1306 concrete canvas road

Upload: tara-curtis

Post on 03-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 1306 Concrete Canvas Road

    1/8

  • 8/11/2019 1306 Concrete Canvas Road

    2/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such product.

    [email protected]+ 44 (0) 845 680 1908 www

    Project Info

    CC8 bulk rolls

    08 / 08 / 2012

    1125sqm

    3 longitudinal layers

    Junction 12, M1

    Bedfordshire, UK.

    Costain & Carillion

    Joint Venture

    #

    7MAY

    Graded ditch section with vegetation removed.

    Completed lined ditch section

    Lining the bottom of the ditch with the rst longitudinal layer of CC

    Batter prior to ditch excavation.

    Lining the left side crest of the ditch

    Part of the M1 junction 12 project involved the lining of a

    320 linear metre top of batter V ditch to prevent seepage

    and control water runoff. Concrete Canvas was specied

    over traditional concrete solutions for this project due to site

    limitations. The project was a success as the programme,

    originally scheduled for completion in 3 weeks, was

    completed in 5 days. Having used the product on previous

    projects, I knew the speed and ease of installation would be

    of great advantage to us.

    Dale Flower Bsc (Hons)

    J12 Roadworks Section Engineer

    Costain Carillion Joint Venture

    Installation time

    reduced by 60%

    CLICK TO

    WATCH VIDEO

    http://www.youtube.com/watch?v=CWpApI4YEF0http://www.youtube.com/watch?v=CWpApI4YEF0http://www.youtube.com/watch?v=CWpApI4YEF0
  • 8/11/2019 1306 Concrete Canvas Road

    3/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such p roduct.

    [email protected]+ 44 (0) 845 680 1908 www

    CC was secured with steel ground pegs at 2m intervals. The edges of the CC were anchor trenched and backlled after hydration.

    CC Bulk rolls arranged for installing three longitudinal layers Detail showing overlap between longitudinal CC layers

    Completed CC ditch section terminating in concrete culvert.

  • 8/11/2019 1306 Concrete Canvas Road

    4/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such p roduct.

    [email protected]+ 44 (0) 845 680 1908 www

    Project Info

    CC8 bulk rolls

    3 / 02 / 2010

    240sqm

    3 linear layers

    Church Village Bypass

    In 2009, Costain were appointed as the

    main contractor for the 90M Church

    Village Bypass scheme in South

    Wales. This involved major ground

    works including the installation of holding ponds

    and an extensive surface drainage network. The

    decision was made to use Concrete Canvas

    (CC), after it was granted Environment Agency

    approval for the project.

    Thanks to the ease and speed with which CC

    is installed compared to traditional concrete

    solutions the project, originally scheduled to

    take 3 days, was completed in 45 minutes.

    The Church Village Bypass scheme presented

    our team with a unique challenge. The location

    and nature of the works required the sensitive

    use of appropriate construction materials

    in order to minimise the impact on the local

    environment. Concrete Canvas provided a

    means of rapidly installing a low carbon concrete

    ditch whilst maintaining the natural aesthetic of

    the overall scheme.

    Daniel Powrie CEng MICE,

    Project Manager

    Costain Group

    Costain

    i

    #

    7MAY

    Project time of 45minutes instead

    of 3 days

  • 8/11/2019 1306 Concrete Canvas Road

    5/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such p roduct.

    [email protected]+ 44 (0) 845 680 1908 www

    Project Info

    CC5 Bulk Rolls

    23 / 07 / 2012

    416sqm

    Vertical layers

    Bogota D.C.,

    Colombia

    MERT S.A.S.

    CC5 was used to stabilise

    and protect a slope suffering

    from severe surface erosion

    and slip. The erosion

    threatened to destabilise a

    road at the crest of the slope

    and damage housing at the

    foot of the slope from falling

    debris.

    i

    #

    7MAY

    Project site prior to CC installation, showing

    severe erosion.

    CC was dispensed from a spreader beam,

    allowing it to be laid at a rate of over 150m/day

    Joints were overlapped by 100mm and xed withscrews at approximately 200mm intervals. CC was secured at the crest with a concretelled anchor trench.

    Soil anchors and drainage pipes were installed

    prior to laying CC, which was easily tailored

    around these features.

    200x200mm steel plates were used to securethe CC to the slope face using the soil anchors.

    CLICK TO

    WATCH VIDEO

    http://www.youtube.com/watch?v=MfeGL-ZaxBc&feature=player_detailpagehttp://www.youtube.com/watch?v=MfeGL-ZaxBc&feature=player_detailpagehttp://www.youtube.com/watch?v=MfeGL-ZaxBc&feature=player_detailpage
  • 8/11/2019 1306 Concrete Canvas Road

    6/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such p roduct.

    [email protected]+ 44 (0) 845 680 1908 www

    Project Info

    CC8 bulk rolls

    24 / 01 / 2011

    250sqm

    1 crosswidth layer

    M25 Widening, UK

    Skanska Balfour Beatty

    CC was used as

    a faster, safer

    alternative to slabbing.i

    #

    7MAY

  • 8/11/2019 1306 Concrete Canvas Road

    7/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric...

    Concrete Canvas Ltd. 2012

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability, with respect to or arising from use of such information or any such p roduct.

    [email protected]+ 44 (0) 845 680 1908 www

    Project Info

    CC8 bulk rolls

    18 / 11 / 2010

    125sqm

    1 crosswidth layer

    M4, Wiltshire, UK

    Enterprisemouchel

    i

    #

    7MAY

    As part of an

    ongoing programme

    E n t e r p r i s e m o u c h e l

    needed to clear and repair

    an interceptor drain adjacent

    to the M4, with a key project

    requirement to introduce a series

    of cascades in order to reduce the

    water ow rate. Originally a series

    of pipes and headwalls were

    considered but concerns over pipe

    blockages meant an alternative

    design was sought. CC provided

    a solution that prevented erosion,suppressed weed growth and

    eliminated the maintenance issues

    associated with blocked pipes. CC

    enabled simple and cost effective

    cascades to be constructed using

    concrete bagwork, over which the

    Canvas was easily laid. Due to the

    size of the drain the Canvas was

    laid across the width allowing a

    20m section was laid by a team of

    3 workers in only 1 day.

  • 8/11/2019 1306 Concrete Canvas Road

    8/8

    TM

    Concrete Impregnated Fabric...

    TM

    Concrete Impregnated Fabric

    The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products

    discussed therein can be used may vary and are beyond our control, we make no warranty, express or implied, of merchantability, tness or otherwise, or against patent infringement, and we accept no

    liability with respect to or arising from use of such information or any such p roduct

    [email protected]+ 44 (0) 845 680 1908 www

    CC Title

    Text BoxText Box

    Project Info

    CC8 bulk rolls

    23 / 06 / 2011

    160sqm

    1 crosswidth layer

    section + 3 linear layer

    section

    A46 Newark to

    Widmerpool

    Improvement

    Balfour Beatty

    Successful trial to

    prove CC as an

    alternative to concrete

    slabbed lined ditches

    i

    #

    7MAY

    Overlap joint compressed with 25mm drywall lining screws at varying

    intervals depending on the substrateCanvas hydration, ensuring areas under overlap are hydrated

    CC8 bulk roll laid from spreader beam for the steep section in 20 mins Side CC layers added.