12th sr-jcc minutes - powergrid meeting/sr/24 12th_sr-jcc_minutes.pdftowards this, representative of...
TRANSCRIPT
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 1 of 12
Minutes of 12th Joint Co-ordination Committee meeting of IPPs granted LTA in SR held on 26.05.2015 at POWERGRID, Gurgaon
1. The 12th meeting of the Joint Co-ordination Committee of IPPs in SR was held at POWERGRID Office, Gurgaon on 26th May, 2015. The list of participants of the meeting is enclosed at Annexure-I.
2. DGM (CTU Planning), POWERGRID stated that Minutes of the 11th meeting of the Joint Co-ordination Committee of IPPs granted LTA in SR held on 21.01.2015 were issued vide letter ref. no. C/CTU/S/OA/11JCC dated 15.04.2015.
Meenakshi Energy Private Limited (MEPL) vide their letter dated 22.01.2015 requested to revise the scheduled commissioning dates for Unit-3&4 to Jul & Aug, 2016 respectively in BPTA as well as in the 11th JCC Minutes and also requested to defer the liability of transmission charges. The scheduled commissioning of the Units were updated and it was clarified that since the transmission system as per the BTPA signed is close to commissioning and the liability for payment of transmission charges cannot be deferred and upon commissioning of the transmission system they are liable to pay transmission charges. However they may approach Commercial Dept of POWERGRID for revision in commisioing schedule of Unit-3&4 in the BPTA. Accordingly, the minutes of 11th Joint Co-ordination Committee of IPPs in SR, as circulated were confirmed.
3. DGM (CTU Planning) mentioned that LTOA/LTA to most of the applicants was granted on the basis of target regions. It is
therefore high time that the firm beneficiaries should be finalized at the earliest as the common transmission system required is completed / very close to completion. However till firm beneficiaries are finalized the end links cannot be planned which may lead to constraints in transmission of power.
4. It was also stressed that generation developers should ensure completion of their dedicated lines to match with the commissioning of transmission network in order to prevent bottling up of power. POWERGRID stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the IPPs need to focus on implementing the final dedicated transmission system. Constraints shall be faced in evacuation of power from the generation projects connected through LILO arrangement, provided as an interim arrangement. Therefore, all the IPPs should expedite the construction of their dedicated line as well as the terminating bays at the Pooling Station.
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 2 of 12
5. Representative of Business Development Department (BDD), POWERGRID informed that wherever POWERGRID is implementing terminal line bays on consultancy basis, timely payment to POWERGRID contractor for the same should be made. In case of non-payment, the work of bays awarded to the contractor shall be cancelled and fresh tender of the same shall delay the work by 6 months to 1 year.
Towards this, representative of CTU Planning stated that the responsibility of such delay shall lies with the generation developer. Delay in completion of terminating bays shall also delay connection to the pooling station and interim arrangement is liable for removal for efficient grid operation and reliability and security of grid.
6. It was further stated that since the construction of transmission line constitutes a very small portion compared to the total
investment made by the developers, it is being put on a lesser priority by the generation developers and POWERGRID emphasized the need to change this scenario as it could lead to a bottleneck for transfer of power.
7. Agenda for the 12th JCC meeting was taken-up and the outcome of the same is placed below
Status of the Generation Projects ����
HIGH CAPACITY TRANSMISSION CORRIDOR – VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1 Simhapuri Energy Private Limited (4x150 MW)
546 366 135 0 NIL U-1/2/3/4:
Commissioned
SEPL/MEPL-Nellore 400kV quad D/c line & commissioned
Representative not attended JCC
2 Meenakshi Energy Private Limited (2x150 + 2x350)
546 186 177 183 NIL U-1/2: Oct’ 12 / Apr’ 13
U-3/4 : Jul/Aug’ 16
U-1/2: commissioned
U-3/4: Jul/Aug’ 16
SEPL/MEPL-Nellore 400kV quad D/c line & commissioned
Representative stated that they are reviewing commissioning schedule of U-3/4, however time being it is scheduled for Jul/Aug’ 16
