difficult. in addition, cc minimised the ... - concrete canvas

3
® © Concrete Canvas Ltd. 2018 The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express www.concretecanvas.com [email protected] +44 (0) 345 680 1908 www ® *Geosynthetic Cementitious Composite Mat i # Project Info MAY 1 01 / 05 / 15 CC5 TM Bulk Rolls 10,600m 2 Transverse layers Mooi River irrigation canal, Muden, South Africa Medina Engineers & Dwenga Trading JV CC5 TM was used to remediate a failing irrigation canal Completed installation In May 2015, Concrete Canvas ® GCCM* (CC) was used to remediate the Mooi River irrigation canal in Muden, KwaZulu Natal, South Africa. The canal was badly cracked leading to large amounts of water loss. Poured concrete was considered for the project, however some areas of the canal were only accessible by foot, which would have made a poured concrete installation difficult. In addition, CC minimised the interruption to the water supply for the residents along the canal who depend on it. The works were carried out by Medina Engineers and Dwenga Trading in a joint venture, with consultation from Element Consulting Engineers, for The Department of Rural Development and Land Reform. Due to the profile varying between 2m and 3m a transverse layup was used to minimised wastage. To prepare the canal, any debris or vegetation was removed, crumbling concrete was removed from cracks and voids before they were filled, and anchor trenches were excavated along the shoulders of the canal. The CC5 TM was mounted onto a spreader beam hung from a JCB 3DX Backhoe Loader and batched to specific profile length on site. The CC was unrolled across the channel, with the open edges placed into the anchor trenches. Subsequent lengths overlapped the previous by 100mm. Following installation, hydration was achieved with a 5000L water bowser and hose. 30 minutes after hydration knuckle joints were formed by folding the material back under itself, creating a 50mm wide knuckle. These joints were then hydrated again and compressed with sandbags. Once the material had set the anchor trenches were backfilled.

Upload: others

Post on 24-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

®

© Concrete Canvas Ltd. 2018The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express

[email protected]+44 (0) 345 680 1908 www®

*Geosynthetic Cementitious Composite Mat

i

#

Project Info

MAY

1 01 / 05 / 15

CC5TM Bulk Rolls

10,600m2

Transverse layers

Mooi River irrigation canal, Muden, South Africa

Medina Engineers & Dwenga Trading JV

CC5TM was used to remediate a failing irrigation canal

Completed installation

In May 2015, Concrete Canvas® GCCM* (CC) was used to remediate the Mooi River irrigation canal in Muden, KwaZulu Natal, South Africa.

The canal was badly cracked leading to large amounts of water loss. Poured concrete was considered for the project, however some areas of the canal were only accessible by foot, which would have made a poured concrete installation difficult. In addition, CC minimised the interruption to the water supply for the residents along the canal who depend on it. The works were carried out by Medina Engineers and Dwenga Trading in a joint venture, with consultation from Element Consulting Engineers, for The Department of Rural Development and Land Reform.

Due to the profile varying between 2m and 3m a transverse layup was used to minimised wastage. To prepare the canal, any debris or vegetation was removed, crumbling concrete was removed from cracks and voids before they were filled, and anchor trenches were excavated along the shoulders of the canal. The CC5TM was mounted onto a spreader beam hung from a JCB 3DX Backhoe Loader and batched to specific profile length on site. The CC was unrolled across the channel, with the open edges placed into the anchor trenches. Subsequent lengths overlapped the previous by 100mm. Following installation, hydration was achieved with a 5000L water bowser and hose. 30 minutes after hydration knuckle joints were formed by folding the material back under itself, creating a 50mm wide knuckle. These joints were then hydrated again and compressed with sandbags. Once the material had set the anchor trenches were backfilled.

© Concrete Canvas Ltd. 2018The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express

[email protected]+44 (0) 345 680 1908 www®

®

© Concrete Canvas Ltd. 2018The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express

[email protected]+44 (0) 345 680 1908 www®

®

Site prior to works

CC was laid transversely across canal width

Completed layup

CC bulk rolls dispensed and cut to length on site

Creating knuckle joints

Hydration and compression of joints

Completed canal

Completed canal following reintroduction to water flow

© Concrete Canvas Ltd. 2018The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express

[email protected]+44 (0) 345 680 1908 www®

®

© Concrete Canvas Ltd. 2018The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express

[email protected]+44 (0) 345 680 1908 www®

®

A total of 10,600m2 of CC5TM were installed by a team of 12 people at rates of up to 240m2 per day. The installation was carried out in temperatures of up to 36oC on a site with some access issues.

The use of CC also allowed the team to carry out the much needed improvement works on the canal without causing too much disruption to the local businesses who rely on the canal to irrigate their crops and land.

The Department of Rural Development and Land Reform were very pleased with the installation and Element Consulting Engineers is considering it for use on similar projects.