18/03/2010 dpg bonn – march 2010 -session: hk 48 a demonstrator for the cbm time of flight wall...

16
18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg People: GSI: M. Ciobanu, H. Deppe, H. Flemming, J. Frühauf, D. Gonzalez-Diaz, M. Kis, K. Koch, S. Linev, W. F.J. Müller KIP: N. Abel, U. Kebschull , S. Manz PI: N. Herrmann, P.-A. Loizeau, I. Deppner, K. Wisniewski

Upload: doreen-terry

Post on 17-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

18/03/2010 DPG Bonn – March 2010 -Session: HK 48

A demonstrator for the CBM Time of Flight wall electronic readout chain

Pierre-Alain Loizeau PI – Uni Heidelberg

People:

GSI: M. Ciobanu, H. Deppe, H. Flemming, J. Frühauf, D. Gonzalez-Diaz, M. Kis, K. Koch, S. Linev, W. F.J. Müller

KIP: N. Abel, U. Kebschull , S. Manz

PI: N. Herrmann, P.-A. Loizeau, I. Deppner, K. Wisniewski

Page 2: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

2/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

2. Readout chain demonstrator design

1. Main requirements for the electronics

Conclusion & Outlook

3. Current components of the demonstrator

4. Clock synchronization

5. First observations on the full chain

Page 3: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

3/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

1. Main requirements for the electronics

•~75000 channels

•Global electronic time resolution < 30ps (TDC < 25ps)

•Self triggered system (Timestamp & Epoch markers)

•Compatible readout, synchronization and time domain with other detectors

•Low power consumption: < 60 mW/ch (~30mW/ch for both Analog and TDC)

Rate per electronic channel, Au+Au at 25 AGev, mbias, 10 MHz interaction rate, field scaling = 0.720

(from a simulation by A. Kiseleva)

Information about the conceptual design: see I. Deppner talk in Session HK58

Page 4: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

4/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

2. Readout chain demonstrator designCLOSY2 + Distribution

CLK

25

0

CLK

15

6

CLK

15

6

Syn

c TD

C

Syn

c TD

C

156/250 MHzclock &

SYNC_TDCdistribution

someauxdets

SYNCmessag

esender

RPCTest

Bench

FOPI RPCTest Environment

MBS System

A ROC EthA

BSYNC-S

AUX

Opt

R2F(AD1)

CLK

25

0

A

B

C

D

E

F

CLK

15

6

G

Syn

c TD

C

PADI GET4

PADI GET4PADI GET4

PADI GET4PADI GET4

PADI GET4

CBMM-RPC

Demo 1

Startcounter

Data readout, Epoch

synchronization check, first

data aggregation

DABC

Online/ Offline

AnalysisGO4

FAIRROOT

ABBOpt B PCIe

Opt A

PC

Hybrid DAQSystem:

triggered + time-

stamped

Other systems: nXYTER,

Page 5: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

5/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

3. Components: Front endAnalog part: Fast Pre-Amplifier & Discriminator

•PADI project by M. Ciobanu at GSI-DetLab

•Performances: resolution <15ps rms

Digital part: Free running High Resolution TDC

•GET4 project at GSI by H. Deppe & H. Flemming from GSI-EE: See first talk of this session

•Performances: ~25ps rms resolution, data readout >150 kHz/ch possible

Clock System: Generate 2 low jitter phase coupled clocks and a synchronization signal for GET4 and ROC• CLOSY2 (Cbm-cLOck-SYnthesizer) developed at GSI by K. Koch from GSI –EE

Page 6: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

6/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

3. Components: readout & aggregation

ROC: FEB readout, first data processing, synchronization, FEB control• SYSCORE v2 based solution•Firmware developed at KIP by S. Manz: see previous talk

Software environment:

•DAQ: DABC = Data Acquisition Backbone Core (HK49.1)

•Data analysis: GO4 = GSI Object Oriented On-line-Offline (HK30.2)

Developed by J.Adamczewski-Musch, S.Linev, M.Al-Turany, D.Bertini & H.G.Essel (GSI - EE)

Page 7: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

7/1018/03/2010

4. Clocks SynchronizationWhy so important?

•2 free running systems with different clocks in CBM =>Event building!

•75000 channels ~19000 TDC chips with current design, with measure of each hit against the received clock!

In the CLOSY2 system:

•Sync signal generated every 5th coincidence

•Correspond to 25 GET4 Epoch

•Correspond to 40 NXYTER timestamp cycle

P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

Page 8: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

8/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

5. First observations on the full chain•Assembled for the first time middle of February

•Using first version of the ROC firmware and an online analysis tool

•In a first time focus on hardware checks:

-2 FEET-TDC & 3 FEET-PADI tested

-Presence of all voltages & error messages

-Clock system: Synchronization of the epochs between chips and between the 2 clock signals=> every 25 epochs

Results:

•The readout of the chain using current versions of the electronic components and of the FAIR software environment is working

•1 FEET-TDC board was operated successfully with all voltages at nominal value and no synchronization error messages

Page 9: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

9/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

ConclusionThe full readout chain for the demonstrator of the CBM ToF wall is a project involving 4 different groups, with strong requirement on the time resolution

Each of its components showed performance meeting the requirements during individual tests

This readout chain is now assembled for the first time since a few weeks and tests just started

Goals•Building & testing a full demonstrator including a differential RPC, with 64 channels (32 strips), until end of 2010

•Demonstration of the readout chain performance with different kinds of Multi-Gap Resistive Plate Chambers

Page 10: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

10/1018/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

Thank you for your attention

Page 11: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

Page 12: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

FEET-PADI

CAEN v1290ARising edge

VME & MBS Readout System

Closy2

CAEN v1290AFalling edge

SplitterSplitter

FEET-PADI VME readout and evaluation system (Pulser)

Online/ Offline

AnalysisGO4

PC

Page 13: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

someauxdets

RPCTest

Bench

FOPI RPCTest Environment

MBS System

START Card TACQUILA

HDM-RPC

PMT

PADI TACQUILA + ToT board

PADI

PADI TACQUILA + ToT board

PADI

PADI2 VME readout and evaluation system

with TACQUILA system (BEAM)

PAW

PC

Page 14: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

CLOSY2

CLK

25

0

CLK

15

6

CLK

15

6

Syn

c TD

C

Syn

c TD

C

156/250 MHzclock &

SYNC_TDCdistribution

A ROC EthA

BSYNC-S

AUX

Opt

AD-1 (R2F)

CLK

25

0

A

B

C

D

E

F

CLK

15

6

G

Syn

c TD

C

FEET-

PADI

FEET-

TDCPulser

RocUtils

Online/ Offline

AnalysisGO4

PC

System for the first full chain tests

Page 15: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

Minimal Numbers of boards for each electronic layer per SM:

FEET-PADI FEET-TDC R2F (AD-1) ROC

Central 300 300 43 22

Middle 1 160 160 23 12

Middle 2 80 80 12 6

Outer 80 80 12 6

Total number of channels: ~75500! Total ROCs: ~710!

Page 16: 18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni

A demonstrator for the CBM Time of Flight wall electronic readout chain

18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48