3 Meenakshi Energy Pvt. Ltd.
364 364 0 0 NIL
4 Thermal Powertech Corpn. India Ltd
1240 1125 115 0 Andhra
Pradesh : 230 MW
U-1: Synchronised in Dec’14, COD by
Feb’15
U-1: Mar’15 COD U-2 :Jul’ 15
TPCIL-Nellore PS 400kV quad D/c line by POWERGRID &
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 3 of 12
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
(2x660 MW) Telangana : 270 MW
U-2: Jun’ 15 commissioned
5 NCC Power Projects Limited (2x660 MW)
740 740 0 0 NIL U-1 : Jan’ 16 U-2 : Apr’ 16
U-1: Feb’ 16 U-2: Apr’ 16
NCC-Nellore PS 400kV quad D/c line by POWERGRID & under construction
Representative stated that they need start-up power from Jul/Aug’ 15. It was informed that issue may be taken-up with CEA/CTU in next SCM
Total 3436 2781 427 183
HIGH CAPACITY TRANSMISSION CORRIDOR – VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1 Coastal Energen Private Limited (2x600 MW)
1100 820 280 0 Tamil Nadu : 558 MW
U-1: Dec’ 14 U-2: Aug-Sep’ 15
U-1: commissioned
U-2: Nov/Dec’ 15
CEPL-Tuticorin PS 400kV quad D/c line (27km) – by Mar’ 16
It was informed to CEPL that as they are depending on interim arrangement, upon commissioning of Tuticorin JV TPS, they may have to back down their generation if margin not available.
2 Ind-Barath Power (Madras) Limited (2x660 MW)
900 225 275 400 NIL U1: Mar’ 17
U2: not awarded
Ind-Barath-Tuticorin PS 400kV quad D/c line - by Dec’16
It was informed to Ind-Barath that upon commissioning of the Common Transmission System, they shall be liable to pay transmission charges as per the signed BPTA.
Total 2000 1045 555 400
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 4 of 12
HIGH CAPACITY TRANSMISSION CORRIDOR – VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1
East Coast Energy Private Limited (2x660 MW)
1240.8 1240.8 0 0
Andhra Pradesh : 300 MW
Kerala : 100 MW
Andhra Pradesh
RFQ short list : 488.55
MW
U-1: Mar’ 16 U-2: Sep’ 16
U-1: Oct’ 16 U-2: Jan’ 17
ECEPL-Srikakulam PS 400kV quad D/c line - by Mar’ 16
Award of contract for dedicated transmission line is in progress.
HIGH CAPACITY TRANSMISSION CORRIDOR – XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, TN)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1
IL & FS Tamil Nadu Power Company Limited (2x600 MW)
1150 575 575 0 Tamil Nadu:
540 MW
U-1 : Apr’ 15 U-2: Six months
from U-1
U-1: Aug’ 15 U-2: Dec’ 15
IL&FS-Nagapattinam PS 400kV quad D/c line – commissioned
2 PEL Power Limited ** (3x350 MW)
987 700 0 287 NIL Not Attended PEL-Nagapattinam PS 400kV quad D/c line
Project abandoned, matter in CERC for return of construction Bank Guarantee
Total 2137 1275 575 287
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 5 of 12
Other Generation Projects – Granted Connectivity & LTA
Generation Projects granted LTOA/LTA ����
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1
GMR Rajahmundry Energy Limited (2x400)
775 175 300 300 NIL
U-1/2: Commissioned but COD not declared
due to non-availability of natural gas
U-1/2 : COD expected in Jun-
Jul’ 15
GMR-LILO point of Vijayawada-Gajuwaka line nearly completed
Representative informed that the project capacity has been de-rated, accordingly LTA shall be revised. It was informed to GMR that for reduction of LTA they shall apply for same.
2 NTPC Limited (Kudgi TPS-3x800)
2392.49 2033.62 0 287 NIL Not Attended
Commissioning schedules as per LTA Jun’ 15, revised to Feb’ 16 as per 26
th SRPC
meeting held on 20.12.2014
Total 3167.49 2208.62 300 587
Generation Projects granted only Connectivity ����
Sl. No.
Connectivity Applicant
Connectivity Quantum
(MW)
Comm. Schedule (TA/Intimation)
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
1 National SEZ Infra Services Pvt. Ltd. (bulk consumer)
250 Date of availability of Tr. System for
Connectivity
GMR Krishnagiri SEZ – Hosur (PG) 230 kV D/c line
Representative informed that they are withdrawing the connectivity, for same they shall approach CTU
2 VSF Projects Limited (1x350 MW)
350 After establishment of Nellore PS, likely
by Sept’ 14 COD Aug/Dec’ 17
Generation switchyard – Nellore PS 400kV D/c line - by Aug’ 17
Representative informed that EPC for line finalized, award will be placed in 3 months. It was informed to VSF that mere connectivity does not guarantee power evacuation and they have to sought LTA/MTOA.
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 6 of 12
Sl. No.
Connectivity Applicant
Connectivity Quantum
(MW)
Comm. Schedule (TA/Intimation)
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per 12th
JCC)
Dedicated / Connectivity line & Status
Remarks
3 Surana Power Limited (2x210 MW)
350 After establishment of Raichur (New), likely by Jan, 14
Uncertain Generation switchyard – Raichur 400 kV D/c line
Representative not attended JCC, however submitted status through email, project uncertain due funding problems, award for line yet to be placed
4 Regen Powertech Private Limited
600 100 MW in every 3
month time from Sept’ 13 onward
Not Attended Regen PS - Pugalur 230 kV D/c (twin moose) line
Representative from these generation projects consistently not attending the JCCs and no substantial progress is there, accordingly it may be refer to Connectivity/LTA committee of SR constituents for discussion & decision
5 Vainateya Power Private Limited (2x660 MW)
1320 Mar’ 15 (Subject to notification of BPC
by Sept’ 11) Not Attended
Generation switchyard - Tuticorin PS 400kV D/c (Quad/Twin HTLS) line
6 RVK Energy (Rajahmundry) Pvt. Ltd. (3x120 MW)
360 After establishment
of Vemagiri PS, likely Sept’ 14
Not Attended Generation switchyard - Vemagiri-II PS 400kV D/c line
Total 3230
Status of the Associated Transmission System ����
HIGH CAPACITY TRANSMISSION CORRIDOR – VI
(Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh)
• Common System Associated With ISGS Projects in Krishnapatnam Area of Andhra Pradesh
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 765/400 kV, 2x1500 MVA pooling station at Nellore by LILO of Simhapuri-Nellore 400 kV D/c quad line Commissioned Commissioned
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 7 of 12
2 Nellore Pooling station – Kurnool 765 kV D/c line Commissioned Commissioned
3 Kurnool – Raichur 2nd 765 kV S/c line Commissioned Commissioned
4 Associated 765 kV & 400 kV bays at Nellore Pooling station, Kurnool and Raichur stations Commissioned Commissioned
HIGH CAPACITY TRANSMISSION CORRIDOR – VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu)
• Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation
projects in Tuticorin Area – Part-A
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 765 kV pooling station in Tuticorin (Initially charged at 400 kV) including 1x80 MVAR, 400 kV bus reactor Commissioned Commissioned
2 LILO of both circuits of Tuticorin JV – Madurai 400 kV D/c (quad) line at Tuticorin Pooling Station Commissioned Commissioned
• Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation projects in Tuticorin Area – Part-B
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 765/400 kV Pooling Station at Salem (Initially charged at 400 kV). Ready Ready
2
Tuticorin Pooling station – Salem Pooling station 765 kV D/c line initially charged at 400 kV.
