Federal Railways) Infrastructure Construction AG, GrazBRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long,

    cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract ManagementTOTAL PROJECT COSTS4,000 Mio.PERIOD2006ongoing (until 2016)

    Recent Tunnel Design and Contract Management Project

    KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    11/25

    CLIENTBB(Austrian Federal Railways) Infrastructure Construction AG, GrazBRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long,

    cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract ManagementTOTAL PROJECT COSTS4,000 Mio.PERIOD2006ongoing (until 2016)

    Recent Tunnel Design and Contract Management Project

    KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    12/25

    CLIENT

    ASFiNAG (Austrian Motorway Authority)

    BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, excavation cross-sections 80-105 m,23 cross-passages to existing tube;Total project length, incl. East/West portal areas, of 5,900 m

    OUR SERVICESPreliminary design; Environmental Impact Assessment; Preparation ofdocuments for approval by authorities; Cost analyses; Risk assessment;Tender design;Preparation of tender documents; Preparation of technical specifications;Design for construction; Consultancy during construction

    TOTAL PROJECT COSTS115 Mio. (including rehabilitation of the 1sttube)

    PERIOD2002 - ongoing

    A12 INN VALLEY MOTORWAYROPPEN TUNNEL, 2NDTUBETyrol, Austria

    Recent Tunnel Design Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    13/25

    CLIENTASFiNAG (Austrian Motorway Authority)

    BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, rehabilitation measures for the existingtube, 23 cross-passages to existing tube;Total project length, incl. East/West portal areas, of 5,900 m

    OUR SERVICESPreliminary design; Cost analyses; Risk assessment; Tender design;Preparation of tender documents; Preparation of technical specifications;Design for construction; Consultancy during construction

    TOTAL PROJECT COSTS115 Mio. (including construction of the 2ndtube)

    PERIOD2002 - ongoing

    A12 INN VALLEY MOTORWAYROPPEN TUNNEL, 1STTUBE (REHABILITATION WORKS)Tyrol, Austria

    Recent Tunnel Rehabilitation Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    14/25

    CLIENT

    ASFiNAG (Austrian Motorway Authority)BRIEF DESCRIPTIONRehabilitation of the Niklasdorf and Massenberg Tunnels to state-of-the-artstandard, in terms of safety and structural integrity.Niklasdorf Tunnel: Twin-tube, 1,332 m long (782 m open-cut); creeping sloperehabilitation conceptsMassenberg Tunnel: Twin-tube, 460 m long; rehabilitation of the inner-lining(constructed in 1964) with a slender sprayed concrete lining

    OUR SERVICESGeotechnical measurements and interpretation; Expert opinion; Cost analyses;Tender design; Preparation of tender documents; Preparation oftechnical specifications; Design for construction; Site supervision (duringemergency repairs)

    TOTAL PROJECT COSTS0.5 Mio.

    PERIOD2008 - ongoing

    S6 SEMMERING HIGHWAYREHABILITATION OF NIKLASDORF ANDMASSENBERG TUNNELSStyria, Austria

    Recent Tunnel Rehabilitation Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    15/25

    NORTH APPROACH TO BRENNER BASE -TUNNEL

    AT LOWER INN VALLEY

    EXPLORATORY ADITS

    Fiecht:

    Heading in loose ground 30 m2; length 400 m

    Heading in rock 30 m2; length 700 m

    Pump cavern 100 m3

    Vomp:

    Exploratory tunnel; cross-sectional area 30 m2

    Length 4,700 m of which 1,600 m were in loose ground

    Brixlegg East:

    Exploratory tunnel; cross-sectional area 30 m2

    Length 2,270 m

    Trial excavation of main tunnel profile 125 m2

    Length 60 m

    Brixlegg West:

    Exploratory tunnel; cross-sectional area 50 m2

    Length 250 m

    Entrance cavern of main tunnel profile 125 m2

    Length 60 m

    Recently Completed Tunneling Supervision Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    16/25

    NORTH APPROACH TO BRENNER BASE -TUNNEL

    AT LOWER INN - VALLEY

    Lot H6 Terfens Gallery:

    Length 1,330 m

    Relocation of existing railway line

    Landscaping and viaduct for wildlife

    Construction Period: 20032006

    Lot H5 Vomp - Terfens:Tunnel:

    Length 8,480 m, 5,030 m in loose ground

    Excavation sections up to 203 m

    Construction Period: 20032009

    Lot H3-4 Mnster - Wiesing Tunnel:

    TBM with slurry shield, diameter 13.5 m

    Length 5,818 m

    River Inn Crossing, 11 escape shafts

    Construction Period: 20062009

    Lot H8 Jenbach - Stans Tunnel:

    TBM with slurry shield, diameter 13.5 m

    Length 5,182 m

    Undercrossing of the Jenbach

    Construction Period: 20062010

    Recent Tunneling Supervision Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    17/25

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    18/25

    NORTH APPROACH TO BRENNER BASE -TUNNEL

    AT LOWER INN - VALLEY

    Lot H6 Terfens Gallery:

    Length 1,330 m

    Relocation of existing railway line

    Landscaping and viaduct for wildlife

    Construction Period: 20032006

    Lot H5 Vomp - Terfens:Tunnel:

    Length 8,480 m, 5,030 m in loose ground

    Excavation sections up to 203 m

    Construction Period: 20032009

    Lot H3-4 Mnster - Wiesing Tunnel:

    TBM with slurry shield, diameter 13.5 m

    Length 5,818 m

    River Inn Crossing, 11 escape shafts

    Construction Period: 20062009

    Lot H8 Jenbach - Stans Tunnel:

    TBM with slurry shield, diameter 13.5 m

    Length 5,182 m

    Undercrossing of the Jenbach

    Construction Period: 20062010

    Recent Tunneling Supervision Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    19/25

    Lot H8 Tyrol

    copyright: BEGcopyright: BEG

    RAILWAY AXIS BRENNERMUNICHVERONA

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    20/25

    CLIENTVerbund-Austrian Hydro Power AG Wien

    BRIEF DESCRIPTIONDiversion power plant with daily-storage reservoir, maximum capacity 63 MW,head 85 m; Increase of diversion flow from 60 to 120 m/s, 3 Francis spiralturbinesHeadrace channel + headrace tunnel 6.1 km, channel and open channelsurge tank 530 m

    OUR SERVICESPreparation of documents for approval by authorities; Preparation of tenderdocuments; Design for construction

    TOTAL PROJECT COSTS55 Mio.

    PERIODMay 2006September 2009

    HIEFLAU HYDROPOWER PROJECTStyria, Austria

    Tunnel Design Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    21/25

    GKI INN HYDRO ELECTRIC POWER PLANTAustria/ Switzerland

    BRIEF DESCRIPTION

    Medium-head hydropower plantCapacity 88 MWHead 150 mDesign flow 75 m/s2 Francis turbines22 km headrace tunnelSurge shaftDeclined steel lined pressure shaft

    CLIENT

    GKI (Verbund - Austrian Hydro Power AG TIWAG-Tiroler Wasserkraftwerke AGEngadiner Kraftwerke AG)

    Recent Design Projects

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    22/25

    REISSECK II PUMPED STORAGE PLANTCarinthia, Austria

    BRIEF DESCRIPTIONPumped storage plantHead 595 mDesign flow 80 m/sCapacity 430 MWExisting upper and lower reservoirs

    CLIENTVerbund-Austrian Hydro Power AG

    Department of Water & Energy

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    23/25

    CLIENTDHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan

    BRIEF DESCRIPTIONHigh-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m;design flow 50 m/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank;300 m steel lined pressure shaft; bifurcator; separate powerhouse andtransformer caverns; access tunnels; tailrace tunnel; outlet structure,all designed using NATM

    OUR SERVICESFeasibility studies; On-site geological assessment;Preliminary design; Environmental Impact Assessment;

    Tender design; Preparation of tender documents;Preparation of technical specifications

    TOTAL PROJECT COSTS152 Mio.

    PERIOD2005ongoing

    DAGACHHU HYDROPOWER PROJECTKingdom of Bhutan

    Department of Water & Energy

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt

    24/25

    CLIENTDHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan

    BRIEF DESCRIPTIONHigh-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m;design flow 50 m/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank;300 m steel lined pressure shaft; bifurcator; separate powerhouse andtransformer caverns; access tunnels; tailrace tunnel; outlet structure,all designed using NATM

    OUR SERVICESFeasibility studies; On-site geological assessment;Preliminary design; Environmental Impact Assessment;

    Tender design; Preparation of tender documents;Preparation of technical specifications

    TOTAL PROJECT COSTS152 Mio.

    PERIOD2005ongoing

    DAGACHHU HYDROPOWER PROJECTKingdom of Bhutan

    Consulting during Construction

  • 8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt