Fields of Activity
Electro TechnologyMaterialsProduction
Industry
Energy
Infrastructure
Transportation
HydropowerPipelinesDistribution Networks
Building ConstructionEnvironmentHydraulic Engineering
Roads and RailroadsBridgesTunnels
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
5/25
Comparative Studies, Environmental Impact Planning,Tender Design, Detailed Design, Design Coordination,Safety Design
Designing
Feasibility Studies, Environmental Impact Studies,Remedial Concepts, Cost-Benefit Analyses,Tender Invitations, Complete Design
Consulting
Controlling
Expert Opinions, Design Verification, Site Supervision, Monitoring,Occupational Safety and Health Management, Measurement Technology
Supervising
Project Development, Project Management,Information Management, Time Scheduling,Financing Concepts, Construction Work Coordination
Our Engineering Services
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
6/25
Scope of services
Feasibility studies; Preparation of tender documents; Detailed planning
Cost estimates and risk analyses
Project management
Site supervision and contract administration
Consulting during construction
Claim and anti-claim management
Department of Geotechnical and Tunnel Engineering
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
7/25
Department of Geotechnical and Tunnel Engineering
RAILWAYS AND TUNNELS
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
8/25
CLIENTASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTIONExisting Pfnder Tunnel constructed 1974 and 1980 to bypass Bregenz.Key component of A14 Rhine Valley Highway and European road network2ndTube required due to increasing traffic and stricter safety standards.6.6 km new 2ndtube excavated by TBM 12.5 m.Geology: Molasse: conglomerates, sandstone, shale, claystone Double-shell lining with a backfilled, non-watertight segmental lining
waterproofing membrane between segments and cast-in-place lining15 cross-passages between the tunnel tubes, 7 lay-bysRehabilitation of existing tube
BERNARD SERVICESSite supervision and construction management
TOTAL PROJECT COSTS218 Mio. (of which192 Mio. are for the construction of the new second tube)
PERIODMay 2006July 2013- TBM heading completed November 2009- Completion of new second tube expected June 2012
PFNDER TUNNEL 2.TUBEVorarlberg, Austria
Recent Tunneling Supervision Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
9/25
Construction of a 7 km long Access-. Dewatering-, andExploratory Tunnel, 30 m Cross section , excavation and
support according to the principles of NATM
Construction of a 3.5 km long, declined Access Tunnel, 85 mCross section , excavation and support according to theprinciples of NATM
BRENNER BASE TUNNELSITE SUPERVISION AT ACCESS AND EXPLORATORY TUNNELS
Recent Tunneling Supervision Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
10/25
CLIENTBB(Austrian Federal Railways) Infrastructure Construction AG, GrazBRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long,
cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract ManagementTOTAL PROJECT COSTS4,000 Mio.PERIOD2006ongoing (until 2016)
Recent Tunnel Design and Contract Management Project
KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
11/25
CLIENTBB(Austrian Federal Railways) Infrastructure Construction AG, GrazBRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long,
cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract ManagementTOTAL PROJECT COSTS4,000 Mio.PERIOD2006ongoing (until 2016)
Recent Tunnel Design and Contract Management Project
KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
12/25
CLIENT
ASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, excavation cross-sections 80-105 m,23 cross-passages to existing tube;Total project length, incl. East/West portal areas, of 5,900 m
OUR SERVICESPreliminary design; Environmental Impact Assessment; Preparation ofdocuments for approval by authorities; Cost analyses; Risk assessment;Tender design;Preparation of tender documents; Preparation of technical specifications;Design for construction; Consultancy during construction
TOTAL PROJECT COSTS115 Mio. (including rehabilitation of the 1sttube)
PERIOD2002 - ongoing
A12 INN VALLEY MOTORWAYROPPEN TUNNEL, 2NDTUBETyrol, Austria
Recent Tunnel Design Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
13/25
CLIENTASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, rehabilitation measures for the existingtube, 23 cross-passages to existing tube;Total project length, incl. East/West portal areas, of 5,900 m
OUR SERVICESPreliminary design; Cost analyses; Risk assessment; Tender design;Preparation of tender documents; Preparation of technical specifications;Design for construction; Consultancy during construction
TOTAL PROJECT COSTS115 Mio. (including construction of the 2ndtube)
PERIOD2002 - ongoing
A12 INN VALLEY MOTORWAYROPPEN TUNNEL, 1STTUBE (REHABILITATION WORKS)Tyrol, Austria
Recent Tunnel Rehabilitation Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
14/25
CLIENT
ASFiNAG (Austrian Motorway Authority)BRIEF DESCRIPTIONRehabilitation of the Niklasdorf and Massenberg Tunnels to state-of-the-artstandard, in terms of safety and structural integrity.Niklasdorf Tunnel: Twin-tube, 1,332 m long (782 m open-cut); creeping sloperehabilitation conceptsMassenberg Tunnel: Twin-tube, 460 m long; rehabilitation of the inner-lining(constructed in 1964) with a slender sprayed concrete lining
OUR SERVICESGeotechnical measurements and interpretation; Expert opinion; Cost analyses;Tender design; Preparation of tender documents; Preparation oftechnical specifications; Design for construction; Site supervision (duringemergency repairs)
TOTAL PROJECT COSTS0.5 Mio.
PERIOD2008 - ongoing
S6 SEMMERING HIGHWAYREHABILITATION OF NIKLASDORF ANDMASSENBERG TUNNELSStyria, Austria
Recent Tunnel Rehabilitation Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
15/25
NORTH APPROACH TO BRENNER BASE -TUNNEL
AT LOWER INN VALLEY
EXPLORATORY ADITS
Fiecht:
Heading in loose ground 30 m2; length 400 m
Heading in rock 30 m2; length 700 m
Pump cavern 100 m3
Vomp:
Exploratory tunnel; cross-sectional area 30 m2
Length 4,700 m of which 1,600 m were in loose ground
Brixlegg East:
Exploratory tunnel; cross-sectional area 30 m2
Length 2,270 m
Trial excavation of main tunnel profile 125 m2
Length 60 m
Brixlegg West:
Exploratory tunnel; cross-sectional area 50 m2
Length 250 m
Entrance cavern of main tunnel profile 125 m2
Length 60 m
Recently Completed Tunneling Supervision Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
16/25
NORTH APPROACH TO BRENNER BASE -TUNNEL
AT LOWER INN - VALLEY
Lot H6 Terfens Gallery:
Length 1,330 m
Relocation of existing railway line
Landscaping and viaduct for wildlife
Construction Period: 20032006
Lot H5 Vomp - Terfens:Tunnel:
Length 8,480 m, 5,030 m in loose ground
Excavation sections up to 203 m
Construction Period: 20032009
Lot H3-4 Mnster - Wiesing Tunnel:
TBM with slurry shield, diameter 13.5 m
Length 5,818 m
River Inn Crossing, 11 escape shafts
Construction Period: 20062009
Lot H8 Jenbach - Stans Tunnel:
TBM with slurry shield, diameter 13.5 m
Length 5,182 m
Undercrossing of the Jenbach
Construction Period: 20062010
Recent Tunneling Supervision Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
17/25
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
18/25
NORTH APPROACH TO BRENNER BASE -TUNNEL
AT LOWER INN - VALLEY
Lot H6 Terfens Gallery:
Length 1,330 m
Relocation of existing railway line
Landscaping and viaduct for wildlife
Construction Period: 20032006
Lot H5 Vomp - Terfens:Tunnel:
Length 8,480 m, 5,030 m in loose ground
Excavation sections up to 203 m
Construction Period: 20032009
Lot H3-4 Mnster - Wiesing Tunnel:
TBM with slurry shield, diameter 13.5 m
Length 5,818 m
River Inn Crossing, 11 escape shafts
Construction Period: 20062009
Lot H8 Jenbach - Stans Tunnel:
TBM with slurry shield, diameter 13.5 m
Length 5,182 m
Undercrossing of the Jenbach
Construction Period: 20062010
Recent Tunneling Supervision Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
19/25
Lot H8 Tyrol
copyright: BEGcopyright: BEG
RAILWAY AXIS BRENNERMUNICHVERONA
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
20/25
CLIENTVerbund-Austrian Hydro Power AG Wien
BRIEF DESCRIPTIONDiversion power plant with daily-storage reservoir, maximum capacity 63 MW,head 85 m; Increase of diversion flow from 60 to 120 m/s, 3 Francis spiralturbinesHeadrace channel + headrace tunnel 6.1 km, channel and open channelsurge tank 530 m
OUR SERVICESPreparation of documents for approval by authorities; Preparation of tenderdocuments; Design for construction
TOTAL PROJECT COSTS55 Mio.
PERIODMay 2006September 2009
HIEFLAU HYDROPOWER PROJECTStyria, Austria
Tunnel Design Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
21/25
GKI INN HYDRO ELECTRIC POWER PLANTAustria/ Switzerland
BRIEF DESCRIPTION
Medium-head hydropower plantCapacity 88 MWHead 150 mDesign flow 75 m/s2 Francis turbines22 km headrace tunnelSurge shaftDeclined steel lined pressure shaft
CLIENT
GKI (Verbund - Austrian Hydro Power AG TIWAG-Tiroler Wasserkraftwerke AGEngadiner Kraftwerke AG)
Recent Design Projects
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
22/25
REISSECK II PUMPED STORAGE PLANTCarinthia, Austria
BRIEF DESCRIPTIONPumped storage plantHead 595 mDesign flow 80 m/sCapacity 430 MWExisting upper and lower reservoirs
CLIENTVerbund-Austrian Hydro Power AG
Department of Water & Energy
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
23/25
CLIENTDHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan
BRIEF DESCRIPTIONHigh-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m;design flow 50 m/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank;300 m steel lined pressure shaft; bifurcator; separate powerhouse andtransformer caverns; access tunnels; tailrace tunnel; outlet structure,all designed using NATM
OUR SERVICESFeasibility studies; On-site geological assessment;Preliminary design; Environmental Impact Assessment;
Tender design; Preparation of tender documents;Preparation of technical specifications
TOTAL PROJECT COSTS152 Mio.
PERIOD2005ongoing
DAGACHHU HYDROPOWER PROJECTKingdom of Bhutan
Department of Water & Energy
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt
24/25
CLIENTDHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan
BRIEF DESCRIPTIONHigh-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m;design flow 50 m/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank;300 m steel lined pressure shaft; bifurcator; separate powerhouse andtransformer caverns; access tunnels; tailrace tunnel; outlet structure,all designed using NATM
OUR SERVICESFeasibility studies; On-site geological assessment;Preliminary design; Environmental Impact Assessment;
Tender design; Preparation of tender documents;Preparation of technical specifications
TOTAL PROJECT COSTS152 Mio.
PERIOD2005ongoing
DAGACHHU HYDROPOWER PROJECTKingdom of Bhutan
Consulting during Construction
-
8/10/2019 1.BERNARD_TUNNEL_PROJECTS_MAR11.ppt