June’ 2015 Dec’15
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 8 of 12
3 Interconnection of Salem pooling station with existing Salem 400/230 kV substation through 400 kV D/c (quad) line. Ready Ready
4 Salem pooling station – Madhugiri pooling station 765 kV S/c initially charged at 400 kV. Jun’ 2015 Dec’15
HIGH CAPACITY TRANSMISSION CORRIDOR – VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh)
• Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation
Projects In Srikakulam Area – Part-A&C
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 765/400 kV Pooling Station at Srikakulam with 2x1500 MVA transformation capacity Jun, 2015 Dec’15
2 Srikakulam Pooling Station – Angul 765 kV D/c line Dec, 2015 June’16
3 Associated 765 kV bays at Srikakulam & Angul Dec, 2015 June’16
• Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation Projects In Srikakulam Area – Part-B
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 2nd Angul – Jharsuguda – Dharamjaigarh 765 kV D/c line Dec, 2015 Mar’16
2 Associated 400 & 765 kV bays at Angul, Jharsuguda & Dharamjaigarh substations. Dec, 2015 Mar’16
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 9 of 12
HIGH CAPACITY TRANSMISSION CORRIDOR – XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu)
• Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu – Part-A1(a)
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 765/400kV GIS Pooling station at Nagapattinam with
4x1500 MVA transformer(initially charged at 400 kV) Feb, 2015 June’15
2 LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling
Station for interim arrangement which later shall be bypassed Ready
Charged as per interim
arrangement
• Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu – Part-A1(b)
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1
2 nos. 400 kV bays each at Nagapattinam Pooling Station and Salem
New (Dharmapuri) for terminating Nagapattinam Pooling Station –
Salem New (Dharmapuri) 765 kV D/C line (initially charged at 400 kV) Dec, 2015 Dec’15
2
1 no. 400 kV bay each at Salem New (Dharmapuri) and Madhugiri for
terminating Salem New (Dharmapuri) - Madhugiri 765 kV S/C line - 2
(initially charged at 400 kV)
Dec, 2015 Dec’15
3
1 no. 63 MVAR line reactor at Nagapattinam Pooling Station and
Salem New (Dharmapuri) each for both circuits of Nagapttinam
Pooling Station – Salem (New) 765 kV D/c line (initially charged at 400
kV)
Dec, 2015 Dec’15
4 1 no. 63 MVAR line reactor at Madhugiri end of Salem New
(Dharmapuri) – Madhugiri 765 kV S/c line (initially charged at 400 kV) Dec, 2015 Dec’15
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 10 of 12
Transmission System under the Scope of Private Sector:
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Nagapattinam Pooling Station – Salem 765kV D/c line Dec, 2015 Dec’15 As per Apr, 2015
CEA report
2 Salem – Madhugiri 765 kV S/c line Dec, 2015 Dec’15 As per Apr, 2015
CEA report
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 11 of 12
Annexure-I
List of Participants in the 12th Joint Co-ordination Committee Meeting of IPPs granted LTA in SR held on 26.05.2015
Sl. No.
Name Designation Organisation E-mail
1. Seema Gupta COO (CTU-Plg & CE) Power Grid Corporation of India Ltd. [email protected]
2. N K Jain GM (Commercial) Power Grid Corporation of India Ltd. [email protected]
3. A K Vaish GM (CMG) Power Grid Corporation of India Ltd. [email protected]
4. Ashok Pal AGM (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
5. D N Rozekar DGM-CTU (Plg) Power Grid Corporation of India Ltd. [email protected]
6. B P Kundu DGM (BDD) Power Grid Corporation of India Ltd. [email protected]
7. P Saraswat DGM (Commercial) Power Grid Corporation of India Ltd. [email protected]
8. V Thiagarajan Asst. GM (CTU-Plgl) Power Grid Corporation of India Ltd. [email protected]
9. S K Varshney Asst. GM (Commercial) Power Grid Corporation of India Ltd. [email protected]
10. Rajesh Verma CDE (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
11. Anil Kumar Meena DCDE (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
12. K Jyoth Kumar Officer (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
13. Devika Jay Engineer (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
14. G Venkatesh Engineer (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
Minutes of 12th JCC Meeting of IPPs granted LTA in SR
Page 12 of 12
Sl. No.
Name Designation Organisation E-mail
15. Anil R Sah Asst. Vice President IL & FS Tamil Nadu Power Co.Ltd [email protected]
16. Akhil Agarwal Associate Vice President
IL & FS Tamil Nadu Power Co.Ltd [email protected]
17. J. Mohapatra Director Ind Barath Energy (Utkal) Ltd [email protected]
18. Rajashekhar. M DGM Thermal Powertech Corpn. India Ltd / NCC Power Projects Limited
19. Ajaya Kumar Nathani
Head Transmission GMR Rajahmundry Energy Ltd. / National SEZ Infra Services Pvt. Ltd.
20. Rishu Garg AM - Transmission GMR Rajahmundry Energy Ltd. [email protected]
21. Peyush Tandon Director – Commercial Meenakshi Energy Private Limited [email protected]
22. Dhananjay Kumar Director – BD Meenakshi Energy Private Limited [email protected]
23. B N Murthy Director VSF Projects Limited [email protected]
24. R S Kumara Swamy Advisor Coast Energen Pvt. Ltd [email protected]
25. Asan Mohammed Manager Coast Energen Pvt. Ltd [email protected]
26. R. Srinivasan V.P. (Corporate) East Coast Energy Pvt. Ltd [email protected]